This is an Approved Plans document for the Washington Suburban Sanitary Commission (WSSC) related to the Anacostia II Wastewater Pumping Station Surge Tanks Removal project, located on Andalusia Lane in Prince George's County, Maryland. The project involves the demolition and in-place abandonment of eight existing surge tanks, removal of four trees, demolition and disposal of associated pavement, sidewalk, curb and gutter, equipment and appurtenances, protection of adjacent features and utilities, erosion and sediment control measures, and site restoration. The sealed responses for this project must be submitted via WSSC's eProcurement Portal prior to 2:00 p.m. on Wednesday, September 30, 2026. The approved plans include 24 sheets covering civil, mechanical, structural, and electrical/automation demolition details, with comprehensive erosion and sediment control provisions. The topographic survey fieldwork was completed between June and August 2024, and the plans were approved by the Maryland Department of the Environment Sediment & Stormwater Plan Review Division on November 25, 2025.
The plans specify that the surge tanks contain lead-based paint, requiring demolition to be performed in accordance with contract documents and applicable requirements to minimize airborne dust and waste generation while protecting workers, the public, and the environment. The contractor is responsible for draining and disposal of surge tank contents, removal of contaminated soil, securing all necessary permits, flow diversion and dewatering of existing pipelines, all safety measures including OSHA and MOSH compliance, and maintenance of erosion control measures until permanent stabilization is established. All excess materials and demolition debris become the property of the contractor for disposal at an off-site solid waste landfill, with the contractor required to provide WSSC a credit for all salvaged metal. The contractor must comply with noise restrictions per Prince George's County Code Section 19-122.01, with maximum limits of 85 dBA with an approved noise suppression plan or 75 dBA without one.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERMIT REQUIREMENTS
DATE REVISIONS
PAGECo. GRID
VICINITY MAP
SCALE
FOR LOCATION OF UTILITIES CALL 8-1-1 OR 1-800-257-7777
OR LOG ON TO www.call811.com OR www.missutility.net 48
HOURS IN ADVANCE OF ANY WORK IN THIS VICINITY
*TO BE ACQUIRED BY APPLICANT
PRINCE GEORGE 203NE04 C3
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I
AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO.: 62632
EXPIRATION DATE: 03-18-2026
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IN
G
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
CONTRACT:
DATE
23303290A
DIVISION MANAGER
FACILITY DESIGN & CONSTRUCTION DIVISION
H O
R Z.
D
AT
U M
VE
R
T.
D
AT
U
M
1" = 10,000'
PA
TH
TE
M
PL
AT
E
LA
YO
U T
C U
R R
EN
T as o f:
/1 4/
COVER SHEET
LOCATION MAP
WASHINGTON SUBURBAN SANITARY COMMISSION
1700 ANDALUSIA LANE, CAPITOL HEIGHTS, MARYLAND 20743
ANACOSTIA II
WASTEWATER PUMPING STATION
SURGE TANKS REMOVAL
ANACOSTIA II WASTEWATER PUMPING STATION
SURGE TANKS REMOVAL
ISSUED FOR BID
THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT BE
REDISTRIBUTED WITHOUT PRIOR WSSC
APPROVAL
1" = 500'
PL
AN
N O
R
TH
TR
U E
NO
OF
24G-1
WSSC 200' SHEET No.: 203NE04-S
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
DELIVERING THE ESSENTIAL
September 4, 2025 - PLOT DATE
G-1 COVER SHEET
G-2 GENERAL NOTES
C-1 EXISTING CONDITIONS PLAN
C-2 DEMOLITION PLAN
C-3 EXCAVATION PLAN
C-4 RESTORATION PLAN
C-5 PROFILES
C-6 EROSION & SEDIMENT CONTROL PLAN
CD-1 EROSION & SEDIMENT CONTROL DETAILS
CD-2 VEGETATIVE STABILIZATION
CD-3 PERMANENT STABILIZATION
CD-4 EROSION & SEDIMENT CONTROL NOTES
CD-5 CIVIL DETAILS
M-1 EAST AND WEST PUMP ROOMS DEMOLITION PLAN
M-2 EAST AND WEST PUMP ROOMS NEW WORK PLANS AND SECTION
M-3 EAST AND WEST PUMP ROOMS CAV DRAIN LINES
M-4 SURGE TANKS REMOVAL DEMOLITION AND NEW WORK PLAN
M-5 SURGE TANKS REMOVAL DEMOLITION
S-1 STRUCTURAL NOTES AND LOWER PLAN
S-2 STRUCTURAL PLAN AT GRADE
S-3 STRUCTURAL UPPER PLAN
S-4 STRUCTURAL SECTIONS I
S-5 STRUCTURAL SECTIONS II
E-1 ELECTRICAL AND AUTOMATION DEMOLITION NOTES
INDEX OF SHEETS
PAGE SHEET
NOS. NOS. DESCRIPTIONANACOSTIA II
WASTEWATER
PUMPING
STATION
10306 Eaton Place, Suite 220 Fairfax, VA 22030 Tel: (703) 691-6500
ANACOSTIA II
WASTEWATER
PUMPING
STATION
AMTRAK MARC PENN LINE
MDE EROSION AND SEDIMENT CONTROL PERMIT
Docusign Envelope ID: F1B58998-AD1B-4C57-B890-87E0B83D03E4
Sep 11, 2025 | 7:01 PM EDT
REVIEWED AND APPROVED FOR SEDIMENT
CONTROL AND STORMWATER MANAGEMENT
UNDER SECTIONS 4-106 AND 4-205
BY: COLLIN HILTNER
DATE:
MARYLAND DEPARTMENT OF THE ENVIRONMENT
SEDIMENT & STORMWATER PLAN REVIEW DIVISION
NOVEMBER 25, 2025
CONTRACT: 23303290A
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
DRAWN:
CHECKED:
DESIGN:
NO
OF 24
ANACOSTIA II
WASTEWATER PUMPING STATION
SURGE TANKS REMOVAL
ISSUED FOR BID
THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT BE
REDISTRIBUTED WITHOUT PRIOR WSSC
APPROVAL
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I
AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO.:
EXPIRATION DATE:
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
DELIVERING THE ESSENTIAL
PA
TH
TE
M
PL
AT
E
LA
YO
U T
C U
R R
EN
T as o f:
/1 4/
9/4/2025 - PLOT DATE
10306 Eaton Place, Suite 220 Fairfax, VA 22030 Tel: (703) 691-6500
GENERAL NOTES G-2
1. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES, AND
OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT
THE TIME OF PREPARATION OF THESE PLANS, BUT DO NOT PURPORT TO BE
ABSOLUTELY CORRECT. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY AND
AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE
OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE FEATURES AFFECTING THE
PROJECT WORK. ANYTHING NOT SHOWN ON THESE DRAWINGS SHOULD BE BROUGHT
TO THE ATTENTION OF THE ENGINEER AND SHALL NOT CONSTITUTE ADDITIONAL
PROJECT COST, UNLESS APPROVED BY THE ENGINEER.
2. THE CONTRACTOR SHALL CONTACT THE ENGINEER'S OFFICE IMMEDIATELY
CONCERNING ANY CONFLICTS ARISING DURING CONSTRUCTION OF ANY
IMPROVEMENTS SHOWN ON THESE DRAWINGS OR SHOULD ANY FIELD CONDITIONS BE
ENCOUNTERED THAT VARY FROM THE INFORMATION PROVIDED IN THE CONTRACT
DOCUMENTS.
3. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND PROTECTING EXISTING UTILITIES
WHETHER SHOWN OR NOT, AND REPAIRING ALL DAMAGE TO UTILITIES AT NO
ADDITIONAL COST TO WSSC. THE CONTRACTOR SHALL TAKE ALL NECESSARY
PRECAUTIONS TO PROTECT EXISTING MAINS AND UTILITIES.
4. SLANTED AND SCREENED TEXT DENOTES INFORMATION TAKEN FROM OR CALCULATED
FROM AS-BUILT SOURCES THAT HAVE NOT BEEN FIELD VERIFIED. AS-BUILT
INFORMATION WAS TAKEN FROM EXISTING RECORD DRAWINGS. THESE DRAWINGS ARE
AVAILABLE FOR REVIEW BY CONTRACTOR AT OWNER'S CONVENIENCE. UNLESS
OTHERWISE NOTED, ALL INFORMATION OBTAINED FROM AS-BUILT SOURCES HAS NOT
BEEN FIELD VERIFIED.
5. THE TERM "ACCEPTABLE TO ENGINEER" SHALL MEAN WRITTEN ACCEPTANCE BY
ENGINEER TO BE RECEIVED BEFORE WORK IS STARTED.
6. ANY DEVIATION FROM CONTRACT DRAWINGS OR SPECIFICATIONS MUST BE ACCEPTED
BY THE ENGINEER IN WRITING PRIOR TO THE WORK BEING STARTED. ANY DEVIATION
PERFORMED WITHOUT THE ENGINEER'S ACCEPTANCE WILL NOT BE PAID FOR AND MAY
BE REQUIRED TO BE REDONE AT THE CONTRACTOR'S EXPENSE.
7. EXCEPT AS MODIFIED BY THE CONTRACT DOCUMENTS, ALL MATERIALS AND METHODS
OF CONSTRUCTION MUST BE SUPPLIED AND INSTALLED IN STRICT CONFORMANCE
WITH ALL WSSC STANDARDS. THE CONTRACTOR SHALL HAVE A COPY OF ALL
APPLICABLE STANDARD SPECIFICATIONS AND DRAWINGS AT THE WORK SITE AT ALL
TIMES.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE LOCAL
POWER COMPANY ANY ADDITIONAL SUPPORT OF EXISTING POWER POLES OR
UNDERGROUND UTILITIES, AS REQUIRED FOR PIPE OR STRUCTURE TRENCH
EXCAVATION. ALL COSTS OF SUCH WORK SHALL BE PAID BY THE CONTRACTOR.
9. THE CONTRACTOR SHALL LIMIT HIS/HER ACTIVITY TO WITHIN THE SITE BOUNDARIES.
EXISTING TREES AND SHRUBS MAY BE TRIMMED OR REMOVED ONLY IF ACCEPTABLE
TO THE OWNER OR IF SPECIFICALLY NOTED ON THE DRAWINGS. TRIMMING AND
REMOVAL OF TREES WILL BE AT NO ADDITIONAL COST TO THE OWNER.
10. ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL THE ENTIRE SITE IS
RE-ESTABLISHED.
11. STAGING LOCATIONS AND LAYDOWN AREAS SHALL BE LOCATED WITHIN THE EXISTING
CONSTRUCTION LIMITS AS NOTED ON PLAN.
12. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ELEVATION, ORIENTATION,
DIMENSIONS, MATERIALS, JOINT TYPES, ETC. OF EXISTING PIPE PRIOR TO SUBMITTING
SHOP DRAWINGS AND ORDERING MATERIAL AND SHALL USE/PROVIDE NECESSARY
FITTINGS AND TRANSITIONS FOR CONNECTIONS AT NO EXTRA COST TO THE OWNER.
THE CONTRACTOR SHALL SUPPORT ALL PIPING AND CONDUITS EXPOSED DURING
CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FLOW DIVERSION
AND DEWATERING OF EXISTING PIPE LINES BEFORE INSTALLING TIE-INS.
13. ALL EXISTING VALVES AND HYDRANTS MUST ONLY BE OPERATED BY WSSC. THE
CONTRACTOR SHALL NOT OPEN/CLOSE EXISTING VALVES, AND COORDINATION OF
VALVE ADJUSTMENTS SHOULD BE MADE AT LEAST THREE (3) DAYS IN ADVANCE OF ANY
NECESSARY OPERATIONS.
14. EXISTING VALVES MAY LEAK, CONTRACTOR SHALL PLAN FOR THIS ACCORDINGLY
PROVIDING PLUGS, DEWATERING PUMPS AND OTHER APPURTENANCES AS NEEDED AT
NO ADDITIONAL COST TO THE OWNER.
15. 6 INCH WIDE MARKING/DETECTOR TAPE SHALL BE REQUIRED 1.5-FEET TO 3-FEET
ABOVE THE CROWN OF PIPE FOR ALL NEW OR EXPOSED BURIED PIPE.
16. ALL EXCESS MATERIALS AND DEMOLITION DEBRIS SHALL BECOME THE PROPERTY OF
CONTRACTOR UNLESS NOTED OTHERWISE, AND SHALL BE DISPOSED OF BY THE
CONTRACTOR AT AN OFF-SITE SOLID WASTE LANDFILL OR OTHER ACCEPTABLE
LOCATION. CONTRACTOR SHALL PROVIDE WSSC A CREDIT FOR ALL SALVAGED METAL.
EXCESS SOIL MUST BE REMOVED FROM THE SITE IMMEDIATELY BY THE CONTRACTOR.
CONTAMINATED SOIL MUST BE REMOVED FROM THE SITE AND PROPERLY DISPOSED
OF. CONTRACTOR WILL BE RESPONSIBLE FOR ALL DISPOSAL COST AND OBTAINING THE
REQUIRED PERMITS.
17. THE CONTRACTOR SHALL TAKE NECESSARY ACTIONS TO MINIMIZE THE TRACKING OF
MUD ONTO THE PAVED ROADWAY/DRIVEWAY DURING CONSTRUCTION. THE
CONTRACTOR SHALL REMOVE MUD/SOIL FROM PAVEMENT DAILY, AS REQUIRED.
18. THE CONTRACTOR IS RESPONSIBLE FOR ALL PROJECT SAFETY INCLUDING, BUT NOT
LIMITED TO, TRENCH EXCAVATION AND SHORING, TRAFFIC CONTROL, CONFINED SPACE
ENTRY AND SITE SECURITY. CONTRACTOR SHALL BE RESPONSIBLE FOR THE SECURITY
OF HIS/HER OWN EQUIPMENT, TOOLS, FACILITIES, MATERIALS, OFFICES, AND OTHER
APPURTENANCES DURING THE LIFE OF PROJECT.
19. THE CONTRACTOR MUST CONFORM TO ALL APPLICABLE OSHA AND MOSH SAFETY
REGULATIONS.
20. THE CONTRACTOR MUST HAVE APPROVED AND CURRENT DRAWINGS AND
SPECIFICATIONS AT THE CONSTRUCTION SITE AT ALL TIMES.
21. THE CONTRACTOR MUST MAINTAIN RED LINE RECORD DRAWINGS AT THE
CONSTRUCTION SITE TO DOCUMENT CONSTRUCTION CHANGES AND INFORMATION.
DRAWINGS WILL BE REVIEWED AT EACH PROGRESS MEETING AND ARE A
PREREQUISITE FOR PROCESSING PAYMENT APPLICATIONS.
22. THE CONTRACTOR MUST OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION.
23. THE CONTRACTOR MUST NOTIFY WSSC AND THE OWNER'S REPRESENTATIVE AT LEAST
(3) THREE DAYS PRIOR TO CONSTRUCTION OF ANY IMPROVEMENT SUBJECT TO
INSPECTION AND/OR MAINTENANCE BY RESPECTIVE AGENCIES.
24. ALL FILL, SUBBASE AND BASE MATERIAL SHALL BE COMPACTED IN ACCORDANCE WITH
SECTION 02300.
25. PROVIDE POSITIVE DRAINAGE AWAY FROM MANHOLES OR STRUCTURES THROUGHOUT
CONSTRUCTION.
26. CONTRACTOR TO VERIFY ELEVATIONS OF EXISTING FOUNDATIONS, TOP OF TANKS, AND
OTHER ELEVATIONS PRIOR TO SUBMITTING PIPING SHOP DRAWINGS.
27. SEE INDIVIDUAL SHEETS FOR ADDITIONAL ABBREVIATIONS, SYMBOLS, LEGENDS,
DETAILS AND NOTES, IF ANY. NOT ALL "STANDARD" DETAILS SHOWN MAY BE
APPLICABLE TO THIS PROJECT.
28. CONTRACTOR SHALL BE RESPONSIBLE FOR DRAINING OF THE SURGE TANKS AND THE
SURGE TANK VAULTS.
29. CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL OF THE CONTENTS OF THE
SURGE TANK AND THE SURGE TANK VAULTS.
30. OWNER HAS RIGHT OF FIRST REFUSAL TO ALL DEMOLISHED ITEMS. CONTRACTOR
SHALL REVIEW WITH THE OWNER ALL ITEMS TO BE DISPOSED OR SALVAGED.
31. CONTRACTOR MUST COMPLY WITH APPLICABLE NOISE RESTRICTIONS, PER THE
PROJECT SPECIFICATIONS OR THE CURRENT PRINCE GEORGE'S COUNTY CODE,
SECTION 19.-122.01, WHICH EVER IS MORE RESTRICTIVE:
(A) 85 dBA IF CONTRACTOR HAS AN APPROVED NOISE SUPPRESSION PLAN FOR THE
CONSTRUCTION ACTIVITY.
(B) 75 dBA IF THE CONTRACTOR DOES NOT HAVE AN APPROVED NOISE SUPPRESSION
PLAN.
GENERAL NOTES
EXISTING OR FUTURE CONDITION DESIGNATION
DETAIL CALL OUT SYMBOLS
SECTION CUT SYMBOLS
DRAWING, SECTION AND DETAIL TITLES
ABBREVIATIONS
A M-1
SECTION A-A
SCALE: 1/8" = 1'-0"
A M-1
DETAIL A
SCALE: 1/8" = 1'-0"
PLAN: SUBTITLE OR DESCRIPTION
SCALE: 1/8" = 1'-0"
SURVEY NOTES:
1. THE TOPOGRAPHIC SURVEY FIELDWORK WAS COMPLETED BETWEEN JUNE AND AUGUST
OF 2024 UNDER THE SUPERVISION OF A LICENSED LAND SURVEYOR FROM PRECISION
MEASUREMENTS, INC.
2. THE MERIDIAN SOURCE OF THIS TOPOGRAPHIC SURVEY IS BASED ON THE
MARYLAND STATE PLANE COORDINATE SYSTEM, NORTH AMERICAN DATUM
1983/2011. THE PROJECT MERIDIAN WAS ESTABLISHED BY PRECISION MEASUREMENTS,
INC. USING CONVENTIONAL GPS METHODS.
3. ELEVATIONS SHOWN ARE A PROJECT DATUM BASED UPON THE ELEVATION OF
THE MANHOLE RIM OF EXISTING I-3 STRUCTURE ON THE PROFILES AS SHOWN
ON AS-BUILT DRAWINGS PROVIDED BY WSSC. TO CONVERT ELEVATIONS SHOWN FROM
PROJECT DATUM TO NVDG 29 SUBTRACT 1.09'.
4. THIS SURVEY WAS PREPARED TO SHOW EXISTING FEATURES AS OF
08/02/2024.
5. THE CONTOUR INTERVALS SHOWN HEREON IS ONE (1) FOOT.
6. THIS SURVEY DOES NOT CONSTITUTE A BOUNDARY SURVEY NOR A SUBDIVISION OF
LAND, AND DOES NOT SHOW EXISTING PROPERTY LINES, EASEMENTS, SETBACK OR
RIGHT-OF-WAYS.
RP
JJS
GC
7/25/2025
7/25/2025
7/25/2025
62632 03-18-2026
E
E
EMH
EMH
GAS
METER
15"RCP
ST
Y
BR
IC
K
BU
IL
D
IN
G
CONC. PAD
ELEVATED
CONC. VAULT
UNK. POST
8'± HIGH
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
CONC. WALK
FOMH
VP
VP
VP
VP
VP
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G
G
G G
G G
G G
G G
G G
G G
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
UG
E
UG
E
UGE
UGE UGE UGE
UGE
UGE
UGE
UGE
U G
E U
G E
U G
E
U G
E U
G E
U G
E U
G E
U G
E
U G
E
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE
UGE
UGE
UG
E
U G
E
U G
E
U G
E
U G
E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE
UGE
EOI
EOI
EO
I
EO
I
EO
I
EO
I
EOI
EOI
EOI
EOI
EOI
EO
I
EO
I
EO
I
TRAV
#3
SCO
SCO
SCO
SCO
TOC EL 19.8±
12'± DEEP
6" CONC.
WALL
W/ WHEEL VALVECONC. VAULT
8'± HIGH
CONC.
STEPS
CONC.
STEP
18.93
CONC.
STEP
(BY O
TH
ER
S) (BY O
TH
ER
S)
FOMH
FO FO FO FO FO FO FO FO FO FO FO FO FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
19 19
TOC EL 20.0±
TOC EL 19.8±
TOC EL 19.8± TOC EL 19.9±
TOC EL 19.9±
TOC EL 19.0± TOC EL 19.0±
T.D.
EMH
EMH
RIM=17.38
T/S=16.00'±
INV.=13.94 (15" RCP)
INV.=14.15 (6" PVC FROM BUILDING)
SDMH
RIM=21.73
INV.=11.84 (OUT)
15"RCP
DEPTH=10.46
RIM=18.25
DEPTH=12.86
RIM=18.77
DEPTH=13.35
RIM=17.09
DEPTH=10.98
CO
CAPPED
TOP=18.20
SU
R
G E
TA
N
K D
R
AI
N (D
AT
R
T.D.
T/S=16.00'±
INV.=13.62 (15" RCP)
INV.=14.22 (3" PVC FROM BUILDING)
CO
TOP=19.15
DEPTH=6.95
VP
SU
R
G E
TA
N
K D
R
AI
N (D
AT
R
ANACOSTIA II WASTEWATER PUMPING STATION
ANDALUSIA LN
CONTRACT: 23303290A
DATE REVISIONS
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
DRAWN:
CHECKED:
DESIGN:
NO
OF 24
ANACOSTIA II
WASTEWATER PUMPING STATION
SURGE TANKS REMOVAL
ISSUED FOR BID
THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT BE
REDISTRIBUTED WITHOUT PRIOR WSSC
APPROVAL
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I
AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO.:
EXPIRATION DATE:
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
DELIVERING THE ESSENTIAL
PA
TH
TE
M
PL
AT
E
LA
YO
U T
C U
R R
EN
T as o f:
/1 4/
9/4/2025 - PLOT DATE
10306 Eaton Place, Suite 220 Fairfax, VA 22030 Tel: (703) 691-6500
EXISTING CONDITIONS PLAN C-1
RN
RN
PF
PLAN - EXISTING CONDITIONS
SCALE: 1" = 10' 7/25/2025
7/25/2025
7/25/2025
57413 03/31/27
APPROVED
BY: COLLIN HILTNER
MD DEPT ENVIRONMENT
SEDIMENT & STORMWATER
PLAN REVIEW DIVISION
E
EMH
EMH
GAS
METER
15"RCP
ST
Y
BR
IC
K
BU
IL
D
IN
G
CONC. PAD
ELEVATED
CONC. VAULT
UNK. POST
8'± HIGH
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
CONC. WALK
FOMH
VP
VP
VP
VP
VP
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G
G
G G
G G
G G
G G
G G
G G
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
UG
E
UG
E
UG
E
UG
E
UG
E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E
UG
E
UG
E
UGE
UGE UGE UGE
UGE
UGE
UGE
UGE
U G
E U
G E
U G
E
U G
E U
G E
U G
E U
G E
U G
E
U G
E
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE
UGE
UGE
UG
E
U G
E
U G
E
U G
E
U G
E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE
UGE
EOI
EOI
EO
I
EO
I
EO
I
EO
I
EOI
EOI
EOI
EOI
EOI
EO
I
EO
I
EO
I
TRAV
#3
SCO
SCO
SCO
SCO
TOC EL 19.8±
12'± DEEP
6" CONC.
WALL
W/ WHEEL VALVECONC. VAULT
8'± HIGH
CONC.
STEPS
CONC.
STEP
18.93
CONC.
STEP
(BY O
TH
ER
S) (BY O
TH
ER
S)
FOMH
FO FO FO FO FO FO FO FO FO FO FO FO FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
19 19
TOC EL 20.0±
TOC EL 19.8±
TOC EL 19.8± TOC EL 19.9±
TOC EL 19.9±
TOC EL 19.0± TOC EL 19.0±
T.D.
EMH
EMH
RIM=17.38
T/S=16.00'±
INV.=13.94 (15" RCP)
INV.=14.15 (6" PVC FROM BUILDING)
SDMH
RIM=21.73
INV.=11.84 (OUT)
15"RCP
DEPTH=10.46
RIM=18.25
DEPTH=12.86
RIM=18.77
DEPTH=13.35
RIM=17.09
DEPTH=10.98
CO
CAPPED
TOP=18.20
SU
R
G E
TA
N
K D
R
AI
N (D
AT
R
T.D.
T/S=16.00'±
INV.=13.62 (15" RCP)
INV.=14.22 (3" PVC FROM BUILDING)
CO
TOP=19.15
DEPTH=6.95
VP
SU
R
G E
TA
N
K D
R
AI
N (D
AT
R
ANACOSTIA II WASTEWATER PUMPING STATION
ANDALUSIA LN
CONTRACT: 23303290A
DATE REVISIONS
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
DRAWN:
CHECKED:
DESIGN:
NO
OF 24
ANACOSTIA II
WASTEWATER PUMPING STATION
SURGE TANKS REMOVAL
ISSUED FOR BID
THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT BE
REDISTRIBUTED WITHOUT PRIOR WSSC
APPROVAL
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I
AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO.:
EXPIRATION DATE:
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
DELIVERING THE ESSENTIAL
PA
TH
TE
M
PL
AT
E
LA
YO
U T
C U
R R
EN
T as o f:
/1 4/
9/4/2025 - PLOT DATE
10306 Eaton Place, Suite 220 Fairfax, VA 22030 Tel: (703) 691-6500
DEMOLITION PLAN C-2
RN
RN
PF
PLAN - DEMOLITION
SCALE: 1" = 10' 7/25/2025
7/25/2025
7/25/2025
57413 03/31/27
APPROVED
BY: COLLIN HILTNER
MD DEPT ENVIRONMENT
SEDIMENT & STORMWATER
E
EMH
EMH
GAS
METER
15"RCP
ST
Y
BR
IC
K
BU
IL
D
IN
G
CONC. PAD
ELEVATED
CONC. VAULT
UNK. POST
8'± HIGH
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
CONC. WALK
FOMH
VP
VP
VP
VP
VP
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G
G
G G
G G
G G
G G
G G
G G
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
UG
E
UG
E
UG
E
UG
E
UG
E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E
UG
E
UG
E
UGE
UGE UGE UGE
UGE
UGE
UGE
UGE
U G
E U
G E
U G
E
U G
E U
G E
U G
E U
G E
U G
E
U G
E
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE
UGE
UGE
UG
E
U G
E
U G
E
U G
E
U G
E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE
UGE
EOI
EOI
EO
I
EO
I
EO
I
EO
I
EOI
EOI
EOI
EOI
EOI
EO
I
EO
I
EO
I
TRAV
#3
SCO
SCO
SCO
SCO
TOC EL 19.8±
12'± DEEP
6" CONC.
WALL
W/ WHEEL VALVECONC. VAULT
8'± HIGH
CONC.
STEPS
CONC.
STEP
18.93
CONC.
STEP
(BY O
TH
ER
S) (BY O
TH
ER
S)
FOMH
FO FO FO FO FO FO FO FO FO FO FO FO FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
19 19
TOC EL 20.0±
TOC EL 19.8±
TOC EL 19.8± TOC EL 19.9±
TOC EL 19.9±
TOC EL 19.0± TOC EL 19.0±
T.D.
EMH
EMH
RIM=17.38
T/S=16.00'±
INV.=13.94 (15" RCP)
INV.=14.15 (6" PVC FROM BUILDING)
SDMH
RIM=21.73
INV.=11.84 (OUT)
15"RCP
DEPTH=10.46
RIM=18.25
DEPTH=12.86
RIM=18.77
DEPTH=13.35
RIM=17.09
DEPTH=10.98
CO
CAPPED
TOP=18.20
SU
R
G E
TA
N
K D
R
AI
N (D
AT
R
T.D.
T/S=16.00'±
INV.=13.62 (15" RCP)
INV.=14.22 (3" PVC FROM BUILDING)
CO
TOP=19.15
DEPTH=6.95
VP
SU
R
G E
TA
N
K D
R
AI
N (D
AT
R
ANACOSTIA II WASTEWATER PUMPING STATION
ANDALUSIA LN
ANACOSTIA II WASTEWATER PUMPING STATION
CONTRACT: 23303290A
DATE REVISIONS
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
DRAWN:
CHECKED:
DESIGN:
NO
OF 24
ANACOSTIA II
WASTEWATER PUMPING STATION
SURGE TANKS REMOVAL
ISSUED FOR BID
THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT BE
REDISTRIBUTED WITHOUT PRIOR WSSC
APPROVAL
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I
AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO.:
EXPIRATION DATE:
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
DELIVERING THE ESSENTIAL
PA
TH
TE
M
PL
AT
E
LA
YO
U T
C U
R R
EN
T as o f:
/1 4/
9/4/2025 - PLOT DATE
10306 Eaton Place, Suite 220 Fairfax, VA 22030 Tel: (703) 691-6500
EXCAVATION PLAN C-3
RN
RN
PF
PLAN - EXCAVATION
SCALE: 1" = 10'
B C-6
B C-6
A C-6
A C-6
7/25/2025
7/25/2025
7/25/2025
57413 03/31/27
APPROVED
BY: COLLIN HILTNER
MD DEPT ENVIRONMENT
SEDIMENT & STORMWATER
EMH
GAS
METER
15"RCP
ST
Y
BR
IC
K
BU
IL
D
IN
G
CONC. PAD
ELEVATED
CONC. VAULT
UNK. POST
8'± HIGH
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G
G
G G
G G
G G
G G
G G
G G
G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E
UG
E
UG
E
UGE
UGE UGE UGE
UGE
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE
UGE
UGE
UG
E
U G
E
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE
UGE
EOI
EO
I
EO
I
EO
I
EO
I
EOI
EOI
EOI
EOI
EO
I
EO
I
EO
I
TRAV
#3
SCO
SCO
12'± DEEP
6" CONC.
WALL
W/ WHEEL VALVECONC. VAULT
8'± HIGH
CONC.
STEPS
CONC.
STEP
18.93
CONC.
STEP
(BY O
TH
ER
S) (BY O
TH
ER
S)
FO FO FO FO FO FO FO FO FO FO FO
T.D.
T/S=16.00'±
INV.=13.94 (15" RCP)
INV.=14.15 (6" PVC FROM BUILDING)
SDMH
RIM=21.73
INV.=11.84 (OUT)
15"RCP
CO
CAPPED
TOP=18.20
T.D.
T/S=16.00'±
INV.=13.62 (15" RCP)
INV.=14.22 (3" PVC FROM BUILDING)
ANACOSTIA II WASTEWATER PUMPING STATION
ANDALUSIA LN
FOMH
FOMH
EMH
EMH
RIM=17.38
DEPTH=10.46
RIM=18.25
DEPTH=12.86
RIM=18.77
DEPTH=13.35
RIM=17.09
DEPTH=10.98
CO
CAPPED
TOP=18.20
CONTRACT: 23303290A
DATE REVISIONS
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
DRAWN:
CHECKED:
DESIGN:
NO
OF 24
ANACOSTIA II
WASTEWATER PUMPING STATION
SURGE TANKS REMOVAL
ISSUED FOR BID
THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT BE
REDISTRIBUTED WITHOUT PRIOR WSSC
APPROVAL
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I
AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO.:
EXPIRATION DATE:
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
DELIVERING THE ESSENTIAL
PA
TH
TE
M
PL
AT
E
LA
YO
U T
C U
R R
EN
T as o f:
/1 4/
9/4/2025 - PLOT DATE
10306 Eaton Place, Suite 220 Fairfax, VA 22030 Tel: (703) 691-6500
RESTORATION PLAN C-4
RN
RN
PF
PLAN - RESTORATION
SCALE: 1" = 10' 7/25/2025
7/25/2025
7/25/2025
57413 03/31/27
APPROVED
BY: COLLIN HILTNER
MD DEPT ENVIRONMENT
SEDIMENT & STORMWATER
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
DRAWN:
CHECKED:
DESIGN:
NO
OF 24
ANACOSTIA II
WASTEWATER PUMPING STATION
SURGE TANKS REMOVAL
ISSUED FOR BID
THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT BE
REDISTRIBUTED WITHOUT PRIOR WSSC
APPROVAL
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I
AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO.:
EXPIRATION DATE:
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
DELIVERING THE ESSENTIAL
PA
TH
TE
M
PL
AT
E
LA
YO
U T
C U
R R
EN
T as o f:
/1 4/
9/4/2025 - PLOT DATE
10306 Eaton Place, Suite 220 Fairfax, VA 22030 Tel: (703) 691-6500
PROFILES C-5
RN
RN
PF
SECTION A-A
SCALE: 1" = 10'
SECTION B-B
SCALE: 1" = 10'
7/25/2025
7/25/2025
7/25/2025
57413 03/31/27
APPROVED
BY: COLLIN HILTNER
MD DEPT ENVIRONMENT
SEDIMENT & STORMWATER
E
RIM=17.18
T.D.
T/S=16.00'±
T.D.
I-2
RIM=16.74
INV.=12.73 (IN)
INV.=12.57 (OUT)
"R
CP
EMH
EMH
20"
DEC.
4"
DEC.
14"
DEC. 19"
DEC.
EMH
GAS
METER
SERVICE ROAD
6" C&G
6" C&G
6" C&G
6" C&G6" C&G
ASPHALT
D R
IVEW
AY
D R
IVEW
AY
BOL
BOL BOLBOL
15"RCP
INV.=12.83 (IN)
INV.=12.74 (OUT)
6"CPP
ST
Y
BR
IC
K
BU
IL
D
IN
G
CONC. PAD
ELEVATED
CONC. VAULT
GRASS
GRASS
UNK. POST
8'± HIGH
ANACOSTIA PUMPING
STATION NO. 2
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
SURGE
TANK
CONC. WALKASPHALT
FOMH
ASPHALT
T/S=16.00'±
VP
VP
VP
VP
VP
GRASS
GRASS
GRASS
GRASS
EOI
EOI
EO
I
EO
I
EO
I
EO
I
SCO
SCO
SCO
SCO
ON CONC PAD
ELEV.= 19.00±
ON CONC PAD
ELEV.= 19.00±
ON CONC PAD
ELEV.= 19.90±
ON CONC PAD
ELEV.= 19.80±
ON CONC PAD
ELEV.= 19.80±
ON CONC PAD
ELEV.= 19.80±
ON CONC PAD
ELEV.= 20.00±
ON CONC PAD
ELEV.= 19.90±
1 CONC. ACCCESS SHAFT
WITH METAL HATCH
COULD NOT ACCESS
CONC. ACCCESS SHAFT
WITH METAL HATCH
12'± DEEP
6" CONC.
WALL
W/ WHEEL VALVECONC. VAULT
8'± HIGH
CONC.
STEPS
19 19
17.4 17.7 18.2
18.3
17.8
17.6
17.8
17.4
17.4
17.6
17.8
18.1 18.3 18.4 18.1 17.8
18.2
17.9
17.8
17.7
17.7
17.4
18.7
17.4
19.0
19.1
18.5
18.4
18.4
18.5
18.5
17.6
17.08
17.29
.25
16.72 16.12
16.06 16.70
17.24
17.66
17.93 17.89
.59
.2
.2
.6
.6
.0
.1
17.62 17.70
17.54
17.4117.6717.9217.70
17.40
17.22
16.96
18.12
17.93 17.53
17.04
17.26
17.77
17.26 16.22
.1
17.46
19.14
17.57 CONC.
STEP
18.93
6" C &G
6" C &G
6" C &G
6" C &G
CONC.
STEP
19.87
19.89
19.87
20.00
(BY O
TH
ER
S)
(BY O
TH
ER
S)
CNA
CNA
CNA
FOMH
LOD LOD LOD LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LODLODLOD
LO
D
LO
DLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
SCE
SCECONTRACTOR'S
STAGING AREA
SP
FB
FB
SP
LOD LOD
SCE
LIMIT OF DISTURBANCE
SILT FENCE
FLOW ARROW
STABILIZED CONSTRUCTOR ENTRANCE
TREE REMOVAL
LEGEND
SILT FENCE ON PAVEMENT
PLAN- EROSION & SEDIMENT CONTROL
SCALE: 1"=10'
00 10' 20'
EROSION AND SEDIMENT CONTROL -
SEQUENCE OF CONSTRUCTION
1. CONTACT THE MARYLAND DEPARTMENT OF THE
ENVIRONMENT AT (410)537-3510 AT LEAST SEVEN (7)
DAYS PRIOR TO COMMENCING ANY LAND DISTURBING
ACTIVITY.
2. CONTACT WSSC INSPECTOR BEFORE ANY LAND
DISTURBANCE OCCURS.
3. CONTRACTOR SHALL ENSURE THAT ALL NECESSARY
PERMITS HAVE BEEN RECEIVED AND THAT THOSE
REQUIRED TO BE DISPLAYED ON-SITE ARE AVAILABLE.
4. HOLD PRE-CONSTRUCTION MEETING UNLESS WAIVED
BY MDE.
5. INSTALL STABILIZED CONSTRUCTION ENTRANCE.
(IF APPLICABLE)
6. INSTALL REMAINING SEDIMENT CONTROL IN
ACCORDANCE WITH THE SEDIMENT CONTROL PLAN.
7. PROCEED WITH CONSTRUCTION.
8. CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY
MAINTAIN ALL EROSION CONTROL DEVICES AND
STRUCTURES.
9. REMOVE TREES.
10. CURB/DRIVEWAY DEMOLISHED.
11. DEMOLISH AND REMOVE STORAGE TANKS.
12. RESTORE CURB/DRIVEWAY.
13. AFTER THE SITE HAS BEEN STABLIZED, REMOVE ALL
SEDIMENT CONTROLS.
14. STABILIZE AREAS DISTURBED BY REMOVAL OF
SEDIMENT CONTROLS
CONTRACT: 23303290A
DATE REVISIONS
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
DRAWN:
CHECKED:
DESIGN: NB
RM
RAM
07/25/2025
NO
OF 24
ANACOSTIA II
WASTEWATER PUMPING STATION
SURGE TANKS REMOVAL
THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT BE
REDISTRIBUTED WITHOUT PRIOR WSSC
APPROVAL
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I
AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO.: 17356
EXPIRATION DATE: 05-21-2025
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
DELIVERING THE ESSENTIAL
PA
TH
TE
M
PL
AT
E
LA
YO
U T
C U
R R
EN
T as o f:
/1 4/
07/25/25 - PLOT DATE
07/25/2025
07/25/2025
10306 Eaton Place, Suite 220 Fairfax, VA 22030 Tel: (703) 691-6500
C-6
CURB INLET
PROTECTION
CURB INLET
PROTECTION
409 12th STREET, S.W.
SUITE 603
WASHINGTON, D.C. 20024
PH: (202) 478-2060
FAX: (202) 478-2050
www.peercpc.com
Est. 1978
Consultants, P.C.
PEER
EROSION & SEDIMENT CONTROL
PLAN
NOTES:
CONTRACTOR TO VERIFY DEWATERING METHOD,
DISCHARGE AND TREATMENT, IF NECESSARY, FOR
DISCHARGED WATER PRIOR TO DEWATERING OPERATIONS.
ESC WILL BE SETUP RIGHT AFTER MOBILIZING AND WILL
REMAIN FOR DURATION OF PROJECT.
IF CONSTRUCTION DOES NOT COMMENCE FOR 180 DAYS
FOLLOWING THE PRE-CON MEETING OR IF IS DORMANT
FOR MORE THAN 180 DAYS DURING THE CONSTRUCTION
PHASE, A NEW PRE-CON MEETING IS REQUIRED BEFORE
CONSTRUCTION CAN RE-START.
ALL APPLICABLE E&S CONTROL MEASURES MUST BE
MAINTAINED UNTIL PERMANENT VEGETATION AND
PAVEMENTS ARE ESTABLISHED.
ALL DEMOLITION DEBRIS IS TO GO TO AN APPROVED
LANDFILL OR RELATED FACILITY AS DETERMINED BY WSSC.
ISSUED FOR BID
FILTER BAG
RELOCATE
AS NEEDED
FILTER BAG
RELOCATE AS
NEEDED
SUMP PITS RELOCATE AS NEEDED
MDE# 25-SF-0149THE CONTRACTOR SHALL DESIGNATE CONSTRUCTION EQUIPMENT
ALLOWED WITHIN THE LOD. THIS EQUIPMENT SHALL REMAIN WITHIN THE
LOD UNTIL PROPOSED WORK IS COMPLETED. PRIOR TO VEHICLES LEAVING
THE LOD, WHEELS OR TRACKS SHALL BE CLEANED TO REMOVE SEDIMENT.
VEHICLE CLEANING SHALL BE PERFORMED ON A STABILIZED AREA THAT IS
EITHER SWEPT/VACUUM OR THAT DRAINS TO AN MDE- APPROVED SEDIMENT
CONTROL DEVICE. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN
AREA STABILIZED WITH STONE THAT DRAINS TO AN APPROVED SEDIMENT
CONTROL DEVICE. ALL SEDIMENT SPILLED, DROPPED, OR TRACKED ONTO
THE ROAD OR PUBLIC RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY BY
VACUUMING, SCRAPING, OR SWEEPING.
APPROVED
BY: COLLIN HILTNER
MD DEPT ENVIRONMENT
SEDIMENT & STORMWATER
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
DRAWN:
CHECKED:
DESIGN: NB
RM
RAM
07/25/2025
NO
OF 24
ANACOSTIA II
WASTEWATER PUMPING STATION
SURGE TANKS REMOVAL
THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT BE
REDISTRIBUTED WITHOUT PRIOR WSSC
APPROVAL
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I
AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO.: 17356
EXPIRATION DATE: 05-21-2025
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
DELIVERING THE ESSENTIAL
PA
TH
TE
M
PL
AT
E
LA
YO
U T
C U
R R
EN
T as o f:
/1 4/
07/25/25 - PLOT DATE
07/25/2025
07/25/2025
10306 Eaton Place, Suite 220 Fairfax, VA 22030 Tel: (703) 691-6500
CD-1EROSION & SEDIMENT CONTROL
DETAILS
409 12th STREET, S.W.
SUITE 603
WASHINGTON, D.C. 20024
PH: (202) 478-2060
FAX: (202) 478-2050
www.peercpc.com
Est. 1978
Consultants, P.C.
PEER
ISSUED FOR BID
MDE# 25-SF-0149
APPROVED
BY: COLLIN HILTNER
MD DEPT ENVIRONMENT
SEDIMENT & STORMWATER
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
DRAWN:
CHECKED:
DESIGN: NB
RM
RAM
07/25/2025
NO
OF 24
ANACOSTIA II
WASTEWATER PUMPING STATION
SURGE TANKS REMOVAL
THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT BE
REDISTRIBUTED WITHOUT PRIOR WSSC
APPROVAL
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I
AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO.: 17356
EXPIRATION DATE: 05-21-2025
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
DELIVERING THE ESSENTIAL
PA
TH
TE
M
PL
AT
E
LA
YO
U T
C U
R R
EN
T as o f:
/1 4/
07/25/25 - PLOT DATE
07/25/2025
07/25/2025
10306 Eaton Place, Suite 220 Fairfax, VA 22030 Tel: (703) 691-6500
CD-2VEGETATIVE STABILIZATION409 12th STREET, S.W.
SUITE 603
WASHINGTON, D.C. 20024
PH: (202) 478-2060
FAX: (202) 478-2050
www.peercpc.com
Est. 1978
Consultants, P.C.
PEER
ISSUED FOR BID
MDE# 25-SF-0149
6b 6b
Annual Ryegrass
Barley
Foxtail Millet
0.5"
0.5"
1.0"
5/16-7/31
3/1-5/15 8/1-10/15
3/1-5/15 8/1-10/15
APPROVED
BY: COLLIN HILTNER
MD DEPT ENVIRONMENT
SEDIMENT & STORMWATER
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
DRAWN:
CHECKED:
DESIGN: NB
RM
RAM
07/25/2025
NO
OF 24
ANACOSTIA II
WASTEWATER PUMPING STATION
SURGE TANKS REMOVAL
THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT BE
REDISTRIBUTED WITHOUT PRIOR WSSC
APPROVAL
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I
AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO.: 17356
EXPIRATION DATE: 05-21-2025
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
DELIVERING THE ESSENTIAL
PA
TH
TE
M
PL
AT
E
LA
YO
U T
C U
R R
EN
T as o f:
/1 4/
07/25/25 - PLOT DATE
07/25/2025
07/25/2025
10306 Eaton Place, Suite 220 Fairfax, VA 22030 Tel: (703) 691-6500
CD-3PERMANENT STABILIZATION409 12th STREET, S.W.
SUITE 603
WASHINGTON, D.C. 20024
PH: (202) 478-2060
FAX: (202) 478-2050
www.peercpc.com
Est. 1978
Consultants, P.C.
PEER
ISSUED FOR BID
MDE# 25-SF-0149
6b
Tall Fescue
Kentucky Bluegrass
Perennial Ryegrass
3/1-5/15 8/1-10/15 3/1-5/15 8/1-10/15 3/1-5/15 8/1-10/15
APPROVED
BY: COLLIN HILTNER
MD DEPT ENVIRONMENT
SEDIMENT & STORMWATER
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
DRAWN:
CHECKED:
DESIGN: NB
RM
RAM
07/25/2025
NO
OF 24
ANACOSTIA II
WASTEWATER PUMPING STATION
SURGE TANKS REMOVAL
THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT BE
REDISTRIBUTED WITHOUT PRIOR WSSC
APPROVAL
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I
AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO.: 17356
EXPIRATION DATE: 05-21-2025
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
DELIVERING THE ESSENTIAL
PA
TH
TE
M
PL
AT
E
LA
YO
U T
C U
R R
EN
T as o f:
/1 4/
07/25/25 - PLOT DATE
07/25/2025
07/25/2025
10306 Eaton Place, Suite 220 Fairfax, VA 22030 Tel: (703) 691-6500
CD-4EROSION & SEDIMENT CONTROL
NOTES
409 12th STREET, S.W.
SUITE 603
WASHINGTON, D.C. 20024
PH: (202) 478-2060
FAX: (202) 478-2050
www.peercpc.com
Est. 1978
Consultants, P.C.
PEER
ISSUED FOR BID
MDE# 25-SF-0149
GENERAL NOTES
1. THE CONTRACTOR SHALL NOTIFY MDE AT (410) 537-3510 SEVEN (7) DAYS BEFORE COMMENCING ANY LAND DISTURBING ACTIVITY AND, UNLESS WAIVED BY MDE, SHALL BE REQUIRED TO HOLD A PRE- CONSTRUCTION MEETING BETWEEN PROJECT REPRESENTATIVES AND A REPRESENTATIVE OF MDE.
2. THE CONTRACTOR SHALL NOTIFY MDE IN WRITING AND BY TELEPHONE AT THE FOLLOWING POINTS:
A. THE REQUIRED PRE-CONSTRUCTION MEETING.
B. FOLLOWING INSTALLATION OF SEDIMENT CONTROL MEASURES.
C. DURING THE INSTALLATION OF SEDIMENT BASINS (TO BE CONVERTED INTO PERMANENT
STORMWATER MANAGEMENT STRUCTURES) AT THE REQUIRED INSPECTION POINTS (SEE
INSPECTION CHECKLIST ON PLAN) NOTIFICATION PRIOR TO COMMENCING CONSTRUCTION OF
EACH STEP IS MANDATORY.
D. PRIOR TO REMOVAL OR MODIFICATION OF ANY SEDIMENT CONTROL STRUCTURE(S).
E. PRIOR TO REMOVAL OF ALL SEDIMENT CONTROL DEVICES.
F. PRIOR TO FINAL ACCEPTANCE.
3. THE PLAN APPROVAL LETTER, APPROVED EROSION AND SEDIMENT CONTROL PLANS, DAILY LOG
BOOKS, AND TEST REPORTS SHALL BE AVAILABLE AT THE SITE FOR INSPECTION BY DULY
AUTHORIZED OFFICIALS OF MDE AND THE AGENCY RESPONSIBLE FOR THE PROJECT.
4. THE CONTRACTOR SHALL CONSTRUCT ALL EROSION AND SEDIMENT CONTROL MEASURES PER THE
APPROVED PLAN AND CONSTRUCTION SEQUENCE AND SHALL HAVE THEM INSPECTED AND
APPROVED BY THE MDE INSPECTOR PRIOR TO BEGINNING ANY OTHER LAND DISTURBANCES. MINOR
SEDIMENT CONTROL DEVICE LOCATION ADJUSTMENTS MAY BE MADE IN THE FIELD WITH THE
APPROVAL OF THE MDE INSPECTOR. THE CONTRACTOR SHALL ENSURE THAT ALL RUNOFF FROM
DISTURBED AREAS IS DIRECTED TO THE SEDIMENT CONTROL DEVICES AND SHALL NOT REMOVE
ANY EROSION OR SEDIMENT CONTROL MEASURE WITHOUT PRIOR PERMISSION FROM MDE
INSPECTOR. THE CONTRACTOR SHALL OBTAIN PRIOR AGENCY AND MDE APPROVAL FOR
MODIFICATIONS TO THE EROSION AND SEDIMENT CONTROL PLAN AND/OR SEQUENCE OF
CONSTRUCTION.
5. THE MDE INSPECTOR HAS THE OPTION OF REQUIRING ADDITIONAL SAFETY OR SEDIMENT CONTROL
MEASURES, IF DEEMED NECESSARY.
6. THE CONTRACTOR SHALL PROTECT ALL POINTS OF CONSTRUCTION INGRESS AND EGRESS TO
PREVENT THE DEPOSITION OF MATERIALS ONTO PUBLIC ROADS. ALL MATERIALS DEPOSITED ONTO
PUBLIC ROADS SHALL BE REMOVED IMMEDIATELY
7. THE CONTRACTOR SHALL INSPECT DAILY AND MAINTAIN CONTINUOUSLY IN AN EFFECTIVE
OPERATING CONDITION ALL EROSION AND SEDIMENT CONTROL MEASURES UNTIL SUCH TIME AS
THEY ARE REMOVED WITH PRIOR PERMISSION FROM THE MDE INSPECTOR.
8. EROSION AND SEDIMENT CONTROL FOR UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY CONSTRUCTION SHALL ONLY BE FOR AREAS WITHIN THE DELINEATED LIMIT OF DISTURBANCE. CALL "MISS UTILITY" AT 1-800-257-7777 48 HOURS PRIOR TO
THE START OF WORK. WHEN SAME DAY STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL BE BACKFILLED, COMPACTED, AND STABILIZED AT
THE END OF EACH WORKING DAY. NO MORE TRENCH SHALL BE OPENED THAN CAN BE COMPLETED
THE SAME DAY
9. ALL WATER REMOVED FROM EXCAVATED AREAS SHALL BE PASSED THROUGH AN MDE APPROVED DEWATERING PRACTICE OR PUMPED TO A SEDIMENT TRAP OR BASIN PRIOR TO DISCHARGE TO A
FUNCTIONAL STORM DRAIN SYSTEM OR TO STABLE GROUND SURFACE.
10. CONCRETE WASHOUT STRUCTURES SHALL BE USED WHEN CONCRETE TRUCKS, DRUMS, PUMPS, CHUTES, OR OTHER EQUIPMENT IS RINSED OR CLEANED ON-SITE.
11. CONSTRUCTION ACTIVITIES PRODUCING DUST SHALL IMPLEMENT CONTROL MEASURES TO AVOID
THE SUSPENSION OF DUST PARTICLES AND/OR PREVENT DUST FROM BLOWING OFF-SITE OR TO
AREAS WITHOUT TREATMENT.
12. FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT OR TEMPORARY
STABILIZATION SHALL BE COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER CONTROLS, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL
(3:1); AND
B. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED AREAS ON THE PROJECT
SITE NOT UNDER ACTIVE GRADING.
13. VEGETATIVE STABILIZATION SHALL BE PERFORMED IN ACCORDANCE WITH THE 2011 MARYLAND
STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL. REFER TO
APPROPRIATE SPECIFICATIONS FOR TEMPORARY SEEDING, PERMANENT SEEDING, MULCHING,
SODDING, AND GROUND COVERS.
14. WHEN SEEDING, ALL DISTURBED AREAS WITH SLOPES FLATTER THAN 21 SHALL BE STABILIZED WITH 4 INCHES OF TOPSOIL, SEED, AND MULCH. ALL DISTURBED AREAS WITH SLOPES 2:1 OR STEEPER
SHALL BE STABILIZED WITH MATTING OVER 2 INCHES OF TOPSOIL AND SEED.
15. ALL SEDIMENT BASINS, TRAP EMBANKMENTS AND SLOPES, PERIMETER DIKES, SWALES AND ALL DISTURBED SLOPES STEEPER OR EQUAL TO 3:1 SHALL BE STABILIZED WITH SEED AND ANCHORED STRAW MULCH, SOD, OR OTHER APPROVED STABILIZATION MEASURES, AS SOON AS POSSIBLE BUT
NO LATER THAN THREE (3) CALENDAR DAYS AFTER ESTABLISHMENT. ALL AREAS DISTURBED
OUTSIDE OF THE PERIMETER SEDIMENT CONTROL SYSTEM SHALL BE MINIMIZED. MAINTENANCE
SHALL BE PERFORMED AS NECESSARY TO ENSURE CONTINUED STABILIZATION.
16. PERMANENT SWALES OR OTHER POINTS OF CONCENTRATED WATER FLOW SHALL BE STABILIZED WITH SEED AND AN APPROVED EROSION CONTROL MATTING, SOD, RIP-RAP, OR OTHER APPROVED
STABILIZATION MEASURES.
17. FOR STOCKPILE SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (31 ), THE CONTRACTOR
SHALL APPLY SEED AND ANCHORED STRAW MULCH, SOD, OR OTHER APPROVED STABILIZATION
MEASURES TO THE FACE OF THE STOCKPILE WITHIN THREE (3) CALENDAR DAYS OF ACTIVITY
HAVING CEASED ON THE RESPECTIVE FACE. FOR SLOPES 31 OR FLATTER, THE CONTRACTOR SHALL APPLY STABILIZATION MEASURES TO THE FACE OF THE STOCKPILE WITHIN SEVEN (7) CALENDAR
DAYS OF ACTIVITY HAVING CEASED ON THE RESPECTIVE FACE. MAINTENANCE SHALL BE
PERFORMED AS NECESSARY TO ENSURE CONTINUED STABILIZATION.
18. FOR FINISHED GRADING, THE CONTRACTOR SHALL PROVIDE ADEQUATE GRADIENTS TO PREVENT WATER FROM PONDING FOR MORE THAN TWENTY-FOUR (24) HOURS AFTER THE END OF A RAINFALL EVENT. DRAINAGE COURSES AND SWALE FLOW AREAS MAY TAKE AS LONG AS FORTY- EIGHT (48) HOURS AFTER THE END OF A RAINFALL EVENT TO DRAIN. AREAS DESIGNED TO HAVE STANDING
WATER SHALL NOT BE REQUIRED TO MEET THIS REQUIREMENT.
19. WHERE DEEMED APPROPRIATE BY THE ENGINEER OR INSPECTOR, SEDIMENT BASINS AND TRAPS
MAY NEED TO BE SURROUNDED WITH AN APPROVED SAFETY FENCE. THE FENCE MUST CONFORM
TO LOCAL ORDINANCES AND REGULATIONS. THE DEVELOPER OR OWNER SHALL CHECK WITH LOCAL BUILDING OFFICIALS ON APPLICABLE SAFETY REQUIREMENTS. WHERE SAFETY FENCE IS DEEMED
APPROPRIATE AND LOCAL ORDINANCES DO NOT SPECIFY FENCING SIZES AND TYPES, THE
FOLLOWING SHALL BE USED AS A MINIMUM STANDARD: THE SAFETY FENCE SHALL BE MADE OF
WELDED WIRE AND AT LEAST 42 INCHES HIGH, HAVE POSTS SPACED NO FARTHER APART THAN 8 FEET, HAVE MESH OPENINGS NO GREATER THAN 2 INCHES IN WIDTH AND 4 INCHES IN HEIGHT WITH A MINIMUM OF 14 GAUGE WIRE. SAFETY FENCE SHALL BE MAINTAINED AND IN GOOD CONDITION AT
ALL TIMES.
20. ALL SEDIMENT TRAP DEPTH DIMENSIONS ARE RELATIVE TO THE OUTLET ELEVATION. ALL TRAPS SHALL HAVE A STABLE OUTFALL. ALL TRAPS AND BASINS SHALL HAVE STABLE INFLOW POINTS.
21. SEDIMENT SHALL BE REMOVED AND THE TRAP OR BASIN RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE QUARTER OF THE TOTAL DEPTH OF THE TRAP OR BASIN. TOTAL DEPTH SHALL BE MEASURED FROM THE TRAP OR BASIN BOTTOM TO THE CREST OF
THE OUTLET.
22. SEDIMENT REMOVED FROM TRAPS (AND BASINS) SHALL BE PLACED AND STABILIZED IN APPROVED AREAS, BUT NOT WITHIN A FLOODPLAIN, WETLAND OR TREE-SAVE AREA. WHEN PUMPING SEDIMENT LADEN WATER, THE DISCHARGE SHALL BE DIRECTED TO AN MDE APPROVED SEDIMENT TRAPPING
DEVICE PRIOR TO RELEASE FROM THE SITE. A SUMP PIT MAY BE USED IF SEDIMENT TRAPS
THEMSELVES ARE BEING PUMPED OUT.
23. PRIOR TO REMOVAL OF SEDIMENT CONTROL MEASURES, THE CONTRACTOR SHALL STABILIZE AND HAVE ESTABLISHED PERMANENT STABILIZATION FOR ALL CONTRIBUTORY DISTURBED AREAS USING
SOD OR AN APPROVED PERMANENT SEED MIXTURE WITH REQUIRED SOIL AMENDMENTS AND AN
APPROVED ANCHORED MULCH. WOOD FIBER MULCH MAY ONLY BE USED IN SEEDING SEASON
WHERE THE SLOPE DOES NOT EXCEED 10% AND GRADING HAS BEEN DONE TO PROMOTE SHEET
FLOW DRAINAGE. AREAS BROUGHT TO FINISHED GRADE DURING THE SEEDING SEASON SHALL BE PERMANENTLY STABILIZED AS SOON AS POSSIBLE, BUT NOT LATER THAN THREE (3) CALENDAR DAYS AFTER ESTABLISHMENT FOR SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) AND
SEVEN (7) CALENDAR DAYS FOR FLATTER SLOPES. WHEN PROPERTY IS BROUGHT TO FINISHED
GRADE DURING THE MONTHS OF NOVEMBER THROUGH FEBRUARY, AND PERMANENT STABILIZATION
IS FOUND TO BE IMPRACTICAL, TEMPORARY SEED AND ANCHORED STRAW MULCH SHALL BE
APPLIED TO DISTURBED AREAS. THE FINAL PERMANENT STABILIZATION OF SUCH PROPERTY SHALL
BE APPLIED BY MARCH 15 OR EARLIER IF GROUND AND WEATHER CONDITIONS ALLOW.
24. TEMPORARY SEDIMENT CONTROL DEVICES SHALL BE REMOVED WITH PERMISSION OF THE MOE
INSPECTOR WITHIN THIRTY (30) CALENDAR DAYS FOLLOWING ESTABLISHMENT OF PERMANENT
STABILIZATION IN ALL CONTRIBUTORY DRAINAGE AREAS. UPON REMOVAL OF SEDIMENT CONTROL DEVICES, THE AREA DISTURBED BY REMOVAL SHALL BE STABILIZED WITH TOPSOIL, SEED, AND
MULCH, OR AS SPECIFIED, WITHIN 24 HOURS OF SAID REMOVAL. STORMWATER MANAGEMENT
STRUCTURES USED TEMPORARILY FOR SEDIMENT CONTROL SHALL BE CONVERTED TO THE
PERMANENT CONFIGURATION WITHIN THIS TIME PERIOD AS WELL.
25. OFF-SITE SPOIL OR BORROW AREAS ON STATE OR FEDERAL PROPERTY SHALL HAVE PRIOR
APPROVAL BY MDE AND OTHER APPLICABLE STATE, FEDERAL, AND LOCAL AGENCIES; OTHERWISE APPROVAL SHALL BE GRANTED BY THE LOCAL AUTHORITIES. ALL WASTE AND BORROW AREAS OFF-
SITE SHALL BE PROTECTED BY SEDIMENT CONTROL MEASURES AND STABILIZED.
26. SITE INFORMATION:
A. AREA DISTURBED O 33 ACRES
B. TOTAL CUT EST. 1500 CUBIC YARDS
C. TOTAL FILL EST. 1790 CUBIC YARDS
D. OFF-SITE WASTE/ BORROW AREA LOCATION: CONTRACTOR TO SELECT REGULATED
WASTE/BORROW LOCATION
STANDARD STABILIZATION NOTE
FOLLOWING INITIAL SOIL DISTURBANCE OR REDISTURBANCE, PERMANENT OR TEMPORARY
STABILIZATION SHALL BE
COMPLETED WITHIN THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER CONTROLS, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL
(31); AND
SEVEN (7) DAYS AS TO ALL OTHER DISTURBED OR GRADED AREAS ON THE PROJECT SITE NOT UNDER
ACTIVE
GRADING.
9/4/2025
Nader Bazzazieh17356
Docusign Envelope ID: 5B0065CB-2572-4CE8-B114-653E6038ADD8
056719 Jacob Beschner Facility Construction Manager
Sep 15, 2025 | 8:50 AM EDT
APPROVED
BY: COLLIN HILTNER
MD DEPT ENVIRONMENT
SEDIMENT & STORMWATER
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
DRAWN:
CHECKED:
DESIGN:
NO
OF 24
ANACOSTIA II
WASTEWATER PUMPING STATION
SURGE TANKS REMOVAL
ISSUED FOR BID
THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT BE
REDISTRIBUTED WITHOUT PRIOR WSSC
APPROVAL
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I
AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO.:
EXPIRATION DATE:
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
DELIVERING THE ESSENTIAL
PA
TH
TE
M
PL
AT
E
LA
YO
U T
C U
R R
EN
T as o f:
/1 4/
9/4/2025 - PLOT DATE
10306 Eaton Place, Suite 220 Fairfax, VA 22030 Tel: (703) 691-6500
CIVIL DETAILS CD-5
RN
JJS
RN
7/25/2025
7/25/2025
7/25/2025
DETAIL A - ASPHALT PAVEMENT
SCALE: NTS
DETAIL B - CURB AND GUTTER
SCALE: NTS
DETAIL C - TYPICAL SIDEWALK SECTIONS
SCALE: NTS
DETAIL D - PAVEMENT MATCH
SCALE: NTS
DETAIL E - 5" CONCRETE SIDEWALK W/ WIRED MASH
SCALE: NTS
E
CD-1
57413 03/31/27
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
DRAWN:
CHECKED:
DESIGN:
NO
OF 24
ANACOSTIA II
WASTEWATER PUMPING STATION
SURGE TANKS REMOVAL
ISSUED FOR BID
THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT BE
REDISTRIBUTED WITHOUT PRIOR WSSC
APPROVAL
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I
AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO.:
EXPIRATION DATE:
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
DELIVERING THE ESSENTIAL
PA
TH
TE
M
PL
AT
E
LA
YO
U T
C U
R R
EN
T as o f:
/1 4/
9/4/2025 - PLOT DATE
10306 Eaton Place, Suite 220 Fairfax, VA 22030 Tel: (703) 691-6500
14EAST AND WEST PUMP ROOMS
DEMOLITION PLAN M-1
PLAN - WEST PUMP ROOM
SCALE: 1/8" = 1'-0"
PLAN - EAST PUMP ROOM
SCALE: 1/8" = 1'-0"
SECTION A-A
SCALE: 1/4" = 1'-0"
PHOTO - EAST PUMP ROOM (LOOKING NORTH)
SCALE: NTS
A
NOTES
1. SECTION A-A ONLY SHOWS
DEMOLITION WORK ON SEWAGE
PUMP NO. 10 IN THE EAST PUMP
ROOM. SAME WORK APPLIES FOR
SEWAGE PUMP NOS. 8, 9, 11, AND 12.
2. DEMOLITION WORK ON SEWAGE
PUMP NOS. 1, 2, 3, 4, AND 5 IN THE
WEST PUMP ROOM IS SIMILAR AS
SHOWN IN SECTION A-A.
3. EXISTING PUMP STATION SHOWN IS
BASED ON RECORD DRAWINGS,
"ANACOSTIA PUMPING STATION NO. 2
UPGRADED PUMPING SYSTEM,"
DATED SEPTEMBER 24, 2007.
SECTION A-A ABOVE DEPICTS PUMP
IMPROVEMENTS FROM THESE
RECORD DRAWINGS, AND IS NOT
REPRESENTATIVE OF ALL PUMPS.
4. DETAIL A PHOTO DATED JUNE 2024.
A
A
DEMOLISH EXISTING 30"
90-DEGREE VERTICAL
BEND (TYP OF 5)
DEMOLISH EXISTING 30"
90-DEGREE VERTICAL BEND
(TYP OF 5)
DEMOLISH EXISTING 30"
90-DEGREE VERTICAL
BEND (TYP OF 5)
DEMOLISH EXISTING 30"
90-DEGREE VERTICAL BEND
(TYP OF 5)
MC
JJS
GC
7/25/2025
7/25/2025
7/25/2025
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
DRAWN:
CHECKED:
DESIGN:
NO
OF 24
ANACOSTIA II
WASTEWATER PUMPING STATION
SURGE TANKS REMOVAL
ISSUED FOR BID
THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT BE
REDISTRIBUTED WITHOUT PRIOR WSSC
APPROVAL
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I
AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO.:
EXPIRATION DATE:
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
DELIVERING THE ESSENTIAL
PA
TH
TE
M
PL
AT
E
LA
YO
U T
C U
R R
EN
T as o f:
/1 4/
9/4/2025 - PLOT DATE
10306 Eaton Place, Suite 220 Fairfax, VA 22030 Tel: (703) 691-6500
15EAST AND WEST PUMP ROOMS
NEW WORK PLANS AND SECTION M-2
PLAN - WEST PUMP ROOM
SCALE: 1/8" = 1'-0"
PLAN - EAST PUMP ROOM
SCALE: 1/8" = 1'-0"
SECTION A-A
SCALE: 3/16" = 1'-0"
NOTES
1. SECTION A-A ONLY SHOWS PROPOSED WORK ON
SEWAGE PUMP NO. 10 IN THE EAST PUMP ROOM.
SAME WORK APPLIES FOR SEWAGE PUMP NOS. 8, 9,
11, AND 12.
2. PROPOSED WORK ON SEWAGE PUMP NOS. 1, 2, 3, 4,
AND 5 IN THE WEST PUMP ROOM IS SIMILAR AS
SHOWN IN SECTION A-A.
3. THE BASIS OF DESIGN FOR THE COMBINATION AIR
VALVE (CAV) IS A SINGLE BODY APCO SERIES
440SCAV WITH 2" INLET AND 1" OUTLET WITH A
DOUBLE ACTING THROTTLING (DAT) DEVICE SET AT
5% OPEN ORIFICE DIAMETER (0.22"). SUBSTITUTE AIR
VALVES SHALL MEET OR EXCEED BASIS OF DESIGN
COMBINATION AIR VALVE VENTING CAPACITY.
4. CONTRACTOR TO FIELD ROUTE DRAIN LINE TO DRAIN
CHANNEL. PROVIDE PIPE HANGERS AND SUPPORT
FOR DRAIN LINE EVERY FOUR FEET.
5. DRAIN LINE SHALL BE CROSS LINKED POLYETHYLENE
PIPE WITH STANDARD GRADE HYDROSTATIC
PRESSURE RATING OF 160 PSI, MANUFACTURED AND
MARKED IN ACCORDANCE WITH AWWA C904. INSTALL
ACCORDING TO MANUFACTURER'S INSTRUCTIONS
AND IN ACCORDANCE WITH AWWA C904 AND LOCAL
CODES.
6. CONTRACTOR TO FIELD VERIFY AND PROVIDE
CONFIRMATION OF FITTING DIMENSIONS AND BOLT
PATTERN AS INITIAL SUBMITTAL ALONG WITH FITTING
SUBMITTAL.
7. EXISTING PUMP STATION SHOWN IS BASED ON
RECORD DRAWINGS, "ANACOSTIA PUMPING STATION
NO. 2 UPGRADED PUMPING SYSTEM," DATED
SEPTEMBER 24, 2007.
A
A
INSTALL 2"X1" SINGLE
BODY APCO SERIES
440SCAV
(TYP OF 5) (SEE NOTE 3)
INSTALL 30"
FLANGED TEE AND
BLIND FLANGE
(TYP OF 5)
INSTALL 2"X1" SINGLE
BODY APCO SERIES
440SCAV
(TYP OF 5) (SEE NOTE 3)
INSTALL 30"
FLANGED TEE AND
BLIND FLANGE
(TYP OF 5)
INSTALL 30" TEE
AND 30" BLIND FLANGE
SEE DETAIL A
(THIS SHEET)
INSTALL 2"X1" SINGLE BODY
APCO SERIES 440SCAV
(SEE NOTE 3)
PEX-A DRAIN LINE
(SUPPORT AS NECESSARY)
1" PEX-A DRAIN LINE TO
SUMP (SEE NOTE 4)
30" FLANGED TEE
1" PEX-A DRAIN
LINE
2"X1" SINGLE BODY APCO
SERIES 440SCAV
DETAIL A
SCALE: 1/4" = 1'-0"
A M-3
MC
JJS
GC
2" THREADED PLUG VALVE
A
A
30" BLIND FLANGE
2" THREADED NIPPLE
DRILL AND TAP BLIND FLANGE
7/25/2025
7/25/2025
7/25/2025
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
DRAWN:
CHECKED:
DESIGN:
NO
OF 24
ANACOSTIA II
WASTEWATER PUMPING STATION
SURGE TANKS REMOVAL
ISSUED FOR BID
THESE DOCUMENTS CONTAIN
PRIVILEGED AND CONFIDENTIAL
INFORMATION WHICH SHALL NOT BE
REDISTRIBUTED WITHOUT PRIOR WSSC
APPROVAL
PROFESSIONAL CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I
AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO.:
EXPIRATION DATE:
WASHINGTON SUBURBAN SANITARY COMMISSION
WSSC
DELIVERING THE ESSENTIAL
PA
TH
TE
M
PL
AT
E
LA
YO
U T
C U
R R
EN
T as o f:
/1 4/
9/4/2025 - PLOT DATE
10306 Eaton Place, Suite 220 Fairfax, VA 22030 Tel: (703) 691-6500
16EAST AND WEST PUMP ROOMS
CAV DRAIN LINES M-3
NOTE 1
NOTES:
1. CONTRACTOR TO FIELD ROUTE DRAIN LINE TO DRAIN
CHANNEL AS SHOWN. PROVIDE PIPE HANGERS AND
SUPPORT FOR DRAIN LINE, WITH A MINIMUM SPACING
OF EVERY FOUR FEET.
2. NEW WORK SHOWN ONLY ON PUMP #5 DISCHARGE AS
AN EXAMPLE. WORK IS SIMILAR ON ALL THE OTHER
PUMP DISCHARGE LINES.
NOTE 1
6"
PHOTO - DRAIN CHANNEL
SCALE: NTS
B
PHOTO - WEST PUMP ROOM (LOOKING SOUTH)
SCALE: NTS
A
PHOTO - EAST PUMP ROOM (LOWER LEVEL)
SCALE: NTS
C
NOTE 2
DRAIN
CHANNEL
1" TEE
WITH PLUG
PIPE SUPPORT
(TYP)
1" PEX-A DRAIN
LINE FROM CAV
(NOTE 1)
MC
JJS
GC
GRATING
FASTENER
ADJUSTABLE STEEL RING
HANGER, CARPENTER AND
PATERSON, INC. FIG 800 OR
APPROVED EQUAL WHEN USED
WITH PVC OR FIBERGLASS PIPE,
PROVIDE STEEL SHIELD AROUND
PIPE AT HANGER W/LOOSE FIT
COPPER TUBES TO HAVE 2" WIDE
STRIP OF RUBBER FABRIC
EXISTING GRATE
LOCK-NUT AND WASHER
LINKED EYE ROD
4" MAX PIPE SIZE
PENETRATION
(SEE NOTE 2)
3/8" SS
ADHESIVE
ANCHOR
1. IF SUBMERGED, LOCATED ON OR ABOVE THE HYDRAULIC GRADE
LINE, BELOW GRADE OR LOCATED OUTDOORS, THE PIPE CLAMP,
WASHER, BOLTS AND SHIELD SHALL BE 316 SS.
2. ADHESIVE ANCHORS SHALL PENETRATE NOT LESS THAN 5".
NOTES:
DETAIL A - PIPE CLAMP FOR WALL-MOUNTED PIPES
SCALE: NTS
BAR 1 1/2" X 1/8"
GALVANIZED
AFTER FABRICATION
DETAIL B - PIPE HANGER FROM GRATING
SCALE: NTS
7/25/2025
7/25/2025
7/25/2025
17SURGE TANKS REMOVAL
DEMOLITION AND NEW WORK PLAN M-4
PLAN - SURGE TANKS PIPING
SCALE: 1/8" = 1'-0"
GRAPHIC SCALE
4 2 0 8
1/8" = 1'-0"
NOTES
1. EXISTING 8" DRAIN LINE MAY NOT BE USED TO DRAIN SURGE TANKS.
2. CONTRACTOR TO FIELD VERIFY WATER-TIGHT SHUT-OFF OF EXISTING PLUG VALVES.
CONTRACTOR SHALL SUBMIT A PLAN FOR TESTING THE WATER-TIGHTNESS OF THE PLUG
VALVES A MINIMUM OF 30 DAYS PRIOR TO TESTING OF THE PLUG VALVES.
3. IF WASTEWATER FLOWS ARE OBSERVED GOING INTO THE SURGE TANKS AFTER CLOSING
THE 24" ISOLATION PLUG VALVES, PROCEED WITH SCENARIO 2. IF WATER TIGHT CLOSURE
IS OBTAINED WITH THE 24" ISOLATION PLUG VALVES, CONTINUE WITH SCENARIO 1.
4. PRIOR TO ORDERING BLIND FLANGES, CONTRACTOR TO CONFIRM EXISTING FLANGE
BOLTING REQUIREMENTS.
5. EXISTING SURGE TANKS SHOWN ARE BASED ON RECORD DRAWINGS, "ANACOSTIA
PUMPING STATION NO. 2," DATED MARCH 19, 1976.
6. SEE SPECIFICATION SECTION 01320 FOR SEQUENCE OF CONSTRUCTION, AND
CONSTRUCTION CONSTRAINTS.
A
A
SCENARIO 2 - PLUG VALVES ARE NOT OPERATIONAL
SECTION A-A
SCALE: 1/4" = 1'-0"
GRAPHIC SCALE
2 1 0 4
1/4" = 1'-0"
SCENARIO 1 -PLUG VALVES ARE OPERATIONAL
NOTES
1. EXISTING 8" DRAIN LINE MAY NOT BE USED TO DRAIN SURGE TANKS. INSTALL A
TEMPORARY LINESTOP ALONG THE 24" SURGE TANK PIPING UPSTREAM OF THE 24"
PLUG VALVE. ONCE THE PIPING DOWNSTREAM OF THE LINESTOP HAS BEEN
DRAINED, INSTALL A 24" BLIND FLANGE DOWNSTREAM OF THE 24" PLUG VALVE.
2. EXISTING SURGE TANKS SHOWN ARE BASED ON RECORD DRAWINGS, "ANACOSTIA
PUMPING STATION NO. 2," DATED MARCH 19, 1976.
3. SEE SPECIFICATION SECTION 01320 FOR SEQUENCE OF CONSTRUCTION, AND
CONSTRUCTION CONSTRAINTS.
4. LINE STOP SHALL BE A TWO-PIECE FULL ENCIRCLEMENT, PRESSURE RETENTION
TYPE SPLIT TEE DESIGN, AND CONSIST OF STAINLESS STEEL SECTIONS AND
HARDWARE. MINIMUM WORKING PRESSURE SHALL BE 150 PSIG. COMPLETION PLUG
SHALL BE STAINLESS STEEL OR COMPOSITE POLYMER AND EQUIPPED WITH TWO
CIRCUMFERENTIAL GROOVES. PROVIDE ALL MATERIALS AND EQUIPMENT, TO
PERFORM INSTALLATION OF LINESTOP. PRESSURE TEST LINE STOP FITTING USING
BLIND FLANGE TO MINIMUM 1.5 TIMES WORKING PRESSURE. CONTRACTOR TO