Appexdix_2_-_Price_form_instruction__for_new_vendors_.pdf

PDF 110 KB Posted

Attached to
QAMILL28SB 200 hours of milling in Queen Anne's County
Solicitation number
BPM056758
Issued by
Queen Anne's County, Maryland

About this file

This document is a Price Form Instructions guide effective July 2024 for state and local contract opportunities. The instructions establish mandatory requirements for bidders and offerors submitting pricing responses through the Price Form, which must not be altered under penalty of bid rejection or proposal disqualification. All pricing submissions must be completed in their entirety with no partial or incomplete bids accepted, and any modifications made prior to the submission deadline must be initialed and dated or resubmitted through eMMA. The Price Form, if it contains a signature box, must be signed and dated by an authorized representative of the bidder or offeror.

All unit and extended prices must be entered clearly in dollars and cents with distinct decimal points and rounded to the nearest cent, with calculations verified for accuracy by the submitting party. Pricing must be fully loaded to include all associated costs such as labor, profit, overhead, general operating, and administrative expenses necessary to perform the contracted work, with no additional amounts payable to the contractor beyond those entered on the Price Form. Prices may not be contingent on any other factors or conditions, and goods or services provided at no cost must be clearly marked as $0.00. Any failure to adhere to these instructions, including incorrect entries, inaccurate calculations, or pricing with conditions and contingencies, may result in the bid being determined not responsive or the proposal being deemed not reasonably susceptible for award selection.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix 2. Price Form Instructions Effective Date: July 2024

Appendix 2. Price Form Instructions

Each Bidder/Offeror shall submit its response via the Price Form in accordance with the instructions specified herein. Do not alter the Price Form; otherwise, the Bid may be determined to be not responsive or the Proposal may be determined to be not reasonably susceptible of being selected for award. If the Price Form contains a signature box, it must be signed and dated by an individual who is authorized to bind the Bidder/Offeror to the prices entered on the Price Form.

Follow these instructions carefully when completing your Price Form:

A) All Unit and Extended Prices must be clearly entered in dollars and cents, e.g., $24.15. Make your decimal points clear and distinct.

B) All Unit Prices must be the actual price per unit the State will pay for the specific item or service identified in this IFB/RFP and may not be contingent on any other factor or condition in any manner.

C) All calculations shall be rounded to the nearest cent, e.g., .344 shall be .34 and .345 shall be .35.

D) Any goods or services required through this IFB/RFP which are proposed to be provided at No Cost to the State must be clearly entered in the Unit Price, if appropriate, and Extended Price with $0.00.

E) Every editable field in the Price Form shall be completed. Any changes or corrections made to the Price Form by the Bidder/Offeror prior to submission due date shall be initialed and dated, if required, or submitted as a new Price Form through eMMA. Partial or incomplete Bids/Proposals will be rejected unless otherwise stated in the solicitation.

F) Except as instructed on the Price Form, nothing shall be entered on or attached to the Price Form that proposes conditions or contingencies on the prices. Conditions may render the Bid not responsive or the Proposal not reasonably susceptible for being selected for award.

G) It is imperative that the prices included on the Price Form have been entered correctly and calculated accurately by the Bidder/Offeror and that the respective total prices agree with the entries on the Price Form. Any incorrect entries or inaccurate calculations by the Bidder/Offeror will be treated as provided in COMAR 21.05.02.12 and may cause the Bid/Proposal to be rejected.

H) All pricing, including labor rates, entered in the Price Form must be fully loaded prices that include all costs/expenses associated with the provision of services required by the IFB/RFP. Examples may include all labor, profit/overhead, general operating, administrative, and all other expenses and costs necessary to perform the work set forth in the solicitation. No other amounts will be paid to the Contractor.

J) Unless indicated elsewhere in the IFB/RFP, sample amounts used for calculations on the Price Form are typically estimates for evaluation purposes only. Unless stated otherwise in the IFB/RFP, a minimum or maximum number of units or usage in the performance of the Contract is not guaranteed.

K) Failure to adhere to any of these instructions may result in the Bid being determined not responsive or the Proposal being determined not reasonably susceptible of being selected for award.

File details come from the government source that posted it. Updated .