Appendix V - Title III Funding Guidelines FA8650-19-S-5010.pdf

PDF 14 KB Posted

Attached to
Defense Production Act Title III Expansion of Domestic Production Capability and Capacity
Opportunity number
FA8650-19-S-5010
Issued by

About this file

Appendix V Title III Funding Guidelines

View the file

Other files

File Type Posted
Appendix VI_SOW Template_JAN 24.pdf PDF
DPA FOA Amendment 5.pdf PDF
FOA - DPA FOA for the Expansion of Domestic Production Capability and Capacity - Revised 30 MAR 2022 - Amend 3.pdf PDF
FOA - DPA FOA for the Expansion of Domestic Production Capability and Capacity - Revised 14 Nov 2019 Amend 1.pdf PDF
FOA - DPA for the Expansion of Domestic Production Capability and Capacity - Revised 27 Apr 2020 Amend 2.pdf PDF
FINAL SOO - DPA Title III - Alane Fuel - Call 001 - 22 August 2019.pdf PDF
FINAL Hybrid DPA Title III FOA - Call 001 - Alane Fuel - Call Announcement - 22 August 2019.pdf PDF
Appendix V_Funding Guidelines.pdf PDF
Appendix IV - Sample Cost Proposal Spreadsheet FA8650-19-S-5010.pdf PDF
Appendix IV_Cost Proposal Spreadsheet.xlsx XLSX spreadsheet
Appendix II_Sample TIA V May 2025.pdf PDF
Appendix II Sample TIA FA8650-19-S-5010.pdf PDF
Appendix II - Sample TIA - FA8650-19-S-5010 - Revised 30 MAR 2022.pdf PDF
Appendix III - Summary Business Plan Outline FA8650-19-S-5010.pdf PDF
Appendix III_Summary Business Plan Outline.pdf PDF
Appendix I_Certs and Reps.pdf PDF
Appendix I - Title III Certs & Reps FA8650-19-S-5010.pdf PDF
FOA - DPA FOA for the Expansion of Domestic Production Capability and Capacity - 12 July 19.pdf PDF
PKG00252928-instructions.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8650-19-S-5010

Appendix V

Funding Guidelines

Government funds may typically be used for labor hours, consumables, materials, special tooling and special test equipment, subcontractors, and similar expenditures. The definitions of special tooling and special test equipment are as follows:

Special Tooling: means jigs, dies, fixtures, molds, patterns, taps, gauges, and all components of these items including foundations and similar improvements necessary for installing special test equipment, and which are of such a specialized nature that without substantial modification or alteration their use is limited to the development or production of particular supplies or parts thereof or to the performance of particular services. Special tooling does not include material, special test equipment, real property, equipment, machine tools, or similar capital items.

Special Test Equipment: means either single or multipurpose integrated test units engineered, designed, fabricated, or modified to accomplish special purpose testing in performing a contract. It consists of items or assemblies of equipment including foundations and similar improvements necessary for installing special test equipment, and standard or general purpose items or components that are interconnected and interdependent so as to become a new functional entity for special testing purposes. Special test equipment does not include material, special tooling, real property, and equipment items used for general purposes or property that with relatively minor expense can be made suitable for general purpose use.

Since the principal objective of all DPA Title III investments is to strengthen and expand domestic productive capacities and to ensure Government access to critical technology items well into the future, the Government funds may be used to purchase capital equipment unless otherwise noted in the FOA. Capital equipment purchases required for the effort may also be included as part of an awardees’ cost share pursuant to DPA Title III.

Proposals may include construction of new facilities or modifications to an existing facility or facilities (including adding equipment or modules) where it is economically and technically advantageous to do so. Government funds may be used to purchase equipment for use on a Title III project. Title III funds may also be used to upgrade or expand existing facilities. Title III funds shall not be used to purchase real property such as land or buildings or the construction of new buildings; such activities shall be paid for by the awardee’s cost share funds.

File details come from the government source that posted it.