Appendix I to M-24-02--Sample BABA Award Term.pdf

PDF 5 MB Posted

Attached to
RFQ - Log Loaders for Newport International Terminal 2025
Solicitation number
S-R21689-00012718
Issued by
Jackson County, Oregon

About this file

This document is Appendix I of sample award term language for Federal agencies regarding the required use of American iron, steel, manufactured products, and construction materials under the Build America, Buy America Act (BABA). The document provides guidance for Federal agencies on incorporating Buy America Preference requirements into infrastructure project awards, requiring that all iron/steel, manufactured products, and construction materials used must be produced in the United States. For manufactured products, at least 55% of the total cost of components must be from U.S.-manufactured components. The document details specific manufacturing standards for various construction materials including non-ferrous metals, plastics, glass, fiber optic cable, lumber, drywall, and engineered wood.

The document outlines waiver provisions that may be granted when: applying Buy America requirements would be inconsistent with public interest, materials are not available in sufficient quantities/quality in the U.S., or using U.S. materials would increase project costs by over 25%. Waiver requests must be submitted in writing, undergo 15-day public comment periods, and be reviewed by the Made in America Office. The document includes detailed definitions of key terms like "infrastructure," "manufactured products," and "construction materials" to guide implementation of the requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .