This file is a floor plan appendix for Western Connecticut State University's Campus Dining Services contract opportunity in Connecticut. The document outlines specific renovation and reconfiguration work for a dining facility, including the relocation of point-of-sale (POS) stations, removal and repositioning of coolers and display items to storage, installation of a rolling counter from the Midtown Campus Dining Hall, and relocation of an action station from the Midtown Campus Student Center. The plan specifies electrical work including capping and patching existing electrical feeds, provision of two 220-volt junction box connections for cooking unit connections, and connection of power and data at existing column connections. Additional scope items include replacement of a grille by Sodexo's contractor, removal of four order-to-go kiosks, installation of removable swing gates and retractable crowd control barriers, and various modifications to accommodate breakfast and dessert service areas. The floor plan is dated May 23, 2023, and reflects the physical layout requirements for the dining services facility renovation.

No pricing terms, set-asides, contract award dates, contract term, renewal options, response deadlines, or funding information is provided in this floor plan document. The file focuses exclusively on the physical layout, equipment relocations, and construction specifications necessary to reconfigure the dining space for the university's operational needs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Remove any coolers or display items -move to storage

Remove and relocate existing coolers per Owner's direction - Install rolling Counter from Midtown Campus Dining Hall

Relocate existing POS Station - Cap and Patch Elec feed in floor

Remove Existing POS Station, move to 190 Warehouse Cap and Patch Elect Feed in Floor

Remove any coolers or display items

B re ak fa st a nd D es se rt

Location of new POS Station. Connect power and data at existing connections at column.

Remove Order to go Kiosk Typical of 4.

Relocate per Owner.

Grille Replacement by Sodexo's Contractor

A ct io n

S ta tio n

Relocate Action Station from Midtown Campus Student Center - Provide 2 - 220 junction box connections for cooking unit connections. Use Electrical panel in kitchen.

Removable One Way 3' Wide Swing Gate

Retractable Crowd Control Barrier

Retractable Crowd Control Barrier Extend to edge of Stair Low wall casinellid Text Box May 23, 2023