APPENDIX F - Significance rev 4_6_2023.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- BASINWIDE & BASIN STATES SALINITY CONTROL PROGRAMS Federal grant opportunity
- Opportunity number
- R23AS00353
About this file
APPENDIX F - Significance rev 4_6_2023.xlsx
View the file
Other files for this federal grant opportunity
| File | Type | Posted |
|---|---|---|
| NOFO R23AS00353 BASINWIDE & BASIN STATES SALINITY CONTROL PROGRAMS. Revised.pdf | ||
| APPLICATION 2023 SALINITY NOFO.docx | DOCX document | |
| APPLICATION 2023 SALINITY NOFO.docx | DOCX document | |
| Appendix A Cost Est. Sheet NOFO 2023.xlsx | XLSX spreadsheet | |
| APPENDIX E - Salt Load Reduction Worksheet.docx | DOCX document | |
| APPENDIX E - Salt Load Reduction Table.pdf | ||
| APPENDIX B - On-Farm Enable rev 04-12-2023.xlsx | XLSX spreadsheet | |
| NOFO R23AS00353 BASINWIDE & BASIN STATES SALINITY CONTROL PROGRAMS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Include just data on the stream flow water's significance; water that will be a part of the proposed project. |
| If the storage water is not the reason the project's size was increased, do not include information on the significance of storage (reservoir) water in this table. If so, change the acre foot to a projected delivery rate (cfs) and add the data to the significance table. |
Significance Table
Project Water Significance
| Percentage of Water for This Project | Points | |
| Enter the percentage of flow water for this project that has a pre 1900 court decree | 0 | |
| Enter the percentage of flow water for this project that has a 1900 - 1922 court decree | 0 | |
| Enter the percentage of flow water for this project that has a 1923 - 1960 court decree | 0 | |
| Enter the percentage of flow water for this project that has a court decree after 1961 | 0 | |
| Enter the percentage of flow water for this project that has a conditional decree or no decree | 0 | |
| Total (should equal the flow capacity listed above) | 0% |
| Final Score | |
| Total Water Score (10 points possible) | 0 |
Example
Project Water Significance
| Percentage of Water for This Project | Points | |
| Enter the percentage of flow water for this project that has a pre 1900 court decree | 36% | 4 |
| Enter the percentage of flow water for this project that has a 1900 - 1922 court decree | 35% | 3 |
| Enter the percentage of flow water for this project that has a 1923 - 1960 court decree | 29% | 1 |
| Enter the percentage of flow water for this project that has a court decree after 1961 | 0% | 0 |
| Enter the percentage of flow water for this project that has a conditional decree or no decree | 0% | 0 |
| Total (should equal the flow capacity listed above) | 100% |
| Final Score | |
| Total Water Score (10 points possible) | 8 |