APPENDIX F - Significance rev 4_6_2023.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
BASINWIDE & BASIN STATES SALINITY CONTROL PROGRAMS Federal grant opportunity
Opportunity number
R23AS00353
Issued by
Department of the Interior Bureau of Reclamation

About this file

APPENDIX F - Significance rev 4_6_2023.xlsx

View the file

Other files for this federal grant opportunity

Other files attached to BASINWIDE & BASIN STATES SALINITY CONTROL PROGRAMS, newest first.
File Type Posted
NOFO R23AS00353 BASINWIDE & BASIN STATES SALINITY CONTROL PROGRAMS. Revised.pdf PDF
APPLICATION 2023 SALINITY NOFO.docx DOCX document
APPLICATION 2023 SALINITY NOFO.docx DOCX document
Appendix A Cost Est. Sheet NOFO 2023.xlsx XLSX spreadsheet
APPENDIX E - Salt Load Reduction Worksheet.docx DOCX document
APPENDIX E - Salt Load Reduction Table.pdf PDF
APPENDIX B - On-Farm Enable rev 04-12-2023.xlsx XLSX spreadsheet
NOFO R23AS00353 BASINWIDE & BASIN STATES SALINITY CONTROL PROGRAMS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Include just data on the stream flow water's significance; water that will be a part of the proposed project.
If the storage water is not the reason the project's size was increased, do not include information on the significance of storage (reservoir) water in this table. If so, change the acre foot to a projected delivery rate (cfs) and add the data to the significance table.

Significance Table

Project Water Significance

Percentage of Water for This ProjectPoints
Enter the percentage of flow water for this project that has a pre 1900 court decree0
Enter the percentage of flow water for this project that has a 1900 - 1922 court decree0
Enter the percentage of flow water for this project that has a 1923 - 1960 court decree0
Enter the percentage of flow water for this project that has a court decree after 19610
Enter the percentage of flow water for this project that has a conditional decree or no decree0
Total (should equal the flow capacity listed above)0%
Final Score
Total Water Score (10 points possible)0

Example

Project Water Significance

Percentage of Water for This ProjectPoints
Enter the percentage of flow water for this project that has a pre 1900 court decree36%4
Enter the percentage of flow water for this project that has a 1900 - 1922 court decree35%3
Enter the percentage of flow water for this project that has a 1923 - 1960 court decree29%1
Enter the percentage of flow water for this project that has a court decree after 19610%0
Enter the percentage of flow water for this project that has a conditional decree or no decree0%0
Total (should equal the flow capacity listed above)100%
Final Score
Total Water Score (10 points possible)8

File details come from the government source that posted it. Updated .