Appendix E is a Performance-Based Matrix document for the Rock Island Arsenal Clock Tower Grounds Maintenance Service contract, detailing performance expectations and quality control measures. The matrix outlines five key performance elements: Contract Services, Overall Contract Performance, Contractor Self Reporting, Customer Feedback, and Invoicing, with specific surveillance methods, frequencies, and acceptable quality levels for each.

The performance requirements mandate that over 95% of contract services be performed timely and without rework, with annual assessments by the Contracting Officer's Representative (COR) determining overall contract performance. Disincentives are included for non-compliance, allowing the government to issue Contract Discrepancy Reports (CDRs) for performance issues, requiring the contractor to respond within 5 days with a prevention plan. The matrix emphasizes quality control through random inspections, monthly self-reporting, customer feedback resolution, and accurate monthly invoicing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix E

Performance-Based Matrix

Performance

Element Performance Requirement

Surveillance Method

Frequency Acceptable Quality Level

Contract Services

Contract Services furnished as prescribed in the SOW as applicable.

Inspection by the COR

Random inspection of all sampling of contract services.

>95% of services inspected performed timely and without rework required.

Overall Contract Performance

Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the COR’s annual report on contractor performance

Assessment by the COR

Annual All service elements rated Satisfactory (or higher) Satisfactory = 95% or above average contract acceptable random sampling

Contractor Self Reporting

Contract Services furnished as prescribed in the SOW as applicable.

Contractor Self Reports

Monthly >95% of services reported performed timely and without rework required.

Customer Feedback

Customer complaints reviewed by

COR

Inspection by the COR

Per Occurrence 100% of valid customer complaints resolved

Invoicing Monthly invoices per contract procedures are timely and accurate.

Review & acceptance of the invoice by

COR

Monthly 100% accuracy

Disincentives:

For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.

In accordance with the inspection of services provisions of the contract (52.212-4 (a) Inspection/Acceptance), the contractor will provide quality products in a timely manner since the Government can require the contractor, at no additional cost, to replace or correct work that fails to meet contract requirements.