Appendix D - Construction Documents.pdf
PDF 10 MB Posted
- Attached to
- Booker T. Dozier Center HVAC Replacement
- Solicitation number
- 37-25-070
- Issued by
- Wayne County, Huntington Woods City, Michigan
About this file
The provided file contains comprehensive construction documents for the Booker T. Dozier Recreation Center HVAC Replacement project, prepared by Detroit Architectural Group and engineering consultants JRED Engineering and ETS Engineering for the City of Inkster, Michigan. The documents include detailed architectural, mechanical, and electrical plans for the removal and replacement of existing rooftop units (RTUs), mechanical systems, and associated electrical infrastructure at the recreation center located at 2025 Middlebelt Road. The project involves demolishing existing HVAC equipment, including air handling units, boilers, pumps, and electrical systems, and installing new replacement equipment. The design documents are dated May 2, 2025, for bidding and permit purposes, with previous review versions issued on February 18 and April 7, 2025.
The construction documents specify technical requirements for the HVAC upgrades, including replacing multiple rooftop units, heating hot water boilers, pumps, and associated control systems. The mechanical plans detail the replacement of existing air handling units (AHU-1, AHU-2, AHU-3) with new units, installation of new boilers, circulating pumps, and modifications to the existing piping and ductwork systems. Electrical drawings outline the power distribution, one-line diagrams, and electrical demolition and installation plans. The project appears to be funded by the City of Inkster and aims to improve the energy efficiency and operational reliability of the Booker T. Dozier Recreation Center's HVAC infrastructure. The comprehensive set of drawings and specifications provides detailed guidance for contractors bidding on the project, covering architectural, mechanical, electrical, and systems integration aspects of the HVAC replacement.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D E F G
DN
DN
M
MECH
MECH
STAIR
EX'G. 4" H CONC.
EQUIP. PADEX'G. F.D.
EX'G. F.D.
EX'G. MTL
LOUVER
EX'G. MTL
LOUVER
EX'G. MTL
LOUVER
AT PROJECT
COMPLETION
LOUVER TO BE
INFILLED
EX'G. MTL
LOUVER
EX'G. MTL
LOUVER
EX'G. MTL
LOUVER
EX'G. 4" H
CONCRETE
EQUIP. PAD
EX'G. 4" H
CONCRETE
EQUIP. PAD
EX'G. MTL LOUVER
TO BE RELOCATED.
INFILL AND PATCH
OPENING AS
REQUIRED
20'-11"EX'G.
'-3
" E X'
G.
'-4
" E X'
G.
'-3 " E
X' G.
16'-11"EX'G.4'-0"EX'G.
'-1
1" E
X' G.
20'-11" EX'G.
REWOK EX'G. F.D.
IN PROPOSED
CONCRETE PAD
EXTENSION
'-0
" E X'
G.
1/ 2"
E X'
G.
'-5
/2 " E
X' G.
'-0
" E X'
G.
1/ 2"
E X'
G.
'-8 " E
X' G.
1' -0
" E X'
G.
4'
-0
EX
'G
1'
-0 " E
X' G.16
'-4 " E
X' G.
1/
2" E
X' G.
T
YP
EX
TE
RI
OR
W
AL
L
4" CONC CURB,
TYP.
8'-1 1/2"EX'G.
8"EX'G.
8'-1 1/2"EX'G.
INSTALL NEW
14'X6' LOUVER
INCLUDE
REQUIRED
STEEL
FRAMING
INFILL EXISTING
24"X24" OPENING
WITH CONCRETE
PROVIDE FRAMING
AS REQUIRED
NEW 24"X24"
OPENING FOR
SUPPLY AIR DUCT
VERIFY FINAL
LOCATION WITH
MECHANICAL
DESIGN.
NEW 4" CONCRETE
PAD EXTENSION,
APPROXIMATELY
114 S.F.
24-107
RTU REPLACEMENT
BOOKER T DOZIER
RECREATION CENTER
PROPOSED
2025 MIDDLEBELT RD
INKSTER, MI 48141
This drawing is an instrument of service, remains the property of Detroit Architectural Group, Inc. Any changes, publication, or unauthorized use is prohibited unless expressly approved.
SHEET NO:
JOB NO:
SHEET NAME:
IN CHARGE:
CHECKED BY:
DRAWN BY:
SEAL:
REV DATE ISSUED
ISSUED FOR REVIEW02-18-25
NORTH
SCALE: 1PENTHOUSE FLOOR PLAN
1/8" = 1'-0"
A-101
PENTHOUSE FLOOR PLAN
TJG
JMR, VW
JMR, VW
ISSUED FOR FINAL OWNER REVIEW04-07-25
BIDS AND PERMITS05-02-25
EPDM ROOFING
ROOF DRAIN
VAPOR BARRIER
DECK CLAMP
STEEL DECK
STORM DRAIN LEADER
SCALE: 4ROOF DRAIN DETAIL
1-1/2" = 1'-0"
MTL. FLASHING
(SEE SPECS)
TAPER INSULATION
TO DRAIN
OVERFLOW
STORM DRAIN
DOME,FLASHING RING
& DRAIN ADJUST TO
PROPER HEIGHT
6"
1'-0" 1'-0"
SUMP
2'-0" MIN.
EXISTING ROOF ASSY -
CUT-IN PER MFR REQ'TS
S.S. CLAMPING RING
O-RING SEALANT
SPLICING CEMENT
WATER CUT-OFF MASTIC
PRE MOLDED PIPE SEAL
LAP SEALANT
SCALE: 2VENT DETAIL
1 1/2" = 1'-0"
ROOF TOP UNIT
METAL COUNTER-FLASHING
OVER MEMBRANE ROOFING
OVER PREFAB ROOF CURB.
EX'G ROOF ASSY - CUT-IN PER
MFR REQ'TS
SCALE: 3ROOF CURB DETAIL
1 1/2" = 1'-0"
" M
IN
EX
'G
. S
LO
PE
EX
'G . S
LO
PE
EX'G. SLOPE
EX
'G
. S
LO
PE
EX
'G . S
LO
PE
EX'G. AIR HANDLING UNITEX'G. CONDENSING UNIT
EX'G. AIR
HANDLING
UNIT
EX
'G
. S
LO
PE EX'G. RELIEF
HOOD
EX
'G
. S
LO
PE
EX
'G
. S
LO
PE
EX'G. SLOPE
EX'G. E.F.
EX'G. E.F.
EX'G. E.F.
EX'G. E.F.
EX'G. SLOPE
EX'G. RELIEF
HOOD TO BE
REMOVED
AND ROOF TO
BE INFILLED
AND PATCHED
AS REQUIRED
EX
'G
. S
LO
PE
EX'G. SLOPE
EX'G. R.S.
EX'G. R.S.
EX'G. R.S.
EX'G. R.S.
EX'G. E.F.
EX'G. R.S.
EX'G. E.F.
EX'G. R.S.
EX'G. RELIEF
HOOD
EX'G. R.S.
EX'G. R.S.
EX'G. R.S.
EX'G. R.S.
EX'G. B.U. ROOF
ON MTL DECK
EX'G. B.U. ROOF
ON MTL DECK
EX'G. B.U. ROOF
ON MTL DECK
EX'G. R.T.U.
INSTALL NEW RELIEF
HOOD INCLUDE
ROOF FRAMING
PATCHING AND
FLASHING AS
REQUIRED
INSTALL 3'-6" HIGH
10-0" LONG GUARD
RAIL
PATCH ROOF AT
LOCATIONS WHERE
BOILER STACKS ARE
BEING REMOVED
NORTH
SCALE: 1ROOF PLAN
3/32" = 1'-0"
A-102
ROOF PLAN
DETAILS AND NOTES
CSM
BK
BK
24-107
RTU REPLACEMENT
BOOKER T DOZIER
RECREATION CENTER
PROPOSED
2025 MIDDLEBELT RD
INKSTER, MI 48141
This drawing is an instrument of service, remains the property of Detroit Architectural Group, Inc. Any changes, publication, or unauthorized use is prohibited unless expressly approved.
SHEET NO:
JOB NO:
SHEET NAME:
IN CHARGE:
CHECKED BY:
DRAWN BY:
SEAL:
REV DATE ISSUED
ISSUED FOR FINAL OWNER REVIEW04-07-25
BIDS AND PERMITS05-02-25
This drawing is an instrument of service, remains the property of Detroit Architectural Group, Inc. Any changes, publication, or unauthorized use is prohibited unless expressly approved.
SHEET NO:
JOB NO:
SHEET NAME:
IN CHARGE:
CHECKED BY:
DRAWN BY:
SEAL:
REV DATE ISSUED
ENGINEERING, INC.
25005
JRED PROJECT NUMBER:
Consulting Engineers 14115 Farmington Rd., Ste. 100 Livonia, MI 48154 Tel: (734) 855-4904 email: esteban@jredengineering.com
24-107
HVAC UPGRADES
BOOKER T DOZIER
RECREATION CENTER
PROPOSED
2025 MIDDLEBELT RD
INKSTER, MI 48141
05/02/25 BIDS & PERMITS
L
ICENSED
PROFESSIONAL
EN
GI
NE
ER
ST
ATE OF MICHIGAN
6201045030
ESTEBAN
CABELLO
ENGINEER
No.
CW
HW
SAN
G
V V
DOMESTIC COLD WATER PIPING
DOMESTIC HOT WATER PIPING
UNDERGROUND SANITARY SEWER PIPING
OVERHEAD SANITARY VENT PIPING
NATURAL GAS PIPING
HWR DOMESTIC HOT WATER RETURN PIPING
ST
RC
STORM DRAIN
STORM ROOF CONDUCTOR
W WASTE
CA COMPRESSED AIR
PLUMBING LEGEND
SYMBOL DESCRIPTION
PITCH IN DIRECTION OF ARROW
DIRECTION OF FLOW
BRANCH OFF TOP OF PIPE, 45° OR 90°
UNION FITTING
SHUT-OFF VALVE
TEMP. & PRESS. RELIEF VALVE
POINT OF NEW CONNECTION
TO EXISTING PIPING
GW GREASE WASTE
NOT ALL SYMBOLS MAY APPEAR ON THIS PROJECT
T
ROUND LOUVER FACED SUPPLY DIFFUSER
24"x24" SUPPLY DIFFUSER
DUCT FLEX
24"x24" RETURN GRILLE
SMOKE DETECTOR
24"x12" RETURN GRILLE
EXHAUST GRILLE
NEW CONNECTION TO EXISTING
EXHAUST FAN
12"x12" SUPPLY DIFFUSER
THERMOSTAT - 7-DAY PROGRAMMABLE (COORDINATE
LOCATION WITH OWNER'S REPRESENTATIVE)
24"x12" TRANSFER GRILLE
VOLUME DAMPER
SD
VERTICAL FIRE DAMPER
HORIZONTAL FIRE DAMPER
VERTICAL COMBINATION FIRE/SMOKE DAMPER
HORIZONTAL COMBINATION FIRE/SMOKE DAMPER
FS
FS
TEMPERATURE SENSOR (COORDINATE LOCATION
WITH OWNER'S REPRESENTATIVE)TS
VERTICAL FIRE DAMPER - EXISTING
HORIZONTAL FIRE DAMPER - EXISTING
DESCRIPTIONSYMBOL
MECHANICAL SYMBOL LEGEND
APPLICABLE CODES AND REGULATIONS
YEAR CODE
2015 MICHIGAN BUILDING CODE
2015 MICHIGAN REHABILITATION CODE FOR EXISTING BUILDINGS
2021 MICHIGAN PLUMBING CODE
2021 MICHIGAN MECHANICAL CODE
2015 MICHIGAN UNIFORM ENERGY CODE
2015 INTERNATIONAL FIRE CODE
2015 INTERNATIONAL FUEL GAS CODE
2015 NFPA 101
2009 ICC/ANSI ACCESSIBLE AND USABLE BUILDING & FACILITIES
AMERICANS WITH DISABILITIES ACT ACCESSIBILITIES GUIDELINE
(ADA-AG)
OVAL DUCTWORK (MAJOR AXIS x MINOR AXIS)X"xY"Ø
NOT ALL SYMBOLS MAY APPEAR ON THIS PROJECT
ALL EXISTING ITEMS INDICATED IN THE CONTRACT DRAWINGS HAVE BEEN TAKEN
FROM THE OWNER'S LIMITED RECORD DRAWINGS AND LIMITED FIELD
OBSERVATIONS AND VERIFICATION. THIS CONTRACTOR AND ALL RELATED
SUB-CONTRACTORS SHALL VISIT THE SITE AND COMPLETELY UNDERSTAND THE
CONDITIONS UNDER WHICH THE WORK MUST BE PERFORMED. IF A DEPARTURE
FROM THE DESIGN INTENT OF THE DOCUMENTS IS REQUIRED DUE TO THE
ACTUAL FIELD CONDITIONS OBSERVED BY THE CONTRACTOR, THE CONTRACTOR
SHALL NOTIFY THE ARCHITECT IN WRITING FOR RESOLUTION PRIOR TO
SUBMITTING FINAL BID OR ENTERING INTO A CONTRACT FOR CONSTRUCTION.
NO GUARANTEE OF EXISTING MECHANICAL, PLUMBING AND ELECTRICAL
SYSTEMS - CONTRACTOR SHALL VERIFY PRIOR TO ANY WORK.
MP-0
MECHANICAL AND PLUMBING
COVER SHEET
DPN
JAC
EDC
GENERAL DEMOLITION NOTES:
1. CONTRACTOR SHALL VISIT THE SITE AND SHALL EXAMINE TO THEIR SATISFACTION
ALL OF THE PHYSICAL CONDITIONS THAT AFFECT THEIR WORK, NOTING THE
EXISTING SERVICE, LOCATION OF EXISTING STRUCTURES AND EQUIPMENT (IF ANY),
AS WELL AS AREAS AVAILABLE FOR THE STORAGE OF MATERIAL. NO ADDITIONAL
COSTS WILL BE ALLOWED FOR THE IGNORANCE OF ANY EXISTING CONDITIONS OF
THE SITE AND SURROUNDING AREA.
2. LOCATE ALL EXISTING UTILITY LINES ON THE SITE AND RELOCATE SAME
UNDERGROUND / OVERHEAD UTILITIES, AND PLUMBING AS NECESSARY TO
ACCOMPLISH THE WORK OR DEMOLITION WITHIN THE CONSTRUCTION SITE. VERIFY
EXACT REQUIREMENTS WITH EACH LOCAL UTILITY COMPANY BEFORE STARTING
WORK. CALL "MISS DIG" BEFORE STARTING CONSTRUCTION.
3. COORDINATE WITH THE OWNER AND ALL SUB CONTRACTORS ON ALL NECESSARY
TEMPORARY INTERRUPTIONS IN THE UTILITY DISTRIBUTION SYSTEMS ON THE SITE
OR WITHIN THE FACILITY. EVERY EFFORT SHALL BE MADE TO GIVE THE MAXIMUM
ADVANCE NOTICE TO PROVIDE A SATISFACTORY MEANS OF PROPER SCHEDULING
OF THE ACTIVITIES OF ALL CONCERNED.
4. WHERE ELECTRICAL OR MECHANICAL SYSTEMS CONFLICT OR ALTERATIONS TO AN
EXISTING SYSTEM IS REQUIRED, NOTIFY AND COORDINATE ALL TRADES SO THAT
THE PROPER ARRANGEMENTS AND SCHEDULING CAN BE MADE FOR INSTALLATION,
CUTTING, REMOVAL, TERMINATION, AND PATCHING OF SURROUNDING SYSTEMS AND
MATERIALS CAN BE PROPERLY COMPLETED.
5. VERIFY ALL CONDITIONS AT THE JOB SITE, REPORTING ANY DISCREPANCIES TO THE
ENGINEER AND ARCHITECT IMMEDIATELY BEFORE PROCEEDING WITH THE WORK.
6. PROVIDE ALL NECESSARY BARRICADES, TEMPORARY SUPPORT OR PARTITIONS,
DUST SHIELDS AND SCAFFOLDING AS NECESSARY TO PROTECT ALL EXISTING,
COMPLETED, OR NEW CONSTRUCTION FROM DAMAGE OR VANDALISM.
7. REMOVE ALL SPOILS AND DEBRIS FROM SITE AND DISPOSE OF SAME IN A LEGAL
MANOR, AND DIRECT ALL SUB TRADES TO KEEP THE SITE CLEAN AT ALL TIMES.
8. CONTINUOUSLY MAINTAIN ADEQUATE PROTECTION OF ALL WORK FROM DAMAGE
AND VANDALISM AND SHALL PROTECT THE OWNER OR OTHER TRADES' PROPERTY
FROM INJURY, OR LOSS.
9. DO NOT SCALE DRAWINGS. USE ONLY THE DIMENSIONS PROVIDED ON THE PLANS.
IF OMISSIONS OR DISCREPANCIES EXIST, NOTIFY THE ENGINEER IMMEDIATELY.
FAILURE TO DO SO BY ANY TRADE WILL RESULT IN THE COMPLETE WAIVER OF ANY
LIABILITY OF THE ENGINEER OR OWNER.
10. IF ANY INTERFERENCES OR VIOLATIONS APPEAR AND DEPARTURE FROM THE
DESIGN INTENT OF THE CONTRACT DOCUMENTS IS REQUIRED, NOTIFY THE
ENGINEER BEFORE ENTERING INTO CONTRACT WITH THE OWNER. FAILURE TO
PROVIDE THE ENGINEER WITH AFOREMENTIONED NOTIFICATION WILL RESULT IN
THE CONTRACTOR BEING HELD RESPONSIBLE TO COMPLETE ALL WORK TO MEET
THE INTENT OF THE CONTRACT DRAWINGS WITH NO ADDITIONAL COST BEING
INCURRED. ANY CHANGES BY THE CONTRACTOR TO THE CONSTRUCTION
DOCUMENTS WILL RESULT IN THE CONTRACTOR ACCEPTING ALL RESPONSIBILITY
FOR THE WORK INSTALLED.
11. ALL WORK SHALL COMPLY WITH ALL MATERIAL SELECTION, CONSTRUCTION
TECHNIQUES, ALL FINISHED CONSTRUCTION SHALL BE IN COMPLIANCE WITH THE
LATEST EDITION OF THE APPLICABLE CODE. CONTACT THE ENGINEER WITH ALL
INTERPRETATIONS OR QUESTIONS. FAILURE TO DO SO WILL RESULT IN THE
COMPLETE ACCEPTANCE OF ALL LIABILITY BY THE CONTRACTOR FOR ANY RELATED
CORRECTIONS.
12. ACTIVELY COOPERATE WITH ALL OTHERS ENGAGED ON THE PROJECT AND
ARRANGE RESPECTIVE WORK TO AVOID INTERFERENCES OR INTERRUPTIONS TO
THE WORK OF OTHERS.
13. PROJECT SAFETY, CARE OF EXISTING AND ADJACENT STRUCTURES AND
PROPERTIES DURING CONSTRUCTION, AND COMPLIANCE WITH ALL FEDERAL, STATE,
AND LOCAL REGULATIONS SHALL BE THE EXCLUSIVE RESPONSIBILITY OF THE
CONTRACTOR.
14. MECHANICAL DEMOLITION WORK SHALL INCLUDE, BUT NOT BE LIMITED TO THE
REMOVAL OF EXISTING EQUIPMENT, GRILLES, REGISTERS, DIFFUSERS,
SHEETMETAL, EXHAUST FANS, HEATING COILS, HUMIDIFIERS, PIPING, AS INDICATED
AND/OR DESCRIBED. REMOVE SAME ALONG WITH CONTROLS, PNEUMATIC TUBING,
HANGERS, SUPPORTS AND ALL RELATED ACCESSORIES COMPLETE.
15. FIELD VERIFY EXACT SIZE AND LOCATION OF EXISTING MECHANICAL SERVICES
BEING REUSED.
16. VERIFY ALL BUILDING DIMENSIONS, PIPING, DUCT SIZES AND LOCATIONS IN FIELD
AND NOTIFY THE RESPECTIVE DISCIPLINE OF ANY DISCREPANCIES BEFORE
COMMENCEMENT OF WORK.
17. CONTRACTOR SHALL VERIFY EXACT LOCATION OF EXISTING JOISTS AND BEAMS
PRIOR TO CORING ANY HOLES FOR MECHANICAL SERVICES.
18. REMOVE ALL BRANCH PIPING AND/OR DUCTWORK BACK TO THEIR REPSPECTVE
MAINS AND CAP.
19. PATCH ALL OPENINGS IN FLOOR, CEILINGS, WALLS, AND ROOF CREATED BY
DEMOLITION AND NEW WORK AS REQUIRED TO MATCH EXISTING.
20. ALL EQUIPMENT BEING REUSED AND/OR RELOCATED SHALL BE THOROUGHLY
CLEANED AND RECONDITIONED PRIOR TO START-UP.
21. SAWCUT CLEAN EDGE AT NEW CONCRETE PADS 1/2" INTO CONCRETE FLOOR. BUSH
HAMMER AND REMOVE EXISTING 1/2" CONCRETE AND CLEAN SCARIFIED SURFACE
PRIOR TO PLACING NEW CONCRETE PAD. PROVIDE MIN. (4) #4 DOWELS IN PAD WITH
EPOXYED 4" EMBED INTO SLAB.
22. CONCRETE PADS BEING REMOVED SHALL BE REMOVED TO AN ELEVATION 1/2"
BELOW SURROUNDING CONCRETE. SAW CUT A CLEAN EDGE ALL AROUND AND
REMOVE ALL LOOSE MATERIAL FROM THE EXCAVATION. WET SURFACE AND PATCH
FLOOR WITH CONCRETE TO MATCH FINISHED FLOOR ELEVATION.
HVAC UNITS (SYSTEMS OVER 2000 CFM) SHALL HAVE DUCT SMOKE DETECTOR IN THE MAIN
SUPPLY AND RETURN DUCT. SMOKE DETECTION WILL SHUT OFF HVAC UNIT UPON
ACTIVATION. THE ACTIVATION OF THE SMOKE DETECTOR SHALL ACTIVATE A VISIBLE AND
AUDIBLE SUPERVISORY SIGNAL AT A CONSTANTLY ATTENDED LOCATION (OR TIE INTO FIRE
ALARM PANEL, IF ONE EXISTS).
SMOKE DETECTION DEVICES THAT ARE NOT VISIBLE SHALL BE PROVIDED WITH A REMOTE
INDICATION DEVICE PER CODE.
1. THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL INTENT OF THE
WORK. PROVIDE SHEET METAL SYSTEMS COMPLETE AND PER APPLICABLE CODES
INCLUDING ALL NECESSARY OFFSETS, FITTINGS, SPECIAL RADIUS OR MITERED
ELBOWS WHICH ARE REQUIRED DUE TO SPACE CONSTRAINTS OR OTHER FIELD
CONDITIONS.
2. COORDINATE WORK WITH ALL OTHER TRADES AND VERIFY ALL CLEARANCES AND
LIMITATIONS PRIOR TO THE FABRICATION OF ANY WORK.
3. DUCTWORK SHALL NOT BE LOCATED OVER ANY ELECTRICAL EQUIPMENT/PANELS.
PROVIDE REQUIRED N.E.C. CLEARANCE IN FRONT OF ELECTRICAL EQUIPMENT.
4. PROVIDE ALL MISCELLANEOUS SUPPORTING STEEL, ETC. FOR THE PROPER
INSTALLATION OF ALL MECHANICAL SYSTEMS.
5. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR FINAL LOCATION OF
GRILLES, REGISTERS AND DIFFUSERS.
6. COORDINATE AND PROVIDE ACCESS DOORS IN HARD CEILING AREAS FOR ACCESS
TO TERMINAL UNITS, BALANCING DAMPERS AND FIRE OR SMOKE DAMPERS. REFER
TO ARCHITECTURAL DRAWINGS FOR HARD CEILING LOCATIONS.
7. ALL BRANCH TAKE-OFFS TO GRILLES, REGISTERS, DIFFUSERS AND TERMINAL
BOXES SHALL BE MADE WITH AIR-WISE, ECCENTRIC, RECTANGULAR-TO-ROUND
HIGH EFFICIENCY TAKEOFFS WITH INTEGRAL VOLUME DAMPER AS MANUFACTURED
BY SHEET METAL CONNECTORS INC. BRANCH RUN-OUTS SHALL MATCH INLET SIZE
OF DEVICE OR AS INDICATED.
8. FLEXIBLE DUCT RUNOUTS TO GRILLES, REGISTERS AND DIFFUSERS SHALL BE
INSULATED AND LIMITED TO 5'-0" IN LENGTH.
9. VERIFY THERE ARE NO COMBUSTIBLES IN ANY RETURN AIR PLENUM. IF
COMBUSTIBLES ARE PRESENT, COORDINATE WITH ARCHITECT/ENGINEER/OWNER'S
REPRESENTATIVE FOR COURSE OF ACTION.
10. PVC, OR ANY OTHER COMBUSTIBLE MATERIAL INSIDE THE RETURN AIR PLENUM
WILL NOT BE ALLOWED.
11. ALL EQUIPMENT AND COMBUSTION VENT TERMINATION ETC. SHALL BE INSTALLED
PER MANUFACTURERS RECOMMENDATIONS. VERIFY AND LOCATE EQUIPMENT
BASED ON MANUFACTURERS RECOMMENDED CLEARANCES.
12. PROVIDE RETURN AIR TRANSFER GRILLES AND DUCTWORK FOR ALL ROOMS HAVING
WALL CONSTRUCTION EXTENDING TO DECK ABOVE CEILINGWITH WALLS FROM
FINISHED FLOOR TO BOTTOM OF DECK. COORDINATE WALL LOCATIONS WITH
ARCHITECTURAL TRADES. REFER TO LINED TRANSFER DUCT DETAIL FOR RETURN
AIR TRANSFER DUCTWORK FABRICATION.
13. ALL EXPOSED DUCTWORK (OUTDOORS) SHALL BE INSULATED, CLAD WITH
ALUMINUM JACKET AND SEALED WEATHER-TIGHT.
14. DUCTWORK SHALL BE SUPPORTED ON ROOF. PENETRATIONS THROUGH ROOF
SHALL BE DUCT CURBS AND FLASHED PROPERLY. COORDINATE ALL WORK WITH
OTHER TRADES TO AVOID INTERFERENCES.
15. ALL SUPPLY AND RETURN AIR DUCTWORK SHALL BE INSULATED ACCORDING TO
THE ASHRAE 90.1 ENERGY STANDARDS. GENERAL REQUIREMENTS FOR INSULATION
SHALL BE AS FOLLOWS: R-6 FOR SUPPLY AND RETURN DUCTS IN AN
UNCONDITIONED SPACE; R-8 OUTSIDE THE BUILDING; R-8 INSULATION INSTALLED
BETWEEN SUPPLY AND RETURN DUCTS AND BUILDING EXTERIOR WHEN DUCTS ARE
PART OF THE BUILDING ASSEMBLY; FOR ALL DUCTS IN UNDERGROUND
INSTALLATIONS.
16. ALL SHEET METAL DUCT SIZES INDICATED ON DRAWINGS ARE CLEAR INSIDE
DIMENSIONS.
1. COMPLY WITH ALL LAWS, LOCAL ORDINANCES AND CODES OF THE STATE OF MICHIGAN,
FEDERAL AGENCIES AND MUNICIPALITY. SECURE AND PAY FOR ALL NECESSARY FEES AND
PERMITS REQUIRED IN THE PERFORMANCE OF THIS WORK.
2. ALL CUTTING, CORING, AND PATCHING FOR NEW WORK SHALL BE DONE BY THIS
CONTRACTOR WITH THE APPROVAL OF THE OWNER'S REPRESENTATIVE.
3. CONTRACTOR SHALL VISIT THE SITE AND VERIFY THE EXISTING CONDITIONS BEFORE
SUBMISSION OF BIDS. NO MONETARY ALLOWANCE SHALL BE MADE DUE TO THE FAILURE
TO MAKE SUCH AN EXAMINATION.
4. ANY CLAIMS FOR ADDITIONAL SERVICES BASED UPON UNDERSTANDING OF THE SYSTEMS
WILL NOT BE ALLOWED.
5. CONTRACT DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO CONVEY THE SCOPE OF
WORK AND GENERAL ARRANGEMENT OF EQUIPMENT. DO NOT SCALE DRAWINGS.
6. PROVIDE A COMPLETE AND OPERABLE SYSTEM AS HERE-IN DESCRIBED. IF THE
DOCUMENTATION IS UNCLEAR OR INCOMPLETE TO THE CONTRACTOR, THEN HE SHALL SO
STATE IN WRITING TO THE GENERAL CONTRACTOR OR CONSTRUCTION MANAGER AND
REQUEST CLARIFICATION ON THOSE ITEMS REQUIRING CLARIFICATION. IF NO SUCH
STATEMENT IS MADE IT SHALL BE PRESUMED THAT THE CONTRACTOR FULLY
UNDERSTANDS THE INTENT OF A FUNCTION OF THE SYSTEM DESCRIBED.
7. COORDINATE WORK WITH ALL OTHER TRADES.
8. SECURE FINAL OCCUPANCY INSPECTION AND SUBMIT CERTIFICATES TO THE OWNER'S
REPRESENTATIVE. CONTRACTOR SHALL FURNISH THE OWNER WITH A WRITTEN
GUARANTEE TO CORRECT ALL IMPERFECTIONS IN MATERIALS AND WORKMANSHIP, WHICH
MAY DEVELOP IN THE SYSTEMS INSTALLED AND UNDER NORMAL USE FOR A PERIOD OF
ONE YEAR AFTER FINAL ACCEPTANCE BY THE OWNER.
9. PROVIDE SUBMITTALS TO THE GENERAL CONTRACTOR OR CONSTRUCTION MANAGER FOR
ALL EQUIPMENT AND MATERIALS FOR REVIEW PRIOR TO PURCHASE.
10. SUBMIT 1/4" SCALE DRAWINGS TO GENERAL CONTRACTOR OR CONSTRUCTION MANAGER
FOR COORDINATION WITH ALL OTHER TRADES. DRAWINGS SHALL INCLUDE EQUIPMENT
LOCATIONS, DISTRIBUTION ROUTING, SIZE, DIMENSIONS, ELEVATIONS (BOTTOM OF DUCT,
ETC.), ETC.
11. CONTRACTOR SHALL PROVIDE, STORE, PLACE AND INSTALL ALL NECESSARY EQUIPMENT
REQUIRED. ALL EQUIPMENT SHALL BE INSTALLED PER THE MANUFACTURER'S
RECOMMENDATIONS AND IN SUCH A MANNER AS TO FUNCTION IN ITS INTENDED USE.
12. AFTER INSTALLATION IS COMPLETE, CONTRACTOR SHALL PROVIDE STARTUP, OBTAIN
INSPECTORS' APPROVAL AND CONDUCT FINAL CLEAN UP.
13. PROVIDE AND INSTALL U.L. LISTED, DYNAMIC FIRE DAMPERS WITH BLADES OUT OF
AIRSTREAM, WHERE DUCTS PENETRATE RATED CONSTRUCTION. ALL DUCTS PENETRATING
SHAFTS (SMOKE BARRIERS) SHALL HAVE COMBINATION FIRE/SMOKE DAMPERS.
ACTIVATION OF DAMPER SHALL BE SIGNALED TO FIRE ALARM PANEL.
14. COORDINATE ALL RATED OR SMOKE BARRIER CONSTRUCTED WALLS OR SHAFTS WITH THE
ARCHITECT AND ALL SMOKE DAMPER REQUIREMENTS WITH FIRE PROTECTION AND ALARM
CONTRACTOR AND ELECTRICAL CONTRACTOR.
15. COORDINATE ALL MECHANICAL EQUIPMENT ELECTRICAL REQUIREMENTS WITH ELECTRICAL
CONTRACTOR PRIOR TO ANY EQUIPMENT PURCHASE.
16. TEMPERATURE CONTROLS: SPLIT AIR CONDITIONING UNITS, DUCT AIR TERMINALS, AND
HEATING UNITS SHALL HAVE INDIVIDUAL CONTROLS FROM EQUIPMENT MANUFACTURER.
CONTROLS SHALL CONTROL EQUIPMENT TO OPERATE PROPERLY.
17. TESTING & BALANCING - ENGAGE THE SERVICES OF AN INDEPENDENT CERTIFIED TEST AND
BALANCE AGENCY THAT SPECIALIZES IN AND WHO'S BUSINESS IS LIMITED TO THE TESTING
AND BALANCING OF HVAC SYSTEMS AND HYDRONIC SYSTEMS. THE AGENCY SELECTED
SHALL BE CERTIFIED BY ASSOCIATED AIR BALANCE COUNCIL (AABC) OR NATIONAL
ENVIRONMENTAL BALANCING BUREAU (NEBB). AGENCY SHALL SUBMIT A COMPLETE
REPORT BASED ON SMACNA "BALANCING AND ADJUSTMENT MANUAL". THE HVAC SYSTEM
SHALL BE TESTED AND BALANCED TO DEMONSTRATE THAT SPECIFIED CAPACITY AND
PROPER CONTROL FUNCTIONING HAS BEEN ATTAINED.
18. START-UP FOR ALL EQUIPMENT SHALL BE CONDUCTED BY EACH MANUFACTURER'S
START-UP REPRESENTATIVE. INCLUDE FINAL REPORT AND CERTIFICATE. PROVIDE
OWNER'S MANUAL AND TRAINING FOR MAINTENANCE PERSONNEL FOR EACH TYPE OF
EQUIPMENT.
19. PROVIDE ALL EQUIPMENT SUPPORTS INCLUDING ROOF MOUNTED EQUIPMENT.
COORDINATE ANY STRUCTURAL REQUIREMENTS WITH ARCHITECT, AS REQUIRED, FOR
PROPER EQUIPMENT MOUNTING AND SUPPORT.
20. INSULATE REFRIGERANT PIPING WITH 3/8" THICK "ARMAFLEX" INSULATION.
21. CONTRACTOR SHALL BE FAMILIAR WITH THE MICHIGAN BOILER CODE (CSD-1)
REQUIREMENTS AND PROVIDE ALL NECESSARY DEVICES AND PAPERWORK FOR APPROVAL
BY AUTHORITIES HAVING JURISDICTION. ALL CONTRACTORS SHALL COORDINATE
REQUIREMENTS (DEVICES, CONTROLS, POWER, TESTING, CERTIFICATIONS ETC.)
22. CONTRACTOR SHALL VERIFY EXACT LOCATION OF EXISTING STRUCTURAL ELEMENTS
PRIOR TO CORING ANY HOLES FOR MECHANICAL SERVICES.
23. SAWCUT CLEAN EDGE AT NEW CONCRETE PADS 1/2" INTO CONCRETE FLOOR. BUSH
HAMMER AND REMOVE EXISTING 1/2" CONCRETE AND CLEAN SCARIFIED SURFACE PRIOR
TO PLACING NEW CONCRETE PAD. PROVIDE MIN. (4) #4 DOWELS IN PAD WITH EPOXYED 4"
EMBED INTO SLAB.
GENERAL HVAC NOTES:
GENERAL MECHANICAL NOTES:
GENERAL SMOKE DETECTOR NOTES:
ALL EXISTING KITCHEN HVAC UNITS, EXHAUST FANS, AND MAKEUP AIR UNIT SHALL
BE INTERLOCKED TO OPERATE AT SAME TIME. CONTROLS CONTRACTOR SHALL
SUBMIT CONTROLS EQUIPMENT AND SEQUENCE OF OPERATIONS PACKAGE FOR
REVIEW TO GENERAL CONTRACTOR OR CONSTRUCTION MANAGER, PRIOR TO
PURCHASE. CONTROLS SHALL BE COORDINATED WITH ALL OTHER TRADES (HOOD
OPERATION, FANS AND INTERLOCKS, HVAC EQUIPMENT CONTROLS AND
INTERLOCKS, ETC.) FOR A COMPLETE OPERATIONAL SYSTEM. COORDINATION WITH
ARCHITECTURAL, ELECTRICAL, HVAC, FIRE PROTECTION, AND KITCHEN EQUIPMENT
TRADES WILL BE REQUIRED.
PROVIDE COMPLETE SHOP DRAWINGS INDICATING ALL CONTROL WIRING, SYSTEM
COMPONENTS, COMPONENT MANUFACTURER AND APPLIED SEQUENCE OF
CONTROLS FOR ALL SYSTEMS TO THE GENERAL CONTRACTOR OR CONSTRUCTION
MANAGER FOR REVIEW BEFORE PURCHASING ANY EQUIPMENT OR PERFORMING
ANY INSTALLATION.
17. DUCT LINING IS NOT ALLOWED EXCEPT AS NOTED.
18. BRANCH DUCTWORK UPSTREAM OF TERMINAL UNITS SHALL BE BOX INLET SIZE NOTED IN
SCHEDULE UNLESS OTHERWISE NOTED.
19. BRANCH DUCTWORK DOWNSTREAM OF TERMINAL UNITS SHALL TRANSITION FROM
OUTLET SIZE TO RECTANGULAR DUCT SIZE NOTED ON PLANS.
GENERAL HVAC NOTES (Continued):
GENERAL CONTROLS NOTES:
1. PIPE ROUTING INDICATED IS DIAGRAMMATIC AND IS INTENDED TO INDICATE GENERAL
ROUTING. PROVIDE ADDITIONAL OFFSETS AND FITTINGS REQUIRED FOR PROPER
INSTALLATION IN ORDER TO MAINTAIN CLEARANCES AS ENCOUNTERED IN THE FIELD.
PIPING SHALL NOT BE ROUTED OVER ELECTRICAL PANELS.
2. SLEEVE AND FIRE STOP ALL PENETRATIONS OF RATED WALLS, FLOORS, CEILINGS, ETC., IN
ACCORDANCE WITH APPLICABLE UL STANDARDS AND LOCAL CODES TO MAINTAIN RATINGS.
REFER TO ARCHITECTURAL DRAWINGS FOR RATED WALL, CEILING AND FLOOR
INFORMATION.
6. ALL SANITARY WASTE AND VENT PIPING WITHIN FIRE RATED WALLS AND IN RETURN AIR
PLENUMS SHALL BE CAST IRON. REFER TO ARCHITECTURAL DRAWINGS FOR WALL FIRE
RESISTANCE RATINGS. COORDINATE PLENUM LOCATIONS WITH MECHANICAL
CONTRACTOR.
11. VIDEO CAMERA AND SCOPE ALL EXISTING UNDERGROUND SANITARY AND STORM PIPING
TO CONFIRM LOCATION AND INVERT ELEVATIONS, AND THAT PIPING INTEGRITY IS FREE OF
OBSTRUCTION, DIRECTION OF FLOW, AND ENSURE PROPER FLOW.
12. PROVIDE 1/8" PER FOOT SLOPE FOR ALL SANITARY AND STORM LINES UNLESS OTHERWISE
NOTED.
14. REDUCED PRESSURE ZONE BACKFLOW PREVENTORS SHALL BE FULL LINE SIZE AS
INDICATED ON PLAN. PIPE RELIEF DRAINS TO NEAREST FLOOR DRAIN.
GENERAL PLUMBING NOTES:
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
D E F G
M
M
M
M
M
M
M
H S
H S
H R
H R
G G
G
H R H S
G
M
C
WH
W
HWR
N
PW
H W
C W
H W
R
HW
M
M
M
M
M
M
M
This drawing is an instrument of service, remains the property of Detroit Architectural Group, Inc. Any changes, publication, or unauthorized use is prohibited unless expressly approved.
SHEET NO:
JOB NO:
SHEET NAME:
IN CHARGE:
CHECKED BY:
DRAWN BY:
SEAL:
REV DATE ISSUED
ENGINEERING, INC.
25005
JRED PROJECT NUMBER:
Consulting Engineers 14115 Farmington Rd., Ste. 100 Livonia, MI 48154 Tel: (734) 855-4904 email: esteban@jredengineering.com
24-107
HVAC UPGRADES
BOOKER T DOZIER
RECREATION CENTER
PROPOSED
2025 MIDDLEBELT RD
INKSTER, MI 48141
05/02/25 BIDS & PERMITS
L
ICENSED
PROFESSIONAL
EN
GI
NE
ER
ST
ATE OF MICHIGAN
6201045030
ESTEBAN
CABELLO
ENGINEER
No.
MECHANICAL PENTHOUSE DEMOLITION PLAN - SHEET METAL
SCALE : 3/16" = 1'-0"
(E)AHU-1
(E)AHU-2
(E) AHU-3
MD-1
MECHANICAL PENTHOUSE
DEMOLITION PLANS
DPN
JAC
EDC
MECHANICAL PENTHOUSE DEMOLITION PLAN - PIPING
SCALE : 3/16" = 1'-0"
KEYED NOTES:
(KEYED NOTES APPLY TO THIS SHEET ONLY)
TAKE PRE-CONSTRUCTION AIR OR WATER MEASUREMENT READING.
THOROUGHLY CLEAN EXISTING LOUVER / BIRD SCREEN AND POWERWASH
SAME WITH SOLVENT & CLEANER.
REMOVE EXISTING LOUVER AND INTAKE PLENUM TO FACILITATE ACCESS TO
THE PENTHOUSE FOR THE DEMOLITION AND REPLACEMENT OF EXISTING
EQUIPMENT.
THOROUGHLY CLEAN AND SANITIZE INTERIOR OF EXISTING DUCTWORK
BEING REUSED IN PENTHOUSE. INSULATE SAME IN ACCORDANCE WITH
ASHRAE 90.1 ENERGY STANDARD.
REMOVE AND REPLACE EXISTING AIR HANDLING UNIT ALONG WITH HEATING
COIL, FILTERS, MOTORIZED DAMPERS, VIBRATION ISOLATORS, AND
CONTROLS - COMPLETE.
REMOVE AND REPLACE EXISTING SPLIT-DX MULTIZONE AHU IN KIND ALONG
WITH HEATING COIL, COOLING COIL, REFRIGERATION SECTION, FILTERS,
HOT/COLD DECK, MOTORIZED DAMPERS, ZONE DAMPERS, VIBRATION
ISOLATORS, AND CONTROLS - COMPLETE.
REMOVE AND REPLACE EXISTING HEATING HOT WATER BOILER, PRIMARY
CIRCULATING PUMP, AND CONTROLS - COMPLETE. ALSO, REMOVE EXISTING
14" DIAMETER FLUE, 16" DIAMETER COMMON VENT THRU ROOF, AND REMOVE
VENTILATED THIMBLE.
REMOVE AND REPLACE EXISTING SECONDARY PUMP ALONG WITH VALVES,
STRAINER, THERMOMETER, CONTROLS, ALONG WITH EXISTING VALVED
BYPASS, BALANCING VALVES, AND ISOLATION VALVES - COMPLETE.
REMOVE AND REPLACE EXISTING DOMESTIC HOT WATER BOILER ALONG
WITH CONTROLS - COMPLETE. ALSO, REMOVE EXISTING 16" DIAMETER FLUE
AND VENTILATED THIMBLE.
REMOVE EXISTING 3-WAY MODULATING CONTROL VALVE ALONG WITH
VALVES, STRAINERS, AND CONTROLS - COMPLETE.
REMOVE AND REPLACE EXISTING DOMESTIC HOT WATER BOILER
CIRCULATING PUMP ALONG WITH VALVES, GAUGES, THERMOMETERS, AND
CONTROLS.
DISCONNECT AND REMOVE EXISTING BRANCH PIPING AS NEEDED TO
FACILITATE THE REMOVAL AND INSTALLATION OF NEW AIR HANDLING UNIT.
REMOVE EXISTING RETURN AIR DUCTWORK AS NEEDED TO FACILITATE THE
REMOVAL OF EXISTING AHU AND INSTALLATION OF NEW AIR HANDLING UNIT.
REMOVE EXISTING SUPPLY AIR DUCTWORK AS NEEDED TO FACILITATE THE
INSTALLATION OF NEW SUPPLY AIR DUCTWORK.
REMOVE EXISTING RETURN FAN - MODIFY EXISTING DUCTWORK AS
REQUIRED TO FACILITATE THE REMOVAL AND INSTALLATION OF NEW RETURN
FAN.
REMOVE EXISTING SECONDARY PUMP, VALVES, CONTROLS - CAP PIPING
RUNNING BELOW ROOF AND ABANDON IN PLACE.
THOROUGHLY CLEAN EXISTING EXHAUST FAN, MOTOR / DRIVE ASSEMBLY, &
BACKDRAFT DAMPER.
REMOVE EXISTING OAI CONNECTION TO LOUVER AND PLENUM. BLANK OFF
EXISTING LOUVER W/ 2" THICK INSULATED METAL PANEL-SEAL
WEATHER-TIGHT AND ABANDON LOUVER IN PLACE.
REMOVE EXISITNG 24x24 DOWN THRU FLOOR - INFILL OPENING WITH
CONCRETE - REFER TO ARCHITECTURAL DRAWINGS. REMOVE PORTION OF
24x24 ON 2ND FLOOR TO FACILITATE NEW LOCATION OF DUCT OPENING THRU
FLOOR.
BLANK OFF 4'-0"x3'-6" PORTION OF EXISTING LOUVER WITH 2" THICK
INSULATED METAL PANEL - SEAL WEATHER-TIGHT.
REMOVE EXISTING AIR HANDLING UNIT ALONG WITH HEATING COIL, FILTERS,
MOTORIZED DAMPERS, VIBRATION ISOLATORS, INTAKE PLENUM, CONTROLS
AND CONCRETE PAD - COMPLETE.
REMOVE VERTICAL PORTION OF DUCT RISER TO FACILITATE INSTALLATION
OF NEW DUCTWORK.
(E) 3'-0"x1'-6" LOUVER
(E)RF-1
(E)28"x20"
(E)28"x20" DN
(E)30"x18"
(E)18"x20"
(E)18"x16" DN
REMOVE & RELOCATE
(E)WEF-2 ALONG WITH
2'-4"x2'-4" LOUVER
(E)44"x24" DN
(E)18"x20"
(E)36"x22"
(E)36"x22" DN
(E)42"x20"
(E)10"x34" DN
(E)20"x32" DN
(E)12"x32" DN
(E)12"x32" DN
(E)12"x32" DN
(E)24"x20" DN
(E)28"x24" DN
(E)DAMPER
ACTUATOR
(TYP.)
0 2 4 8 0 2 4 8
(E)AHU-3
(E)AHU-2
(E)AHU-1
(E)HOT WATER BOILER
REMOVE (E)16"Ø UTR
(E)WEF-1
REMOVE
(E)16"Ø UTR
(E)B-2
(E)B-1
REMOVE (E)14"Ø
REMOVE (E)14"Ø(E)HW S.T.
(E)HW BOILER
(E)B-2 & CP
(E)B-1 & CP
(E)EF
(E)2'-4"x2'-4"
EXHAUST LOUVER
(E)10'-0" x 4'-0"
OAI LOUVER
(E)3'-0" x 4'-0" & 2'-0"x4'-0"
OAI LOUVER
(E)5'-0" x 4'-0"
OAI LOUVER
(E)4'-0" x 4'-0"
CAI LOUVER
46x28
2"
2"
2"
(E)30"x18" DN 1
4 4
4 4
(E)24"x24" DN
(E)UH
REMOVE (E)COMPRESSION
TANK (NOT SHOWN)
(E)CP-1 8
(E)CP-2 8
(E)CP-3 8
(E)CP-5 16
2 17
REMOVE (E)36"x36" UTR & ROOF
MTD. RELIEF HOOD & CURB
(E)UH
1 19
REMOVE & REPLACE
(E)CHEMICAL SHOT
FEEDER (NOT SHOWN)
7 8
(E)RF-1
(E)IN-LINE AIR SEPARATOR
(E)2"HS&R
ABANDON IN
PLACE
2"4"
2"21
2"
(E)4"G DN
TO 6"G DN
(E)2"CW DN
(E)11
2"HW DN
(E)34"HWR
(E)HWR PUMP
(E)MIXING
VALVE
CABINET
CAP
REMOVE &
RELOCATE
(E)FD
REMOVE (E)BOILER
SEQUENCE PANEL
2"
(E)UH (E)UH
A B C D E F G H J K L M
EX
'G
. S
LO
PE
EX
'G . S
LO
PE
EX'G. SLOPE
EX
'G
. S
LO
PE
EX
'G . S
LO
PE
EX
'G
. S
LO
PE
EX
'G . S
LO
PE
EX
'G
. S
LO
PE
EX'G. SLOPE
EX'G. SLOPE
EX
'G
. S
LO
PE
EX'G. SLOPE
R
EF
R
IG
This drawing is an instrument of service, remains the property of Detroit Architectural Group, Inc. Any changes, publication, or unauthorized use is prohibited unless expressly approved.
SHEET NO:
JOB NO:
SHEET NAME:
IN CHARGE:
CHECKED BY:
DRAWN BY:
SEAL:
REV DATE ISSUED
ENGINEERING, INC.
25005
JRED PROJECT NUMBER:
Consulting Engineers 14115 Farmington Rd., Ste. 100 Livonia, MI 48154 Tel: (734) 855-4904 email: esteban@jredengineering.com
24-107
HVAC UPGRADES
BOOKER T DOZIER
RECREATION CENTER
PROPOSED
2025 MIDDLEBELT RD
INKSTER, MI 48141
05/02/25 BIDS & PERMITS
L
ICENSED
PROFESSIONAL
EN
GI
NE
ER
ST
ATE OF MICHIGAN
6201045030
ESTEBAN
CABELLO
ENGINEER
No.
MECHANICAL ROOF DEMOLITION PLAN
SCALE : 3/32" = 1'-0"
(E)RTU-1
(E)COND-1
(E)RTU-2
(E)MAU-1
MD-2
MECHANICAL ROOF
DEMOLITION PLAN
DPN
JAC
EDC
(E)REFRIGERANT PIPING
KEYED NOTES:
(KEYED NOTES APPLY TO THIS SHEET ONLY)
REMOVE AND REPLACE EXISTING ROOF TOP UNIT.
EXISTING DUCTWORK, GAS PIPING, CURB, AND POWER
TO REMAIN.
REMOVE AND REPLACE EXISTING CONDENSER ALONG
WITH (E)REFRIGERANT PIPING . EXISTING STEEL
GRILLAGE TO REMAIN.
REMOVE AND REPLACE EXISTING MAKEUP AIR UNIT.
DUCTWORK, GAS PIPING, CURB, AND POWER TO REMAIN.
REMOVE EXISTING EXHAUST FAN, CURB, AND CONTROLS.
REMOVE EXISTING DISH WASHER HOOD EXHAUST FAN -
CAP EXISTING CURB AND ABANDON IN PLACE.
TAKE PRE-CONSTRUCTION AIR MEASUREMENT READING.
0 4 8 16
REMOVE
(E)RELIEF HOOD &
ROOF CURB
(E)EF
REMOVE (E)REF-5 &
CURB
(E)RELIEF HOOD
REMOVE (E)REF-1
REMOVE (E)REF-2
(E)RELIEF HOOD
(E)REF-6
M
D E F G
H S
H R
G G
G
H R H S
G
C
WH
W
HWR
N
PW
H W
C W
H W
R
HW
RL
RL
RS
RS
G
G
H
SH
R
R L
R L
R S
R S
This drawing is an instrument of service, remains the property of Detroit Architectural Group, Inc. Any changes, publication, or unauthorized use is prohibited unless expressly approved.
SHEET NO:
JOB NO:
SHEET NAME:
IN CHARGE:
CHECKED BY:
DRAWN BY:
SEAL:
REV DATE ISSUED
ENGINEERING, INC.
25005
JRED PROJECT NUMBER:
Consulting Engineers 14115 Farmington Rd., Ste. 100 Livonia, MI 48154 Tel: (734) 855-4904 email: esteban@jredengineering.com
24-107
HVAC UPGRADES
BOOKER T DOZIER
RECREATION CENTER
PROPOSED
2025 MIDDLEBELT RD
INKSTER, MI 48141
05/02/25 BIDS & PERMITS
L
ICENSED
PROFESSIONAL
EN
GI
NE
ER
ST
ATE OF MICHIGAN
6201045030
ESTEBAN
CABELLO
ENGINEER
No.
MECHANICAL PENTHOUSE SHEET METAL PLAN
SCALE : 3/16" = 1'-0"
(E )2
8" x2
0"
(E)28"x20" DN
(E)30"x18"
(E)18"x20"
(E)18"x16" DN.
RELOCATED WEF-2 -
RECONNECT
CONTROLS
(E )1
8" x2
0"
(E )3
6" x2
2"
14"Ø DN TO TU-7 IN RISE & DN TO
(E)34x10 DN
14"Ø DN TO TU-3 IN RISE & DN TO
(E)32x12 DN
(E)24"x20" DN
28"x24" DN TO (E)28x24 DN
MECHANICAL PENTHOUSE HVAC PIPING PLAN
SCALE : 3/16" = 1'-0"
M-1
MECHANICAL PENTHOUSE SHEET
METAL PLANS & PIPING
DPN
JAC
EDC
(E)LOUVER 36"x18" TO
REMAIN
2"
4"
2"
AHU-1
AHU-3
2"
CP-3
(E)30"x18" DN
ABANDONED
3'-0" x 4'-0" & 2'-0"x4'-0"
OAI LOUVERS
(E)5'-0" x 4'-0"
OAI LOUVER
(E)44"x24"
DN
RELOCATED
2'-4"x2'-4" LOUVER
18"x20"
R
IS
E x2
36"x20" AS HIGH AS
POSSIBLE - CONT.
SHT. M-2TV(TYP.)
22"
14"
(E)36"x22" DN
R
IS
E
34"x34" UTR TO RELF-134"x22"
30"x20" 30"x18"
2"
CP-B2
CP-B1
CP-1
EXP. TANK
ET-1
(E)4"G DN TO
6"G DN
2"
2"
4"
2"
KEYED NOTES:
(KEYED NOTES APPLY TO THIS SHEET ONLY)
INSTALL DOMESTIC HOT WATER BOILER AND CIRC. PUMP. RECONNECT
EXISTING PIPING AND EXTEND 2 12"G AS REQUIRED.
INSTALL SECONDARY PUMP ALONG WITH ISOLATION VALVES, CHECK VALVE,
STRAINER - REFER TO PIPING DIAGRAM.
INSTALL HEATING HOT WATER BOILER, PRIMARY PUMP VALVES, ETC. - REFER
TO PIPING DIAGRAM.
INSTALL DOMESTIC HOT WATER BOILER ALONG WITH CIRCULATING PUMP,
VALVES, ETC. - RECONNECT EXISTING PIPING TO MATCH ORIGINAL
INSTALLATION. - REFER TO PIPING DIAGRAM.
INSTALL DOMESTIC HOT WATER CIRCULATING PUMP, VALVES, ETC. -
RECONNECT EXISTING PIPING TO MATCH ORIGINAL INSTALLATION.
CONNECT 2"G TO EXISTING BRANCH MAIN AND EXTEND TO BOILER.
CONNECT 2 12"G TO EXISTING BRANCH MAIN AND EXTEND TO BOILER.
36x22 DN. TO 17x56 AHU-3
24x24 DN. THRU FLR. w/ FIRE
DAMPER - RECONNECT TO
DUCT ON 2ND FLR.
HWB-1
NOTE:
FOR CONTINUATION OF PIPING REFER
TO M-2.
(E)11
2"HW DN
2"CW DN
(E)WEF-1
B-1 63
6"Ø VENT
5"Ø VENT
6"Ø VENT
5"Ø VENT
2CP-HWB15
(E)HWR PUMP
CA/VENT KIT UTR
B-1
B-2
HWB-1
2"
(E)WEF-1
(E)IN-LINE AIR
SEPARATOR
B-2 63
0 2 4 80 2 4 8
14"Ø DN TO TU-4 IN RISE & DN TO
(E)32x12 DN
14"Ø DN TO TU-5 IN RISE & DN TO
(E)32x12 DN
24x16 DN TO TU-6 IN RISE & DN TO (E)32x20 DN
96x36 UTR TO RH-1 & DN TO 97x20
97x20
95x28
97x20 x3
688x48
THROAT
168x72x24 OAI
PLENUM
AHU-1
(ON 4"CONC. PAD)
14'-0"x6'-0"
OAI LOUVER
20,000 CFM
14"Ø 24x16
14"Ø
16"Ø
TU-2
TU-124x16
D R
O P
TV
R
IS
E
5"Ø 6"Ø
7 4
TU-2
TU-1
2"
2"
2"
2"
TU-7
TU-6
TU-5
TU-4
TU-3
4"FD-1 EXTEND WASTE
TO EXISTING & CONNECT
(E)UH (E)UH
2"
GENERAL NOTE:
INSULATE ALL EXISTING DUCTWORK (SUPPLY AIR)
FROM AHU-1, 3, AND DOAS-1 PER ASHRAE 90.1.
ABANDONED
OAI LOUVERS
A B C D E F G H J K L M
EX
'G
. S
LO
PE
EX
'G . S
LO
PE
EX'G. SLOPE
EX
'G
. S
LO
PE
EX
'G . S
LO
PE
EX
'G
. S
LO
PE
EX
'G . S
LO
PE
EX
'G
. S
LO
PE
EX'G. SLOPE
EX'G. SLOPE
EX
'G
. S
LO
PE
EX'G. SLOPE
R
EF
R
IG
G
This drawing is an instrument of service, remains the property of Detroit Architectural Group, Inc. Any changes, publication, or unauthorized use is prohibited unless expressly approved.
SHEET NO:
JOB NO:
SHEET NAME:
IN CHARGE:
CHECKED BY:
DRAWN BY:
SEAL:
REV DATE ISSUED
ENGINEERING, INC.
25005
JRED PROJECT NUMBER:
Consulting Engineers 14115 Farmington Rd., Ste. 100 Livonia, MI 48154 Tel: (734) 855-4904 email: esteban@jredengineering.com
24-107
HVAC UPGRADES
BOOKER T DOZIER
RECREATION CENTER
PROPOSED
2025 MIDDLEBELT RD
INKSTER, MI 48141
05/02/25 BIDS & PERMITS
L
ICENSED
PROFESSIONAL
EN
GI
NE
ER
ST
ATE OF MICHIGAN
6201045030
ESTEBAN
CABELLO
ENGINEER
No.
MECHANICAL ROOF PLAN
SCALE : 3/32" = 1'-0"
M-2
MECHANICAL ROOF PLAN
DPN
JAC
EDC
RTU-1
RTU-2
MAU-1
REF-5
INSTALL INSULATED CURB
CAP ON (E)ROOF CURB
DOAS-1
MECHANICAL KEYED NOTES:
(MECHANICAL KEYED NOTES APPLY TO THIS SHEET ONLY)
INSTALL RTU ON EXISTING ROOF CURB - PROVIDE CURB
ADAPTOR TO SUIT NEW UNIT. EXTEND NEW SUPPLY AND
RETURN AIR DUCTWORK - TRANSITION AS NEEDED AND
CONNECT TO EXISTING DUCTWORK.
INSULATE EXPOSED DUCTWORK , CLAD WITH ALUMINUM
JACKET AND SEAL JOINTS AND SEAMS WATER-TIGHT.
INSTALL MAU ON EXISTING ROOF CURB - PROVIDE CURB
ADAPTOR TO SUIT NEW UNIT. EXTEND NEW SUPPLY AIR
DUCTWORK - TRANSITION AS NEEDED AND CONNECT TO
EXISTING PIPING AND DUCTWORK.
INSTALL NEW EXHAUST FAN ON UL 705 LISTED ROOF
CURB. EXTEND NEW EXHAUST DUCTWORK - TRANSITION
AS NEEDED AND CONNECT TO EXISTING DUCTWORK.
MODIFY EXISTING STEEL GRILLAGE TO FACILITATE
INSTALLATION OF NEW CONDENSING UNIT.
x1
"x
36"x20"
RISE
MECHANICAL
PENTHOUSE ROOF
VD
VD
26"x16" DN. TO
(E)E.A. DTR
26"x16" DN. TO
(E)E.A. DTR
16"Ø DN. TO
(E)GREASE
DUCT DTR
21"x20" DN. TO
(E)MA DUCT DTR
(E)EF
"x
"CU-3
CU-1
REFRIGERANT
PIPING
RACKED ON
BUILDING
2"
0 4 8 16
RELF-1
RH-1 NOTE:
PROVIDE DUCT AND PIPE ROOF SUPPORTS.
REFER TO DETAILS.
REFRIGERANT
PIPINGPROVIDE 18" HIGH
EQUIPMENT STANDS,
BASED ON MIRO 8(HD)
(E)AHU-1
(E)B-1 (E)B-2
(E)AHU-2(E)AHU-3
HS
HS
HS
HS
HS
HR
HR
HR
HR
2 1/2"
1 1/2"
2"
2"
3"
3" 3"
2"
EXISTING HEATING HOT WATER SYSTEM PIPING DEMOLITION SCHEMATIC
NO SCALE
2"
3"
3"
2 1/2"2 1/2"
2"
(E)CP-5
(E)CP-B2(E)CP-B1
(E)CP-1
(E)CP-3
(E)CP-2
(E)INLINE AIR SEPERATOR
HR
HR
CAP CAP
CAP
CAP
CAP
CAP
CAP
REMOVE (E)GATE VALVE
REMOVE (E)GATE VALVE
(E)2"HS&R TO ABANDONED POOL
- ABANDON IN PLACE
B-1 B-2
AHU-3
HS
HS
HR
HR
1 1/2"
3"
3"
MODIFICATIONS TO EXISTING HEATING HOT WATER SYSTEM PIPING SCHEMATIC
NO SCALE
2"
3"
3"
2 1/2"2 1/2"
CP-B2CP-B1
(E)INLINE AIR SEPERATOR
HR
HR
3"
CAP
HS
HS
1 1/2"
CP-1
CP-3
1 1/2"
(E)2"HS&R TO ABANDONED POOL
- ABANDON IN PLACE
TU-7TU-6TU-5TU-4TU-3
TU-1
TU-2
2"1 1/2"1 1/2"
This drawing is an instrument of service, remains the property of Detroit Architectural Group, Inc. Any changes, publication, or unauthorized use is prohibited unless expressly approved.
SHEET NO:
JOB NO:
SHEET NAME:
IN CHARGE:
CHECKED BY:
DRAWN BY:
SEAL:
REV DATE ISSUED
ENGINEERING, INC.
25005
JRED PROJECT NUMBER:
Consulting Engineers 14115 Farmington Rd., Ste. 100 Livonia, MI 48154 Tel: (734) 855-4904 email: esteban@jredengineering.com
24-107
HVAC UPGRADES
BOOKER T DOZIER
RECREATION CENTER
PROPOSED
2025 MIDDLEBELT RD
INKSTER, MI 48141
05/02/25 BIDS & PERMITS
L
ICENSED
PROFESSIONAL
EN
GI
NE
ER
ST
ATE OF MICHIGAN
6201045030
ESTEBAN
CABELLO
ENGINEER
No.
M-3
HEATING HOT WATER SYSTEM
PIPING SCHEMATICS
JRED
JAC
EDC
NO SCALE
RETURN OR EXHAUST DUCT CONNECTION DETAIL
BRANCH EXHAUST
OR RETURN DUCT
NOTE:
TRANSITION (THIS
PLANE ONLY)
MANUAL VOLUME DAMPER
WITH LOCKING MECHANISM
(TYPICAL)
AREA OF "A" INLET = 1.5
TIMES AREA OF "B" OUTLET"B" OUTLET
"A" INLET
AI
R
F
LO
W
AIR FLOW
MAIN DUCT
2"
(MIN)
15° TRANSITION
MANUAL VOLUME DAMPER
WITH LOCKING MECHANISM
AT LAST BRANCH
30°
(MAX)
M
IN
FROM AIR INTAKES
10'-0" MIN.
SECURING ANGLE IRON SUPPORT
BY MECHANICAL CONTRACTOR
SPUN ALUMINUM DOME
CURB CAP BY FAN
MANUFACTURER
EXHAUST DUCT UP THRU
ROOF (REFER TO PLANS
FOR DUCT SIZE)
CURB FLASHING AND COUNTER-
FLASHING BY ARCHITECTURAL
TRADES
CURB BY FAN
MANUFACTURER
BIRD SCREEN ALL
AROUND DISCHARGE
CENTRIFUGAL ROOF MOUNTED RELIEF FAN
NO SCALE
NOT TO SCALE
PIPE HANGERS (6" AND SMALLER)
TO FIT PIPE AND HANGER
6" LONG HARDWOOD BLOCKS SHAPED
INSULATION
AT LEAST 6" LONG
SHEET STEEL SADDLE,
PIPE
HANGER ROD
14 GAUGE ZINC COATED
HEAVY DUTY CLEVIS
HANGER
LOCKING NUT
SUPPORT NUT
NO SCALE
AHU CONDENSATE TRAP DETAIL
DRAIN PAN
OPEN DRAIN
CLEANOUT TEE
PITCH DOWN
TOWARD DRAIN
DRAIN LINE SHALL BE AT LEAST THE
SAME SIZE AS THE NIPPLE ON THE
DRAIN PAN
CONTRACTOR NOTE: VERIFY P-TRAP DIMENSIONS AND SIZE P-TRAP
PER MANUFACTURER'S INSTALLATION INSTRUCTIONS
L = 7.5" J = 3.0" H = 4.5"
L
J
H
PRE-FAB ROOF CURB
PROVIDED W/ RELIEF
(BY MECH. TRADES)
SECURITY BARS: 1"x1"x1/4" W.W.M.
ROOF MOUNTED RELIEF HOOD
NO SCALE
FIXED
SINGLE-PLY
ROOF
BACK DRAFT DAMPER
AIRFLOW
BUILDING RELIEF OUTLET
M
IN
FROM AIR INTAKES
10'-0" MIN.
SECURING ANGLE IRON SUPPORT
BY MECHANICAL CONTRACTOR
SPUN ALUMINUM DOME
CURB CAP BY FAN
MANUFACTURER
EXHAUST DUCT UP THRU
ROOF (REFER TO PLANS
FOR DUCT SIZE)
SELF-ACTIVATED
BACKDRAFT DAMPER
CURB FLASHING AND COUNTER-
FLASHING BY ARCHITECTURAL
TRADES
CURB BY FAN
MANUFACTURER
REFER TO FAN SCHEDULE FOR MANUFACTURER, MODEL NUMBER, CFM AND ADDITIONAL NOTES.1.
NOTE:
BIRD SCREEN ALL
AROUND DISCHARGE
CENTRIFUGAL ROOF MOUNTED EXHAUST FAN
NO SCALE
PAINTED (BY
CAP TO BE
ARCH. TRADES)
(E) ROOF CURB
IN FIELD)
(VERIFY SIZE
(E) ROOF
OVERLAPPING SEAMS
1-1/2" WITH
(2) LAYERS OF
3" BOARD INSULATION
INSULATED CURB CAP FOR (E) CURB
ARCH. TRADES)
PAINTED (BY
EXISTING CURB DIMENSIONS)
IN FIELD BASED ON
(SIZE TO BE DETERMINED
CAP FOR (E) ROOF CURB
(N) INSULATED CURB
CAP TO BE
NO SCALE
IN FIELD)
(VERIFY SIZE
(E) ROOF CURB
NOT POND
WATER DOES
KINK TOP SO
SHEETMETAL SCREWS
SILICONE SEAM
ON ALL SIDES
CURB CAP W/
GALVANIZED STEEL
CRICKET
VARIES
VARIES
VARIES
NOTE:
1. BASED ON "MIRO INDUSTRIES, INC." MODEL# 8-DS-DB
DUCTWORK SUPPORT DETAILS
NO SCALE
ISOMETRIC VIEW
SUPPORT SPACING FOR PIPE SIZE: 2"=10'; 11
2"=9'; 11
4"=8'; 1"=7'; 3 4"=6'.1.
NOTES:
2. INSTALL PIPE STANDS IN ACCORDANCE WITH PIPE STAND
MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS.
PLACE SUPPORT PADS ON ROOFING, AND SET PIPE STANDS FREE
AND CENTERED ON SUPPORT PAD. INSTALL PIPE TO ALLOW FOR
EXPANSION AND CONTRACTION. PRIME AND PAINT GAS PIPING.
COLOR SHALL BE PER AUTHORITY HAVING JURISDICTION.
PIPE SUPPORT DETAIL
NO SCALE
PIPE STRAP AND SCREWS
ACCESSORY ITEM
PIPE TO BE PROVIDED AND
INSTALLED BY OTHERS
BASE PAD
ACCESSORY ITEM
PROVIDED BY OTHERS
This drawing is an instrument of service, remains the property of Detroit Architectural Group, Inc. Any changes, publication, or unauthorized use is prohibited unless expressly approved.
SHEET NO:
JOB NO:
SHEET NAME:
IN CHARGE:
CHECKED BY:
DRAWN BY:
SEAL:
REV DATE ISSUED
ENGINEERING, INC.
25005
JRED PROJECT NUMBER:
Consulting Engineers 14115 Farmington Rd., Ste. 100 Livonia, MI 48154 Tel: (734) 855-4904 email: esteban@jredengineering.com
24-107
HVAC UPGRADES
BOOKER T DOZIER
RECREATION CENTER
PROPOSED
2025 MIDDLEBELT RD
INKSTER, MI 48141
05/02/25 BIDS & PERMITS
L
ICENSED
PROFESSIONAL
EN
GI
NE
ER
ST
ATE OF MICHIGAN
6201045030
ESTEBAN
CABELLO
ENGINEER
No.
M-4
MECHANICAL DETAILS
AND DIAGRAMS
JRED
NO SCALE
IN-LINE CIRCULATING PUMP DETAIL
SILENT CHECK
VALVE
REDUCER
INLINE CIRCULATOR
DOUBLE BOLT PIPE CLAMP
STRAINER WITH BLOWDOWN FITTING
BALL VALVE (TYP)
HANGER RODS
VIBRATION ISOLATORS
CIRCUIT BALANCE
VALVE
2. PROVIDE PIPE INSULATION, SERVICE MARKERS AND FLOW ARROWS TO COIL.
REFER TO PLANS FOR PIPE SIZES.1.
NOTES:
HYDRONIC COIL PIPING DETAIL
NO SCALE
TEMPERATURE AND PRESSURE
TEST PORT "PETES PLUG" (TYP)
OFFSET PIPING AT COIL CONNECTION
TO ALLOW FOR REMOVAL OF COIL
WITHOUT PIPING INTERFERENCE
DRAIN VALVE WITH
HOSE END FITTING
AUTOMATIC
AIR VENT
HYDRONIC
COIL BALL VALVE (TYP)
COMBINATION BALL VALVE, WYE STRAINER WITH
AUTO AIR VENT, 2 - P/T TEST PORTS, HOSE END
DRAIN VALVE AND CAP
PIPE UNION (TYP)
PIPE REDUCER OR INCREASER
THREE-WAY MODULATING CONTROL VALVE
T
REMOTE THERMOSTAT
HHWS
3. PROVIDE ELBOWS AND UNIONS FOR COIL REMOVAL CLEARANCES.
HHWR
NC NO
NO
CIRCUIT BALANCE VALVE
CIRCUIT BALANCE VALVE
BALL VALVE (TYP)
NOT TO SCALE
CHEMICAL SHOT FEEDER DETAIL
MIN CAPACITY EQUAL
M
AX
8"
A
BO
VE
F
LO
O
R
SYSTEM VOLUME
TO 1/1000 OF
3/4" HOSE COCK
SHOT FEEDER
PRESSURE RATED
FILL VALVE
3/4" VENT AND
FUNNEL
UNION
TO HS MAIN
/4 3 "
FLOW INDICATOR
SITE GLASS OR
PRESSURE GAUGE
AND COCK
EXPANSION TANK PIPING DETAIL
(E) INLINE AIR SEPARATOR WITH STRAINER
AIR VENT (HIGH CAPACITY FLOAT TYPE)
(VERTICAL TANK)
AIR CONNECTION
PRE-CHARGING
NOT TO SCALE
LOCK-SHIELD TYPE SHUT-OFF
VALVE RECOMMENDED. DRAIN
VALVE ALSO REQUIRED TO
PROPERLY PRECHARGE TANK.
TANK CONNECTION LOCATIONS
VARY DEPENDING ON TANK
SIZE AND MODEL.
PROVIDE ANTI-THERMOSYPHON
LOOP TO PREVENT GRAVITY
HEATING OF TANK. 12" MINIMUM
EXPANSION TANK
BLADDER TYPE
DROP.
CONNECT TO SIDE OF MAIN.
AVOID TOP OR BOTTOM
CONNECTION TO PREVENT AIR
OR DEBRIS FROM ENTERING
PIPE TO TANK.
TO SYSTEM PUMP SUCTION
PRESSURE GAUGE
MANUAL
AIR VENT
NOTES:
ROOFTOP UNIT
ROOFTOP UNIT CURB MOUNTING DETAIL
NO SCALE
1" RIGID INSULATION
UNIT BASE
ACOUSTICALLY LINED DUCT
(FIRST 15 FEET)
(EX)CURB
(EX)ROOF INSULATION
(EX)ROOF DECK
(EX)STRUCTURE
ACOUSTICALLY LINED DUCT
(FIRST 15 FEET)
GASKET
DUCT SMOKE
DETECTORSD
INSULATED CURB ADAPTER
(EX)ROOF
APPLY ACOUSTICAL INSULATION
TO CURB. 2" RIGID INSULATION.
2 LAYERS WATER RESIST.
8" GYP. BOARD AND W/R-30 BATT.
INCREASE ROOF OPENING AS
REQUIRED TO FACILITATE NEW
DUCTWORK, PACK AROUND
DUCT OPENINGS WITH
FIBERGLASS AND SEAL WITH
SOUND ISOLATING MASTIC
(TYP.)
BOILER STATUS (TYP.)
DI
SEQUENCE OF OPERATION - BOILER SYSTEM
FLOW SWITCHES WILL PROVE FLOW BEFORE ANY BOILER BURNER IS ENERGIZED. TYPICAL BOILER SAFETIES, INTEGRAL TO THE BOILER CONTROL PANEL, SHALL
WILL BE RESET AUTOMATICALLY.
IF THE TEMPERATURE CHANGE ACROSS SUPPLY AND RETURN DROPS 10°F AND REMAINS FOR 15 MINUTES THEN LAG BOILER SHALL STOP.
WHEN THE OUTDOOR AIR TEMPERATURE DROPS BELOW 50°F THE SECONDARY PUMP CP-1 AND CP-3 WILL START. LEAD BOILER B-1 & PRIMARY PUMP CP-B1 WILL START TO MAINTAIN WATER TEMPERATURE SET POINT AS RESET BY THE OUTDOOR AIR SENSOR. IF B-1 CANNOT MAINTAIN SETPOINT, THEN CP-B2 AND B-2 SHALL START.
NOT BE MONITORED BY DDC. BOILER AND CP STATUS SHALL BE MONITORED AT THE CENTRAL DDC. THE PRESSURE SENSOR SHALL, THROUGH THE DDC, CONTROL CP-1 & CP-3 SHALL RUN CONTINUOUSLY. BOILERS WILL STOP AND ALARM, IF HIGH LIMIT (200°F) OR LOW LIMIT (100°F) IS REACHED. SYSTEM
BOILER SAFETY
TERMINALS) (TYP)
FLOW SWITCH
(WIRED TO
B-1
FS DO
AL
AR
M B-2
FS
BOILER CONTROLS (B-1, B-2)
NO SCALE
DI
LOW WATER
CONTROL PANEL (TYP.)
CUT OFF (TYP)
ENABLE/DISABLE (TYP.)
BOILER CONTROL
AL
AR
M
DO
BOILER
PUMP START/
PUMP ALARMDI
DO
O A
H
STOP
RESET SCHEDULE
O.A.T.
50°F 0°F 160°F
110°F
H.H.S.T.
AI
T
TEMP. RESET
OUTDOOR AIR
CONTROL
STATUS
PUMP DI STATUS
PUMP
HS
DI
RETURN
HS
T AI
AI
CP-1
CP-3
SUPPLY
TEMP
TEMP
T
PUMP STATUS
PUMP STATUS
PUMP START/
PUMP ALARM
AI
HS
DI
AI
A O H
DO STOP
HR
TEMPERING COILS
FROM SYSTEM
/4 3 "
TO HR MAIN
TO AHU-3
CP-B1
HR
HS
HSHS
TO AHU-1
CP-B2
This drawing is an instrument of service, remains the property of Detroit Architectural Group, Inc. Any changes, publication, or unauthorized use is prohibited unless expressly approved.
SHEET NO:
JOB NO:
SHEET NAME:
IN CHARGE:
CHECKED BY:
DRAWN BY:
SEAL:
REV DATE ISSUED
ENGINEERING, INC.
25005
JRED PROJECT NUMBER:
Consulting Engineers 14115 Farmington Rd., Ste. 100 Livonia, MI 48154 Tel: (734) 855-4904 email: esteban@jredengineering.com
24-107
HVAC UPGRADES
BOOKER T DOZIER
RECREATION CENTER
PROPOSED
2025 MIDDLEBELT RD
INKSTER, MI 48141
05/02/25 BIDS & PERMITS
L
ICENSED
PROFESSIONAL
EN
GI
NE
ER
ST
ATE OF MICHIGAN
6201045030
ESTEBAN
CABELLO
ENGINEER
No.
M-5
MECHANICAL DETAILS
AND DIAGRAMS
JRED
DRY BULB ECONOMIZER - THE SUPPLY AIR TEMPERATURE SENSOR MODULATES THE
DAMPERS TO MAINTAIN THE REQUIRED SUPPLY AIR TEMPERATURE THROUGH A DRY
BULB ECONOMIZER ALGORITHM. WHEN THE OUTDOOR AIR TEMPERATURE IS ABOVE
72° F, THE OUTDOOR AIR DAMPER MOVES TO THE MINIMUM POSITION.
SEQUENCE OF OPERATION, RTU-1, AND RTU-2
THESE UNITS ARE CONSTANT VOLUME, SINGLE ZONE UNITS, WHICH WILL OPERATE
CONTINUOUSLY WHENEVER THE BUILDING IS OCCUPIED. THE UNIT SHALL BE
PROVIDED WITH PROPRIETARY DDC CONTROLS TO ACCOMPLISH THE FOLLOWING
SEQUENCE. IN ADDITION, THE UNITS SHALL BE PROVIDED WITH AN INTERFACE
MODULE TO ALLOW MONITORING AND CONTROL FROM THE BAS.
SWITCH IS IN THE "AUTO" POSITION. WHEN THE FANS START, THE OUTDOOR, RELIEF,
AND RETURN AIR DAMPERS MOVE TO MINIMUM OUTDOOR AIR POSITION.
BUILDING AUTOMATION SYSTEM (BAS) WHEN THE FAN "HAND-OFF-AUTO" (H-O-A)
FAN START - SUPPLY AND RETURN FANS SHALL START ON A SIGNAL FROM THE
TEMPERATURE
RETURN
RETURN AIR
T
AI
SUPPLY AIR TEMP.
TEMPERATURE SENSOR
SUPPLY
EXCHANGER
GAS - FIRED HEAT
T
AI
SUPPLY
FAN
M
N.G.
H O
A DI
FAN
STATUS
DI
AIR COOLED
CONDENSING UNIT
RELIEF AIR
DAMPER
AO
M
RELIEF
C
DI
T
FILTER
MIXED
AIR TEMP.
DO
S
D0
P
FILTER"
"DIRTY DI
ENABLE/
DISABLE
C
M
M
AO
AO
AI
T
AIR TEMP.
OUTDOOR
OUTDOOR AIR
COOLING COIL
START/
FAN
STOPSUPPLY AIR TEMP.
RETURN AIR TEMP.
(COOLING)
(HEATING)
SUPPLY AIR SETPOINT
SUPPLY AIR SETPOINTAI
AI
AI
AI
UNIT
DI
DI
MOUNTED
INTERFACE
MODULE
SETPOINT.
HEATING AND COOLING - WHEN THE SUPPLY AIR TEMPERATURE SENSOR CANNOT
MAINTAIN THE REQUIRED SUPPLY AIR OR SPACE TEMPERATURE, MECHANICAL HEATING
AND COOLING WILL OCCUR.
COOLING MODE: WHEN THE SUPPLY AIR TEMPERATURE EXCEEDS ITS SETPOINT,
MECHANICAL COOLING WILL OCCUR. THE REFRIGERANT SOLENOID VALVE WILL OPEN,
ALLOWING REFRIGERANT TO THE COOLING COIL. IF AIRFLOW THROUGH THE AIR
WILL BE ENABLED. THE HIGHER PRESSURE IN THE SUCTION LINE WILL START THE
COOLING COMPRESSORS. A SUPPLY AIR TEMPERATURE SENSOR IN THE SUPPLY AIR
DUCT WILL CONTROL THE REFRIGERANT SOLENOID VALVE. A HOT GAS BYPASS VALVE
UNOCCUPIED MODE - HEATING AND COOLING SETPOINTS AND DEAD BANDS SHALL
ALLOW FOR INTERMITTENT OPERATION OF UNITS.
MODE, THE UNIT SHALL PROVIDE HEATING TO WARM THE ZONE TO A PRE SELECTED
MORNING WARM-UP - AFTER THE UNOCCUPIED MODE AND BEFORE THE OCCUPIED
TO SATISFY SPACE SETPOINT.
SUPERVISION, PROOF OF IGNITION SHALL OCCUR. THE GAS VALVE SHALL MODULATE
HEATING MODE: IN THE HEATING MODE, A PRE-PURGE, POST-PURGE, FLAME
WILL ALLOW THE REFRIGERATION SYSTEM TO OPERATE AT LOW COOLING LOADS.
THE FIRE ALARM PANEL.
THE SMOKE DETECTORS ARE HARD-WIRED INTO THE FAN STARTER CIRCUIT AND
SAFETIES - A FREEZESTAT WILL TRIP THE SUPPLY AND RETURN FAN WHEN ITS
SETPOINT IS REACHED. A SMOKE DETECTOR IN THE SUPPLY AND RETURN FAN
DUCTS WILL ALSO TRIP THE FANS IF PRODUCTS OF COMBUSTION ARE PRESENT.
DISABLE
UNIT
FILTER
DIRTY
ALARMD1
NO SCALE
RTU - 1 & 2 CONTROL DIAGRAM
ENABLE/
HANDLER IS PROVEN, AS INDICATED BY AN AIR FLOW SENSOR COMPRESSOR OPERATION
INTEGRAL
AI
T
SOLAR
SHIELD
DDC ARCHITECTURE SCHEMATIC DIAGRAM
BACNET DDC CONTROLLER
(NETWORK AUTOMATION ENGINE)
ETHERNET
OPERATOR
WORKSTATION
AHU CONTROLLER(S)
FIREWALL
ROUTER
HUB OR SWITCH
EF CONTROLLER
oa
OUTSIDE AIR SENSOR (LOCATED ON
NORTH SIDE OF BUILDING, OUT OF DIRECT
SUNLIGHT)
WEATHER SHIELD
EXTERIOR WALL
DDC COMMUNICATION SCHEMATIC DIAGRAM NOTES
THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL EXTENT OF THE WORK. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PROPER INSTALLATION OF TEMPERATURE CONTROLS SYSTEMS.
1.
2.
3.
4.
TEMPERATURE CONTROLS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPERATURE CONTROL RELATED POWER SUPPLIES.
FIELD VERIFY AVAILABLE POWER SOURCE AND SPACE CIRCUITS.
5.
6.
ALL CONTROL DEVICES, SENSORS, SWITCHES, TRANSMITTERS, RELAYS, WIRING, POWER TRANSFORMERS, ACTUATORS, VALVES, DAMPERS, ETC. SHOWN ON THE TEMPERATURE CONTROL SHEETS ARE TO BE PROVIDED, INSTALLED, WIRED, ADJUSTED, CALIBRATED, ETC. BY THE TEMPERATURE CONTROLS CONTRACTOR.
7.
THE TEMPERATURE CONTROLS CONTRACTOR SHALL PROVIDE ALL DDC CONTROLLERS AS REQUIRED TO MEET THE INTENT OF THE
DRAWINGS.
8.
THE TEMPERATURE CONTROLS CONTRACTOR IS TO PROVIDE ALL SEQUENCE OF OPERATIONS AS SPECIFIED. ANY QUESTIONS OR CONFLICTS WITH THE SEQUENCES SHALL BE DIRECTED TO THE ENGINEER FOR CLARIFICATION PRIOR TO INSTALLATION.
ALL SETPOINTS DESCRIBED IN THE SEQUENCE OF OPERATIONS SHALL BE ADJUSTABLE BY THE SYSTEM OPERATORS (CREATE
VIRTUAL POINTS AS REQUIRED).
CONTROL LOOPS SHALL BE PROGRAMMED WITH APPROPRIATE DEAD BANDS AND TIME DELAYS TO AVOID SHORT CYCLING AND/OR
OVER SHOOTING SITUATIONS.
APPROPRIATE NOTIFICATION AND ALARMS SHALL BE PROGRAMMED IN THE DDC SYSTEM TO INDICATE EQUIPMENT FAILURE, HIGH, AND LOW TEMPERATURES, PRESSURE, ETC. AND GENERAL SYSTEMS MONITORING/DIAGNOSTICS.
(REFER TO SPECIFIC
CONTROL DIAGRAMS FOR
ADDITIONAL NOTES - SEE
PLANS FOR QUANTITIES)
(REFER TO SPECIFIC
CONTROL DIAGRAMS FOR
ADDITIONAL NOTES - SEE
PLANS FOR QUANTITIES)
WORKSTATION TO TIE-INTO
NEW CONTROL
NETWORK THROUGHOUT
BUILDING
PROVIDE UPS BACKUP
POWER FOR NETWORK
CONTROL
CONTROLS SHALL BE OPEN PROTOCOL, NON-PROPRIETARY.
BOILER CONTROLLER
(REFER TO SPECIFIC
CONTROL DIAGRAMS FOR
ADDITIONAL NOTES - SEE
PLANS FOR QUANTITIES)
PLAN VIEW ISOMETRIC VIEW
NOTES:
1. BASED ON "MIRO INDUSTRIES, INC.
ROOF MOUNTED EQUIPMENT SUPPORT DETAILS
NO SCALE
FRONT ELEVATION SIDE VIEW
1'-6"
VARIES
This drawing is an instrument of service, remains the property of Detroit Architectural Group, Inc. Any changes, publication, or unauthorized use is prohibited unless expressly approved.
SHEET NO:
JOB NO:
SHEET NAME:
IN CHARGE:
CHECKED BY:
DRAWN BY:
SEAL:
REV DATE ISSUED
ENGINEERING, INC.
25005
JRED PROJECT NUMBER:
Consulting Engineers 14115 Farmington Rd., Ste. 100 Livonia, MI 48154 Tel: (734) 855-4904 email: esteban@jredengineering.com
24-107
HVAC UPGRADES
BOOKER T DOZIER
RECREATION CENTER
PROPOSED
2025 MIDDLEBELT RD
INKSTER, MI 48141
05/02/25 BIDS & PERMITS
L
ICENSED
PROFESSIONAL
EN
GI
NE
ER
ST
ATE OF MICHIGAN
6201045030
ESTEBAN
CABELLO
ENGINEER
No.
M-6
TEMPERATURE CONTROLS
DIAGRAMS
JRED
SENSOR
ENTHALPY
OUTDOOR AIR
"DIRTY
FILTER"
DI
P
NC FILTER
OUTDOOR
AIR TEMP.
M
AI
E
AO
AI
T
COOLING COIL
AHU-3 CONTROL DIAGRAM
SMOKE DETECTORS PROVIDED BY ELECTRICAL
TRADES AND INSTALLED BY MECHANICAL TRADES.
NO SCALE
NOTE:
RETURN AIR
DAMPER
STOP
START/
FAN
DO
C
DO
STATUSDO
MAO
DI
FS
NO
ST
SUPPLY FAN
MIXED AIR TEMP.
FREEZE STAT
AI
T C
AI
T
AI AI
RETURN
TO FIRE ALARM PANEL
SUPPLY
(BY ELEC. CONT.)
SUPPLY AIR TEMP.
DETECTOR
SMOKE
RETURN AIR
TEMPERATURE
STOP
START/
FAN
R
EL
IE
F
DO AO
VFD
DO
ALARMFAN
SPEED
RELIEF FAN
RELIEF
DAMPERNC
M AO
H O A
H O A
AO
HR
HS
HEATING COIL
3-WAY MODULATING
CONTROL VALVE
AI
DPS
OUTSIDE WALL
DIFFERENTIAL PRESSURE
SENSOR SET FOR
0.05 IN. WG (ADJUSTABLE)
AHU-3 SEQUENCE OF OPERATION
THIS UNIT IS A CONSTANT VOLUME AIR HANDLING UNIT WHICH WILL OPERATE CONTINUOUSLY
WHENEVER THE BUILDING IS OCCUPIED. THE UNIT SHALL BE PROVIDED WITH DDC CONTROLS TO
ACCOMPLISH THE FOLLOWING SEQUENCE.
FAN START - SUPPLY FAN SHALL START ON A SIGNAL FROM THE BUILDING AUTOMATION SYSTEM (BAS) WHEN THE FAN "HAND-OFF-AUTO" (H-O-A) SWITCH IS IN THE "AUTO" POSITION. WHEN THE
FAN STARTS THE OUTSIDE AIR DAMPER SHALL OPEN TO ITS MINIMUM POSITION, RETURN AIR
DAMPER SHALL GO TO ITS CORRESPONDING OPEN POSITION. RELIEF AIR DAMPER SHALL TRACK
RETURN AIR DAMPER, RELIEF FAN RELF-1 SHALL START AT ITS LOW SPEED AND RAMP UP TO
MAINTAIN MAXIMUM BUILDING PRESSURE DIFFERENTIAL OF 0.05 IN. WG (ADJUSTABLE)..
SUPPLY AIR TEMPERATURE - THE SUPPLY AIR TEMPERATURE WILL RESET, BASED ON OUTDOOR
AIR TEMPERATURE. THE SUPPLY AIR TEMPERATURE WILL RESET AS FOLLOWS:
OUTDOOR AIR TEMP. SUPPLY AIR TEMP.
57° F AND ABOVE 55°
32° F AND BELOW 60°
ENTHALPY ECONOMIZER - THE MIXED AIR TEMPERATURE SENSOR SHALL SEQUENCE THE O.A.,
RETURN AND RELIEF DAMPERS TO MAINTAIN THE REQUIRED SUPPLY AIR TEMPERATURE THROUGH AN ENTHALPY ECONOMIZER ALGORITHM. WHEN THE OUTDOOR AIR TEMPERATURE IS ABOVE 72° F, THE DAMPERS MOVE TO MINIMUM POSITION SET POINTS. DURING ECONOMIZER OPERATION, THE
ENERGY RECOVERY DAMPERS SHALL BE OPEN.
HE…
This is the start of the file's text. The full file is on GovTribe.