Appendix C_StaVallejo Dredging Specs2021_June18.pdf

PDF 488 KB Posted

Attached to
BID ABSTRACT for Invitation to Bid# 70Z08821BPQQ17700, Maintenance Dredging at USCG Station Vallejo in Vallejo, CA
Solicitation number
70Z08821BPQQ17700
Issued by

About this file

This invitation for bid solicits firms to conduct maintenance dredging at the United States Coast Guard Station Vallejo in Vallejo, California. Firms are invited to bid on dredging up to 16,000 cubic yards of sediment from the entrance channel and berthing area at the station to a depth of -10 feet mean lower low water plus a 2-foot overdepth allowance, transporting dredged materials by barge to approved beneficial reuse sites, and conducting pre-dredge and post-dredge hydrographic surveys. Bids are due by the specified deadline and the contract will be a firm fixed-price award. Firms are directed to carefully review attachments outlining the full statement of work, permits, drawings, wage determinations and other requirements.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

CIVIL ENGINEERING UNIT OAKLAND

OAKLAND, CALIFORNIA 94612-5203

PSN 10228760

SPECIFICATIONS

FOR

MAINTENANCE DREDGING

AT

STATION VALLEJO

VALLEJO, CALIFORNIA

Civil Engineering Unit Oakland Initials Date A. Gilda Barboza

PROJECT MANAGER

Constance M. Callahan

CHIEF, ENVIRONMENTAL MANAGEMENT BRANCH

AGB 18 June 2021

CMC 21 June 2021

TABLE OF CONTENTS

SECTION TITLE PAGE

DIVISION 1 - GENERAL REQUIREMENTS 1

SECTION 01 01 00 - GENERAL PARAGRAPHS 1

SECTION 01 33 00 - SUBMITTALS 10

SECTION 01 35 29 - SAFETY, HEALTH, AND ENVIRONMENTAL PROTECTION 12

DIVISION 2 – EXISTING CONDITIONS 18

02 41 00 TEMPORARY REMOVAL AND 18

RE-INSTALLATION OF FLOATING DOCKS 18

DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION 21

35 20 23 - DREDGING 21

APPENDIX A

ARMY CORPS OF ENGINEERS PERMIT

REGIONAL WATER BOARD 401 CERTIFICATION

SAN FRANCISCO BAY CONSERVATION DEVELOPMENT COMMISSION

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01 01 00 - GENERAL PARAGRAPHS

PART 1 GENERAL

1.01 SCOPE OF WORK: Furnish all labor, materials, and equipment necessary to conduct maintenance dredging of up to 16,000 cubic yards (cy) at the U.S. Coast Guard (USCG) Station Vallejo, located within the City of Vallejo Municipal Marina (Vallejo Marina) at 2 Harbor Way, Vallejo, California. The work includes dredging to a permitted design depth of -10 feet (ft.) mean lower low water (MLLW) plus a 2ft. over depth allowance.

The sediment shall be removed using a mechanical clamshell dredge and transported by barge for disposal at a Contractor furnished approved beneficial reuse site, either Montezuma Wetlands Restoration Project in Collinsville or Cullinan Ranch Restoration Project near Mare Island. Up to 4,000 cy may be disposed of at the Government furnished Carquinez Strait In-Bay Disposal Site (SF-9) at the Contractor’s discretion. It is the contractor’s responsibility to ensure the beneficial reuse site(s) is available to receive the sediment. It is also the Contractor’s responsibility to provide the necessary equipment to access and dispose of the sediment at the selected site(s).

All in-water work shall be completed during the approved in-water work window of August 1 to November 30 and coordinated with USCG staff as to not interfere with USCG vessel and Station Vallejo operations.

The USCG is currently in the process of renewing dredge permits from the Army Corps of Engineers, the State of California Water Quality Control Board, the San Francisco Bay Conservation and Development Commission, and the National Marine Fisheries Services.

The episode approval is anticipated to be received on or about July 2021, The Contractor is responsible for complying with all permit conditions. For reference purposes only, Appendix A includes a copy of previous dredge permit for this location.

The work includes, but is not limited to, the following:

A. Mobilization, Dredging & Disposal: Conduct maintenance dredging with a clamshell bucket. The depth and position of the bucket and dredge shall be monitored by visual and positioning computer systems, including a global positioning system (GPS). The dredge footprint includes the entrance to the Vallejo Marina, the access channel, and the berthing area along and under the floating dock. Shoal areas are shown on the hydrographic survey conducted 11 June 2021, Drawing C-1. The estimated quantity to project depth (-10ft MLLW and 2:1 slope) at the time of the survey was 7,737cy, plus an additional 1,957cy of 2ft overdepth; conditions may have changed since. It is the Contractor’s responsibility to confirm conditions prior to dredging. The sediment may be disposed of at a Contractor furnished approved beneficial reuse site, either Montezuma Wetlands Restoration Project in Collinsville or at the Cullinan Ranch Restoration Project near Mare Island. A maximum of 4,000 cy may also be disposed of at the Government-furnished Carquinez Strait In-Bay Disposal Site (SF-9) at the Contractor’s discretion. Per the results of the sediment sampling and analysis and episode approval from the Dredge Material Management Office, the sediment is suitable for disposal at the aforementioned beneficial reuse sites as ‘cover material.’

The Vallejo Marina wooden floating dock, located adjacent to the USCG’s floating docks and within the dredge area, shall remain; the Contractor shall work around it with great care. Work may be conducted 24 hours a day, 7 days a week. To reduce impacts to the USCG Station Vallejo, dredging shall be coordinated in a way to not interfere with USCG or Vallejo Marina activities.

The Contractor must provide the USCG with access to real-time and near real time internet monitoring of dredging operations and production. The Contractor shall provide the USCG with access to a third party dredge and disposal monitoring system to processes incoming data automatically as it is received. The Contractor shall provide a means to measure and record position, speed and draft of the disposal vessel, bin-levels of each scow loaded by the dredge, and volume of material loaded.

Monitoring shall be continuous from initial loading through discharge at the disposal site, including time and location of the beginning and end of each disposal event. Hull position and heading of the scow shall be monitored using an onboard Global Positioning System capable of position accuracy less than 6 ft. Data shall be transmitted wirelessly in real-time at the same intervals to a helmsman display within the wheelhouse of the towing vessel. The records must include disposal trip number and date, estimated bin volume of material disposed, and a visual display of the beginning and end locations of the disposal event relative to the Carquinez Strait In- Bay Disposal Site (SF9) boundaries and internal cells. The data shall be posted for viewing on a password-protected web site when it is received and programmed with an automated alarm system to notify the USCG and Contractor should leakage or a misplacement of material occur during transit. Determination of leakage and placement information shall be derived from draft sensor data and position information.

B. Temporary Removal and Re-Installation of Floating Docks (Option Item): Temporary removal and reinstallation of the existing four Jet Docks (measuring approximately 15 ft wide x 30 ft long each) and the concrete floating dock (measuring approximately 9 ft wide x 70 ft long) is approved if necessary by the Contractor to dredge. The scope of work includes disconnecting the existing floating docks, tugging them away temporarily, and reinstalling them in the same original configuration once dredging work is completed. The temporary removal and re-installation shall be completed per the scope of work described in Division 2.

C. Hydrographic Surveys: The Contractor shall hire an independent contractor to conduct the required hydrographic surveys. The surveys shall be similar to or equal in quality to Drawing C-1. A pre-dredge survey is required no earlier than 60 calendar days and not later than 30 calendar days before commencement of dredging. Include areas to be dredged with over depth allowances; existing depths; estimated quantities to be dredged for the project; and estimated quantities for over depth. A post-dredge hydrographic survey is required within 30 calendar days of the last disposal activity.

Include the Corps permit number (Permit 2008-00049N), dates of dredging commencement and completion, and actual quantities dredged (identify project depth and overdepth quantities).

D. Permit Compliance and Reporting: Environmental permits and approvals are included in Appendix A. The Contractor is responsible for complying with the terms and conditions in the permits and shall have the required copies of the permit on site during the dredging and disposal of the sediments. The environmental permits require specific submittals that are the Contractor’s responsibility. Submittals include pre-dredge and post-dredge hydrographic surveys, solid debris management plan, disposal site verification logs (DSVL), water quality monitoring, post-dredge report, etc.). The Contractor shall copy the Contracting Officer and USCG Project Manager on all submittals within the specified period; and inform the Contracting Officer and USCG Project Manager of all responses and advise them on the likelihood of any delays or noncompliance.

A Dredge and Disposal Operations Plan (DOP) shall be prepared and submitted to the Contracting Officer and USCG Project Manager no later than 30 days prior to dredging. The DOP will be submitted to the regulatory agencies and approval must be received prior to initiation of work by the Contractor. At a minimum, the DOP shall include the pre-dredge hydrographic survey, volume calculations, disposal locations, equipment, and a solid debris management plan; additional requirements are specified in USACE Permit SPN-2008-0049.

Within 30 days after the completion of the project, the Contractor shall submit a post-dredge report to document the project’s execution. This report will be submitted to the regulatory agencies to satisfy permit requirements. At a minimum, the report will include calculated final dredging volume based on the pre and post dredge surveys, copies of the all hydrographic surveys, maps of the dredging footprint, dates of work, any noncompliance issues, required monitoring logs, environmental permitting compliance documentation, and the disposal location of the dredged material/ DSVL.

Furthermore, the Contractor shall obtain a grading permit from the City of Vallejo, per the Vallejo Municipal Code Chapter 12.40. Contact the City of Vallejo Central Permit Center at City Hall 555 Santa Clara Street, Vallejo, CA 94590, (707) 648- 4328. The permit application shall be submitted no later than two weeks prior to initiation of work.

1.02 MEASUREMENT AND PAYMENT: The Contractor shall provide hydrographic surveys before and after dredging. An independent surveyor licensed to perform such work by the State of California shall perform the Hydrographic surveys. The vertical datum for all soundings shall be Mean Lower Low Water (MLLW). These surveys shall be used to calculate the actual gross volume and design volume of dredged sediment removed. The total quantity of dredge sediment for which payment will be made will be by in-place (quantity) measurement in cubic yards by computing the difference in available sediment between the pre-dredge survey and the post-dredge survey.

A. Method of Measurement: The sediments removed will be measured by cubic yard in place, by means of soundings taken before and after dredging. The contract drawings represent existing conditions based on current available information, but will be verified and corrected by the Contractor, if necessary, by soundings taken before dredging. Prior to start of dredging operations, copies of the pre-dredge survey shall be submitted to the Contracting Officer. Upon completion of the dredge, the Contractor shall perform a post-dredge survey. This, along with the pre-dredge survey, shall be the sole source used to calculate the actual gross volume of dredged sediment. The design volume is the volume within the design template that consists of the bottom of the basin at the dredge depth including the allowable overdepth and the specified side slopes. The surveyor who performed the surveys shall calculate the gross volume and design volume from the results of the surveys. The Contractor shall submit for approval copies of the post-dredge survey, and the calculations, along with sufficient documentation to verify the accuracy of the results.

1.03 SCHEDULE, DELIVERABLES, AND MILESTONES: Refer to Table 1 Submittal

Register. Any deviations must be approved by the Contracting Officer and/or the USCG Project Manager.

1.04 LOCATION: Project site is located at USCG Station Vallejo, within the Vallejo Municipal Marina in Vallejo, California.

1.05 LIAISION: The USCG Project Manager is Ms. Gilda Barboza, ana.g.barboza@uscg.mil,

(510) 637-5512.

1.06 SITE INVESTIGATION: Investigate the site per FAR 52.236-3 to ascertain the general and local conditions that can affect the work or its cost.

1.07 COORDINATION: The Contracting Officer will conduct a pre-construction meeting.

Contractor shall provide 10 business days advance notice to the USCG Station Vallejo to allow time for scheduling.

1.08 KICK OFF MEETING: A project kick off meeting shall be conducted within 10 days of contract award.

1.09 LAYOUT OF WORK: The contractor is responsible for the layout of work. No mailto:ana.g.barboza@uscg.mil information other than that provided on the contract drawings is provided. Contractor is responsible for conducting surveys and determining when the project is complete.

1.10 DAMAGE TO PROPERTY: The contractor shall be responsible for the cost of repairing any damage to USCG property.

1.11 CONTRACTOR SECURITY REQUIREMENTS: Prior to starting work the Contractor shall provide a list of all on-site personnel, including sub-contractors (including second and third-tier subcontractors) and suppliers, to the Contracting Officer. The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to the USCG facility. Contractor personnel will be restricted to designated working areas. Any personnel violating this policy may lose access to the USCG facility.

Contractor personnel shall have photo identification at all times while working on USCG facilities.

Contractor and delivery personnel may be required to present personal photo identification to gain access to a USCG installation. If identification does not indicate United States citizenship, USCG Security may require proof of the legal right to work in the United States. Contractor and delivery personnel also may be subjected to an immigration status and outstanding criminal warrants check.

Contractors shall provide the Contracting Officer with 24 hours of advance notice of every delivery to the site (e.g., concrete, lumber, parts, etc.) and provide the company name, delivery person, and phone number of the firm(s) making deliveries. All vehicle access to government property requires vehicle registration and proof of liability insurance. Otherwise access may be denied.

1.12 CONTINUITY OF FACILITIES OPERATION: Schedule work to minimize interference with the facilities operations. The Contractor shall provide 5-day advance notice to the Contracting Officer and Station POC prior to initiating work. Notify the Contracting Officer and Station POC 3 business days in advance of any shutdowns. Work can be performed 24 hours a day 7 days a week. Contractor shall schedule work to avoid interference with operations at Station Vallejo. Coordination between the Contractor and the Station Vallejo POC is essential to avoid incidents and to manage movement of vessels and floating docks. The vessels shall have availability for radio communication with the Station Vallejo POC.

1.13 NOTIFICATION OF START AND COMPLETION OF WORK: The Contractor shall notify the Contracting Officer in writing 5 business days in advance of commencement of onsite work, and 5 business days prior to the date that work will be ready for final inspection.

1.14 SAFETY: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction and State of California, Division of

Occupational Safety and Health, Cal/OSHA. When the standards differ, the more restrictive standard shall apply. The Contractor shall provide barriers, temporary fencing, trench covers, etc. wherever work could cause injury to workers, visitors, USCG personnel, or dependents.

1.15 RECYCLING AND DISPOSAL OF REFUSE: Refuse, excess or waste materials resulting from construction operations shall become the property of the Contractor and shall be recycled and/or disposed of off Government property. All disposal and/or recycling shall be done in accordance with federal, state, and local laws and regulations.

1.16 EXISTING UTILITIES: The existence of any other utility locations and cable crossings is unknown. The Contractor shall verify all utility and cable crossing locations prior to dredging

1.17 DRAWING: The work shall conform to the drawing listed below which forms a part of these specifications. An AutoCAD file will be provided at the project kickoff.

Number Title Drawing C-1 Condition Hydrographic Survey, USCG Station Vallejo (dated 11 June 2021)

1.18 TEMPORARY FACILITIES:

A. STORAGE: No storage area is available.

B. SANITARY FACILITIES: No toilet facilities are available.

C. WATER AND ELECTRICITY: Water and electricity are not available.

D. TELEPHONE: No telephone service is available.

E. DOCKAGE: Dockage is unavailable at Station Vallejo.

A. PARKING: No onsite parking is available. Limited on street parking may be available outside Station Vallejo.

PART 2 PRODUCTS Not Used

PART 3 EXECUTION Not Used

FIGURE 1. Civil Engineering Unit Oakland Standard Drawing Template

END OF SECTION

*NLT: No Later Than

TABLE 1

CEU OAKLAND SUBMITTAL REGISTER

PSN:

10228760

CONTRACT NO.:

TBD

PROJECT TITLE AND LOCATION :

Maintenance Dredging at Station Vallejo Vallejo, California

Submittal Reference Location ACTION DATE

NO.

SPEC.

SECTION

SECTION PAGE DESCRIPTION OF SUBMITTAL DATE REQUIRED DISAPPROVED APPROVED

01 010100 1.08 4 Kick Off Meeting 10 days after award

02 013300 1.06 10 Bar Chart Progress Schedule 10 days after award 03 024100 1.03(A) 17 Temporary Removal Plan 10 days after award 04 010100 1.10 4 Contractor Security Requirements 10 days after award 05 352023 1.02(A) 20 Dredge and Disposal and Operations Plan NLT 30 days pre- dredge 06 352023 1.02(B) 20 Hydrographic Survey: Pre-dredge NLT 30 days pre- dredge 07 352023 1.02(B) 20 Hydrographic Survey: Post-dredge 5 days after dredge 08 013300 1.07 11 Contractor’s Daily Report Daily

352023 1.01(D)

21 Post Dredge Project Report NLT 30 days after project completion

10 010100 1.01(D) 3 Grading Permit from the City of Vallejo NLT 14 days pre- dredge

SECTION 01 33 00 - SUBMITTALS

1.01 GENERAL

A. Forward all submittals to the Contracting Officer within 10 business days from date of award, unless indicated otherwise in this specification. Submittals shall be accompanied with the USCG furnished material submittal form in Microsoft Word Format. Unless noted otherwise, all submittals shall be provided in an electronic image format. Provide these submittal images to the Contracting Officer, the USCG Project Manager, and the Contracting Officer's Representative (COR) simultaneously. If the electronic image is insufficient to ascertain submittal acceptability, the Contracting Officer may request a hard copy submittal. The Contracting Officer will e-mail approval or disapproval of submittals, within 10 business days after receipt.

B. The USCG Project Manager will review all submittals for compliance with these specifications. The Contracting Officer shall have approved submittals before acceptance.

C. Approval of submittals, and corrections or comments made during the review, does not relieve the Contractor from compliance with the requirements of the plans and specifications or permits and coordination.

D. The schedule of submittals listed in the following paragraphs and in the individual sections are the submittals required for this contract. Unsolicited submittals may be returned to the Contractor without review.

1.02 STATEMENTS OF PROCEDURES: Submit job-specific detailed procedure statements for aspects of the project requiring special attention. The statements shall indicate all methods and materials to be used for proper execution of the work. The statements shall also indicate any limiting criteria and scheduling requirements. Submit statements of procedures for the following:

Task Section

1. Hydrographic Surveys 010100 & 020100

2. Movement of floating docks 010100

3. Submittals required per 010100 & Appendix A environmental permits

1.03 STANDARD COMPLIANCE: When materials or equipment must conform to the standards of organizations such as the American Society for Testing and Materials (ASTM), and Underwriter's Laboratories (UL), proof of such conformance shall be submitted to the Contracting Officer for approval. If an organization uses a label or listing to indicate compliance with a particular standard, the label or listing will be acceptable evidence. In lieu of the label or listing, submit a certificate from an independent testing organization, which is competent to perform the test. The certificate shall state that the item has been tested in accordance with the specified organization's standard.

1.04 HAZARDOUS MATERIAL IDENTIFICATION: Submit Material Safety Data Sheets

(MSDS) for any materials defined as hazardous under the most current revision of Federal Standard 313. One copy of each MSDS shall be submitted to the Contracting Officer's Representative no later than the delivery date of the product. Two copies shall be submitted to the Contracting Officer.

1.05 AS-BUILT DRAWINGS: The Contractor shall maintain at the job site one set of full size contract drawings marked in red to show any deviations which are found to exist or have been made from the contract drawings. Upon completion of the work, the marked set of prints shall be delivered to the Contracting Officer. Request for final payment will not be approved until the marked prints are delivered to the Contracting Officer.

1.06 BAR CHART PROGRESS SCHEDULE: Within 10 business days after award, submit a bar chart progress schedule. On-site work shall not begin until a bar chart schedule has been approved and a kickoff meeting held. The bar chart shall show the complete sequence of construction by activity (including acquisition of materials and equipment).

The chart shall identify the construction start date, the completion date, and all workdays through the duration of the project. The bar chart shall also identify the cost for the various activities which shall be used as the basis for the Contractor's periodic request for payments.

1.07 CONTRACTOR'S DAILY REPORT: Complete Form 17-148 "Contractor's Daily Report to Construction Manager" every day there is any type of contractor or subcontractor activity (including equipment or material delivery) at the construction site. The daily reports shall be compiled during the week and mailed to the USCG Project Manager at the close of business each Friday.

PART 2 PRODUCTS Not Used

PART 3 EXECUTION Not Used

SECTION 01 35 29 - SAFETY, HEALTH, AND ENVIRONMENTAL PROTECTION

1.01 SECTION INCLUDES: This section applies to all necessary steps taken by the

Contractor to comply with the safety, health, and environmental protection requirements listed herein.

1.02 APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

A. ENVIRONMENTAL PROTECTION AGENCY (EPA) REGULATIONS:

40 CFR 204 Noise Abatement Program for Construction Equipment

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 262 Standards Applicable to Generators of Hazardous Waste

40 CFR 263 Standards Applicable to Transporters of Hazardous Waste

B. U.S. DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH

ADMINISTRATION (OSHA) REGULATIONS:

29 CFR 1910.120 Hazardous Waste Operations

C. U. S. DEPARTMENT OF TRANSPORTATION REGULATIONS:

49 CFR 100-199 Hazardous Materials Transportation, Handling, and Storage

Regulations

1.03 REFERENCE STATUTES: The statutes listed below form a part of this specification to the extent referenced.

Clean Air Act (CAA) (42 U.S.C. §§ 7401 to 7642)

Clean Water Act (33 U.S.C. §§ 1251 to 1387)

Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (42 U.S.C. §§ 9601 to 9675)

Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) (7 U.S.C. §§ 136 to

139y)

Noise Control Act (NCA) (42 U.S.C. §§ 4901 to 4918)

Toxic Substance Control Act (TSCA) (15 U.S.C. §§ 2601 to 2654)

Resource Conservation and Recovery Act (RCRA) (42 U.S.C. §§ 6901 to 6991i)

1.04 KNOWN HAZARDS:

A. Working near heavy equipment can be dangerous.

B. Working on the water can be dangerous.

1.05 UNFORSEEN HAZARDOUS MATERIALS:

A. If any material is found that may be hazardous to human health upon disturbance during construction operations, stop that portion of work and notify the Contracting Officer immediately. Within 10 business days, the Government will determine if the material is hazardous. If the material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If the material is hazardous and handling of the material is necessary to accomplish the work, the Government will issue a contract modification.

1.06 DEFINITIONS

A. Sediment: Soil and other debris that has been eroded and transported by runoff water.

B. Solid Waste: Rubbish, debris, sanitary waste, and other discarded solid materials resulting from industrial, commercial, and agricultural operations, and from community activities.

C. Rubbish: A variety of combustible and noncombustible wastes such as paper, boxes, glass, crockery, metal, lumber, cans, and bones.

D. Debris: Includes combustible and noncombustible wastes, such as ashes, waste materials that result from construction or maintenance and repair work, leaves, and tree trimmings.

E. Chemical Wastes: Includes salts, acids, alkalies, herbicides, pesticides, and organic chemicals.

F. Sanitary Wastes:

1. Sewage: Wastes characterized as domestic sanitary sewage.

2. Garbage: Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.

G. Oily Waste: Includes petroleum products and bituminous materials.

H. Hazardous Material (HM): Chemicals defined by OSHA 29 CFR 1926.59 and under the U.S. Department of Transportation (DOT) regulations (Title 49 CFR Parts 100 through 199) which are determined by the Secretary of Transportation to present risks to safety, health, and property during transportation. The DOT regulations include requirements for shipping papers, package marking, labeling, transport vehicle placarding, and training of personnel handling hazardous materials.

I. Hazardous Substance: Substances defined under the Clean Water Act and

CERCLA as chemicals which are harmful to aquatic life or the environment and are regulated, if spilled or otherwise released to the environment. The EPA has designated "reportable quantities" for each hazardous substance under CERCLA. If an amount equal to or greater than the reportable quantity of a hazardous substance is released to the environment, that spill must be reported.

J. Hazardous Waste (HW): Substances that are hazardous and have been discarded are regulated as hazardous waste under RCRA or State Health and Safety Codes and the implementing regulations. A waste is hazardous if it meets certain levels of reactivity, ignitability, corrosivity, or toxicity, or is otherwise listed as a hazardous waste in Title 40 CFR Part 261 or in the respective State Health and Safety Code or Code of Regulations.

01 35 43 – ENVIRONMENTAL PROCEDURES

1.01 SECTION INCLUDES: This section applies to all necessary steps taken by the

Contractor to comply with the environmental protection requirements listed herein.

1.02 APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

A. Environmental Protection Agency (EPA) Regulations:

40 CFR 122 National Pollution Discharge Elimination System

40 CFR 261 Identification and Listing of Hazardous Waste

1.03 REFERENCE STATUTES: The statutes listed below form a part of this specification to the extent referenced.

Clean Air Act (CAA) (42 U.S.C. §§ 7401 to 7642)

Clean Water Act (33 U.S.C. §§ 1251 to 1387)

Coastal Zone Management Act (CZMA; P.L. 92-583, 16 U.S.C. §§1451-1466)

Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (42 U.S.C. §§ 9601 to 9675)

Endangered Species Act 16 U.S.C. §1531 et seq. (1973)

Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) (7 U.S.C. §§ 136 to 139y)

Federal Water Pollution Control Act (CWA) (33 U.S.C. §§ 1251)

Toxic Substance Control Act (TSCA) (15 U.S.C. §§ 2601 to 2654)

Resource Conservation and Recovery Act (RCRA) (42 U.S.C. §§ 6901 to 6991i)

1.04 ENVIRONMENTAL PROTECTION REQUIREMENTS: Provide and maintain environmental protection during the life of the Contract to control pollution or to correct conditions that develop during construction. Comply with all Federal, State, and local laws and regulations pertaining to water, air, soil, and noise pollution.

1.05 PROTECTION OF NATURAL RESOURCES

A. Environmental Permits: The USCG is awaiting authorization to conduct the maintenance dredge activities under the terms and conditions of Department of the Army Corps of Engineers Permit SPN-2008-0049. The authorization is anticipated to be received by 1 July 2021. This permit includes concurrences from the U.S.

Environmental Protection Agency and the U.S. Army Corps of Engineers for compliance with Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbor Act, the Regional Water Quality Control Board for compliance with Section 401 of the Clean Water Act, the San Francisco Bay Conservation and Development Commission for compliance with the Coastal Zone Management Act, and the U.S.

Fish and Wildlife Service and National Marine Fisheries Service for compliance with Section 7 of the Endangered Species Act, Marine Mammal Protection Act, and Magnuson- Stevens Fisheries Conservation and Management Act. These permits include additional compliance requirements to those already captured in this specification. Copies of the permits for previous dredge events are enclosed in Appendix A for reference only. This year’s permits are anticipated to be no different.

B. Construction equipment is to be kept in good repair, without leaks of hydraulic or lubricating fluids. If such leaks or drips do occur, they shall be cleaned up immediately. Drip pans shall be utilized when vehicles are parked. Confine equipment maintenance and/or repair to one location. Control runoff in this area to prevent contamination of soils and water.

C. For all work in or over water habitats, provide a debris boom. Take precautions to preclude construction materials from entering the water and immediately remove any material that enters the water in the work area. Report spills of any liquids into the water habitat and take steps to preclude spread or dissipation of spilled liquids.

1.06 CONTROL AND DISPOSAL OF WASTES: With the exception of materials specifically indicated, all wastes and demolished materials become the Contractor's property and shall be removed from the job site daily.

1.07 NOISE: Make the maximum use of "low-noise-emission products" as certified by EPA and described at 40 CFR Part 204. No blasting or use of explosives is permitted.

Comply with applicable portions of the Noise Control Act (NCA). The Contractor is responsible for complying with all other federal, state, and local noise control laws and regulations.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

DIVISION 2 – EXISTING CONDITIONS

02 41 00 TEMPORARY REMOVAL AND

RE-INSTALLATION OF FLOATING DOCKS

1.01.1 TEMPORARY REMOVAL AND RE-INSTALLATION OF FLOATING DOCKS

(Option Item): This section applies to temporary removal and reinstallation of the existing four Jet Docks (measuring approximately 15ft wide x 30ft long each) and the concrete floating dock (measuring approximately 9ft wide x 70ft long). The scope of work includes disconnecting the existing floating docks, tugging them away temporarily, and reinstalling them in the same original configuration once dredging work is completed.

1.02 APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only:

A. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI A10.6-2006 (R2016) Safety Requirements for Demolition Operations.

B. U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) U.S. Army Corps of Engineers Safety and Health Requirements Manual.

1.03 SUBMITTALS:

A. TEMPORARY REMOVAL PLAN: The contractor shall submit a removal plan in accordance with Section 01 33 00 SUBMITTAL PROCEDURES within 10 days after award. Do not begin any work until authorization is received from the Contracting Officer. Removal plan shall include procedures for coordination with other work in progress, description of methods and equipment to be used for each operation and of the sequence of operations. The plan shall address the schedule for removing the existing floating docks and the stowaway location and re-installation plans.

1.04 REGULATORY AND SAFETY REQUIREMENTS: Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," safety requirements shall conform to ANSI A10.6.

1.05 DUST AND DEBRIS CONTROL: Prevent the spread of dust and debris and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution.

1.06 PROTECTION:

A. Existing Work: Before beginning any removal work, the contractor shall survey the site and examine the reference drawings and specifications to determine the extent of the work and verify current conditions. The Contractor shall take all necessary precautions to avoid damage to existing items remaining in place; any damaged items shall be repaired or replaced as approved by the Contracting Officer. The Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required. The Contractor shall ensure that structural elements are not overloaded and shall be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Provide new supports and reinforcement for existing construction weakened by demolition or removal work. Repairs, reinforcement, or structural replacement must have Contracting Officer approval.

B. Facilities: the Contractor shall isolate all electrical power or other stored energy systems and disconnect them from the dock to be removed. The Contractor is required to isolate and lock out any energized lines feeding to the dock. The Contractor shall work with assigned station personnel to identify isolation points and to notify station personnel that the systems have been locked out. Where removal of existing utilities is required, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. The Contractor shall ensure that no elements determined to be unstable are left unsupported and shall be responsible for placing and securing bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, or demolition work performed under this contract.

C. Relocations: Perform the removal and reinstallation of relocated items (floating docks) with workmen craftsmanship skilled in the trades involved. Any damages to items during relocation process shall be repaired or replaced with new undamaged items as approved by the Contracting Officer at the Contractor’s expense.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

3.01 EXISTING FACILITIES TO BE REMOVED:

A. Jet Docks: The contractor is responsible for removing and reinstalling the Jet Docks in the existing configuration. The Jet Docks are currently tied to the concrete floating dock via chains and include electrical utilities. Temporary storage and protection is the responsibility of the contractor. The Contractor shall contact the COR prior to removal and re-installation to conduct a joint inspection and document any existing damages or deficiencies. Any damages caused by the Contractor is the Contractor’s responsibility and shall be corrected prior to installation. The Contractor is responsible for any hardware and parts directly related to removal and reinstallation.

B. Disconnect all utilities and lock out all energy sources to the existing floating docks.

C. Cap utilities and ensure all feed lines are closed and temporarily isolated and non-operable.

D. Disconnect the concrete floating dock sections from the (7) guide piles by removing the guide pile framing and rollers. Docks shall be moved to the floater boat that will tug them away.

E. Tug the float to a nearby pre-approved temporary stationing location, inside the bay, and maintain in this position until time for re-installation. All existing guide piles shall remain in place.

F. The existing gangways shall be removed and stored on site in a safe place away from work area at a location to be designated by the Contracting Officer or facility local contact personnel. The gangway shall be reinstalled after work completion.

Items A through F above shall be executed in sequence. All tugging activity shall be by pulling on the floats with the proper size chains/cables/ropes attachments and at connections properly fit for the action (i.e. cleats) care shall be taken not to damage any components of the floats.

3.02 RE-INSTALLATION OF FACILITIES: After job completion

A. Tug the floating dock back into original functioning position and secure to existing guide piles, use same framing, re-install rollers.

B. Re-install gangway, as it was originally configured and attached to the float.

DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION

35 20 23 - DREDGING

1.01 SECTION INCLUDES: This section applies to all work required for dredging and disposal of the sediment. Perform all operations necessary for the removal of all sediments to the required dimensions, the disposal thereof, and all operations thereto.

1.02 SUBMITTALS: Submit the following in accordance with Section 01 30 00 “Submittals.”

A. Dredge and Disposal Operations Plan: Submit a detailed dredge and disposal operations plan (DOP) of the entire dredging and dredge sediment disposal operation including a list of equipment, environmental controls, means of transport, and means and locations of intermediate storage or handling of dredge sediment.

The DOP shall address Special Conditions of the Department of the Army Corps of Engineers Permit (SPN-2008-0049). The DOP shall adhere to the permit requirements from the Army Corps and shall include, at a minimum, the pre-dredge hydrographic survey, volume calculations, disposal locations, equipment types, a Notice to Mariners, and solid debris management plan.

Provide plans and procedures should gale force winds or higher be forecast.

Precautions shall include, but not be limited to, closing all openings, removing all loose materials, tools and equipment from exposed locations, anchoring and tying down barge, dredge, and/or pipeline.

This submittal is required 30 days prior to start of work and must be approved by the Corps prior to initiating the work.

B. Hydrographic Survey: Submit results of hydrographic surveys taken before and after dredging. The hydrographic surveys and related drawings must include the dredged prism. The pre-dredge survey submittal is required no later than 25 days prior to dredging operations and the post-survey submittal is required prior to final acceptance of the dredging work or 5 days after dredging is completed.

Include areas to be dredged with over depth allowances; existing depths; estimated quantities to be dredged for the project; and estimated quantities for over depth.

Include the Corps permit number (SPN-2008-0049), dates of dredging commencement and completion, and actual quantities dredged (identify project depth and overdepth quantities). The surveys shall be signed by the Contractor’s engineer and must include the USCG logos and signatures.

Hydrographic survey procedures (positioning modes, EPS calibration, accuracy requirements, depth measurements calibration, and data reduction, adjustment, processing and plotting, etc.) shall conform to industry standards similar to, or more stringent than, those found in Army Corps of Engineers Manual EM 1110-2-1003 for Hydrographic Surveying and published November 30, 2013 (http://www.publications.usace.army.mil/USACEPublications/EngineerManuals.aspx) . The contractor is responsible for installing any survey points required and shall include that information on the drawings. If necessary, a tide board shall be installed and will remain at the facility. Include a typical cross section(s) of the dredge footprint on the drawing. The survey shall locate the shoreline including mean higher high water (MHHW) and MLLW and show it on the cross section of the survey drawing. Locate all in-water structures, outfalls, cable crossings or other man made features within or adjacent to the dredge footprint and include these structures within the hydrographic survey drawing. Drawings shall be provided in AutoCAD version 2017 file format (.dwg and .xyz) using the Civil Engineering Unit Oakland standard template (Figure 1), and in Adobe Pdf.

C. Dredge Volume Calculations: Submit results of actual gross and design volume of dredged sediment. Cover sheet shall be signed, dated, and sealed by third party licensed surveyor.

D. Post-Dredge Project Report: Within 20 days after the completion of the dredging, the Contractor shall submit a post-dredge report to document the project’s execution. The post-dredge report shall satisfy permit requirements. At a minimum, the report will include calculated final dredging volume based on the pre and post dredge surveys, copies of the all hydrographic surveys, maps of the dredging footprint, dates of work, any noncompliance issues, required monitoring and disposal logs, and environmental permitting compliance documentation.

1.03 ARTIFICIAL OBSTRUCTIONS: The USCG anticipates debris such as, but not limited to, metal bands, pallets, pieces of broken cable, rope, hose, and broken piles. The Government has no knowledge of existing wrecks or wreckage. Prior to dredging, the Contractor shall survey the dredge area and remove debris encountered. Debris removed from the dredge area shall be removed from the water. Explosives shall not be used under any circumstance. Disposal of debris shall be the responsibility of the Contractor and disposal shall be outside the limits of the USCG Station Vallejo and Vallejo Marina property.

1.04 QUANTITY OF MATERIAL:

A. Overdepth Dredging: To cover unavoidable inaccuracies of dredging processes, removal of sediment to a depth of two feet below the elevation -10.0 feet MLLW depth specified and within the dredging limits will be allowed.

B. Side Slopes: Side slopes at the side limits of the dredge area shall be 3:1 (horizontal:

vertical). Project the side slope from the dredged bottom elevation at the limits of the dredge area line outward until it intersects the existing bottom of the adjacent waterway. Dredging on side slopes shall follow, as closely as practicable, the lines indicated on the reference drawings.

C. Slides: In the event sliding occurs in any excavation after its completion but prior to its acceptance, the Contractor shall remove such portions of the slide at no additional cost to the Government. Particular attention shall be provided to the slope nearest to the eastern edge of the float dock.

1.05 OBSTRUCTION OF WORK AREA: USCG Station Vallejo is located within the City of Vallejo Marina, which is home to numerous recreational boats, likely to transit the channel during the dredge operations. The Contractor shall not obstruct the navigable water or endanger the passage of vessels, and the Contractor’s vessel shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. Upon completion of the work, the Contractor shall promptly remove his plant, buoys, piles, and other marks placed under the contract in navigable waters or onshore. If required, the Contractor’s plant must have the ability to be maneuvered from the boat basin immediately following direction from the USCG, in the event that the USCG needs access to the facilities during the work period. In some instances it may be an emergency and the Contractor should respond with as much speed as reasonable and safe under the circumstances.

PART 2 PRODUCTS

2.01 Not used.

PART 3 EXECUTION

3.01 INSPECTION: Inspect the work, keep records of work performed, and ensure that gages, targets, ranges, and other markers are in place and usable for the intended purpose.

Furnish, at the request of the Contracting Officer, boats boatmen, laborers, and materials necessary for inspecting, supervising, and surveying the work.

3.02 CONDUCT OF DREDGING WORK

A. Interference with Navigation: Minimize interference with the use of channels and passages. The Contracting Officer will direct the shifting or moving of dredger or the interruption of dredging operations to accommodate the movement of vessels and floating equipment, if necessary.

B. Lights: Each night, between sunset and sunrise and during periods of restricted visibility, provide lights for floating plants, scows, barges, and markers. Also, provide lights for buoys that could endanger or obstruct navigation.

C. Ranges, Gages, and Lines: Furnish, set, and maintain ranges, buoys, and markers needed to design the work and to facilitate inspection. Establish and maintain gates in locations observable from each part of the work so that the depth may be determined.

Suspend dredging when the gates or ranges cannot be seen or followed.

D. Plant: Maintain plant, scows, coamings, barges, and associated equipment to meet the requirements of the work.

E. Dispose of Excavated Sediment: Provide for safe transportation and disposal of dredged sediments. Transport and dispose of dredge sediment in the area designated for disposal of dredged sediment. The deposit of dredged sediments in unauthorized places is forbidden.

F. Method of Disposal: The sediment excavated from the boat basin shall be transported to Cullinan Ranch and/or SF9 Carquinez. The Contractor shall ensure compliance with the provision of this Specification Section and the regulatory permits. The Contractor must also ensure minimal disturbance of nearby areas.

G. Salvaged Material: Anchors, chains, firearms, and other articles of historical or monetary value, which are brought to the surface during dredging operations, shall remain or become the property of the Government and shall be deposited on shore at a convenient location near the site of the work. Contact the Contractor Officer Representative immediately upon salvage.

H. Working in the Vicinity of Structures: The Contractor shall exercise caution when working in the vicinity of structures adjacent to and within the piers and bulkheads.

Repair of any damage resulting from excessive or improper excavation of the basin shall be the responsibility of the Contractor. When dredging to obtain the required dimensions might endanger any structure, the Contracting Officer, upon request, may reduce the required excavation in the vicinity of such structure.

I. Plant Removal: Upon completion of the work, promptly remove plant, including ranges, buoys, piles, and other markers or obstructions.

3.03 DISPOSAL OPERATIONS:

A. Prevention of Damage: The dredged sediment shall be transported and deposited in such a manner as to ensure that no damage will occur to the adjacent docks, vessels, shore protection (rip rap), drainage systems, pipelines, utilities, structures, revetments, seawall, or other improvements.

3.04 MEASUREMENT: The Contractor shall provide hydrographic surveys before and after dredging. An independent surveyor licensed to perform such work by the State of California shall perform the Hydrographic surveys. The vertical datum for all soundings shall be Mean Lower Low Water (MLLW). These surveys shall be used to calculate the actual gross volume and design volume of dredged sediment removed.

The total quantity of dredge sediment for which payment will be made will be by in-place (quantity) measurement in cubic yards by computing the difference in available sediment between the pre-dredge survey and the post-dredge survey.

A. Method of Measurement: The sediments removed will be measured by cubic yard in place, by means of soundings taken before and after dredging. The contract drawings represent existing conditions based on current available information, but will be verified and corrected by the Contractor, if necessary, by soundings taken before dredging. Prior to start of dredging operations, copies of the pre-dredge survey shall be submitted to the Contracting Officer. Upon completion of the dredge, the Contractor shall perform a post-dredge survey. This, along with the pre-dredge survey, shall be the sole source used to calculate the actual gross volume dredged sediment. The design volume is the volume within the design template that consists of the bottom of the basin at the dredge depth including the allowable overdepth and the specified side slopes. The surveyor who performed the surveys shall calculate the gross volume and design volume from the results of the surveys. The Contractor shall submit for approval, copies of the post-dredge survey, and the calculations along with sufficient documentation to verify the accuracy of the results.

B. Extent of Dredge Surveys: The dredge surveys shall cover all the bottom area within the dredge limits of the bottom and side slope areas. Bottom elevation shall be determined to the nearest tenth of a foot at horizontal intervals of no more than 10 feet.

3.05 FINAL EXAMINATION AND ACCEPTANCE: As soon as practicable, and no later than five (5) days after the completion of the entire work, the area will be examined by sounding or sweeping, or both. Remove shoals and lumps by dragging the bottom or by dredging.