Amendent 0002_Correction to Pricing Schedule_IFB SECTION B_PAGE 4.pdf

PDF 16 KB Posted

Attached to
BID ABSTRACT for Invitation to Bid# 70Z08821BPQQ17700, Maintenance Dredging at USCG Station Vallejo in Vallejo, CA
Solicitation number
70Z08821BPQQ17700
Issued by

About this file

This document contains an amendment to an invitation for bid and related federal contract opportunity notice. The amendment corrects pricing in Section B of IFB 70Z08821BPQQ17700 for maintenance dredging at the U.S. Coast Guard Station in Vallejo, California. The work includes dredging up to 16,000 cubic yards to a depth of 10 feet below MLLW with 2 feet of overdepth authorized. A fixed price option is provided for temporary removal and reinstallation of floating docks. Bids are due by August 1, 2021 for work to be completed between August 1 and November 30, 2021. The contract will be a firm fixed price award made to the lowest priced responsive bidder.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0002 dated 07/13/21-Correction to Pricing Schedule in RED

INIVITATION FOR BID 70Z08821BPQQ177007 MAINTENANCE DREDGING AT THE

U.S. COAST GUARD (USCG), STATION VALLEJO, VALLEJO CALIFORNIA, PAGE 4

SECTION B: SCHEDULE OF PRICES

THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC.,

NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND

CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

CLIN 0001: MAINTENANCE DREDGING OF UP TO 16,000 CUBIC YARDS (CY) AT

THE U.S. COAST GUARD (USCG), STATION VALLEJO, VALLEJO MARINA AT 2

HARBRO WAY, VALLEJO CA.

BASE

CLIN

Description Unit of

Issue

QTY Unit Price Total Amount

B-0001 Required Dredging depth is

-10.00 ft mean lower low water

(MLLW). Two foot of

Overdepth is authorized to

-12.00 ft, see Appendix C SOW pg 2/ Appendix C-1 Drawing

LS 1 $ $

OPTION

CLIN

*The exercise and award of the Option

CLIN will be made within 90 days of the award of the Base CLIN. Award of the Option CLIN will be dependent on the availability of funds. The

Government reserves the right to award none or all of the Option CLIN

O-0002 The temporary removal and re-installation of USCG Station

Vallejo Floating Docks, see

Appendix C SOW pg 2/

Appendix C-2 Drawing

LS 1 $ $

GRAND TOTAL BASE CLIN

B-0001 AND OPTION CLIN

O-0002

File details come from the government source that posted it. Updated .