About this file

This is a Contractor Personnel Qualifications Form for the City of Minneapolis Lead Service Line Replacements Year 4 project in Minnesota. The form must be completed and submitted to the City upon notice of award and prior to mobilization. The project involves specialized work on lead service line replacements, including installation of potable drinking water lines and potential plumbing connections within property owners' residences. Contractors must furnish names of all employees and subcontractors proposed for the work and provide evidence and experience records demonstrating their qualifications.

The City requires that each installation crew have at least one qualified installer with a minimum of five years' experience installing water service lines of 2 inches or smaller and a minimum of 50 previously completed water service installations of 2 inches or smaller. Other employees and apprentices working on the project are exempt from minimum experience requirements provided they work under the direct supervision of a qualified installer. Only prequalified installers and those working under their direct supervision are permitted on the project. If multiple installation crews are proposed, each crew must have at least one qualified installer present at all times. The form accommodates up to nine work packages (Red, Orange, Blue, Green, Brown, Purple, Teal, Gold, or Yellow) with space to list employee qualifications for each package. The City reserves the right to reject bids if false or misleading documentation is discovered.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR PERSONNEL QUALIFICATIONS

Minneapolis Lead Service Line Replacements Year 4

Appendix C – CONTRACTOR PERSONNEL QUALIFICATIONS

(Minneapolis Lead Service Line Replacements Year 4)

Complete this form and submit to City upon notice of award and prior to mobilization.

PART 1 – GENERAL

1.01 CRITERIA

Contractor Qualifications: Lead service line replacement is specialized work and involves working with potable drinking water lines and their respective owners. This work can also involve plumbing connections within the line owners’ residence.

A. Furnish names of all employees and/or subcontractors proposed for use for this Work including evidence and/or experience records. The City requires the following qualifications for contractor personnel:

1. At least one qualified installer per installation crew having a minimum of 5 years’ experience installing water service lines (2-in or smaller) and

2. A minimum of 50 previously completed water service installations of 2-in or smaller.

3. Other employees and/or apprentices working on this project are exempt from the minimum experience requirements listed above provided they are working under the direct supervision of a qualified installer.

B. Only prequalified installers and those working under their direct supervision will be permitted to work on this project.

If more than one installation crew is proposed, each crew shall have at least one qualified installer on it at all times.

1.02 DOCUMENTATION

Name of Contractor/Subcontractor:

Address:

Work Package _____________________ (Red, Orange, Blue, Green, Brown, Purple, Teal, Gold, or Yellow)

Employee Qualifications

Name of Employee Experience Installing Water Service Lines 2-in or smaller (Years)

Has Installed Over 50 Service Lines 2-in or smaller? (Yes/No)

Work Package ____________________ (Red, Orange, Blue, Green, Brown, Purple, Teal, Gold, or Yellow)

Employee Qualifications

Name of Employee Experience Installing Water Service Lines 2-in or smaller (Years)

Has Installed Over 50 Service Lines 2-in or smaller? (Yes/No)

Work Package ____________________ (Red, Orange, Blue, Green, Brown, Purple, Teal, Gold, or Yellow)

Employee Qualifications

Name of Employee Experience Installing Water Service Lines 2-in or smaller (Years)

1.03 TERMINATION OR CANCELLATION OF BID

If it is determined or discovered that the Contractor has provided false or misleading documentation, their bid can and may be rejected.

Complete this form and submit to City upon notice of award and prior to mobilization.
PART 1 – GENERAL
1.02 DOCUMENTATION
Address:
1.03 TERMINATION OR CANCELLATION OF BID
Work Package:
Name of EmployeeRow1:
Experience Installing Water Service Lines 2in or smaller YearsRow1:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow1:
Name of EmployeeRow2:
Experience Installing Water Service Lines 2in or smaller YearsRow2:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow2:
Name of EmployeeRow3:
Experience Installing Water Service Lines 2in or smaller YearsRow3:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow3:
Name of EmployeeRow4:
Experience Installing Water Service Lines 2in or smaller YearsRow4:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow4:
Name of EmployeeRow5:
Experience Installing Water Service Lines 2in or smaller YearsRow5:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow5:
Work Package_2:
Name of EmployeeRow1_2:
Experience Installing Water Service Lines 2in or smaller YearsRow1_2:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow1_2:
Name of EmployeeRow2_2:
Experience Installing Water Service Lines 2in or smaller YearsRow2_2:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow2_2:
Name of EmployeeRow3_2:
Experience Installing Water Service Lines 2in or smaller YearsRow3_2:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow3_2:
Name of EmployeeRow4_2:
Experience Installing Water Service Lines 2in or smaller YearsRow4_2:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow4_2:
Name of EmployeeRow5_2:
Experience Installing Water Service Lines 2in or smaller YearsRow5_2:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow5_2:
Work Package_3:
Name of EmployeeRow1_3:
Experience Installing Water Service Lines 2in or smaller YearsRow1_3:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow1_3:
Name of EmployeeRow2_3:
Experience Installing Water Service Lines 2in or smaller YearsRow2_3:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow2_3:
Name of EmployeeRow3_3:
Experience Installing Water Service Lines 2in or smaller YearsRow3_3:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow3_3:
Name of EmployeeRow4_3:
Experience Installing Water Service Lines 2in or smaller YearsRow4_3:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow4_3:
Name of EmployeeRow5_3:
Experience Installing Water Service Lines 2in or smaller YearsRow5_3:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow5_3:
Work Package_4:
Name of EmployeeRow1_4:
Experience Installing Water Service Lines 2in or smaller YearsRow1_4:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow1_4:
Name of EmployeeRow2_4:
Experience Installing Water Service Lines 2in or smaller YearsRow2_4:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow2_4:
Name of EmployeeRow3_4:
Experience Installing Water Service Lines 2in or smaller YearsRow3_4:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow3_4:
Name of EmployeeRow4_4:
Experience Installing Water Service Lines 2in or smaller YearsRow4_4:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow4_4:
Name of EmployeeRow5_4:
Experience Installing Water Service Lines 2in or smaller YearsRow5_4:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow5_4:
Work Package_5:
Name of EmployeeRow1_5:
Experience Installing Water Service Lines 2in or smaller YearsRow1_5:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow1_5:
Name of EmployeeRow2_5:
Experience Installing Water Service Lines 2in or smaller YearsRow2_5:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow2_5:
Name of EmployeeRow3_5:
Experience Installing Water Service Lines 2in or smaller YearsRow3_5:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow3_5:
Name of EmployeeRow4_5:
Experience Installing Water Service Lines 2in or smaller YearsRow4_5:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow4_5:
Name of EmployeeRow5_5:
Experience Installing Water Service Lines 2in or smaller YearsRow5_5:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow5_5:
Work Package_6:
Name of EmployeeRow1_6:
Experience Installing Water Service Lines 2in or smaller YearsRow1_6:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow1_6:
Name of EmployeeRow2_6:
Experience Installing Water Service Lines 2in or smaller YearsRow2_6:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow2_6:
Name of EmployeeRow3_6:
Experience Installing Water Service Lines 2in or smaller YearsRow3_6:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow3_6:
Name of EmployeeRow4_6:
Experience Installing Water Service Lines 2in or smaller YearsRow4_6:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow4_6:
Name of EmployeeRow5_6:
Experience Installing Water Service Lines 2in or smaller YearsRow5_6:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow5_6:
Work Package_7:
Name of EmployeeRow1_7:
Experience Installing Water Service Lines 2in or smaller YearsRow1_7:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow1_7:
Name of EmployeeRow2_7:
Experience Installing Water Service Lines 2in or smaller YearsRow2_7:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow2_7:
Name of EmployeeRow3_7:
Experience Installing Water Service Lines 2in or smaller YearsRow3_7:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow3_7:
Name of EmployeeRow4_7:
Experience Installing Water Service Lines 2in or smaller YearsRow4_7:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow4_7:
Name of EmployeeRow5_7:
Experience Installing Water Service Lines 2in or smaller YearsRow5_7:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow5_7:
Work Package_8:
Name of EmployeeRow1_8:
Experience Installing Water Service Lines 2in or smaller YearsRow1_8:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow1_8:
Name of EmployeeRow2_8:
Experience Installing Water Service Lines 2in or smaller YearsRow2_8:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow2_8:
Name of EmployeeRow3_8:
Experience Installing Water Service Lines 2in or smaller YearsRow3_8:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow3_8:
Name of EmployeeRow4_8:
Experience Installing Water Service Lines 2in or smaller YearsRow4_8:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow4_8:
Name of EmployeeRow5_8:
Experience Installing Water Service Lines 2in or smaller YearsRow5_8:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow5_8:
Work Package_9:
Name of EmployeeRow1_9:
Experience Installing Water Service Lines 2in or smaller YearsRow1_9:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow1_9:
Name of EmployeeRow2_9:
Experience Installing Water Service Lines 2in or smaller YearsRow2_9:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow2_9:
Name of EmployeeRow3_9:
Experience Installing Water Service Lines 2in or smaller YearsRow3_9:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow3_9:
Name of EmployeeRow4_9:
Experience Installing Water Service Lines 2in or smaller YearsRow4_9:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow4_9:
Name of EmployeeRow5_9:
Experience Installing Water Service Lines 2in or smaller YearsRow5_9:
Has Installed Over 50 Service Lines 2in or smaller YesNoRow5_9:
Contractor/Subcontractor:
Address:

File details come from the government source that posted it. Updated .