Main

PMTL ITEMS
PMTLPMTL LinkDisciplinePMTL DescriptionUOMQTY
B3015225195001B3015225195001StructuresRoof, Low Sloped, Small (< 5000 sf, min 2 person task)Each32
B3015225195002B3015225195002StructuresRoof, Low Sloped, Medium ( 5K - 10K Sf , min 2 person task)Each4
B3015225195003B3015225195003StructuresRoof, Low Sloped, Large (up to 15k sf, min 2 person task)Each16
B3015225195004B3015225195004StructuresRoof, Steep Slope, Small ( <5k sf, min 2 person task)Each163
B3015225195005B3015225195005StructuresRoof, Steep Slope, Medium (5k sf - 10k sf, min 2 person task)Each40
B3015225195006B3015225195006StructuresRoof, Steep Slope, Lg (up to 15k sf, min 2 person task)Each32
B2035225195007B2035225195007StructuresLadders, FixedEach6
B20354001950B20354001950StructuresDoor, overhead, manual, up to 24' high x 25' wideEach56
B20354101950B20354101950StructuresDoor, overhead, electric, roll up, to 24' high x 25' wideEach43
B2035450195001B2035450195001StructuresDoors, Igloo/Blast, Hinged/Sliding (2 person task)Each2
B2035450195004B2035450195004StructuresFabric Folding DoorEach6
C10251101950C10251101950StructuresFire doors, swingingEach1
D20252601950D20252601950Water Fuels SystemsWater heater, gas, to 120 gal.Each35
D2025260395001D2025260395001Water Fuels SystemsHeater, Water, ElectricEach2
D20252603950D20252603950Water Fuels SystemsWater heater,steam coil, to 2500 gallonEach3
D2025260395001D2025260395001Water Fuels SystemsHeater,Water,ElectricEach53
D3025210195002D3025210195002HVACExpansion TankEach24
D30451201950D30451201950HVACFan coil unitEach66
D30451601950D30451601950HVACVAV BoxesEach2
D3045160195001D3045160195001HVACVAV Boxes, Reheat and/or Fan PoweredEach4
D3045600195002D3045600195002HVACHeat Exchanger, Shell & Tube, Non-SteamEach1
D30551101950D30551101950HVACUnit heater, gas radiantEach9
D30551102950D30551102950HVACUnit heater, gas infraredEach24
D30551103950D30551103950HVACUnit heater, steamEach32
D3065100195001D3065100195001Energy Mgmt Control SysFrequency Drive ControllersEach87
D3065100195003D3065100195003Energy Mgmt Control SysCO/CO2/NO2/LEL SENSOR CALIBRATIONEach1
D30952201950D30952201950HVACDehumidifier, desiccant wheelEach9
D4065100195011D4065100195011Energy Mgmt Control SysDDC Cabinet, Primary/Secondary ControllerEach113
D4095100195001D4095100195001AlarmsCarbon Dioxide SystemsEach1
D5015234195001D5015234195001ElectricalAutomatic Transfer Switch (ATS)Each15
D50152801950D50152801950ElectricalMotor control center, over 400 AEach11
D50952501950D50952501950ElectricalLight, emergency, hardwired systemEach28
D50952502950D50952502950ElectricalLight, emergency, dry cellEach1
D50952503950D50952503950ElectricalLight, emergency, wet cellEach18
D5095250395002D5095250395002ElectricalPerform Grounding Checks AF System Facility -Per FacilityEach15
D5095250395003D5095250395003ElectricalPerform Grounding Checks Ammo FacilityEach12
D5095250395004D5095250395004ElectricalPerform Grounding Checks Comm FacilityEach19
E1035100195001E1035100195001PavementsTire Shredder, ManualEach12
G20451501950G20451501950StructuresManual swing gateEach4
G2045150195006G2045150195006PavementsAirfield Pavement (per 10K SY)Each144
G2045150195009G2045150195009PavementsBridgeEach2
G3015118195006G3015118195006PavementsOutfallEach50
G3015612195002G3015612195002EntomologyTermite InspectionsEach582
D3035160295002D3035160295002StructuresBoiler-CHW Closed Loop Water TreatmentEach95
D30454101950D30454101950HVACCentrifugal, over 1 HPEach126
D5015280195011D5015280195011Power ProAircraft Arresting System UHMW Poly PanelsEach5
G3025544195002G3025544195002Water Fuels SystemsFlush and Inspect Manhole and SewerEach450
D5035710195001D5035710195001AlarmsFACP 301 or More Heat DevicesEach95
G3025420195001G3025420195001Water Fuels SystemsLift Station, Dry WellEach34
D3035160295005D3035160295005HVACChiller, Scroll, Air Cooled 30 to 130 TonEach27
C10201025800C10201025800StructuresRoll up grille, aluminum, manual, 10' x 10' high, mill finishEach16
D30551221950D30551221950HVACForced air heater, oil or gas fired, up to 120 MBHEach21
D5095250195011D5095250195011ElectricalInspect Lightning Protection System (Per Node)Each585
D3035160295001D3035160295001HVACAir Cooled Screw Chiller >100 TNEach9
G3065310195054G3065310195054Water Fuels SystemsValve, Non-Lubricated Plug, above 2"Each55
D5095210295001D5095210295001Power ProDiesel Generator, >500 KWEach6
D30351602950D30351602950HVACChiller, screw, water cooled, over 100 tonsEach5
D30552301950D30552301950HVACPackage unit, computer roomEach40
G3065310195022G3065310195022Water Fuels SystemsTank, Aboveground Fuel Storage (AST)Each18
D5035710195003D5035710195003AlarmsFACP 50 or Less Heat DevicesEach213
D5035710195006D5035710195006AlarmsFACP 50 or Less Smoke DevicesEach258
G3065310195018G3065310195018Water Fuels SystemsPipe, all metal, above 3" (per 1000 LF)Each12
D30452101950D30452101950HVACFan, axial, up to 5,000 CFMEach160
D5095250195003D5095250195003ElectricalInspect A/F Signs (distance/barrier/taxiway)Each99
D30552502950D30552502950HVACAir conditioning,split system,DX air cooled,over 10 tonsEach36
G3025536195001G3025536195001Water Fuels SystemsInspect/Clean Grease TrapsEach9
D5095250195002D5095250195002ElectricalInspect A/F (runway, taxiway, & threshold)Each2
D30552102950D30552102950HVACPackage unit, air cooled, 25 thru 50 tonEach33
G3065310195014G3065310195014Water Fuels SystemsMeters, Flow, Positive Displacement - Issue and ReceiptEach28
D5035710195004D5035710195004AlarmsFACP 51 to 100 Heat DevicesEach26
D30251304950D30251304950HVACBoiler, hot water, oil, gas, or comb. fired, over 1000 MBHEach24
D30351402950D30351402950HVACChiller, centrif., water cooled, over 100 tonsEach1
D40204103650D40204103650AlarmsDetectors with brackets, fixed temperature heat detectorEach99
D50952501950010D50952501950010ElectricalInspect Static Grounding System - POL, (LOX) StorageEach103
D30553101950D30553101950HVACHeat Pump, air cooled, up to 5 tonsEach59
D2025410195001D2025410195001Water Fuels SystemsBackflow Prevention Device DCVA (Double check valve assembly) Class I or IIEach120
D5095250195004D5095250195004ElectricalInspect Approach LightsEach2
D2095910195001D2095910195001Water Fuels SystemsWater (Sound Tape Wells)Each10
D30452501950D30452501950HVACHood and blowerEach20
D30352201950D30352201950HVACCondensing unit, air cooled, 3 tons to 25 tonsEach172
D30951182950D30951182950HVACAir compressor, reciprocating, 5 to 40 H.P.Each4
D30352602950D30352602950HVACCompressor, DX refrigeration, 25 to 100 tonsEach1
D30351302950D30351302950HVACChiller, recip., air cooled, over 25 tonsEach3
STREET SWEEPINGSTREET SWEEPINGPavementsSTREET SWEEPING (per 10K SY)Each346
E10953203950E10953203950ElectricalFAT FRYEREach8
D30351301950D30351301950HVACChiller, recip., air cooled, up to 25 tonsEach4
D30951141950D30951141950HVACAir compressor, centrifugal, to 40 H.P.Each50
G3065310195009G3065310195009Water Fuels SystemsFuel systems, All AreasEach7
D30251302950D30251302950HVACBoiler, hot water, oil, gas, or comb. fired, 120 TO 500 MBHEach17
D4015150195002D4015150195002Water Fuels SystemsWet Pipe Sprinkler SystemEach79
D5035710195005D5035710195005AlarmsUnmonitored FACP (Monthly)Each30
G3025536195002G3025536195002Water Fuels SystemsOil Water Separators (sewer)Each15
D30553202950D30553202950HVACHeat pump, water cooled, over 5 tonEach22
D2025410295001D2025410295001Water Fuels SystemsBackFlow Prevention (BFP) Device RPZ High HazzardEach74
D40151002950D40151002950Water Fuels SystemsBackflow prevention device, over 4"Each7
D30552101950D30552101950HVACPackage unit, air cooled, 3 thru 24 tonEach15
D5095250195001D5095250195001ElectricalConduct Insulation Resistance Testing - A/F Lighting CircuitsEach12
D4015310195001D4015310195001Water Fuels SystemsDry Pipe Automatic Sprinkler SystemEach6
D30251303950D30251303950HVACBoiler, hot water, oil, gas, or comb. fired, 500 to 1000 MBHEach12
G3065310195002G3065310195002Water Fuels SystemsControl Panels, Master Control/Pump ControlEach4
D5095250195009D5095250195009ElectricalInspect Wind ConesEach8
D4095400195001D4095400195001Water Fuels SystemsDry & Wet Chemical SystemsEach8
D5095210295007D5095210295007Power ProPOL Fuels GeneratorEach2
G3065310195005G3065310195005Water Fuels SystemsFuel Pump, API 610, Electric Motor DrivenEach30
G3065310195055G3065310195055Water Fuels SystemsValve, Pressure (Safety) Relief, AllEach30
D30552202950D30552202950HVACPackage unit, water cooled, 25 thru 50 tonEach8
D5015280195010D5015280195010Power ProAAS Doughnut LoaderEach2
D5095250195005D5095250195005ElectricalInspect Obstruction Lights - No Special Equipment (Per 25 lights)Each5
D5095250195006D5095250195006ElectricalInspect Obstruction Lights - Special Equipment (Per 10 lights)Each7
G3065310195010G3065310195010Water Fuels SystemsGauge, Pressure/VacuumEach25
D30552501950D30552501950HVACAir conditioning,split system,DX air cooled,to 10 tonsEach7
D5095210295002D5095210295002Power ProDiesel Generator, 5-25 KWEach7
B20351102950B20351102950StructuresHanger doors, slidingEach4
D4095210195001D4095210195001Water Fuels SystemsLow-Expansion Foam Systems for Flammable Liquid TanksEach9
D5095250195007D5095250195007ElectricalInspect PAPI LightsPer approach4
D5095210295004D5095210295004Power ProDiesel Generator, 26 - 249 KWEach18
G3065310195011G3065310195011Water Fuels SystemsHoses, Receipt, Hard Semi-hard, above 1.5 inchesEach6
D30251101950D30251101950HVACBoiler, electric, to 1500 gal.Each32
D30351601950D30351601950HVACChiller, screw, water cooled, up to 100 tonsEach1
D3035160195001D3035160195001HVACAir Cooled Screw Chiller 26-100 TonsEach1
G3065310195056G3065310195056Water Fuels SystemsValve, Thermal Relief, AllEach20
D30552201950D30552201950HVACPackage unit, water cooled, 3 tons through 24 tonsEach7
D4015210195001D4015210195001Water Fuels SystemsFire System (Electric Motor Pump)Each13
G3065310195004G3065310195004Water Fuels SystemsFilter SeparatorEach12
D30351102950D30351102950HVACWater cooling tower, 50 thru 500 tonsEach7
D30351352950D30351352950HVACChiller, recip., water cooled, over 50 tonsEach1
D5035710195008D5035710195008AlarmsFACP 101 to 300 Smoke DevicesEach9
D30451101950D30451101950HVACAir handling unit, 3 thru 24 tonsEach173
G3015612195006G3015612195006EntomologyFood Facility Surveillance - Per FacilityEach12
D5095210295003D5095210295003Power ProDiesel Generator, 250 - 499 KWEach8
G3065310195013G3065310195013Water Fuels SystemsLevel Alarms, High, High-High/Low, Low-LowEach8
D30452103950D30452103950HVACFan, axial, over 10,000 CFMEach12
G3065310195024G3065310195024Water Fuels SystemsTank, Underground Storage Tank (UST)Each3
D5035710195007D5035710195007AlarmsFACP 51 to 100 Smoke DevicesEach12
G3065310195015G3065310195015Water Fuels SystemsMotors, All hpEach22
D4015180195002D4015180195002Water Fuels SystemsPre-Action Automatic Sprinkler SystemEach7
D30553201950D30553201950HVACHeat pump, water cooled, up to 5 tonEach3
D30451103950D30451103950HVACAir handling unit, over 50 tonsEach44
G3065310195048G3065310195048Water Fuels SystemsValve, Automatic, above 4", Product Recovery Tank OV (2129AF)Each10
G3065310195021G3065310195021Water Fuels SystemsSwitch, FlowEach9
G3025536195003G3025536195003Water Fuels SystemsSeptic Tank InspectionEach10
G3065310195008G3065310195008Water Fuels SystemsFuel pump, Split Case, Electric Motor DrivenEach4
G3065310195040G3065310195040Water Fuels SystemsValve, Automatic, above 4", High-Level Shut-Off Valve (129AF)Each8
G30302106300G30302106300Water Fuels SystemsManhole/catch basin, concrete, precast, 6' ID riser, 14' deepEach2
B2035450195003B2035450195003StructuresElectronic LocksEach4
G3065310195030G3065310195030Water Fuels SystemsValve, Automatic, above 4", Non-Surge/Check Valve (81AF/81AF-8)Each13
G3065310195006G3065310195006Water Fuels SystemsFuel pump, Deep Well Turbine, electric motor drivenEach3
G3065310195007G3065310195007Water Fuels SystemsFuel pump, Self-priming Electric Motor DrivenEach3
D30451102950D30451102950HVACAir handling unit, 25 thru 50 tonsEach37
G3065310195028G3065310195028Water Fuels SystemsValve, Automatic, above 4", Fuel Shut-off Control Valve (41AF-2C)Each10
G3065310195035G3065310195035Water Fuels SystemsValve, Automatic, above 4", Fill Stand Control Valve (90AF-4A-3)Each4
D5035710195002D5035710195002AlarmsFACP 101 to 300 Heat DevicesEach2
D30553102950D30553102950HVACHeat Pump, air cooled, over 5 tonsEach1
D30452102950D30452102950HVACFan, axial, 5,000 to 10,000 CFMEach2
G3065310195020G3065310195020Water Fuels SystemsSuppressor, SurgeEach2
D30452203950D30452203950HVACFan, centrifugal, over 10,000 CFMEach1
G30653101950G30653101950Water Fuels SystemsFUEL OIL STORAGE TANK, ABOVE GROUNDEach1
D30452201950D30452201950HVACFan, centrifugal, up to 5,000 CFMEach1
G3065310195053G3065310195053Water Fuels SystemsValve, Manual Ball, above 2"Each54
D40151001950D40151001950Water Fuels SystemsBackflow prevention device, up to 4"Each8
D5015210195001D5015210195001ElectricalInspect Distribution Panel - 1201 to 2000 AmpsEach56
D5015210195002D5015210195002ElectricalInspect Distribution Panel - >2001 AmpsEach3
D5015210195003D5015210195003ElectricalInspect Distribution Panel - 601 to 1200 AmpsEach4
D5015260195001D5015260195001ElectricalInspect Sub Panel - 225 Amps and SmallerEach697
D5015260195002D5015260195002ElectricalInspect Sub Panel - 226 Amps and LargerEach146
D5035710195010D5035710195010ElectricalInspect Mass Notification System (MNS) Per BldgEach1
D5095250195011D5095250195011ElectricalInspect Lightning Protection SystemEach47
B2035300195001B2035300195001StructuresAircraft Blast ShieldsEach1
D3095122195001D3095122195001HVACAIR COMPRESSOR 40HP OR LESS ROTARY SCREWEach1
D4095210195002D4095210195002Water Fuels SystemsFOAM SPRAY SPRINKLER SYSTEMEach1
D5095250195008D5095250195008ElectricalInspect Rotating
BeaconEach1
G2045150495001G2045150495001StructuresTilt-A-Way vertical pivot gate, chainlinkEach1
D30251301950D30251301950HVACBOILER LESS THAN 120 MBHEach2
D3045220295D3045220295HVACFAN CENTRIFUGAL 5K TO 10K CFMEach2
D5015280195007D5015280195007Power ProBAK-15

Aircraft Arresting

SystemEach2
D5095210295011D5095210295011Power ProLoad Bank
InspectionEach2
D5015280195001D5015280195001Power ProE-5

Runway Overrun

BarrierEach4
G2045150195010G2045150195010PavementsInspect Retaining Walls (per 300 square yards, per person) over 4' highEach4
G3015612195003G3015612195003EntomologyBASH SURVEILLANCE (Per Sector)Each4
G3015612195008G3015612195008EntomologyAIRFIELD WEED SURVEILLANCE (Per Sector)Each4
D4015180195001D4015180195001Water Fuels SystemsDELUGE SPRINKLER SYSTEMEach9
D3035110195001D3035110195001HVACCOOLING TOWER LEGIONELLAEach6
D30551222950D30551222950HVACFURNACE OVER 120 MBHEach6
D5015280195005D5015280195005Power ProBAK-12

Aircraft arresting

systemEach8
D50952102955002D50952102955002Power ProDiesel Generator 5 - 25 KWEach8
G3035070195002G3035070195002PavementsRetention Pond Per pondEach10
E10351001950031E10351001950031ElectricalTraffic Pop-Up Hydraulic Per RowEach12
E1035100195003E1035100195003ElectricalTraffic Control

Barriers Pop-Up Electric

Per RowEach13
D30352601950D30352601950HVACDX REFRIGERATIONEach14
G20451504950G20451504950ElectricalELECTRIC SLIDE GATEEach14
E1035100195002E1035100195002StructuresDrop Arms
EachEach15
B2035450195002B2035450195002StructuresDoors, VaultEach17
G40955110195001G40955110195001ElectricalCathodic Protection (60 Day and Annual)Each27
D5095210295006D5095210295006Power ProEAID GeneratorsEach34
B2035110295001B2035110295001StructuresHangar Doors, Sliding, LargeEach40
D3025210195001D3025210195001HVACAIR SEPERATOREach46
D2025410295001D2025410295001Water Fuels SystemsBack Flow Prevention (BFP) Device RPZ High Hazard Class IIIEach161
G3015612195010G3015612195010EntomologyRODENT SURVEILLANCE - PER FACILITYEach236
G3015612195009G3015612195009EntomologyWEED SURVEILLANCE - PER ACREEach22
D5015280195004D5015280195004Power ProMB 60.9.9.C

Textile Brake

Arresting SystemEach4
G3015612195001G3015612195001EntomologyADULT MOSQUITO SURVEILLANCEEachN/A
G3015612195005G3015612195005EntomologyLARVAL MOSQUITO SURVEILLANCEEachN/A
D30451701950D30451701950HVACFIRE DAMPERSEach194
G2045150395002G2045150395002StructuresEOD RangeEach1
MFR. SpecsMFR. SpecsElectricalFinal Denial Barriers ElectricEach2
MFR. Specs 1MFR. Specs 1ElectricalFinal Denial Barriers HydraulicEach7

E10351001950031

Equipment ComponentAs Of: 12/21/2020
Equipment Type:E1035100195003
Component:Vehicle Barriers, Pop-Up
Notes:Ref: AFI 32-1001
StepPM Components (Task Description)QSA
Ref: AFI 32-1001xxx
1Check with Facility Manager for deficienciesxxx
2Coordinate inspection with Security Forcesxxx
3Close lanes and change traffic flowxxx
4Check for proper operation, binding or misalignment and adjust as necessaryxxx
5Inspect all indicator lights and traffic lights for proper operation, replace bulbs as necessaryxxx
6Gain access to maintenance control panelxxx
7Cycle barrier to road closed positionxxx
8Install safety barsxxx
9Bleed off all hydraulic pressure and lock and tag out powerxxx
10Remove access panel that covers actuatorsxxx
11Clean barrier pits of debris and inspect drainagexxx
12Repair, tighten, or replace bolts or partsxxx
13Inspect hoses and wiring for wear and damage, repair as neededxxx
14Grease fittings on actuatorsxxx
15Reinstall actuator access panelxxx
16Perform remaining manufacturer's recommended maint.xxx
17Inspect outside plates for damagexxx
18Inspect barrier for corrosion and paint coating condition repair as neededxxx
19Remove tag out and restore power and hydraulic pressurexxx
20Remove safety barsxxx
21Test barrier and safety systems for proper operationxxx
22Cycle barrier to road open positionxxx
23Reopen lane and return traffic flow to normalxxx
24Compile list of discrepancies and open corrective maintenance work task(s) to make repair(s)xxx

D50952501950010

Equipment Type:D5095250195010
Component:Inspect Static Grounding System - POL, MUNS, LOX Storage - Per Facility
StepPM Components (Task Description)QSA
1Collect maps, communication equipment, tools, safety equipmentx
2Check for current meter calibration date if requiredx
3Coordinate inspection with facility managerxxx
4Obtain approval to enter secured area from guard if requiredx
5Perform visual inspection of static ground conductorxxx
6Don safety gear if requiredx
7Check to see if grounding system within the facility are bonded together at ground level or belowx
8Check to see if flashover protection is installed on insulated fittings on underground metallic pipeline entering the facility (if accessable)x
9Inspect cable and ground rods for corrosionx
10Inspect/tighten ground connections as requiredx
11Locate test pointx
12Drive reference pins and attach cablesx
13Check ground readingx
14Check resistance across all connectionsx
15Record resultsx
16Disconnect cables, remove reference pins and clean up areax
17Compile list of discrepancies and open corrective maintenance job order(s) to make the repair(s)xxx

D30451701950

B2035110295001

Equipment ComponentAs Of: 08/06/2019
Equipment Type:B2035110295001
Component:Hangar Doors, Sliding, Large
Notes:Initial Aug 17 Updated Aug 19. Changed AFI 91-203 to AFMAN 91-203.
StepPM Components (Task Description)A
1Dated Aug 2017 Frequency determined by asset condition, mission dependency, and ROI Ref: AFMAN 91-203 para 24.14x
2Collect maps, tools, communication equipment, and safety equipmentx
3Check with Facility Manager for deficienciesx
4Remove debris from door trackx
5Operate doorx
6Check alignment of hanger door, door guide and lubricatex
7Inspect and lubricate wheel drive chainx
8Adjust brake shoes and check for wear
9Inspect and lubricate drive wheels, guides, stops and rollersx
10Inspect door for general condition, paint, functionality, warning and caution signagex
11Inspect bumpers, springs and stops blocks for wearx
12Check and lubricate door guides, pulleys, hinges, and latching mechanismsx
13Inspect and lubricate motor gearbox, drive chain (or belt), and motor where applicable; adjust as necessaryx
14Check operation of door controls, limit switch, alarms, warning lights, adjust as necessaryx
15Coordinate with Electrical work center to inspect electrical switches, limit switches, wiring, alarms, warning lights, electrical connections, and contacts; adjust as necessaryx
16Repair loose hardware and identify missing hardwarex
17Replace motor gear box oilx
18Compile list of discrepancies and open corrective maintenance work task(s) to make the repair(s)x

G40955110195001

Equipment ComponentAs Of: 02/27/2015
Equipment Type:G4095110195001
Component:Cathodic Protection (60 day and Annual
Notes:Per AFI 32-1001 and UFC 3-570-06
StepPM Components (Task Description)BMA
1Inspect exterior of rectifier cabinet, all exposed connecting conduit, and fittings for corrosion, deteriorated paint, mechanical integrity and cleanliness, make minor repairs and clean/touch-up paint as required. All steps Per AFI 32-1001 and UFC 3-570-06xx
2Open and inspect interior of rectifier cabinet, inspect wiring for fraying, signs of overheating, deterioration mechanical damage, and loose connections; make adjustments as requiredxx
3Check electrical contacts for overheating and pitting; make adjustmentsxx
4Clean interior of rectifier cabinetxx
5Check panel voltmeter and ampmeter with standard test instrumentsxx
6Read and record panel meter voltage and current values on AF IMT Form 491xx
7Measure and record rectifier voltage and current with portable instrumentxx
8Perform Impressed Current Anode Bed Survey and annotate findings on AF IMT Form 1688x
9Perform Resistance Bond Check/Check potential at cathode locations; tighten loose connectionsxx
10Perform Galvanic Anode Check and annotate findings on AF IMT Form 1686x
11Conduct Water Tank Callibration and annotate findings on AF IMT Form 1689x
12Compile list of discrepancies and open corrective maintenance job order(s) to make the repair(s)xx

G20451504950

D30352601950

D50952102955002

Equipment ComponentAs Of: 12/23/2020
Equipment Type:D5095210295002
Component:Diesel Generator, >5 - 25 KW
Notes:Ref: AFMAN 32-1062 and UFC 3-540-07
StepPM Components (Task Description)Labor-hrsJMSA2yr
Ref: AFMAN 32-1062 and UFC 3-540-07xxxxx
1Collect maps, communication equipment, tools, safety equipment. Conduct tailgate safety briefing. Don all required PPE. Notify Facility Manager/facility occupantsxxxxx
2Inspect Batteries and DC Charging Systemxxxxx
3Complete inspection Report (Compile list of discrepancies and open corrective maintenance work task(s) to make repair(s)xxxxx
4Inspect Cooling System, coolant hoses and Louversxxxx
5Test Coolantxxxx
6Ensure Belt Proper Tensionxxxx
7Check Fuel System for Leaksxxxx
8Inspect Day Tank and Test Aux Pumpxxxx
9Inspect Unit Grounding and Wiresxxxx
10Inspect Controls/Gauges Conditionxxxx
11Exhaust Gas temperature readingxxxx
12Operate Generator Under Load (Monthly)x
13Drain Water from Fuel Systemxxxx
14Disconnect Power From Mainxxx
15Perform semiannual inspections and full system tests (generator, ATS, and full emergency facility loads; check integral load bank maintenance)xxx
16Change Oil and Lube Filters. (oil change deferment only permitted IAW UFC 3-540-07)xx
17Change Fuel Filters. (follow manufacturer guidance on frequencies)xxx
18Clean Airbox and Change Air Filter. (follow manufacturer guidance on frequencies)xxx
19Change Coolant and Filter; Flush Radiator every 2 yearsx

D30551222950

D30251301950

D40151001950

D30452201950

G30653101950

D30452203950

D30452102950

D30553102950

D30451102950

G30302106300

D30451103950

D30553201950

D30452103950

D30451101950

D30351352950

D30351102950

D30552201950

D30351601950

D30251101950

D30552501950

D30552202950

D30251303950

D30552101950

D40151002950

D30553202950

D30251302950

D30951141950

D30351301950

E10953203950

D30351302950

D30352602950

D30951182950

D30352201950

D30452501950

D30553101950

D40204103650

D30351402950

D30251304950

D30552102950

D30552502950

D30452101950

D30552301950

D30351602950

D30551221950

C10201025800

D30454101950

G20451501950

D50952503950

D50952502950

D50952501950

D50152801950

D30952201950

D30551103950

D30551102950

D30551101950

D30451601950

D30451201950

D20252601950

C10251101950

B20354101950

B20354001950

STREET SWEEPING

Equipment Type:N/A
Component:Paved Roads
PM Components (Task Description)DailyWeeklySemi-MonthlyMonthlyBi-MonthlyQuarterlySemi-AnnuallyAnnually20mo21mo2yrs3yr40mo4yr5yr6yr10yr20yr50yrFrequencyTotal Hours
1Sweep AirfieldxDaily0
2Sweep paved roadsxWeekly0
3Semi-Monthly0
4Monthly0
5Bi-Monthly0
Quarterly0
Semi-Annually0
Annually0
20mo0
21mo0
2yrs0
3yr0
40mo0
4yr0
5yr0
6yr0
10yr0
20yr0
50yr0

B20351102950

Equipment Type:B20351102950
Component:Hangar Doors, Sliding, Large
PM Components (Task Description)DailyWeeklySemi-MonthlyMonthlyBi-MonthlyQuarterlySemi-AnnuallyAnnually20mo21mo2yrs3yr40mo4yr5yr6yr10yr20yr50yrFrequencyTotal Hours
1Dated Aug 2017 Frequency determined by asset condition, mission dependency, and ROI Ref: AFMAN 91-203 para 24.14xDaily0
2Collect maps, tools, communication equipment, and safety equipmentxWeekly0
3Check with Facility Manager for deficienciesxSemi-Monthly0
4Remove debris from door trackxMonthly0
5Operate doorxBi-Monthly0
6Check alignment of hanger door, door guide and lubricatexQuarterly0
7Inspect and lubricate wheel drive chainxSemi-Annually0
8Adjust brake shoes and check for wearAnnually0
9Inspect and lubricate drive wheels, guides, stops and rollersx20mo0
10Inspect door for general condition, paint, functionality, warning and caution signagex21mo0
11Inspect bumpers, springs and stops blocks for wearx2yrs0
12Check and lubricate door guides, pulleys, hinges, and latching mechanismsx3yr0
13Inspect and lubricate motor gearbox, drive chain (or belt), and motor where applicable; adjust as necessaryx40mo0
14Check operation of door controls, limit switch, alarms, warning lights, adjust as necessaryx4yr0
15Coordinate with Electrical work center to inspect electrical switches, limit switches, wiring, alarms, warning lights, electrical connections, and contacts; adjust as necessaryx5yr0
16Repair loose hardware and identify missing hardwarex6yr0
17Replace motor gear box oilx10yr0
18Compile list of discrepancies and open corrective maintenance work task(s) to make the repair(s)x20yr0
Total50yr0

B2035225195007

Equipment Type:B2035225195007
Component:Ladders, Fixed
PM Components (Task Description)DailyWeeklySemi-MonthlyMonthlyBi-MonthlyQuarterlySemi-AnnuallyAnnually20mo21mo2yrs3yr40mo4yr5yr6yr10yr20yr50yrFrequencyTotal Hours
0Ref: AFMAN 91-203 para 7.3.2xDaily0
1Check with Facility Manager for deficienciesxWeekly0
2Inspect for loose, worn, or damaged rungs/side railsxSemi-Monthly0
3Inspect for damaged or corroded handrails/brackets on platformsxMonthly0
4Inspect for deteriorating masonry or siding where fixed ladder anchorages are secured to the structurexBi-Monthly0
5Inspect for lose or damaged carrier rails or cablesxQuarterly0
6Inspect for cracked, rusted, or damaged weldsxSemi-Annually0
7Inspect for any surface rustxAnnually0
8Tighten or replace loose, damaged, or missing bolts, rivet heads, hardwarex20mo0
9Document and/or Update BE Asset Record and SMS data to capture ladder type, safety climbing device installed (note if none), open corrective maintenance work task for any deficiencies.x21mo0
2yrs0
3yr0
40mo0
4yr0
5yr0
6yr0
10yr0
20yr0
50yr0

B2035225195008

Equipment Type:B2035225195008
Component:Hangar doors, Tilt-up
PM Components (Task Description)DailyWeeklySemi-MonthlyMonthlyBi-MonthlyQuarterlySemi-AnnuallyAnnually20mo21mo2yrs3yr40mo4yr5yr6yr10yr20yr50yrFrequencyTotal Hours
0Dated Aug 2017 Frequency determined by asset condition, mission dependency, and ROI Ref: AFMAN 91-203 para 24.14xDaily0
1Collect maps, tools, communication equipment, and safety equipment. Check with Facility Manager for deficienciesxWeekly0
2Remove debris from door track.xSemi-Monthly0
3Operate door.xMonthly0
4Check alignment of hanger door, door guides and lubricate.xBi-Monthly0
5Inspect and lubricate wheel drive chain.xQuarterly0
6Adjust brake shoes and check for wear.xSemi-Annually0
7Inspect and lubricate drive wheels, guides, stops and rollers.xAnnually0
8Compile list of discrepancies and open corrective maintenance work task(s) to make the repair(s)x20mo0
21mo0
2yrs0
3yr0
40mo0
4yr0
5yr0
6yr0
10yr0
20yr0
50yr0

B2035300195001

Equipment Type:B2035300195001
Component:Aircraft Blast Shields
PM Components (Task Description)DailyWeeklySemi-MonthlyMonthlyBi-MonthlyQuarterlySemi-AnnuallyAnnually20mo21mo2yrs3yr40mo4yr5yr6yr10yr20yr50yrFrequencyTotal Hours
1Check with Facility Manager for deficienciesxDaily0
2Inspect for damaged or deteriorating structural membersxWeekly0
3Inspect fastners and hardware for proper tightness and installationxSemi-Monthly0
4Tighten or replace loose/missing hardwarexMonthly0
5Fill out maintenance checklist and report deficienciesxBi-Monthly0
Quarterly0
Semi-Annually0
Annually0
20mo0
21mo0
2yrs0
3yr0
40mo0
4yr0
5yr0
6yr0
10yr0
20yr0
50yr0

B2035450195001

Equipment Type:B2035450195001
Component:Hangar Doors, Igloo/Blast, Hinged/Sliding (2 person task)
PM Components (Task Description)DailyWeeklySemi-MonthlyMonthlyBi-MonthlyQuarterlySemi-AnnuallyAnnually20mo21mo2yrs3yr40mo4yr5yr6yr10yr20yr50yrFrequencyTotal Hours
0Frequency determined by asset condition, mission dependency, and ROI Ref: AFMAN 91-203 para 24.14xDaily0
1Check with Facility Manager for deficienciesxWeekly0
2Inspect door for general condition/functionalityxSemi-Monthly0
3Check for proper operation, binding or misalignment and adjust as necessaryxMonthly0
4Check and lubricate door guides, pulleys, hinges, and latching mechanismsxBi-Monthly0
5Inspect and lubricate motor gearbox, drive chain (or belt), and motor where applicable; adjust as necessaryxQuarterly0
6Check operation of limit switch, adjust as necessaryxSemi-Annually0
7Check electrical operator, wiring, connections, and contacts; adjust as necessaryxAnnually0
8Repair or replace loose or missing hardwarex20mo0
9Clean area around doorx21mo0
10Compile list of discrepancies and open corrective maintenance work task(s) to make the repair(s)x2yrs0
3yr0
40mo0
4yr0
5yr0
6yr0
10yr0
20yr0
50yr0

B2035450195002

Equipment Type:B2035450195002
Component:Doors, Vault
PM Components (Task Description)DailyWeeklySemi-MonthlyMonthlyBi-MonthlyQuarterlySemi-AnnuallyAnnually20mo21mo2yrs3yr40mo4yr5yr6yr10yr20yr50yrFrequencyTotal Hours
1Collect maps, communication equipment, tools, safety equipmentxDaily0
2Check with Facility Manager and or vault manager for deficienciesxWeekly0
3Perform operational inspection per AFI 16-1404 Table A6.1. Ref: AFI 16-1404, Air Force Information Security Program, para 5.2.4.1.xSemi-Monthly0
4Compile list of discrepancies and open corrective maintenance work task(s) to make the repair(s).xMonthly0
Bi-Monthly0
Quarterly0
Semi-Annually0
Annually0
20mo0
21mo0
2yrs0
3yr0
40mo0
4yr0
5yr0
6yr0
10yr0
20yr0
50yr0

D20252603950

B2035450195003

Equipment Type:B2035450195003
Component:Electronic Locks
PM Components (Task Description)DailyWeeklySemi-MonthlyMonthlyBi-MonthlyQuarterlySemi-AnnuallyAnnually20mo21mo2yrs3yr40mo4yr5yr6yr10yr20yr50yrFrequencyTotal Hours
1Check with Facility Manager for deficienciesxxDaily0
2Remove HousingxWeekly0
3Replace BatteryxSemi-Monthly0
4Replace HousingxMonthly0
5Clean Electronic Locks with Swipe CardxxBi-Monthly0
6Fill out maintenance checklist and report deficienciesxxQuarterly0
Semi-Annually0
Annually0
20mo0
21mo0
2yrs0
3yr0
40mo0
4yr0
5yr0
6yr0
10yr0
20yr0
50yr0

B2035450195004

Equipment Type:B2035450195004
Component:Fabric Folding Door
PM Components (Task Description)DailyWeeklySemi-MonthlyMonthlyBi-MonthlyQuarterlySemi-AnnuallyAnnually20mo21mo2yrs3yr40mo4yr5yr6yr10yr20yr50yrFrequencyTotal Hours
1Collect maps, communications equipment, tools, safety equipmentxxxDaily0
2Perform manual test on brake; release brake and make sure door stops in the desired positionxxxWeekly0
3Inspect chain for wear; tighten or replace as required. LubricatexxSemi-Monthly0
4Clean and check all controls and wiring connectionsxxMonthly0
5Make sure sideframe and header covers are installedxxBi-Monthly0
6Clean Curtain with Isopropyl alcohol or warm soapy water. DO NOT use abrasive cleaner. Inspect for wear, damage and tears. Make sure curtain is tracking straightxxxQuarterly0
7Check gearbox for unusual noise. Check fluid levelxxSemi-Annually0
8Check header mounting hardware connections. Blow dust and debris from the headerxxAnnually0
9Check the limit switch open and close positions, check to ensure chain is tightxxx20mo0
10Check motor for normal operation, check connectionsxx21mo0
11Check photoeyes alignment, adjust as required. Check all connections. Wipe lens or reflectors cleanxxx2yrs0
12Check door seals for wear and tear. Make sure seals are sealing at the header and sideframe locationsxxx3yr0
13Inspect sideframe for damage. Check all mounting hardwarexx40mo0
14Inspect stabilizing bars for damage; straighten or replace as requiredxx4yr0
15Inspect lifting straps for wear and tear, replace as required. Make sure straps and tension pin nuts are tightxxx5yr0
16Make sure strap clamps are tight and curtain is sealing at the floorxx6yr0
17Compile list of discrepancies and open corrective maintenance job order(s) to make repair(s)xxx10yr0
20yr0
50yr0

B2035450195005

Equipment Type:B2035450195005
Component:Fabric Roll-Up Door
PM Components (Task Description)DailyWeeklySemi-MonthlyMonthlyBi-MonthlyQuarterlySemi-AnnuallyAnnually20mo21mo2yrs3yr40mo4yr5yr6yr10yr20yr50yrFrequencyTotal Hours
1Collect maps, communications equipment, tools, safetyxxxDaily0
2Operate all devices to verify proper operationxxxWeekly0
3Verify auto re-feed is operationalxxxSemi-Monthly0
4Verify that the brake stops the door at open and closed positions as well as when stopped in the middle of travel. To move the curtain manually, turn the brake release handle to the disengaged position. The curtain should be able to be moved manually. IfxxxMonthly0
5Clean, check all connections with disconnect off. Make sure all wires are free from moving partsxBi-Monthly0
6Inspect curtain for wear or damage, patch immediately to prevent condensation or frost buildup. Clean with warm soapy water. Check drive spheres, if missing or damaged, replaced. Check top roller for proper operationxxxQuarterly0
7Perform visual inspection for damage. Tighten all hardware. Replace any worn labels. Use air hose to remove dust and debrisxSemi-Annually0
8Operate door and make sure all operations are functioning properlyxAnnually0
9Verify drive tube gear is centered over track groove. Make sure bearing set screws and mounting bolts are tightx20mo0
10Check gearbox fluid level, fill with Mobil - SHC 624 or Phillips 66 - Syncon 32 if low. Check lock collar set screws for tightnessx21mo0
11Verify Encoder chain and sprocket set screws are tight. Verify lock collar on encoder is tight. Check open and close positions, adjust as requiredx2yrs0
12Verify lintel seal is sealing wall properlyx3yr0
13Check motor. Inspect junction box and plug connectionsx40mo0
14With power off, verify chain hoist opens door. Lubricate chain, sprockets and check alignmentx4yr0
15Verify both photoeyes reverse the curtain. LED’s on receiver should go on/off. Clean emitter and receiver lensxxx5yr0
16Perform visual inspection of tracks. Lubricate radials and tracks with food grade synthetic grease. (It may be required to remove the existing grease prior to adding new.) Verify proper width and tighten all hardware. Check foam seal if present.xxx6yr0
17Inspect track retention strips, replace if crackedx10yr0
18Compile list of discrepancies and open corrective maintenance job order(s) to make repair(s)xxx20yr0
50yr0

B3015225195001

Equipment Type:B3015225195001
Component:Roof, Low Sloped, Small (< 5000sf, min 2 person task)
PM Components (Task Description)DailyWeeklySemi-MonthlyMonthlyBi-MonthlyQuarterlySemi-AnnuallyAnnually20mo21mo2yrs3yr40mo4yr5yr6yr10yr20yr50yrFrequencyTotal Hours
0Ref: AFI 32-1001 and UFC 3-110-03xDaily0
1Check with Facility Manager for deficiencies. Ensure All Safety Equipment Is In Place Before Starting JobxWeekly0
2Inspect surface for wear and UV protection deteriorationxSemi-Monthly0
3Inspect membrane for holes or damagexMonthly0
4Parapet Membrane Flashing: Inspect for damage/holes/deterioration; Inspect for open seams/end laps; Inspect for open upper edge; Validate membrane is properly secured and counter flashing is in placexBi-Monthly0
5Parapet Counter Flashing: Inspect metal counterflashing; Inspect fasteners; Inspect end/lap joints in metalxQuarterly0
6Wall Membrane Flashing: Inspect membrane flashing for holes or damage; Inspect the flashing seams; Inspect the metal counterflashings for damage/holes and proper attachmentxSemi-Annually0
7Wall Counter Flashing: Inspect membrane flashing for holes or damage; Inspect the flashing seams; Inspect the metal counterflashings for damage/holes and proper attachmentxAnnually0
8Surface, Membrane, Flashing: Apply mastic and fabric. Tighten/install fasteners. Apply caulk/sealant to open metal joints to prevent moisture intrusionx20mo0
9Pipe vent: Inspect for corrosion; Inspect pipe flashing for damage/leaks; Inspect for proper air flowx21mo0
10Roof Hatch: Inspect base flashing; Inspect metal counterflashing; Inspect fasteners; Inspect end/lap joints in metal; Inspect the gasket in hatch hood for damage/holes; Inspect hatch door mechanism to ensure proper closeage/ lockingx2yrs0
11Mech Equip/Exhaust Fan/Vent: Inspect exhaust vent equipment for corrosion, missing/damaged panels, ensure equipment is running properly. Ensure drain lines properly piped and supported. Ensure the equipment properly supported/flashed. Ensure metal flashx3yr0
12Other Equip (Satelite Dish, etc): Inspect for damage; Inspect for proper support and proper membrane protection; Inspect for proper securement to support membersx40mo0
13Field Drain: Inspect flashing around drain; Inspect clamping ring for damage; Inspect bolts in clamping ring; Inspect strainer for damage; ensure drain flows freelyx4yr0
14Overflow Scupper: Inspect flashing around drain; Inspect strainer for damage; ensure drain flows freely; Inspect for proper connection to scupper box/downspout;x5yr0
15Drains/Scuppers: Tighten/install bolts. Clear debris.x6yr0
16Pitch Pan: Inspect for flashing around pitch pan; Inspect pitch pan edges for damage/holes/corrosion; Inspect for integrity of filler material; Fill with pitch as necessaryx10yr0
17Coping Cap: Inspect base flashing; Inspect metal cap end/lap joints; Inspect fasteners; Inspect for rust on metalx20yr0
18Gutters/Downspouts: Inspect. Clear debrisx50yr0
19Fill out maintenance checklist and report defeficiencies. Note: If re-coating is required, ensure a corrective maintenance task is opened.x

B3015225195002

Equipment Type:B3015225195002
Component:Roof, Low Sloped - Medium (5k sf - 10k sf, min 2 person task)
PM Components (Task Description)DailyWeeklySemi-MonthlyMonthlyBi-MonthlyQuarterlySemi-AnnuallyAnnually20mo21mo2yrs3yr40mo4yr5yr6yr10yr20yr50yrFrequencyTotal Hours
0Ref: AFI 32-1001 and UFC 3-110-03xDaily0
1Check with Facility Manager for deficiencies. Ensure All Safety Equipment Is In Place Before Starting JobxWeekly0
2Inspect surface for wear and UV protection deteriorationxSemi-Monthly0
3Inspect membrane for holes or damagexMonthly0
4Parapet Membrane Flashing: Inspect for damage/holes/deterioration; Inspect for open seams/end laps; Inspect for open upper edge; Validate membrane is properly secured and counter flashing is inplacexBi-Monthly0
5Parapet Counter Flashing: Inspect metal counterflashing; Inspect fasteners; Inspect end/lap joints in metalxQuarterly0
6Wall Membrane Flashing: Inspect membrane flashing for holes or damage; Inspect the flashing seams; Inspect the metal counter flashings for damage/holes and proper attachmentxSemi-Annually0
7Wall Counter Flashing: Inspect membrane flashing for holes or damage; Inspect the flashing seams; Inspect the metal counter flashings for damage/holes and proper attachmentxAnnually0
8Surface, Membrane, Flashing: Apply mastic and fabric. Tighten/install fasteners. Apply caulk/sealant to open metal joints to prevent moisture intrusionx20mo0
9Pipe vent: Inspect for corrosion; Inspect pipe flashing for damage/leaks; Inspect for proper air flowx21mo0
10Roof Hatch: Inspect base flashing; Inspect metal counter flashing; Inspect fasteners; Inspect end/lap joints in metal; Inspect the gasket in hatch hood for damage/holes; Inspect hatch door mechanism to ensure proper closeage/lockingx2yrs0
11Mech Equip/Exhaust Fan/Vent: Inspect exhaust vent equipment for corrosion, missing/damaged panels, ensure equipment is running properly. Ensure drain lines properly piped and supported. Ensure the equipment properly supported/flashed. Ensure metal flashx3yr0
12Other Equip (Satelite Dish, etc): Inspect for damage; Inspect for proper support and proper membrane protection; Inspect for proper securement to support membersx40mo0
13Field Drain: Inspect flashing around drain; Inspect clamping ring for damage; Inspect bolts in clamping ring; Inspect strainer for damage; ensure drain flows freelyx4yr0
14Overflow Scupper: Inspect flashing around drain; Inspect strainer for damage; ensure drain flows freely; Inspect for proper connection to scupper box/downspout;x5yr0
15Drains/Scuppers: Tighten/install bolts. Clear debris.x6yr0
16Pitch Pan: Inspect for flashing around pitch pan; Inspect pitch pan edges for damage/holes/corrosion; Inspect for integrity of filler material; Fill with pitch as necessaryx10yr0
17Coping Cap: Inspect base flashing; Inspect metal cap end/lap joints; Inspect fasteners; Inspect for rust on metalx20yr0
18Gutters/Downspouts: Inspect. Clear debrisx50yr0
19Fill out maintenance checklist and report defeficienciesx

B3015225195003

Equipment Type:B3015225195003
Component:Roof, Low Sloped, Large (up to 15k sf, min 2 person task)
PM Components (Task Description)DailyWeeklySemi-MonthlyMonthlyBi-MonthlyQuarterlySemi-AnnuallyAnnually20mo21mo2yrs3yr40mo4yr5yr6yr10yr20yr50yrFrequencyTotal Hours
0Ref: AFI 32-1001 and UFC 3-110-03xDaily0
1Check with Facility Manager for deficiencies. Ensure All Safety Equipment Is In Place Before Starting Job. Note: Roofs should be managed in sections corresponding with appropriate PMTL sizingxWeekly0
2Inspect surface for wear and UV protection deteriorationxSemi-Monthly0
3Inspect membrane for holes or damagexMonthly0
4Parapet Membrane Flashing: Inspect for damage/holes/deterioration; Inspect for open seams/end laps; Inspect for open upper edge; Validate membrane is properly secured and counter flashing is inplacexBi-Monthly0