Appendix C-402 AMXG Aircraft Painters.docx
DOCX document 49 KB Posted
- Attached to
- AMXG Aircraft Painters Federal contract opportunity
- Solicitation number
- FA8571
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Aircraft Painters Ktr Q and A.docx | DOCX document | |
| Aircraft Painters Pricing Sheet April 2022.xlsx | XLSX spreadsheet | |
| PWS dated 13 April 2022.pdf | ||
| CDRL A004 - Contractors Safety Plan.pdf | ||
| CDRL A006 - Status Report - Work Management Plan.pdf | ||
| CDRL A005 - Accident Incident Report.pdf | ||
| Wage Determination 2015-4495 Rev 18.pdf | ||
| Solicitation - FA857122R0010 5-19.pdf | ||
| CDRL A001 - Status Report - Monthly.pdf | ||
| CDRL A002 - Certification_Data Report.pdf | ||
| CDRL A003 - Quality Program Plan.pdf | ||
| DD Form 254 - F3QCCL2083A005 TBD.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX C
INDUSTRIAL SAFETY AND HEALTH REQUIREMENTS
For
402nd AMXG Aircraft Painters
22 March 2021
PR:
PART I
INSTRUCTIONS
The contractor Safety and Health Plan shall address in detail the items listed in Part II through Part III as applicable. Repeating the referenced standard without addressing the company’s specific processes or procedures will not suffice. If task specific procedures are incorporated into a company local document, those procedures must be attached to the submitted Safety and Health Plan. Referencing the company's local procedure/document in the Safety and Health Plan is not adequate. If the company's local procedure/document is not attached; the submitted Safety Plan will be returned NOT ACCEPTED.
PART II
1. ENVIRONMENTAL, SAFETY, AND OCCUPATIONAL HEALTH (ESOH): The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees.
2. VOLUNTARY PROTECTION PROGRAMS (VPP): The Air Force is part of the OSHA VPP. All contractors are required to familiarize themselves with the requirements of VPP. Information on VPP can be accessed at http://www.osha.gov. The intent of the Air Force Safety Program is to prevent injuries and to communicate our safety expectations with potential offerors as well as those contractors awarded a government contract. The Air Force’s interest is to protect personnel working in or around contractor operations, and to protect Air Force equipment/property.
3. CONTRACTOR EMPLOYEES: Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor. Note: The Air Force Consolidated Occupational Safety Instruction is annotated because many of the Air Force Safety Instruction exceeds the OSHA standard criteria. If a conflict is noted, the most stringent requirement takes precedence. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. The contractor shall furnish to each of his/her employees a place of employment, `which is free from recognized hazards. The contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks. The contractor is responsible for compliance with OSHA Public Law and the resultant standards identified within. In addition, the contractor is required to flow down the safety requirements/specification to all subcontractors. This applies to Federal Acquisition Regulation (FAR) 12 commercial acquisitions as well. This contract shall in no way require persons to work in surroundings or under working conditions which are unsafe or dangerous to their health. The contractor must coordinate and perform work so as not to impact the safety of government employees or cause damage to government property. This requires providing personnel with protective equipment and associated safety equipment as may be necessary. The contractor must also protect personnel from hazards generated by the work. If the contractor employs BILINGUAL speaking employees, they must post bilingual signs and have written procedures for specific tasks in applicable languages.
4. INSPECTIONS: Air Force Environmental, Safety, Occupational Health and Fire protection officials or responsible Quality Assurance Evaluator (QAE) may periodically enter a contractor’s workplace to verify working conditions of Air Force personnel. If an Air Force employee observes improper procedures or unsafe conditions exits which place Air Force personnel or equipment/facilities in jeopardy, the contractor will remove personnel and/or equipment from the unsafe condition and immediately notify the Contracting Officer and the Installation Safety Office. Department of Labor, OSHA inspectors are authorized right of entry to inspect any place of employment operated by an Air Force contractor. They are for the most part, “NO NOTICE” inspections. NOTE: Notify the Safety Office at (478)-222-0043 if an OSHA inspector visits your site unescorted by an Air Force Safety Technician. Noncompliance with safety requirements can result in work stoppage, inexcusable delays, and/or costly fines issued by the DOL. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. Fines and additional costs for violations levied against the contractor as a result of OSHA findings, and/or installation safety, fire, health or environmental are the sole responsibility of the contractor and shall not be passed through to the Government.
5. MISHAP NOTIFICATION: The contractor shall notify the Safety Office telephonically at (478)-222-0043 during duty hours and (478)-926-3567 after hours, within four (4) hour after initial notification of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as a result of the contract operation. A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the Procurement Contracting Officer (PCO) or the Administrative Contracting Officer (ACO) (with a copy to program manager), who will forward it to the Safety Office. The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:
| a. Contract, Contract Number, Name and Title of Person(s) Reporting |
| b. Date, Time and exact location of accident/incident |
| c. Brief Narrative of accident/incident (Events leading to accident/incident) |
| d. Cause of accident/incident, if known |
| e. Estimated cost of accident/incident (material and labor to repair/replace) |
| f. Impound Authority Name and Phone Number (as applicable) |
| g. Nomenclature of equipment and personnel involved in accident/incident |
| h. Corrective actions (taken or proposed) |
| i. Other pertinent information |
Note: If requested by Government Personnel (PCO/ACO), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the investigating safety office. If the government investigates the mishap, the contractor and the subcontractors shall cooperate fully and assist the government personnel until the investigation is finalized and closed out.
*A CLASS A mishap is: A fatality or permanent total disability and property damage cost totaling 2 million dollars or more.
*A CLASS B mishap is: An injury resulting in permanent or partial disability or property damage cost totaling of 500,000 dollars or more but less than $2,000,000.
*A CLASS C mishap is: An injury or occupational illness resulting in lost workdays or property damage cost totaling of 50,000 dollars or more but less than $500,000.
*A CLASS D mishap is: An injury or occupational illness resulting in restricted days, transfer days, or property damage cost totaling of 20,000 dollars or more but less than $50,000.
* These numbers are subject to change.
*A CLASS E event is: An unplanned occurrence, or series of occurrences, that does not meet the reporting criteria of a mishap.
6. IMPOUNDMENT PROCEDURES: The contractor shall establish written impoundment procedures, as part of their Safety and Health Plan. Impound data must be included in the Mishap Notification Procedures as applicable. As a minimum, the procedures must address:
| a. Appointment of Impound Authority in writing (copy faxed to QAP and Safety Office) |
| b. Impound Authority e-mail address and phone numbers |
| c. Specific instructions (cordon, facility locked facility, etc.) to secure the site or |
| government asset, to prevent tampering with the aircraft, site or government assets |
| d. Specific instructions or measures to ensure only authorized personnel directly involved |
| in management, SAFING, troubleshooting, or repair of aircraft or equipment gain access |
| to the impound site |
| e. Additional guidance is located within AFI 21-101, AFMC Supplement 1 and WR-ALC |
OI 91-204
7. CONTRACTOR SAFETY AND HEALTH PROGRAM: The contractor shall establish and maintain an acceptable safety and health program.
a. Contractor Safety and Health Manager. As part of the Contractor Safety and Health Program, the contractor shall assign in their plan, by name and phone number, a person who will be the primary point of contact for safety and health issues for the on-site operation.
b. Contractor’s Safety and Health Plan. Contractor shall prepare a safety and health plan in accordance with PART I, PART II, and PART III; incorporating the listed elements above, and the flagged items below in PART II and PART III of this Appendix, prior to award. The contractor shall ensure that each element identified below is adequately addressed in detail in the safety and health plan. The plan must be accepted by the government prior to work commencing and will be incorporated into the awarded contract. Should a master safety and health plan remain on file with the Installation Safety Office; the contractor must ensure that it is current, updated, and includes all elements below. An addendum to the plan must include the processes noted below:
(1) Changes to the Plan. If, during the performance of this contract, changes to the contractor’s Safety and Health Plan are required, the contractor shall submit a revised Safety and Health Plan to the following Contracting Monitor: 402 MXSG/OB, (478) 926-8579. The accepted revised Safety and Health Plan shall then be incorporated by contract modification as an attachment or by reference.
(2) Tracking Rates. The Contractor’s Safety and Health Plan shall identify how their Total Case Incident Rate (TCIR) & Days Away, Restricted and/or Transferred (DART) rates, or comparable insurance rates or compensation injury rates will be tracked, and the corrective measures to be used if these rates begin to decline. The contractor must also describe the processes and procedures to be used to track their compliance with their Safety and Health Plan and how they will correct any deviations from the plan, when and if identified.
PART III
The following checked items are required elements for performance of this contract. The contractor’s safety and health plan shall address how compliance with these requirements will be ensured. The safety plan shall clearly define company procedures on specific tasks/processes, personnel qualifications, how facilities comply with fire requirements to include the electrical wiring and fire protection systems installed (i.e., fire suppression, fire detection, fire extinguishers, firewall ratings, etc.) required equipment used to accomplish tasks and other necessary requirements to fulfill the checked items for the protection of government personnel and property. The contractor’s safety and health plan shall meet, but may exceed the referenced standards. The contractor must ensure AF Civil Engineering Support Agency (AFCESA) Engineering Technical Letters (ETL) are incorporated into their safety and health plan as applicable.
Note regarding Motor Vehicles: Installation Commanders of all DOD installations in the United States and over which the United States has exclusive or concurrent legislative jurisdiction are delegated the authority to establish additional vehicular and pedestrian traffic rules and regulations for their installations. All persons on a military installation shall comply with locally established vehicular and pedestrian traffic rules and regulations. A person found guilty of violating, on a military installation, any State vehicular or pedestrian traffic law or local DoD 5525.4, paragraph 3 – 4: Pursuant to the authority established in Enclosure 1, installation vehicular or pedestrian traffic rule or regulation made applicable to the installation under the provisions of this directive is subject to a fine of not more than $50 or imprisonment for not more than 30 days, or both, for each violation (40 U.S.C., Section 318c (reference d).
X, Yes, does apply to this contract
Note: MANDATORY for on installation services.
PEDESTRIAN CROSSWALKS: All contractor personnel are required to use the closest crosswalk, or traffic controlled intersection when crossing the road. Pedestrians must look both ways to ensure the coast is clear before stepping out into the crosswalk. Pedestrians DO NOT have the right of way unless they are already in the crosswalk. Contractor vehicle operators have the same responsibilities as pedestrians, to share the road and mutually observe and yield to pedestrians.
MOTOR VEHICLES: Contractor shall comply with the standards in: DoD Directive 5525.4, Enforcement of State Traffic Laws on DoD Installations", Nov 2, 1981, para 3-4; DODI 6055.4, DoD Traffic Safety Program, 20 April 2009; AFI 91-207, USAF Traffic Safety Program, 16 Feb 2017. Each applies to all persons at any time on an Air Force Installation and includes all leased, owned, or privatized property including housing areas. In addition: AFI 13-213, Airfield Driving, 1 June 2011, paras 1.1 and 3.2.2 and RAFBI 13-213 Control and Operation of Vehicles on Robins AFB Airfield, Chap 4, guidance applies to all contractors, sub-contractors, vendors, commercial delivery companies, and all other private business vehicles who operate anywhere on Robins Air Force Base, including the airfield (to include the industrial areas and any buildings or hangars located upon the airfield) in support of their mission.
FOREIGN OBJECT DAMAGE (FOD) Awareness, Prevention and Responsibilities: Contractor shall comply with the standards in: AFI 21-101 AFMC Sup 1, Aircraft and Equipment Maintenance Management, 26 April 2012, paragraphs 14.19 - 14.19.10.; National Aerospace Standard (NAS) 412, Foreign Object Damage/Foreign Object Debris (FOD) Prevention Program, Oct 97; AFMAN 91-203, Air Force Occupational Safety, Fire and Health Standards, 11 Dec 18, Chap 24 Aircraft Flight line – Ground Ops and Activities, and RAFBI 13-213 Control and Operation of Vehicles on Robins AFB Airfield, Chap 4, The FOD program must be integrated into the day-to-day operations to reduce/eliminate FOD incidents. Programs will include covering waste dumpsters, waste hauling trucks, barriers in place to stop migrating FOD from dirt and gravel piles, and end of shift or daily clean-up. The contractor will brief their personnel at least weekly on any FOD requirements. All contractors, subcontractors performing maintenance in a FOD–potential area will receive and have documented initial FOD Awareness and Prevention training. For AFMC organizations, Course number MHPMAS00001300 may be used to satisfy this requirement. Subject training will be given during Flight Line Drivers Training by the host Base Operations Flight, 78 OSS/OSA. All vehicle operators are responsible for performing a Foreign Object (FO) inspection on their vehicles including all towed equipment, vehicle tires and open cargo areas of vehicles prior to entering the marked runway, taxiway, flight line, and aircraft parking ramps and other areas as directed by the Installation FOD Awareness and Prevention Officer. All “open-air” delivery vehicles must be free of loose items/debris that could potentially fall from the vehicle and cause a FOD hazard. The cargo beds of pickups truck must be clean or covered prior to entering the airfield. Vehicles will be subject to inspection and denied entry if found unacceptable. Contractors and site/operations evaluators will ensure tools; equipment, rags, residue and hardware are properly stored and accounted for. “Clean as you go” methods are required.
WALKING – WORKING SURFACES: Contractor shall comply with the standards in 29 CFR 1910 Subpart D and NFPA 101, Life Safety Code. All interior walking and working surfaces which are part of the means of egress shall remain clear at all times and comply with the requirements of NFPA 101, Life Safety Code. Floors shall be kept in good condition and free of defects that can endanger workers or interfere with the handling of materials. Housekeeping – methods and controls are in place to minimize tripping hazards, the accumulation of flammable/combustible materials, etc. Portable metal ladders – methods and controls are in place to ensure inspection and safe use. Open-sided floors/platforms/runways must be protected and not left uncovered to prevent injury.
X, Yes, does apply to this contract
SCAFFOLDING: Contractor shall comply with the standards in: 29 CFR 1910 Subpart D and 29 CFR 1926 Subpart L. Scaffolds are used for persons engaged in work that cannot be done safely from the ground or from solid construction. A competent and qualified person must be on site to make decisions on scaffolding operations. Contractor’s Safety Plan shall also address:
| - Safety requirements for construction (as applicable), operation, maintenance, railings, |
| toeboards, inspections, fall protection, and use |
| - Rails |
| - Bracing |
| - Toeboards |
| - Fall Protection |
POWERED PLATFORMS, MANLIFTS AND VEHICLE-MOUNTED WORK PLATFORMS: Contractor shall comply with the standards in 29 CFR 1910 Subpart F. Manlifts are used for the purpose of allowing workers to perform duties at elevated levels. A competent and qualified person must be onsite to make decisions on manlift operations.
Note: Fall restraint is the preferred method for fall protection. Contractor’s Safety Plan shall also address:
| - Personal Fall Arrest Systems (PFAS) {body harness, lanyard, lifeline, etc., inspections} |
| - Manlift – maintenance, inspection, and operation |
AERIAL LIFTS EQUIPMENT: Contractor shall comply with the standards in 29 CFR 1910.66 Subpart F , American National Standards Institute (ANSI) ANSI 92.2, ANSI 92.5, ANSI 92.6, AFMAN 91-203, Air Force Occupational Safety, Fire and Health Standards, 11 Dec 18 , Chap 16, Mobile Elevating Work Platforms, and Para 16.4, and WR-ALC OI 91-203, Chap 6, Vehicle and Self-Propelled Equipment Operations in Industrial and Flight Line Areas. Aerial lifts have inherent risks associated with their use. The Air Force has established procedures to ensure only trained and qualified personnel are operating aerial lifts. In the past, the lifts were identified that did not meet regulatory safety requirements and foreign objects (FO) were found on the equipment. Based on this negative trend and a fatal mishap in years past, the following policies, procedures and processes will be adhered to when aerial lifts are used to support a contractor mission:
| (1) Aerial devices shall include the following types of vehicle mounted aerial devices |
| used to elevate personnel to job sites above ground: |
| - Extendible boom platforms |
| - Aerial ladders |
| - Articulating boom platforms |
| - Vertical towers and a combination of any of the above |
| (2) Aerial equipment may be made of metal, wood, fiberglass reinforced plastic, or other |
| material; may be powered or manually operated, and are deemed to be aerial lifts |
| whether or not they are capable of rotating about a substantially vertical axis. |
| Note: SCISSOR LIFTS: OSHA Interpretation letters on file, place scissors lifts in the |
| above described category regardless of powered or manual. |
PERSONAL PROTECTIVE EQUIPMENT FOR AERIAL LIFT DEVICES: To ensure compliance with 29 CFR 1910.66, Subpart F, Appendix C, 29CFR 1910.133, Personal Protective Equipment, 29CFR 1926.453, Aerial Lifts, 29CFR 1926.104, Safety belts, Lifelines & Lanyards, and 29CFR 1926.501, Duty to have Fall Protection; the contractor will ensure the following: Contractor employees will use fall restraint on all aerial lift devices unless so certified for fall arrest by the manufacturer. Fall restraint is the preferred standard for DOD installation operations with aerial devices. Fall restraint will consist of a harness (no body belts allowed) and a lanyard shortened to the minimum length to allow work but not allow the employee to leave the platform cage or stand on toe-boards or mid-rails. Energy absorbing lanyards are not authorized for fall restraint. Lanyards will have self-closing; self-locking keepers which remain closed and locked until unlocked and pressed open for connection or disconnection. Contractor employees operating, observing and spotting for aerial devices will wear approved hard hats.
GENERAL FALL PROTECTION: Contractor shall comply with the standards in: 29 CFR 1910.66, Appendix C, Subpart F and 29 CFR 1926.500-502, Subpart M – If a person can fall 4 feet or more; fall protection must be provided to prevent injury. Contractor’s Safety Plan shall also address:
| - Guardrail System (height and load rating) |
| - Safety Net System (location, inspection, and testing) |
| - Personal Fall Arrest System (PFAS) - life line, lanyard, component strength, and |
anchorage
| - Fall Protection Plan |
| - Qualifications of persons |
HAZARDOUS MATERIALS: Contractor shall comply with the standards in 29 CFR 1910.120, Subpart H – The handling and Storing of Hazardous Materials (chemicals, compressed air, acetylene, etc). When handling the hazardous material the following must be accomplished: Compressed gases – training, handling, storage, use, and PPE; flammable and combustible liquids – training, handling, storage use, and PPE. Contractor’s Safety Plan shall also address:
| - Training, handling, storage, use and PPE |
| - Explosives and blasting agents |
| - Dipping and coating operations |
COMPRESSED GAS AND COMPRESSED AIR EQUIPMENT: Contractor shall comply with the standards in 29 CFR 1910.169, Subpart M. Contractor’s Safety Plan shall also address:
| - Employee Training |
| - Inspections |
| - Storage and Handling |
X, Yes, does apply to this contract
MATERIALS HANDLING AND STORAGE: Contractor shall comply with the standards in 29 CFR 1926.250, 953, 957 and 29 CFR 1910.101, Subparts F, H & N; and 29 CFR 1910.178, Powered Industrial Truck. Contractor’s Safety Plan shall also address:
| - Storage and handling of materials |
| - Disposal of trash from elevations |
| - Personnel lifting techniques--proper storage to prevent shifting, for stability, etc. |
| - Rigging (requirements, inspection, components, and qualifications) |
| - Equipment (use in handling materials) |
| - Industrial trucks (training, inspection, maintenance, and safe use) |
PERSONAL PROTECTIVE EQUIPMENT: Contractor shall comply with the standards in29CFR1910.132, 134, 136 Subpart I and 29 CFR 1926, 28, 95, 100, 101, 102, & 951. Personnel protective equipment is required to be worn when employees are exposed to a potential hazard, working overhead, falling objects, etc. Contractor’s Safety Plan shall also address:
| - Eye and face protection |
| - Head protection |
| - Foot Protection |
| - Electrical protective equipment |
| - Hand protection |
| - Safety harnesses, life lines, and lanyards. |
RESPIRATORY PROTECTION PROGRAM ELEMENTS: Contractor shall comply with the standards in 29 CFR 1910.134 and 29 CFR 1926.134. Respirators are required to be worn if employees are exposed to inhalation hazard. Contractor’s Safety Plan shall also address:
| - Training |
| - Medical evaluation |
| - Fit tests |
| - Selection of respiratory equipment |
| - Storage of respiratory equipment |
| - Pre-use checks |
HAND AND PORTABLE POWERED TOOLS AND OTHER HAND-HELD EQUIPMENT: Contractor shall comply with the standards in 29 CFR 1910 Subpart P and 29 CFR 1926 Subpart I. Contractor’s Safety Plan shall also address:
| - Inspection |
| - Proper use |
| - Guarding |
| - Maintenance |
| - Control of rotating parts, flying chips, and sparks |
HAZARDOUS COMMUNICATIONS: Contractor shall comply with the standards in 29 CFR 1910.1200. Contractor’s Safety Plan shall also address:
| - Written Program-list of hazardous chemicals |
| - Identify the hazardous chemical(s)-labeling system |
| - SDS data sheet location |
| - Employee information and training-methods used to inform employees of the hazards, |
| and precautionary measures |
HEARING CONSERVATION PROGRAM ELEMENTS: Contractor shall comply with the standards in 29 CFR 1910.95 and 29 CFR 1926.52. .NOTE: Noise exposures are based on ACGIH guidelines of 85 dB TWA. Contractor’s Safety Plan shall also address:
| - Monitoring (survey of noise producing equipment) |
| - Audiometric testing |
| - Hearing Protectors |
| - Training |
| - Recordkeeping/Access to information and training material |
X, Yes, does apply to this contract
MEDICAL AND FIRST AID: Contractor shall comply with the standards in 29 CFR 1910 Subpart K and 29 CFR 1926 Subpart C. Contractor’s Safety Plan shall also address:
| - Adequate first aid supplies |
| - Trained employee to render first aid |
| - Recordkeeping |
| - Reporting and investigating accidents/incidents |
| - Off-site physician(s) |
| - Maintenance of and employee access to exposure monitoring data and medical records |
GROUNDING, BONDING OF AIRCRAFT & AVIONICS EQUIPMENT: Contractor shall comply with the standards for grounding and bonding in accordance with TO 00-25-172, Ground Servicing of Aircraft and Static Grounding/Bonding, 15 Jul 02/Change 12-12 Feb 08, for aircraft repair and TO 00-25-234, General Shop Practice Requirements for the Repair, Maintenance and Test of Electrical Equipment, 1 Aug 88/Change 36, 13 Aug 07, for avionics equipment.
HOUSEKEEPING: Housekeeping shall be conducted according to the requirements in OSHA Standard 29 CFR 1910.141. CLEAN AS YOU GO will be enforced. Refuse, trash, and debris will be collected daily and not left on site to prevent hazards during high winds and inclement weather.
AIRCRAFT PAINTING & PAINT REMOVAL OPERATIONS: Contractor shall comply with the standards in T.O. 1-1-8, Application and Removal of Organic Coatings, Aerospace and Non-aerospace Equipment, 15 February 06, Change 3/30 January 08;NFPA 33, Spray Application Using Flammable or Combustible Materials, 2011 Edition, NFPA 70, National Electrical Code, 2014 Edition; NFPA 91, Exhaust Systems for Air Conveying of Vapors, Gases, Mists, and Noncombustible Particulate Solids, 2010 Edition; NFPA 409, Aircraft Hangars, 2011 Edition ; NFPA 410, Aircraft Maintenance, 2010 Edition (cite specific applicable aircraft T.O.s) and AFMAN 91-203, Air Force Occupational Safety, Fire and Health Standards, 11 Dec 18, Chap 28, Para 28.12.
CLEANING/CORROSION CONTROL OF AIRCRAFT: Corrosion removal and treatment shall be conducted according to T.O. 1-1-691, Cleaning and Corrosion Prevention and Control, Aerospace and Non-Aerospace Equipment, 1 Jul 03, Change 2, 19 Oct 07.
WORK STANDS/PLATFORMS: Contractor’s procedures shall comply with AFMAN 91-203, Air Force Occupational Safety, Fire and Health Standards, 11 Dec 18, Chap 16 and 35A4 series T.O.s -Ground Support Equipment (various maintenance stands).
FIRE PROTECTION FOR FACILITIES: Contractor’s procedures shall comply with NFPA 10, Portable Fire Extinguishers, 2010 Edition; NFPA 13, Installation of Sprinkler Systems, 2013 Edition; NFPA 33, Spray Application Using Flammable or Combustible Materials, 2013 Edition; NFPA 70, National Electrical Code, 2014 Edition; NFPA 72, National Fire Alarm Code, 2013 Edition; NFPA 91, Exhaust Systems for Air Conveying of Vapors, Gases, Mists, and Noncombustible Particulate Solids, 2010 Edition; NFPA 409, Aircraft Hangars, 2011 Edition; NFPA 410, Aircraft Maintenance, 2010 Edition; NFPA 418, Fire protection for Heliports, 2011 Edition; NAS 3306, Facility Requirements for Aircraft Operations, May 00 and RAFBI 32-2001, The Fire Protection Operations and Fire Prevention Program, 6 June 16, and Air Force Civil Engineer Support Agency (AFCESA) Engineering Technical Letters (ETL) listed in PART III.
PART IV
Air Force Civil Engineering Center (AFCEC) Engineering Technical Letters (ETLs). Offerors should contact AFCEC, 1-888-232-3721, DSN 523-6995, to request access to the current listing of all applicable ETLS.
Applicable References
Mishap Reporting/Notification Requirements AFI 91-204 and WR-ALC OI 91-204
| Towing/Parking | AFMAN 91-203 Chapter 24 & Applicable |
| Technical Orders |
Grounding and Bonding T.O. 00-25-172
Material Handling Equipment (MHE) AFMAN 91-203 Chapters 4/12, OSHA CFR
1910.176 and Applicable Manufacturers Specifications
Handling, Storage and Use of Flammable and NFPA 30, NFPA 33, AFMAN 91-203 Chapter Combustible Liquids 22 Storage and DoD 4140.25 (for POL Storage)
Housekeeping and Sanitation AFMAN 91-203 Chapter 2 and OSHA 29 CFR 1910.141
Work Stands/Platforms/Scaffolding AFMAN 91-203 Chapters 16 and 17
Welding, Cutting and Brazing AFMAN 91-203 Chapter 27, OSHA CFR 1910.252/132 and NFPA 410, NFPA 51B
Foreign Object Damage (FOD) Prevention AFI 21-101, AFMCI 21-122 and AFMAN 91-
Facility Requirements NFPA 10, 13, 33, 70, 72, 91, 101,409, and 410
Flight line Requirements AFMAN 91-203 Chapter 24
Traffic Safety AFI 91-207 and RAFBI 13-213
Electrical Safety AFMAN 91-203 Chapter 8 and NEC70/70E
Cranes, Hoists OSHA CFR 1910-179 and 1926-550
Facility Fire Protection AFMAN 91-203 Chapter 6, RAFBI 32-2001 and NFPA 13, 70, 72, 101, 409 and 410
Responsibility of Vehicle Operators WR/ALC OI 24-2
Weather AFMAN 91-203 Chapter 3, WR-ALCI 15-125 and RAFB 15-1
FILE NUMBER:
PREPARED BY: WR - ALC/SEG
FILE NUMBER:
PREPARED BY: KATHYA PRESCOTT, WR - ALC/SEG
File details come from the government source that posted it. Updated .