This document is a Statement of Work (SOW) for a three-year (3) Blanket Purchase Agreement contract for the purchase and delivery of landscaping materials for Argonne National Laboratory.
The SOW outlines the objective to furnish a Blanket Purchase Agreement for landscape materials, including topsoil, dirt, compost, sand, mulch, fertilizer, grass seed, straw, and timber. The contractor shall provide delivery of these materials, with a lead time of 1-3 days, between the hours of 7 am - 3:30 pm, Monday - Friday. All deliveries must be in the presence of an Argonne employee, and the contractor must follow Argonne's policies and procedures. The estimated annual usage for each material is provided.
The related federal contract opportunity is a solicitation for this Blanket Purchase Agreement, with a period of performance from November 1, 2024, through October 31, 2027. The solicitation requires the offeror to provide a published price list, completed forms (JSA, Service Contract Act Certification, etc.), and a Certificate of Insurance. The award will be made to the contractor who can best meet Argonne's requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Argonne National Laboratory Appendix “B” – Scope of Work
Landscape Material Blanket Purchase Agreement October 10, 2024
Objective Furnish a three-year (3) Blanket Purchase Agreement contract for the purchase and delivery of landscaping materials. There is no guarantee of quantities of supplies to be purchased or number of purchases to be placed.
Scope
- Contractor shall provide delivery of the below miscellaneous landscape materials.
- The Contractor will provide the Safety Data Sheet(s) for any hazardous materials that will be used prior to service.
- Deliveries shall be made between the hours of 7 am – 3:30 pm, Monday – Friday.
- All deliveries shall be in the presence of an ANL employee. Contractor personnel shall be escorted by an ANL employee while on site, who will spot and supervise the driver while unloading.
- After dumping load Driver must lower bed before driving away.
Material Estimated Usage
Topsoil 300 Yards
Rough Dirt 300 Yards
Compost-Garden Mix 50 Yards
Play Sand/50 lb. Bag 200 Bags
Playground Mulch 400 Yards
Hardwood Mulch 1400 Yards
Fertilizer/ 45 lb. Bag 50 Bags
Grass Seed/50 lb. Bag 100 Bags
Straw Bale 100 Bales
Timber 5.5” x 8” 50 Each
Sod 2’ x 50’ Rolls 300 Rolls
Contractor Requirements
- The lead time for deliveries shall be one (1) to three (3) days.
- The Contractor shall abide by all ANL policies and procedures in the completion of work on site.
- Drivers must adhere to “Illinois Rules of the Road” while driving on site.
- The Contractor shall provide a completed and signed Job Safety Analysis (JSA) using ANL form ANL-209H and valid Certificate of Insurance prior to receiving the “Notice to Proceed”.
Place of Performance Argonne National Laboratory 9700 South Cass Ave Receiving, Building 46 Lemont, IL 60439
Period of Performance November 1, 2024, through October 31, 2027
Call Manager(s) Rachel Carlson Dawn Ferrazzi