Appendix B - SC5.2 AE CMGC_2025.docx
DOCX document 130 KB Posted
- Attached to
- FRCC Facilities Master Plan
- Solicitation number
- RFQ1 GJEA 2026000042 1
- Issued by
- Adams County, Weston CDP, Colorado
About this file
Summary of Appendix B - SC5.2 AE CMGC_2025
I am unable to provide the requested summary because the actual content of the "Appendix B - SC5.2 AE CMGC_2025.docx" file was not included in your message. While you provided the file metadata (GovTribe ID, filename, and associated contract opportunity information for the FRCC Facilities Master Plan in Colorado), the document's substantive content—including details about services, products, quantities, timelines, pricing, and other contract terms—was not provided for review.
To complete this summary, please share the full text or content of the Appendix B document so I can analyze and summarize the key details according to your specified format.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix A - Evaluation Forms.docx | DOCX document | |
| Appendix D - Building Inventory List.pdf | ||
| FRCC Master Plan - 6.3.26.pdf | ||
| Appendix C - Acknowledgement and Attestation Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
ARCHITECT/ENGINEER AGREEMENT CONSTRUCTION MANAGER/GENERAL CONTRACTOR Comment by State Buildings Program: Note to Drafters: Gray highlighted sections are fillable fields. To use those fields, use “protect document” to restrict editing to “filling in forms”, then type in the appropriate field. If the document is unprotected, then typing in the field will delete that field and replace it with the text typed.
(STATE FORM SC-5.2)
State Agency Insert Department or IHE’s Full Legal Name Department I.D.
Insert Department identification Contract I.D. Number Insert CMS number or other contract number Project Number Insert OSC Project Number Project Name Insert Project as as provided by the State Controller's Office Consultant Name Insert Consultant's full Legal Name including "Inc.", "LLC" etc.
SC-5.2
Rev. 07/2025
Principal Representatives
For the State:
Name Department Name Address Line 1 Address Line 2 City, State ZIP Email
For Contractor:
Name Company Name Address Line 1 Address Line 2 City, State ZIP Email
SC-5.2
Rev. 01/2024
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
ARCHITECT/ENGINEER AGREEMENT
CONSTRUCTION MANAGER/GENERAL CONTRACTOR
(STATE FORM SC-5.2)
TABLE OF CONTENTS Page Comment by State Buildings Program: Note to Drafter: remember to update the Table of Contents before finalizing
| 1 | ARTICLE 1 BASIC SERVICES OF THE ARCHITECT/ENGINEER | 4 |
| 1.1 | THE SERVICES | 4 |
| 1.2 | QUALIFICATIONS | 6 |
| 1.3 | PRE-DESIGN PHASE | 7 |
| 1.4 | SCHEMATIC DESIGN PHASE | 7 |
| 1.5 | DESIGN DEVELOPMENT PHASE | 8 |
| 1.6 | CONSTRUCTION DOCUMENTS PHASE | 10 |
| 1.7 | BIDDING PHASE | 11 |
| 1.8 | CONTRACT ADMINISTRATION PHASE FOR MULTIPLE SEPARATE BID PACKAGES | 13 |
| 1.9 | POST CONSTRUCTION PHASE | 20 |
| 2 | ARTICLE 2 REIMBURSABLE EXPENSES | 20 |
| 2.1 | REIMBURSEMENT | 20 |
| 3 | ARTICLE 3 BASIS OF COMPENSATION | 21 |
| 3.1 | PAYMENT | 21 |
| 3.2 | ADDITIONAL COMPENSATION | 21 |
| 3.3 | PAYMENTS WITHHELD | 22 |
| 3.4 | ARCHITECT/ENGINEER'S ACCOUNTING RECORDS | 22 |
| 3.5 | CONDITION PRECEDENT | 23 |
| 4 | ARTICLE 4 TIME | 23 |
| 4.1 | DESIGN SERVICES SCHEDULE | 23 |
| 4.2 | TERM | 23 |
| 5 | ARTICLE 5 PRINCIPAL REPRESENTATIVE | 24 |
| 5.1 | THE RESPONSIBILITIES | 24 |
| 6 | ARTICLE 6 CONSTRUCTION COSTS | 25 |
| 6.1 | BUDGETING AND FIXED LIMIT OF CONSTRUCTION COST | 25 |
| 6.2 | CONSTRUCTION COST | 26 |
| 6.3 | CONSTRUCTION MANAGER COST ESTIMATES | 26 |
| 6.4 | ARCHITECT/ENGINEER COST ESTIMATES | 27 |
| 6.5 | FIXED LIMIT OF CONSTRUCTION COST EXCEEDED | 27 |
| 7 | ARTICLE 7 OWNERSHIP OF DOCUMENTS | 28 |
| 7.1 | INSTRUMENTS OF SERVICE | 28 |
| 7.2 | AS-BUILT DRAWINGS/RECORD DRAWINGS | 28 |
| 8 | ARTICLE 8 INSURANCE | 29 |
| 8.1 | GENERAL | 29 |
| 8.2 | COMMERCIAL GENERAL LIABILITY INSURANCE (CGL) | 29 |
| 8.3 | AUTOMOBILE LIABILITY INSURANCE | 29 |
| 8.4 | WORKERS’ COMPENSATION INSURANCE | 29 |
| 8.5 | PROFESSIONAL ERRORS AND OMISSIONS LIABILITY | 30 |
| 9 | ARTICLE 9 TERMINATION OR SUSPENSION OF AGREEMENT | 30 |
| 9.1 | DEFAULT | 30 |
| 9.2 | TERMINATION FOR CONVENIENCE OF STATE | 30 |
| 9.3 | SUSPENSION | 32 |
| 10 | ARTICLE 10 INTENT OF DOCUMENTS, PARTNERING AND FACILITATED NEGOTIATIONS | 32 |
| 10.1 | INTENT OF DOCUMENTS | 32 |
| 10.2 | PARTNERING | 33 |
| 10.3 | FACILITATED NEGOTIATIONS | 33 |
| 11 | ARTICLE 11 COLORADO SPECIAL PROVISIONS | 35 |
| 11.1 | STATUTORY APPROVAL, C.R.S. § 24-30-202(1) | 35 |
| 11.2 | FUND AVAILABILITY, C.R.S. § 24-30-202(5.5) | 35 |
| 11.3 | GOVERNMENTAL IMMUNITY | 35 |
| 11.4 | INDEPENDENT ARCHITECT/ENGINEER | 35 |
| 11.5 | COMPLIANCE WITH LAW | 36 |
| 11.6 | CHOICE OF LAW, JURISDICTION, AND VENUE | 36 |
| 11.7 | PROHIBITED TERMS | 36 |
| 11.8 | SOFTWARE PIRACY PROHIBITION. SOFTWARE PIRACY PROHIBITION | 36 |
| 11.9 | EMPLOYEE FINANCIAL INTEREST/CONFLICT OF INTEREST | 36 |
| 11.10 | VENDOR OFFSET AND ERRONEOUS PAYMENTS | 36 |
| 12 | ARTICLE 12 MISCELLANEOUS PROVISIONS | 37 |
| 12.1 | DEFINITIONS | 37 |
| 12.2 | PROFESSIONAL ASSOCIATION PERMITTED | 38 |
| 12.3 | DISSOLUTION OF PROFESSIONAL ASSOCIATION | 38 |
| 12.4 | WAGE RATES, in accordance with C.R.S. § 24-30-1404 (1) | 38 |
| 12.5 | PUBLIC ART LAW | 38 |
| 12.6 | ASSIGNMENT | 38 |
| 12.7 | SUBCONTRACTS | 39 |
| 12.8 | BINDING EFFECT | 39 |
| 12.9 | AUTHORITY | 39 |
| 12.10 | CAPTIONS AND REFERENCES | 39 |
| 12.11 | COUNTERPARTS | 39 |
| 12.12 | DESIGNATED REPRESENTATIVES | 39 |
| 12.13 | ENTIRE UNDERSTANDING | 39 |
| 12.14 | DIGITAL SIGNATURES | 39 |
| 12.15 | MODIFICATION | 40 |
| 12.16 | STATUTES, REGULATIONS, FISCAL RULES AND OTHER AUTHORITY | 40 |
| 12.17 | EXTERNAL TERMS AND CONDITIONS | 40 |
| 12.18 | SEVERABILITY | 40 |
| 12.19 | SURVIVIAL AND CERTAIN CONTRACT TERMS | 40 |
| 12.20 | TAXES | 40 |
| 12.21 | THIRD PARTY BENEFICIARIES | 40 |
| 12.22 | WAIVER | 41 |
| 12.23 | CORA DISCLOSURE | 41 |
| 12.24 | STANDARD AND MANNER OF PERFORMANCE | 41 |
| 12.25 | LICENSES, PERMITS, AND OTHER AUTHORIZATIONS | 41 |
| 12.26 | INDEMNIFICATION | 41 |
| 12.27 | ACCESSIBILITY | 42 |
| 13 | ARTICLE 13 CONFIDENTIAL INFORMATION-STATE RECORDS | 42 |
| 13.1 | CONFIDENTIALITY | 42 |
| 13.2 | OTHER ENTITY ACCESS AND NONDISCLOSURE AGREEMENTS | 43 |
| 13.3 | USE, SECURITY, AND RETENTION | 43 |
| 13.4 | INCIDENT NOTICE AND REMEDIATION | 43 |
| 13.5 | DATA PROTECTION AND HANDLING | 44 |
| 13.6 | SAFEGUARDING PERSONAL IDENTIFIABLE INFORMATION (PII) | 44 |
| EXHIBIT A: | ARCHITECT/ENGINEER PROPOSAL | A |
| EXHIBIT B: | WAGE RATES SCHEDULE | B |
| EXHIBIT C: | BUILDING CODE COMPLIANCE POLICY | A |
| EXHIBIT D: | ADDITIONAL DESIGN REQUIREMENTS/ PROGRAM PLAN/SUSTAINABILITY GOALS | E |
| SUPPLEMENTARY GENERAL CONDITIONS: FEDERAL PROVISIONS | 6 |
SC-5.2
| Rev. 01/2024 | TOC |
| SIGNATURE PAGE | Comment by State Buildings Program: Note to Drafter: The SC5.1 template has been waived from a Risk Assessment and legal review so long as the document is not edited beyond the fillable fields. |
THE PARTIES HERETO HAVE EXECUTED THIS AGREEMENT
Each person signing this Agreement represents and warrants that the signer is duly authorized to execute this Agreement and to bind the Party authorizing such signature.
In accordance with §24-30-202, C.R.S., this Contract is not valid until signed by the State Controller (or an authorized delegate) or the Title of IHE CFO per the Fiscal Rules of the individual Institution of Higher Education Comment by State Buildings Program: Note to Drafters: If this contract is for a University that is outside State Fiscal Rule, insert the name of your organization here
| Project Number/Name: | Insert OSC Project Number followed by Project Name |
| Contract ID No.: | Insert CMS Number & Encumbrance Number |
SC-5.3
Rev. 02/2022 Page 1
SC-5.3
Rev. 07/2025 15
CONSULTANT
INSERT: Legal Name of Consultant By: Name & Title of Person Signing for Consultant Date: __________________
STATE OF COLORADO
Jared S. Polis, Governor INSERT: Name of Agency or IHE INSERT: Name & Title of Head of Agency / IHE By: Name & Title of Person Signing for Agency or IHE Date: __________________
State Buildings Program
By: Name & Title of Person Signing for State Buildings Date: __________________
LEGAL REVIEW
Philip J. Weiser, Attorney General
By: Assistant Attorney General Date: __________________
STATE CONTROLLER
Robert Jaros, CPA, MBA, JD By: Name of Agency or IHE Delegate-Delete if contract will be routed to OSC for approval Effective Date: __________________
STATE OF COLORADO
STATE BUILDINGS PROGRAM
ARCHITECT/ENGINEER AGREEMENT
CONSTRUCTION MANAGER/GENERAL CONTRACTOR
(STATE FORM SC-5.2)
Department ID: Insert Dept. Code Contract ID #: Insert Contract ID Project #:Insert Project #
PARTIES. THIS AGREEMENT is entered into by and between the STATE OF COLORADO, acting by and through the Insert Department's or IHE's Full Legal Name hereinafter referred to as the State or Principal Representative, and Insert Consultant's full Legal Name including "Inc.", "LLC" etc. having its offices at Street address, City, State and Zip Code hereinafter referred to as the Consultant.
EFFECTIVE DATE AND NOTICE OF NONLIABILITY. This Agreement shall not be effective or enforceable until it is approved and signed by the State Controller or its designee (hereinafter called the “Effective Date”), but shall be effective and enforceable thereafter in accordance with its provisions. The State shall not be bound by any provision of this Contract before the Effective Date, and shall have no obligation to pay Consultant for any Work performed or expense incurred before the Effective Date.
RECITALS:
WHEREAS, the Principal Representative intends to procure Insert Project Name as provided by the State Controller's Office hereinafter called the Project; and
WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated, and otherwise made available, and a sufficient unencumbered balance thereof remains available for payment In Fund Number Insert Fund Number Here, Account Number Insert Account Number here; and
WHEREAS, the State has Appropriated and the Principal Representative has been authorized to expend the total sum of Insert dollar value written in words Dollars ($ ) for this project including all professional services, construction/improvements, project contingencies, furnishings, movable equipment, reimbursable expenses and miscellaneous expenses; and
(WHEREAS, funds are available for only a portion of the services defined herein, as more fully described in the funding Condition Precedent clause in Article 3.5) Comment by State Buildings Program: Note to Drafters: If the Condition Precedent clause is to be used remove the parenthesis and remove the italics.
If not accepting the Condition Precedent strike out the language – DO NOT DELETE
WHEREAS, the Principal Representative has established the Fixed Limit of Construction Cost in the amount of Insert dollar value written in words Dollars ($ ); and Comment by State Buildings Program: The Fixed Limit of Construction should be the amount the Architect./Engineer shall be confined to design within.
WHEREAS, the Construction Manager/General Contractor shall establish a Guaranteed Maximum Price that is within this Fixed Limit of Construction Cost as established by the Principal Representative, at the completion of the Design Development Phase; and
WHEREAS, the Architect/Engineer was selected and determined to be the most qualified, and fees were negotiated in accordance with the provision of Title C.R.S. § 24-30-1401 et seq., as amended; and
NOW THEREFORE, the Principal Representative and the Architect/Engineer, for the considerations hereinafter set forth, agree as follows:
ARTICLE 1 BASIC SERVICES OF THE ARCHITECT/ENGINEER
THE SERVICES
The Architect/Engineer’s services shall be provided in conjunction with the services of the Construction Manager/General Contractor, hereinafter referred to as “Construction Manager” or CM, as set forth in the Contract between the State and Construction Manager, hereinafter referred to as the Construction Manager Contract. The Architect/Engineer’s services shall consist of design phases hereinafter set forth and include normal architectural, structural, mechanical, electrical and civil engineering services; landscaping if any; space planning/interior layout; and any other services included in this Agreement as delineated in the proposal letter dated , submitted by the Architect/Engineer, which is attached hereto and made a part hereof by reference as Exhibit A. Numerous exhibits developed over a period of time are also attached to and made a part of this Agreement, some of which may be in conflict with other exhibits or portions of this Agreement. In the event of any conflict in any of these, the greater service shall be included in the professional services provided and the contract sum without additional compensation to be superseded by applicable amendment sum or supplement.
In the performance of the professional services, the Architect/Engineer acknowledges that time is critical for Project delivery and that portions of the work shall have their design completed as separate Bid Packages and ready for construction before other portions of the work are fully designed. It is further recognized that this accelerated approach to construction utilizing the services of an Architect/Engineer and a Construction Manager/General Contractor is a unique concept and that its feasibility requires maximum cooperation between all parties. It is also recognized that the services to be rendered by the Construction Manager and the interrelationships and coordinative aspects thereof are not traditional. The Architect/Engineer has, however, reviewed the Construction Manager Contract and accepts the terms thereof as expressing a workable concept. In furtherance thereof, in the event there appears to be a duplication, overlap, or conflict of responsibility or duties between the Architect/Engineer and the Construction Manager, or an absence of designation, the question shall be submitted to the Principal Representative for determination. The Architect/Engineer shall abide by the decision of the Principal Representative provided it does not require the performance of services beyond what was reasonably contemplated and accepted by the Architect/Engineer as its responsibility.
The Architect/Engineer further acknowledges that the Fixed Limit of Construction Cost recited above as the Principal Representative’s expenditure limit is intended to cover the entire cost of the Project and is sufficient therefore and has been fully appropriated. The Architect/Engineer therefore agrees to cooperate fully with the Principal Representative in the design and construction aspects to keep within these limitations.
The number of Bid Packages shall be established at . Should the Principal Representative request additional or fewer Bid Packages than the established number, the cost involved in development of additional or the deletion of proposed bid packs shall be reflected in an Amendment to the Agreement for Additional Services.
Buy Clean Colorado
| If the box below is marked, this Project meets the definition of Public Project and must comply with the requirements of the Buy Clean Colorado Act, §24-92-117, C.R.S. (BCCO), and the Buy Clean Colorado Act Policy established by the State’s Office of State Architect (OSA). | Comment by State Buildings Program: Note to Drafter: Double-click on the box to bring up Check Box Form Field window and select “Checked” |
| Comment by State Buildings Program: Note to Drafter: Public Project is a project with a construction cost of $500,000 or more as defined in §24-92-102 (8), C.R.S. |
☐ ______ Principal Representative initial 1.1.1 1.1.2 The Architect/Engineer shall specify an Environmental Product Declaration (EPD) for each eligible material (specified below) within the project specifications included in the bid documents. When specifying materials, the Architect/Engineer shall prioritize products with EPDs for the design. The Architect/Engineer will verify EPD compliance using the BCCO EPD Submittal form (EE-5.2). The Consultant must verify that the specified EPDs contain global warming potential (GWP) values that are less than or equal to the maximum GWP limits established by OSA.
During the submittal process the Consultant shall work with the Contractor to ensure that eligible materials are obtainable and can be installed. If an eligible material with a compliant EPD is unobtainable, a waiver process defined by OSA shall be utilized.
“Eligible materials” or “material categories” means materials used in the construction of a Public Project, including:
Asphalt and asphalt mixtures Cement and concrete mixtures Glass Post-tension steel Reinforcing steel Structural steel Wood structural elements The Consultant shall participate in sessions at the close of Schematic Design Phase, Design Development Phase, and as Construction Documents are finalized for each Bid Package. These Project Design Review Sessions shall be attended by the Architect, and a representative of the Principal Representative. The purpose of the project design review sessions is to (1) confirm consistency with the design intent; (2) confirm complete, coordinated, constructible and cost-effective designs for all disciplines (e.g. architectural, structural, mechanical, electrical); (3) confirm that the design documents are code compliant; (4) endeavor to confirm that all Work has been included and described in sufficient detail to confirm complete pricing of the Work; and (5) allow for phased construction. The Consultant shall collect all design review comments from the various participants, provide reports to the Principal Representative, and confirm that with the issuance of each progress set of design documents all comments have either been incorporated or resolved to the satisfaction of the Principal Representative.
The Architect/Engineer shall participate in formal value engineering workshops at the end of the Schematic Design Phase and the Design Development Phase, bringing multidiscipline cost estimating and design experts to evaluate alternative designs, systems and materials.
The Architect/Engineer shall make certain to the best of its knowledge, information and belief, that the drawings and specifications prepared by it are in compliance with the approved codes as adopted by State Buildings Program (as a minimum standard) as indicated in Exhibit C, Approved State Building Codes / Code Compliance Plan Review Procedures and other more restrictive standards as specified by the Principal Representative are as indicated in Exhibit C. Drawings and specifications are to be reviewed by the State's approved Code Review Agents at the appropriate phases and with the required information as described in Exhibit C.
QUALIFICATIONS
The services shall be performed by the Architect/Engineer or by consultants licensed or registered by the State of Colorado as required by law. If these special consulting services are to be performed by professionals in the Architect/Engineer’s employ, then the services must currently be and have been for at least two (2) years previously, regularly a service of the Architect/Engineer’s organization.
In the event the Architect/Engineer does not have as part of its regular staff and services certain professional consultants and consulting services, such as but not limited to, architectural, structural, mechanical, electrical, civil, landscaping, and/or space planning/interior layout, then such consulting services shall be performed by practicing professional consultants.
All professional consultants, staff or practicing, must be retained for the duration of the Project, provided, however, that acceptable replacements must have prior approval, in writing, by the Principal Representative which approval shall not be unreasonably withheld.
Prior to designating a professional to perform any of these services, the Architect/Engineer shall submit the name, together with a resume of training and experience in work of like character and magnitude of the project being contemplated, to the Principal Representative, and receive approval in writing therefrom.
No consultant shall be engaged or perform work on the Project wherein a conflict of interest exists, such as being connected with the sale or promotion of equipment or material which may be used on the Project, provided, however, that in unusual circumstances and with full disclosure to the Principal Representative of such interest, the Principal Representative may permit a waiver, in writing, in respect to the particular consultant.
The Architect/Engineer shall designate all of its consultants in Exhibit A, which list may only be modified in accordance with § 1.2.4 or § 1.2.5.
PRE-DESIGN PHASE
As designated and defined in the Architect/Engineer’s Proposal Exhibit A.
SCHEMATIC DESIGN PHASE
The Architect/Engineer or its duly authorized representative shall attend regular meetings with the Principal Representative and the Construction Manager, and such additional meetings as the Principal Representative may request or as may be requisite to a complete understanding of the Project. All regular meetings shall be scheduled by the Architect/Engineer with the agreement of the Construction Manager and approval of the Principal Representative. The Architect/Engineer shall document all such conference notes and distribute same to the Principal Representative.
The Architect/Engineer shall review the design program furnished by the Principal Representative and/or as prepared under separate contract by the Architect/Engineer, including the approved Facilities Program Plan, to ascertain the requirements of the Project and shall refine the design program in accordance with Exhibit D, reviewing and confirming the understandings of these requirements and other design parameters with the Principal Representative.
During the progress of the Schematic Design Phase, the Architect/Engineer shall keep the Construction Manager informed of changes in requirements or in materials, equipment, component systems and types of construction as the drawings and specifications are developed so that the Construction Manager can formulate the Estimates of Construction Cost and the Guaranteed Maximum Price appropriately.
The Architect/Engineer shall review with the Principal Representative and Construction Manager site use and improvements, selection of materials, building systems and equipment, construction methods, and methods of Project delivery.
Based on the mutually agreed upon design program and the Fixed Limit of Construction Cost, the Architect/Engineer shall prepare, for acceptance by the Principal Representative, Schematic Design Documents consisting of drawings, outline specifications and other documents illustrating the scale and relationship of Project components. Schematic Design Documents shall be prepared in sufficient detail and number to come to an agreement on the basic design of the Project.
At intervals appropriate to the progress of the Schematic Design Phase, the Architect/Engineer shall provide copies of schematic design studies for the Construction Manager’s review, monitoring, and input, for the in-progress work and any completed components thereof, which will be completed so as to cause no delay to the Architect/Engineer. The purpose of such input shall address efficiency of materials, constructability, availability of components and compatibility of systems.
At intervals appropriate to the progress of the Schematic Design Phase, the Architect/Engineer shall provide the Principal Representative with copies of all materials, documents, and studies necessary to permit the Principal Representative to monitor, review, provide input to, and any necessary acceptance of, the Schematic Design Phase in progress and completed components thereof. This reviewing process shall be made so as to cause no delay to the Architect/Engineer. The Architect/Engineer shall respond in writing to the Principal Representative's comments resulting from this reviewing process.
At the completion of the Schematic Design Phase, the Architect/Engineer shall:
Provide ( ) complete sets of drawings, outline specifications and construction materials, and such other documents necessary to fully illustrate the Schematic Design Phase to the Principal Representative and solicit its acceptance;
Provide ( ) complete sets of drawings and (1 reproducible) complete set, outline specifications and construction materials, and such other documents necessary for the Construction Manager to prepare an estimate of the cost of construction;
Assist the Construction Manager in reviewing and verifying such Estimates of Construction Cost; and Independent of the Construction Manager, prepare and submit to the Principal Representative a construction cost estimate which will serve as a "Statement of Probable Cost”.
The Architect/Engineer shall also prepare a written report, accompanied by drawings, setting forth the following as a minimum:
1. Analysis of the structure as it relates to the Approved Codes as defined in Exhibit C, including responses to the State's Code Review Agent;
Recommend site locations and scope of site development;
Correlation of spaces with approved State standards;
Conceptual drawings of floor plans, elevations, section, and site plan;
Conceptual drawings and descriptions of project plumbing, mechanical and electrical systems as necessary;
Area computations, gross square footage and net square footage, and volume;
Outline of proposed construction materials;
Review of time anticipated for the Construction Phase(s); and Written description of the bid packaging strategy agreed upon with the Construction Manager/General Contractor.
The above Schematic Design data shall be subject to the acceptance in writing by the Principal Representative, Construction Manager and State Buildings Program.
Architect/Engineer shall also assist the Construction Manager in the preparation of the Construction Manager's written report at the end of the Schematic Design Phase summarizing the Construction Manager's value engineering activities.
DESIGN DEVELOPMENT PHASE
Based on the written acceptance of the Schematic Design Documents and any adjustments authorized by the Principal Representative in the design program or the Fixed Limit of Construction Cost, if any, the Architect/Engineer shall prepare, for acceptance by the Principal Representative and State Buildings Program the Design Development Documents consisting of drawings, outline specifications, and other documents to fix and describe the size and character of the entire Project as to architectural, structural, mechanical, and electrical systems, materials, and such other elements as may be appropriate. The Design Development Documents shall be developed in sequence replicating the proposed Bidding Packages.
During the progress of the Design Development Phase the Architect/Engineer shall keep the Construction Manager informed of changes in requirement or in materials, equipment, component systems and types of construction as the drawings and specifications are developed so that the Construction Manager can formulate the Estimates of Construction Cost and the Guaranteed Maximum Price appropriately.
At intervals appropriate to the progress of the Design Development Phase, the Architect/Engineer shall provide copies of Design Development studies for the Construction Manager’s review, monitoring and input, to the in-progress Work and any completed components thereof, which will be completed so as to cause no delay to the Architect/Engineer. The purpose of such input shall address efficiency of materials, systems, and components; constructability within acceptable means; availability of materials, systems, and components; and cost control.
At intervals appropriate to the progress of the Design Development Phase, the Architect/Engineer shall provide the Principal Representative with copies of all materials, documents, and studies necessary to permit the Principal Representative to monitor, review, provide input to, and any necessary acceptance of, the Design Development Phase in progress and completed components thereof. This reviewing process shall be made so as to cause no delay to the Architect/Engineer. The Architect/Engineer shall respond in writing to the Principal Representative’s comments resulting from this reviewing process.
At the completion of the Design Development Phase, the Architect/Engineer shall provide:
1. complete sets of drawings, outline specifications and construction materials, and such other documents necessary to fully illustrate the Design Development Phase to the Principal Representative and solicit its acceptance.
1. complete sets of drawings and (1 reproducible) complete set, outline specifications and construction materials, and such other documents necessary for the Construction Manager to prepare an estimate of the cost of construction.
The Architect/Engineer shall prepare a written report and drawings outlining in detail Design Development Documents from the accepted Schematic Design study. The report, when submitted for acceptance by the Principal Representative and the Construction Manager shall include as a minimum:
1. Analysis of the structure as it relates to the Approved Codes defined in Exhibit C, including responses to the State's Code Review Agent;
1. Site development drawings, defining the proposed scope of development including earthwork, surface development, and utility infrastructure;
1. Plans in one-line format of the proposed structural, mechanical, and electrical systems as necessary to define size, location and quality of equipment, materials, and constructions;
1. Floor plans including proposed movable equipment and furnishings and exterior elevations;
1. Cut-sheets and/or samples of proposed materials, equipment and system components including all such items normally specified under the Construction Specifications Institute, Specifications Format Divisions;
1. Proposed architectural finish schedule, HVAC, plumbing and electrical fixture schedules;
1. Outline specifications, using CSI format, identifying conditions of the contract, materials, and standards;
1. Review of the time anticipated for the Construction Phase(s); and
1. These documents shall be of sufficient detail to allow the Construction Manager to enter into an agreement for the execution of the construction based on a Guaranteed Maximum Price.
The Architect/Engineer shall assist the Construction Manager in the preparation of the Construction Manager’s written report at the conclusion of the Design Development Phase summarizing the Construction Manager’s value engineering activities.
The Architect/Engineer shall make certain that to the best of its knowledge, information, and belief the drawings and specifications prepared by it are in full compliance with applicable codes, regulations, laws and ordinances, including both technical and administrative provisions thereof. Such drawings and specifications shall conform to the list of Approved Codes as defined in Exhibit C. If the Architect/Engineer shall deviate from such codes, regulations, law or ordinance, without written authorization to do so from the Principal Representative, then the Architect/Engineer shall, at its own expense, make such corrections in the Construction Documents as may be necessary for compliance.
The final Design Development Documents, revised as required by the Construction Manager's approved Guaranteed Maximum Price established within the recited Fixed Limit of Construction Cost, shall be subject to acceptance in writing by the Principal Representative and State Buildings Program.
Independent of the Construction Manager, the Architect/Engineer shall prepare and submit a construction cost estimate which will serve as an update of the Statement of Probable Construction Cost.
CONSTRUCTION DOCUMENTS PHASE
Based on the Principal Representative and State Buildings Program accepted Design Development Documents and any further adjustments in the scope or quality of the Project or in the Construction Manager's Guaranteed Maximum Price, if any, authorized by the Principal Representative, the Architect/Engineer shall prepare, for acceptance by the Principal Representative, Construction Documents consisting of drawings and specifications setting forth in detail the requirements for the construction of the Project.
During the progress of the Construction Document Phase, the Architect/Engineer shall keep the Construction Manager informed of any changes in requirements or in construction materials, systems or equipment.
At intervals appropriate to the progress of the Construction Document Phase, the Architect/Engineer shall provide copies of documents for the Principal Representative and the Construction Manager’s review, monitoring and input to the in-progress Construction Document Phase and any completed components thereof, which will be completed so as to cause no delay to the Architect/Engineer. These intervals shall be no fewer than at 50% and 95% completion of the Construction Documents Phase. The Architect/Engineer shall respond in writing to the Principal Representative’s review comments.
These Construction Documents, when each Bid Package is submitted for approval, shall include:
1. ( ) complete sets and (1 reproducible) complete set of architectural, civil, site development, structural, mechanical and electrical drawings as appropriate to assist in the definition of the submitted Bid Package;
1. Complete Bidding Documents including architectural, structural, mechanical and electrical specifications for that Bid Package. The format for these technical specifications shall be the current edition of MasterFormat published by the Construction Specifications Institute;
1. The title sheet shall contain the International Building Code (I.B.C.) occupancy type, construction type, gross square footage and net square footage, and gross building volume; and
1. Each Bidding Package, as appropriate, shall contain a Code Compliance Plan as per Exhibit C, that defines area separation, fire and smoke barriers, exits, exit passages, and exit enclosures.
The Architect/Engineer shall assist the Construction Manager in preparation of the Construction Manager's written report summarizing the Construction Manager’s value engineering activities through the completion of this phase of the work.
The final Construction Documents shall be subject to the final acceptance by the Principal Representative, Construction Manager and State Buildings Program in writing.
BIDDING PHASE
The Architect/Engineer, following the Principal Representative’s and State Buildings Program’ approval of the Construction Documents, shall assist the Construction Manager in obtaining bids conforming to the requirements of C.R.S. § 24-103-202(7), as amended, by rendering interpretations and clarifications of the drawings and specifications in appropriate written form. The Architect/Engineer shall assist the Construction Manager in conducting mandatory pre-bidding conferences with all principal bidders and pre-award conferences with successful bidders.
The Architect/Engineer shall consult with and make recommendations to the Principal Representative pertaining to the Construction Manager’s proposed subcontractors.
In addition to the copies required for the preceding design phases, the Architect/Engineer shall furnish copies of the Construction Documents for each Bid Package as follows, subject to limitations hereinafter set forth:
1. For Bidding Documents: ( ) sets and (1 reproducible) complete set to confirm distribution among contractors and subcontractors in accordance with the advertisement for bids.
1. For Contract Documents: The Principal Representative will require ( ) sets of Contract Documents. The Contract Documents for each Bid Package, bearing the professional seal and signature of the Architect/Engineer and the appropriate responsible professional engineering consultants, are to be signed by the Construction Manager and Principal Representative at each contract signing conference. The Architect/Engineer acknowledges that prior to the contract signing conference and State Buildings Program authorizing the Notice to Proceed to Commence Construction Phase State Form SBP-7.26 a Letter of Compliance must be obtained from the State’s Code Review Agent verifying that the contract Documents and all addenda, value engineering recommendations and all other changes to the bidding documents are in compliance with the applicable codes as adopted by State Buildings Program as indicated in Exhibit C.
1. For Construction: The Construction Manager shall be furnished with ( ) sets or partial sets of the Contract Documents to insure prompt prosecution of the work.
1. ( ) complete sets of drawings and specifications shall be the maximum required to be furnished by the Architect/Engineer. The Principal Representative will pay for all other sets of documents or partial sets of documents required at the cost of reproduction.
The Architect/Engineer shall assist the Principal Representative and Construction Manager in the preparation of the necessary bidding information, bidding forms and amendments to the Construction Manager Contract, to include the respective Bid Packages.
The Architect/Engineer shall assist the Principal Representative and Construction Manager in connection with the Principal Representative’s responsibility for filing documents required for approvals of governmental authorities having jurisdiction over the Project.
At the completion of each bidding package, the Architect/Engineer shall prepare independent of the Construction Manager and present to the Principal Representative an update of the Design Development Statement of Probable Construction Cost for each specific Bid Package and the project total.
Prior to the Authorization to Commence Construction Phase for the first Bid Package, the Architect/Engineer and the Construction Manager shall certify that the entire Project has been completed through at least the Design Development Phase of the Architect/Engineer’s Agreement and the Construction Manager shall certify that the sum of all proposed individual Bid Package Guaranteed Maximum Prices total the Project Guaranteed Maximum Price. This Project Guaranteed Maximum Price shall be equal or less in sum to the Fixed Limit of Construction Cost. It is agreed that only when those conditions are met and accepted by the Principal Representative may the Authorization to Commence Construction Phase be issued for the first Bid Package.
CONTRACT ADMINISTRATION PHASE FOR MULTIPLE SEPARATE BID PACKAGES
The Construction Administration Phase will commence with the award of the initial Bid Package and, together with the Architect/Engineer’s obligation to provide basic services under this Agreement, will end upon expiration of the one (1) year warranty period from the Notice of Substantial Completion or the Notice of Partial Substantial Completion of the construction.
The Architect/Engineer shall provide the Contract Administration and perform all of the duties to be provided by the Architect/Engineer for the Project as set forth in this Agreement and in the Contract Documents. The Architect/Engineer acknowledges that while most of the construction of the Project will be constructed through the Construction Manager, the State has reserved the right to perform portions of the work on the Project through its own forces or through separate contractors. The Architect/Engineer expressly agrees to perform all of the same services set forth herein and in the Contract Documents with the Construction Manager for any and all separate contractors engaged by the Principal Representative to perform work designed by the Architect/Engineer on the Project.
The Architect/Engineer and Construction Manager shall advise and consult with the Principal Representative during the construction phases. All instructions and written communications with the Construction Manager shall be copied to the Principal Representative. The Architect/Engineer shall have authority to act on behalf of the Principal Representative only to the extent provided in the Contract Documents.
The Architect/Engineer and its structural, mechanical and electrical engineers will visit the site at intervals appropriate to the stage of construction or otherwise agreed by the Principal Representative in writing to become generally familiar with the progress and quality of the Work to determine in general if the Work is being performed in a manner indicating that the Work when completed will be in accordance with the Contract Documents. Observation may extend to all or any part of the Work and to the preparation, fabrication or manufacture of materials. However, the Architect/Engineer shall not be required to make exhaustive or continuous on-site inspections to check the quality of the Work. On the basis of observation as an architect/engineer, the Architect/Engineer shall keep the Principal Representative informed of the progress and quality of the Work, and shall endeavor to guard the Principal Representative against defects and deficiencies in the Work.
If through no fault of the Architect/Engineer, trips to observe construction during the Construction Phase of the project are required in excess of those reasonably necessary to perform all Architectural/Engineering services described herein, the Architect/Engineer’s compensation for the Construction Administration Phase shall be adjusted as an Additional Service for the cost to the Architect/Engineer of such trips, and paid in accordance with Article 3.2.
The Architect/Engineer shall provide notice to the Principal Representative of specific visits to be made during the various phases of construction and provide a written report of conditions observed, instructions given, and actions agreed to.
If requested by the Principal Representative, the Architect/Engineer shall provide, in addition to the above, a full-time representative on site during all regularly scheduled work hours. This representative shall have a minimum of 10 years’ experience in work closely related to construction management/general contractor construction field administration and shall be approved by the Principal Representative in writing. If requested by the Principal Representative, the Architect/Engineer's compensation for the Contract Administration Phase shall be adjusted as an Additional Service and paid in accordance with § 3.2.4. The Construction Manager shall provide the full-time representative with a suitable private office supported with standard office equipment including access to copiers, fax machines, etc.
From the time of the Construction Manager's on-site mobilization to the issue of the final Notice of Final Acceptance, the Architect/Engineer, or an appropriate consultant, shall observe for contract compliance, the following without limitation:
1. Bearing surfaces of excavations before concrete is placed;
1. Reinforcing steel after installation and before concrete is placed;
1. Structural concrete;
1. Laboratory reports on all concrete testing;
1. Structural steel during and after erection and prior to its being covered or enclosed;
1. Steel welding;
1. Mechanical and plumbing work following its installation and prior to its being covered or enclosed;
1. Electrical work following its installation and prior to its being covered or enclosed;
1. Compaction testing reports; and
1. Any special or quality control testing required in the Contract Documents.
The observation contemplated in this article does not include the responsibility to conduct testing but does include the responsibility to confirm that tests were conducted as required in the Documents as well as a review of the test results.
The Architect/Engineer shall exercise due diligence to safeguard the State against defects, deficiencies, noncompliance with the Contract Documents, and/or unsatisfactory workmanship. If, in the opinion of the Architect/Engineer, the Work is not being carried out in a sound, efficient, workmanlike and skillful manner, the Architect/Engineer shall promptly notify the Principal Representative and Construction Manager setting forth the reasons.
The Architect/Engineer shall keep accurate records with respect to the construction on the Project including fiscal accounting, changes in the work, directives, and other documentation to establish a clear history of the Project.
If at any time the Architect/Engineer delegates any of its responsibility for the observation of the Work to some other person, such other person must be properly qualified by training and experience to observe the work. The Principal Representative and State Buildings Program may review and approve the qualifications of all persons in writing, other than the Architect/Engineer, performing the functions of the Architect/Engineer in respect to the services required by this Agreement.
The Principal Representative and State Buildings Program may also have a representative observing the construction and its progress. Nothing contained herein shall in any way relieve the Architect/Engineer of its responsibilities for Contract Administration.
The Architect/Engineer shall attend all weekly or periodic job progress meetings.
The Architect/Engineer shall not be responsible for, nor have control or charge of, construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Project. The Architect/Engineer shall not be responsible for, nor have control over, the acts or omissions of the Construction Manager, subcontractors, any of their agents or employees, or any other persons performing any part of the construction, nor shall the Architect/Engineer be responsible for the Construction Manager’s obligations.
The Architect/Engineer shall at all times have access to the construction wherever it is in preparation or progress.
The Architect/Engineer shall assist the Principal Representative in the review of the Construction Manager’s Schedule of Values submitted in accordance with the Contract Documents. Further the Architect/Engineer shall attend a conference with the Construction Manager and the Principal Representative to finalize the Schedule of Values. The finalized Schedule of Values will serve as the basis for progress payments and will be incorporated into the form of Project Applications for Payment acceptable to the Architect/Engineer and the Principal Representative. The Architect/Engineer shall further participate in any revisions to the Schedule of Values as provided in the Contract Documents.
The Architect/Engineer shall see to the proper issuance of State form SC-7.2 used as the Construction Manager's Project Certificate and Application for Payment. The Architect/Engineer will, within five (5) working days after the receipt of each Project Application for Payment, review the Project Application for Payment and either execute a Project Certificate and Application for Payment to the Principal Representative for such amounts as the Architect/Engineer determines are properly due, or notify the Principal Representative and Construction Manager in writing of the reasons for withholding a Certificate.
The execution and issuance of a Project Certificate and Application for Payment, State form SC-7.2 shall constitute a representation by the Architect/Engineer to the Principal Representative that, based on the Architect/Engineer’s observations at the site and on the data comprising the Construction Manager's Project Application for Payment, the construction has progressed to the point indicated; that, to the best of the Architect/Engineer’s knowledge, information and belief, the quality of construction is in accordance with the Contract Documents and that the Construction Manager is entitled to payment in the amount certified. However, the issuance of a State form SC-7.2, Construction Manager's Project Certificate for Payment shall not be a representation that the Architect/Engineer has made any examination to ascertain how or for what purpose the Construction Manager has used the monies paid on account of the previously issued Certificates.
The Architect/Engineer shall be the interpreter of the requirements of the Contract Documents and the judge of the performance thereunder by the Construction Manager and all subcontractors. The Architect/Engineer shall render interpretations necessary for the proper execution or progress of construction, with reasonable promptness.
All interpretations and decisions of the Architect/Engineer shall be consistent with the intent of, and reasonably inferable from the Contract Documents, and shall be in writing or in graphic form and the Architect/Engineer shall send a copy to the Principal Representative and Construction Manager.
The Architect/Engineer’s decision in matters relating to artistic effect shall be final if consistent with the intent of the Contract Documents and neutral in terms of cost impact.
The Architect/Engineer shall have authority to reject constructed work which does not conform to the Contract Documents, and whenever, in the Architect/Engineer’s reasonable opinion, it is necessary or advisable for the implementation of the intent of the Contract Documents, the Architect/Engineer shall have authority to require special inspection or testing of constructed work in accordance with the provisions of the Contract Documents, whether or not such constructed work be then fabricated, installed or completed; but the Architect/Engineer shall take such action only after consultation with the Principal Representative. However, the Architect/Engineer’s authority to act under the Contract Documents and any decision made by the Architect/Engineer in good faith either to exercise or not to exercise such authority shall not give rise to any duty on the part of the Architect/Engineer to the Construction Manager, any subcontractor of any tier, any of their agents or employees, or any other person performing any of the construction.
The Architect/Engineer shall review and approve or take other appropriate action upon Construction Manager's submittals such as shop drawings, product data and samples as indicated in the Contract Documents, but only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents. The Architect/Engineer's action shall be taken with such reasonable promptness as to cause no delay in the Work or in the activity of the Principal Representative, Construction Manager or separate contractors, while allowing sufficient time in the Architect/Engineer's professional judgment to permit adequate review. Review of such submittals is not conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities or for substantiating instructions for installation or performance of equipment or systems designed by the Construction Manager, all of which remain the responsibility of the Construction Manager to the extent required by the Contract Documents. The Architect/Engineer’s review shall not constitute approval of a specific item nor indicate approval of an assembly of which the item is a component. When professional certification of performance characteristics of materials, systems or equipment is required by the Contract Documents, the Architect/Engineer shall be entitled to rely upon such certification to establish that the materials, systems or equipment will meet the performance criteria required by the Contract Documents.
All changes in the work shall be documented on State form Change Order (SC-6.31) or Amendment (SC-6.0), supplied by the Principal Representative, and the Architect/Engineer shall keep a current record of all variations or departures from the Agreement as originally approved.
The Architect/Engineer…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .