Appendix A - Evaluation Forms.docx
DOCX document 55 KB Posted
- Attached to
- FRCC Facilities Master Plan
- Solicitation number
- RFQ1 GJEA 2026000042 1
- Issued by
- Adams County, Weston CDP, Colorado
About this file
This document comprises three evaluation forms prepared by the State of Colorado Office of the State Architect State Buildings Program for use in the FRCC Facilities Master Plan prequalification and selection process. The forms establish a structured methodology for evaluating architectural, engineering, and consulting services firms through both written submittals and oral interviews. Agencies and institutions are instructed to assign weighted criteria across multiple evaluation categories and assign numerical ratings on a scale of 0 to 5, with evaluators assessing firm qualifications based on minimum requirements, acknowledgments, and attestations prior to advancing candidates to the interview phase.
The evaluation framework encompasses six primary assessment categories: Project Team (including qualifications, relevant experience, team cohesion, staff commitment, and subconsultant experience); Firm/Team Capabilities (organizational structure, management functions, and workload capacity); Prior Experience (demonstrated success on comparable projects and references); Project Approach (budget methodology, quality control, and scheduling); Equity, Diversity and Inclusion (promotion of diverse individuals and partnerships with disadvantaged businesses); and Work Location (proximity of prime and subconsultants, local familiarity, and knowledge of labor and material markets). The forms include a prequalification submittal evaluation form, an oral interview evaluation form, and a ranking matrix to consolidate scores from multiple evaluators and determine the most qualified firm for selection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix B - SC5.2 AE CMGC_2025.docx | DOCX document | |
| Appendix D - Building Inventory List.pdf | ||
| FRCC Master Plan - 6.3.26.pdf | ||
| Appendix C - Acknowledgement and Attestation Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
APPENDIX A1: PREQUALIFICATION SUBMITTAL EVALUATION FORM
Name of Firm:____________________________________________________________________ Name of Project: _________________________________________________________________ Evaluator No:_______________________________________ Date:______________________________________________
RFQ REFERENCE MINIMUM REQUIREMENTS Y ____ N ____
If the minimum requirements (including letter from surety) have not been met, specify the reason(s): __________________________________________________________________________________________________________________________________________________________________
Acknowledgment and Attestation included: Y ____ N ____
INSTRUCTIONS:
1. Criteria: Agencies/Institutions are encouraged to include additional criteria that reflect unique characteristics of the project under each category to help determine the submitter’s overall qualifications.
2. Weights: Agency/Institutions to assign weights, using whole numbers, to all criteria on evaluation forms for inclusion into RFQ document and prior to evaluations.
3. Ratings: Evaluator to assess the strength of each firms qualifications and assign a numerical rating of 1 to 5 using whole numbers
4. Rating: 0 = Not provided, 1 = Unacceptable, 2 = Poor, 3 = Fair, 4 = Good, 5 = Excellent
5. Total Score: Includes the sum of all criteria.
| 1. PROJECT TEAM |
| Weight |
| X |
| Rating |
| = |
| Score |
· Qualifications and Relevant individual experience x
· Unique knowledge of key team members
X
· Experience on projects as a team
X
· Key staff involvement in project management and on-site presence
X
· Time commitment of key staff
X
· Qualifications and relevant subconsultant experience
X
| 2. FIRM/TEAM CAPABILITIES |
| Weight |
| X |
| Rating |
| = |
| Score |
· Are the lines of authority and coordination clearly defined?
X
· Are essential management functions identified?
X
· Are the functions effectively integrated? (e.g., subconsultants’ role delineated)?
X
· Current and projected work load.
X
| 3. PRIOR EXPERIENCE |
| Weight |
| X |
| Rating |
| = |
| Score |
· Experience of key staff and firm with projects of similar scope and complexity
X
· Demonstrated success on past projects of similar scope and complexity
X
· References
X
| 4. PROJECT APPROACH |
| Weight |
| X |
| Rating |
| = |
| Score |
· Budget Methodology / Cost Control
X
· Quality Control Methodology
X
· Schedule
X
| 5. EQUITY, DIVERSIY AND INCLUSION |
| Weight |
| X |
| Rating |
| = |
| Score |
· Incentives and promotion of diverse individuals
X
· Partnering with SDVOSB or other disadvantaged businesses
X
| 6. WORK LOCATION |
| Weight |
| X |
| Rating |
| = |
| Score |
· Location of prime and subconsultants
X
· Familiarity with project area
X
· Knowledge of local labor and material markets
X
Total Score: _________
RFQ1-App-A
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
APPENDIX A2: ORAL INTERVIEW EVALUATION FORM
INSTRUCTIONS/EXAMPLE:
1. Criteria: Agencies/Institutions are encouraged to include additional criteria that reflect unique characteristics of the project under each category to help determine the submitter’s overall qualifications.
2. Weights: Agency/Institutions to assign weights, using whole numbers, to all criteria on evaluation forms for inclusion into RFQ document and prior to evaluations.
3. Ratings: Evaluator to assess the strength of each firms qualifications and assign a numerical rating of 0 to 5 with 5 being the highest rating. (Use whole numbers), 0 is missing information.
4. Total Score: Includes the sum of all criteria. Note: a passing score (as a percentage of the total points available) is optional and should be assigned by the agency/institution prior to evaluation.
| CRITERIA |
| Weight |
| X |
| Rating |
| = |
| Score |
1. PROJECT TEAM
x
2. TEAM CAPABILITIES
3. PRIOR EXPERIENCE
4. PROJECT APPROACH
5. WORK LOCATION
TOTAL SCORE
APPENDIX A3: PREQUALIFICATION AND ORAL INTERVIEW RANKING MATRIX
QUALIFICATION BASED SELECTION
(Use this form to rank and determine the most qualified architectural/engineering/consulting services firm for both the preliminary and interview evaluations.)
FIRM NAME
QUALIFICATIONS
QUALS SCORE
RANK
| EVAL #1 |
| EVAL #2 |
| EVAL #3 |
| EVAL #4 |
| EVAL #5 |
| EVAL #6 |
image1.jpeg
File details come from the government source that posted it. Updated .