This is an Architect/Engineer Agreement (Form SC-5.1) template issued by the State of Colorado Office of the State Architect State Buildings Program for Design/Bid/Build project delivery. The agreement establishes the terms under which a consultant provides professional architectural and engineering services for state-funded construction projects. The consultant's scope of services includes pre-design activities, schematic design, design development, construction documents, bidding phase support, contract administration, and post-construction services as detailed in the consultant's proposal (Exhibit A). The consultant must comply with the Buy Clean Colorado Act if the project meets the definition of a public project with construction costs of $500,000 or more, requiring specification of Environmental Product Declarations for eligible materials including asphalt, cement, concrete, glass, post-tension steel, reinforcing steel, structural steel, and wood structural elements. The consultant shall furnish copies of bidding and contract documents in electronic format as specified and must obtain a Letter of Compliance from the State's Code Review Agent prior to contract signing.
Compensation is structured on a phase-by-phase basis with separate line items for pre-design, schematic design, design development, construction documents, bidding, contract administration, post-construction services, and reimbursable expenses not to exceed specified amounts, with total compensation and individual phase fees to be inserted by the parties. Monthly payments are due within forty-five days of receipt of the Application for Payment (Form SBP-7.1), contingent upon the consultant's performance and progress. The agreement includes a Condition Precedent clause allowing the state to phase funding if insufficient appropriations exist at execution, requiring written amendment prior to the consultant performing unfunded services. Reimbursable expenses include document reproduction costs, travel expenses within state and federal per diem limits, consultant fees approved in advance, and other expenses authorized in writing by the Principal Representative and State Buildings Program. The agreement becomes effective only upon approval and signature by the State Controller or designee, and the consultant must maintain professional liability insurance as specified in the terms and conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
ARCHITECT/ENGINEER AGREEMENT Comment by State Buildings Program: Note to Drafters: Gray highlighted sections are fillable fields. To use those fields, use “protect document” to restrict editing to “filling in forms”, then type in the appropriate field. If the document is unprotected, then typing in the field will delete that field and replace it with the text typed.
DESIGN/BID/BUILD (D/B/B)
(STATE FORM SC-5.1)
State Agency Insert Department or IHE’s Full Legal Name Department I.D.
Insert Department identification Contract I.D. Number Insert CMS number or other contract number Project Number Insert OSC Project Number Project Name Insert Project as as provided by the State Controller's Office Consultant Name Insert Consultant's full Legal Name including "Inc.", "LLC" etc.
SC-5.1
Rev. 07/2026
Principal Representatives
For the State:
Name Department Name Address Line 1 Address Line 2 City, State ZIP Email
For Contractor:
Name Company Name Address Line 1 Address Line 2 City, State ZIP Email
ATTACHMENT 1: Architect/Engineer Agreement Terms and Conditions, SC-5.1TC Comment by State Buildings Program: Note to Drafter: Always include the SC-5.1TC Terms and Conditions in the electronic envelope or as a hard copy attached to this base agreement.
STATE OF COLORADO
STATE BUILDINGS PROGRAM
ARCHITECT/ENGINEER AGREEMENT DESIGN/BID/BUILD
(STATE FORM SC-5.1)
TABLE OF CONTENTS (partial) Page (TABLE OF CONTENTS for entire agreement located in Attachment 1 – Architect/Engineer Agreement Terms and Conditions, SC-5.1TC)
| RECITALS: | 1 | |
| 1 | ARTICLE 1 BASIC SERVICES OF ARCHITECT/ENGINEER | 2 |
| 1.1 | THE SERVICES | 2 |
| 1.1.1 | Professional Services | 2 |
| 1.1.2 | Buy Clean Colorado | 2 |
| 1.2 | DEVELOPMENT OF THE PROJECT | 3 |
| 1.2.5.6 | Bidding Phase | 3 |
| 1.2.7 Post Construction Phase | 4 | |
| 2 | ARTICLE 2 REIMBURSABLE EXPENSE | 4 |
| 2.1 | REIMBURSEMENT | 4 |
| 2.1.1 | Basic and Additional Services | 4 |
| 2.1.2 | Items for Reimbursement | 4 |
| 3 | ARTICLE 3 BASIS OF COMPENSATION | 5 |
| 3.1 | PAYMENT | 5 |
| 3.1.1 | The Total Compensation | 5 |
| 3.1.2 | Monthly Payments | 5 |
| 3.5 | CONDITION PRECEDENT | 5 |
| 12 | ARTICLE 12 MISCELLANEOUS PROVISIONS | 6 |
| 12.26 | DESIGNATED REPRESENTATIVES | 6 |
| EXHIBIT A: ARCHITECT/ENGINEER PROPOSAL | A | |
| EXHIBIT B: WAGE RATES SCHEDULE | B | |
| EXHIBIT C: BUILDING CODE COMPLIANCE POLICY | C | |
| EXHIBIT D: ADDITIONAL DESIGN REQUIREMENTS/ PROGRAM PLAN/SUSTAINABILITY GOALS | E | |
| SUPPLEMENTARY GENERAL CONDITIONS: FEDERAL PROVISIONS | E |
Rev. 07/2026 TOC
SC-5.1
Rev. 07/2026 5
SIGNATURE PAGE Comment by State Buildings Program: Note to Drafter: The SC5.1 template has been waived from a Risk Assessment and legal review so long as the document is not edited beyond the fillable fields.
THE PARTIES HERETO HAVE EXECUTED THIS AGREEMENT
Each person signing this Agreement represents and warrants that the signer is duly authorized to execute this Agreement and to bind the Party authorizing such signature.
In accordance with §24-30-202, C.R.S., this Contract is not valid until signed by the State Controller (or an authorized delegate) or the Title of IHE CFO per the Fiscal Rules of the individual Institution of Higher Education Comment by State Buildings Program: Note to Drafters: If this contract is for a University that is outside State Fiscal Rule, insert the name of your organization here
| Project Number/Name: | Insert OSC Project Number followed by Project Name |
| Contract ID No.: | Insert CMS Number & Encumbrance Number |
SC-5.3
Rev. 02/2022 Page 1
SC-5.1
Rev. 07/2026 15
CONSULTANT
INSERT: Legal Name of Consultant By: Name & Title of Person Signing for Consultant Date: __________________
STATE OF COLORADO
Jared S. Polis, Governor INSERT: Name of Agency or IHE INSERT: Name & Title of Head of Agency / IHE By: Name & Title of Person Signing for Agency or IHE Date: __________________
State Buildings Program
By: Name & Title of Person Signing for State Buildings Date: __________________
STATE CONTROLLER
Robert Jaros, CPA, MBA, JD By: Name of Agency or IHE Delegate-Please delete if contract will be routed to OSC for approval Effective Date: __________________
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
ARCHITECT/ENGINEER AGREEMENT DESIGN/BID/BUILD
(STATE FORM SC-5.1)
Department ID: Insert Dept. Code Contract ID #: Insert Contract ID Project #:Insert Project #
PARTIES. THIS AGREEMENT is entered into by and between the STATE OF COLORADO, acting by and through the Insert Department's or IHE's Full Legal Name hereinafter referred to as the State or Principal Representative, and Insert Contractor's full Legal Name including "Inc.", "LLC" etc. having its offices at Street address, City, State and Zip Code hereinafter referred to as the Architect/Engineer.
EFFECTIVE DATE AND NOTICE OF NONLIABILITY. This Agreement shall not be effective or enforceable until it is approved and signed by the State Controller or its designee (hereinafter called the “Effective Date”), but shall be effective and enforceable thereafter in accordance with its provisions. The State shall not be bound by any provision of this Contract before the Effective Date, and shall have no obligation to pay Architect/Engineer for any Work performed or expense incurred before the Effective Date.
RECITALS:
WHEREAS, the Principal Representative intends to procure Insert Project Name as provided by the State Controller's Office hereinafter called the Project; and
WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated, and otherwise made available, and a sufficient unencumbered balance thereof remains available for payment In Fund Number Insert Fund Number Here, Account Number Insert Account Number here; and
WHEREAS, the State has Appropriated and the Principal Representative has been authorized to expend the total sum of Insert dollar value written in words Dollars ($ ) for this project including all professional services, construction/improvements, project contingencies, furnishings, movable equipment, reimbursable expenses and miscellaneous expenses; and
(WHEREAS, funds are available for only a portion of the services defined herein, as more fully described in the funding Condition Precedent clause in Article 3.5) Comment by State Buildings Program: Note to Drafters: If the Condition Precedent clause is to be used REMOVE the parenthesis and the italics.
If not accepting the Condition Precedent strike out the language – DO NOT DELETE
WHEREAS, the Principal Representative has established the Fixed Limit of Construction Cost in the amount of Insert dollar value written in words Dollars ($ ) and Comment by State Buildings Program: Note to Drafters: The Fixed Limit of Construction should be the amount the Architect./Engineer shall be confined to design within.
WHEREAS, the ARCHITECT/ENGINEER was selected and determined to be the most qualified, and fees negotiated in accordance with the provisions of Section 24‑30‑1401, C.R.S. as amended, and
ENTIRE AGREEMENT – The entire contract consists of the Architect/Engineer Agreement (SC-5.1) and Attachment 1, the Architect/Engineer Terms and Conditions (SC-5.1TC) incorporated herein by reference. The ARCHITECT/ENGINEER acknowledges having reviewed and accepted the Architect/Engineer Agreement Terms and Conditions (SC-5.1TC).
NOW, THEREFORE,
The Principal Representative and the Architect/Engineer, for the considerations hereinafter set forth, agree as follows:
ARTICLE 1 BASIC SERVICES OF ARCHITECT/ENGINEER
THE SERVICES
1.1.1 Professional Services
For services in connection with the design of a funded project, the Architect/Engineer promises to perform the professional services for the contemplated project as delineated in the proposal letter dated , submitted by the Architect/Engineer, which is attached hereto and made a part hereof by reference as Exhibit A. In addition, the Architect/Engineer promises to perform the professional services as set forth in Terms and Conditions (SC-5.1TC) 1.1.1, 1.1.2, 1.1.3, 1.1.4, 1.1.5, 1.1.6 and 1.1.7.
1.1.2 Buy Clean Colorado
| If the box below is marked, this Project meets the definition of Public Project and must comply with the requirements of the Buy Clean Colorado Act, §24-92-117, C.R.S. (BCCO), and the Buy Clean Colorado Act Policy established by the State’s Office of State Architect (OSA). Refer to Exhibit C: State Development Requirements of the Code Compliance Policy. | Comment by State Buildings Program: Note to Drafter: Double-click on the box to bring up Check Box Form Field window and select “Checked” |
| Comment by State Buildings Program: Note to Drafter: Public Project is a project with a construction cost of $500,000 or more as defined in §24-92-102 (8), C.R.S. |
☐ ______ Principal Representative initial 1.1.1 1.1.2 The Architect/Engineer shall specify an Environmental Product Declaration (EPD) for each eligible material (specified below) within the project specifications included in the bid documents. When specifying materials, the Architect/Engineer shall prioritize products with EPDs for the design. The Architect/Engineer will verify EPD compliance using the BCCO EPD Submittal form (EE-5.2). The Architect/Engineer must verify that the specified EPDs contain global warming potential (GWP) values that are less than or equal to the maximum GWP limits established by OSA.
During the submittal process the Architect/Engineer shall work with the Contractor to ensure that eligible materials are obtainable and can be installed. If an eligible material with a compliant EPD is unobtainable, a waiver process defined by OSA shall be utilized.
“Eligible materials” or “material categories” means materials used in the construction of a Public Project, including:
Asphalt and asphalt mixtures Cement and concrete mixtures Glass Post-tension steel Reinforcing steel Structural steel Wood structural elements
DEVELOPMENT OF THE PROJECT
1.2.5.6 Bidding Phase Comment by State Buildings Program: Note to drafter: remove the word “electronic” if hard copies are desired.
If electronic sets will NOT be used – REMOVE the word “electronic” The Architect/Engineer shall furnish copies of the Construction Documents as follows, subject to limitations hereinafter set forth:
1. For Bidding Documents: ( ) electronic sets to enable distribution among prime contractors and subcontractors in accordance with the advertisement for bids.
For Contract Documents: The Principal Representative will require up to ( ) electronic sets. The Contract Documents bearing the seal and the signature of the Architect/Engineer and the appropriate responsible professional Engineering Consultants are to be signed by the Contractor and the Principal Representative at the Contractor's contract signing conference. The Architect/Engineer acknowledges that prior to the contract signing conference and State Buildings Program authorizing the Notice to Proceed State Form SBP-6.26, a Letter of Compliance must be obtained from the State’s Code Review Agent verifying that the contract Documents and all addenda, value engineering recommendations and all other changes to the bidding documents are in compliance with the applicable codes as adopted by State Buildings Program as indicated in Exhibit C.
For Construction: Each prime contractor shall be furnished with ( ) electronic sets or partial sets of the Contract Documents to enable prompt prosecution of the work.
( ) complete sets of drawings and specifications shall be the maximum required to be furnished by the Architect/Engineer. The Principal Representative will pay for all other sets of documents or partial sets of documents required at the cost of reproduction.
1.2.7 Post Construction Phase
1.2.7.1 (As designated and defined in the Architect/Engineer’s Proposal Exhibit A.)
2 ARTICLE 2 REIMBURSABLE EXPENSE
REIMBURSEMENT
2.1.1 Basic and Additional Services
Reimbursable expenses are in addition to the compensation for Basic and Additional Services and include actual expenditures made by the Architect/Engineer and its employees, associate Architect/Engineer, and consultants in the interest of the Project. Pay requests for reimbursable expense shall be submitted with receipts, statements, or other acceptable supporting data. The Architect/Engineer understands and agrees that a certain dollar amount as enumerated in line H of paragraph 3.1.1 has been established as a maximum amount to be paid for all reimbursable expenses.
2.1.2 Items for Reimbursement
The Architect/Engineer shall be reimbursed for:
1. In accordance with the provisions of paragraph 1.2.5.6 (d) of this Agreement, for all copies over ( ) of the Construction Documents which are provided for the project. Comment by State Buildings Program: This amount should be the total of all sets in Article 1.2 The costs of all items furnished by the Architect/Engineer in accordance with paragraphs 5.1.1 (d) and (e) of the Architect/Engineer Agreement Terms and Conditions Design/Bid/Build (SC-5.1TC) as requested by the Principal Representative.
Fees of special consultants if their employment is authorized in advance by the Principal Representative for other than the required architectural, structural, mechanical, electrical and civil engineering services; landscaping, if any; space planning/interior layout; and any other services included in this Agreement.
Expense of data processing and photographic production techniques when used in connection with Additional Services.
Expense of long distance telecommunication related to the performance of Basic Services.
Expense of renderings, models and mock-ups requested by the Principal Representative other than those described in the designated services.
Expense of mail, deliveries, mileage for local travel other than that necessary for the performance of Basic Services, and expense travel for consultants per Article 1 Basic Services of Architect/Engineer. Reimbursement of travel expenses is to be based on reasonable and necessary travel costs within the limits of State/Federal per diem rates as published in the travel section of the State Controller’s Fiscal Rules, Meal and Incidental Per Diem Rates, Appendix A1.
Expense of any additional insurance coverage or limits, including professional liability insurance, requested by the Principal Representative in excess of that required in Article 8 as set forth in the Terms and Conditions (SC-5.1TC).
Other expenses as approved in writing by the Principal Representative and State Buildings Program.
3 ARTICLE 3 BASIS OF COMPENSATION
3.1 PAYMENT
3.1.1 The Total Compensation
The total compensation for Basic Services fees (B through F), including a not-to-exceed price for Reimbursable Expenses and, if applicable, Pre-Design and Post Construction Services fees (A and/or G), shall be allocated as follows: Comment by State Buildings Program: Note to Drafter: The Architect/Engineer shall provide their services broken out by design phase NOT by discipline.
| Pre-Design Phase (If Applicable) | $_____________ | |||
| Schematic Design Phase | $_____________ | |||
| Design Development Phase | $_____________ | |||
| Construction Documents Phase | $_____________ | |||
| Bidding Phase | $_____________ | |||
| Contract Administration Phase | $_____________ | |||
| Post Construction Phase | $_____________ | |||
| Reimbursable Expenses (not to exceed) | $_____________ | |||
| TOTAL COMPENSATION | $_____________ |
3.1.2 Monthly Payments
Payments to the Architect/Engineer shall be made monthly based upon Architect/Engineer's performance and progress, through a properly executed Application for Payment (SBP-7.1). Payments shall be due per § 24-30-202(24) (correct notice of amount due), within forty-five (45) days of receipt by the Principal Representative of the Applications for Payment.
3.5 CONDITION PRECEDENT Comment by State Buildings Program: Note to Drafters: If the Condition Precedent clause is to be used REMOVE the parenthesis and REMOVE the italics.
If not accepting the Condition Precedent strike out the language – DO NOT DELETE (At the time of the execution of this Agreement, there are sufficient funds budgeted and appropriated to compensate the Architect/Engineer only for performance of the services through and including Insert the phases that have been fully funded Therefore, it shall be a Condition Precedent to the Architect/Engineer's performance of the remaining services specified in Insert the parts of Article 1.2 that describes the services not fully funded_and the State's liability to pay for such performance, sufficient funding must be appropriated and made available to the Principal Representative for the Project prior to and, as a further Condition Precedent, a written Amendment is entered into in accordance with the State of Colorado Fiscal Rules, stating that additional funds are lawfully available for the project. If either Condition Precedent is not satisfied by , the Architect/Engineer's obligation to perform services for Insert the scope pf work or phases that will be completed as part of the Condition Precedent and the State's obligation to pay for such service is discharged without liability to each other. If funding is eventually made available after , the Architect/Engineer has no right to perform services under Insert the parts of Article 1.2 that describes the services not fully funded of this Agreement and the state has no right to require the Architect/Engineer to perform the said services.) Comment by State Buildings Program: Note to Drafter: Insert the latest date that the funds will be released and the Architect/Engineer is willing to hold their fee. Comment by State Buildings Program: Note to Drafter: Insert the latest date that the funds will be released and the Architect/Engineer is willing to hold their fee. Comment by State Buildings Program: Note to Drafter: Insert the last date the architect is willing to hold their fee. Comment by State Buildings Program: Note to Drafter: Insert the latest date that the funds will be released and the Architect/Engineer is willing to hold their fee. Comment by State Buildings Program: Note to Drafter: Insert the last date the architect is willing to hold their fee.
| 1. ARTICLE 12 | MISCELLANEOUS PROVISIONS |
| 12.26 | DESIGNATED REPRESENTATIVES |
The Principal Representative and the Architect/Engineer authorize the individuals noted on the cover page to act on their behalf as Designated Representatives and points of contact as described in paragraphs 1.1.4 and 5.1.1(b):
FOR THE STATE:
Insert Name of Individual acting on the PR behalf Insert Street Address City, State Zip Code Insert email address
FOR THE ARCHITECT/ENGINEER:
Insert Name of Individual acting on the contractor behalf Insert Street Address City, State Zip Code Insert email address
SC-5.1
Rev. 04/2025 1
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
ARCHITECT/ENGINEER AGREEMENT DESIGN/BID/BUILD
EXHIBIT A: ARCHITECT/ENGINEER PROPOSAL
ARCHITECT/ENGINEER PROPOSAL
(Including Design Services Schedule and Certificates of Insurance, attached)
Rev. 07/2026 Ex A
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
ARCHITECT/ENGINEER AGREEMENT DESIGN/BID/BUILD
EXHIBIT B: WAGE RATES SCHEDULE
WAGE RATES SCHEDULE
(Attached)
SC-5.1
Rev. 07/2026 Ex B
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
ARCHITECT/ENGINEER AGREEMENT
DESIGN/BID/BUILD
EXHIBIT C: BUILDING CODE COMPLIANCE POLICY
APPROVED STATE BUILDING CODES
BUILDING CODE COMPLIANCE POLICY: COORDINATION OF APPROVED BUILDING CODES, PLAN REVIEWS, BUILDING INSPECTIONS AND STATE DEVELOPMENT REQUIREMENTS
Refer to the Office of the State Architect’s Building Codes Webpage for the Building Code Compliance Policy (Rev. July 2025)
Exhibit A: Approved Building Codes of the Code Compliance Policy dated July 2025 including the Amendments to the International Building Code and Code Compliance Plan Review Procedures (Rev. July 2025);
Exhibit B: Plan Review Procedures of the Code Compliance Policy dated July 2025
Exhibit I: State Development Requirements of the Code Compliance Policy dated July 2025
The State Buildings Program Building Codes Webpage may be found at:
Rev. 07/2026 Ex C
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
ARCHITECT/ENGINEER AGREEMENT
DESIGN/BID/BUILD
EXHIBIT D: ADDITIONAL DESIGN REQUIREMENTS/ PROGRAM PLAN/SUSTAINABILITY GOALS
DESIGN REQUIREMENTS/FACILITIES PROGRAM PLAN/SUSTAINABILITY GOALS
(Attached, as applicable)
This Exhibit D is in addition to Exhibit I: State Development Requirements of the Code Compliance Policy dated July 2025 as listed as Exhibit C of this agreement.
SC-5.1
Rev. 07/2026 Ex D
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
ARCHITECT/ENGINEER AGREEMENT DESIGN/BID/BUILD
SUPPLEMENTARY GENERAL CONDITIONS: FEDERAL PROVISIONS Comment by State Buildings Program: Note to drafter: REMOVE THIS PAGE if project is not funded by a federal grant.
Supplementary General Conditions Federal Provisions
SLFRF Federal Funds: Contractor Terms and Conditions Certification
SLFRF Federal Funds: Contractor Terms and Conditions
Rev. 07/2026
File details come from the government source that posted it. Updated .