APPENDIX B - QASP.pdf
PDF 130 KB Posted
- Attached to
- Industrial Plant Equipment Maintenance Program
- Solicitation number
- N42158-22-R-S007
About this file
This document contains a Quality Assurance Surveillance Plan (QASP) and details of a related federal contract opportunity for industrial plant equipment maintenance services. The QASP outlines twelve maintenance and reporting tasks required of the contractor, along with performance standards and acceptance quality levels to be monitored by the Contracting Officer's Representative. Key deliverables include weekly service reports, preventative maintenance reports within ten days of each service, certification and calibration reports within thirty days, and quality inspection reports monthly. The related solicitation is for industrial plant equipment maintenance at the Naval Sea Systems Command, consisting of preventative maintenance, corrective maintenance, calibration analysis, and personnel training for up to six hundred machine tools. The contractor must provide certified technicians, transportation, equipment, parts, tools and materials to perform on-site services on a continual basis for an initial one-year base period and four one-year option periods.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix B Quality Assurance Surveillance Plan (QASP)
This Quality Assurance Surveillance Plan (QASP) includes performance standards. The Government will use these standards to determine contractor performance and shall complete contractor performance to the Acceptable Quality
Level (AQL). The COR will use this document to rate contractor. Rating will be either SAT or UNSAT. Any USAT rating will be explained in the notes block.
PWS
Paragraph
Task
Performance Standard Acceptable Quality
Levels (AQL)
Surveillance
Method /
By Whom
Performance
Rating
Sat / Unsat
8.
The contractor shall perform annual
Preventive
Maintenance (PM) on all machines listed in
Appendix A.
The contractor shall coordinate arrival with COR and perform
PM successfully.
0 (zero) failures to respond to the agreed upon arrival date or perform successful PM.
100% Inspection
– COR will inspect.
9.
The contractor shall perform a
Certification and
Calibration test on all machines listed in
Appendix A.
The contractor shall coordinate arrival with COR and perform
Certification and Calibration test successfully.
0 (zero) failures to respond to agreed-upon arrival date or perform successful comprehensive calibration test.
100% Inspection
10.
perform corrective maintenance repair response.
The contractor shall respond to phone call within allotted time and perform maintenance successfully.
1 failure to respond in allotted time or perform maintenance successfully
Periodic
Inspection – COR will review
11.
provide on-the-job maintenance training.
The contractor shall provide on-the-job maintenance training to
NNSY maintenance personnel.
0 (zero) failures to supply training.
Periodic
Inspection – COR will review
12. The contractor shall provide consumables.
The contractor shall provide maintenance consumables for all relevant equipment on an as-needed basis as part of preventive and corrective maintenance.
0 (zero) failures to supply consumables.
100% Inspection
16. The contractor shall provide reports.
The contractor shall provide COR with maintenance report within 10 days of completion of maintenance.
0 (zero) failures to supply report within 10 days.
100% Inspection
Notes:
Deliverables Schedule
Deliverable Frequency Copies Medium/Format Submit To
5.1. Kick-Off
Meeting Minutes
(CDRL A001)
Within 10 calendar days after kick-off meeting
As specified/
Electronic
COR
5.2.1.2. and
5.2.2.3 Service
Reports
(CDRL A002)
Within 7 calendar days after event and weekly thereafter
As specified/
Electronic
COR
16.1.
PM Service
Report
(CDRL A003)
Within 10 calendar days after each PM and yearly thereafter
As specified/
Electronic
COR
8.6. Change of
PM
(CDRL A004)
Within 5 days after event 2 As specified/
Electronic
COR
16.2.
Certification and
Calibration
Report
(CDRL A005)
Within 30 calendar days after each Certification and Calibration and yearly thereafter
As specified/
Electronic
COR
16.3.
Corrective
Maintenance
Repair Report
(CDRL A006)
Within 10 calendar days after each CM Repair
As specified/
Electronic
COR
17.2.
Quality
Management
Plan
(CDRL A007)
Within 60 calendar days after award and within 7 calendar days of any changes and yearly thereafter
As specified/
Electronic
COR
17.4.
Quality
Inspection and
Surveillance
Report
(CDRL A008)
Within 30 calendar days of each
Quality Inspection and
Surveillance and monthly thereafter
As specified/
Electronic
COR
17.5.1.
Certificate of
Completion
(COC)
(CDRL A009)
After each PM and CM service 2 As specified/
Electronic
COR