Appendix A MI Writer Checklist (1).docx

DOCX document 28 KB Posted

Attached to
INSURV Logistician and Writer Recorder Federal contract opportunity
Solicitation number
N0018923Q0148
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document outlines requirements for logistician and writer recorder services to support naval inspections. The Navy seeks these services to assist with inspection preparation and documentation. Responsibilities include creating file structures, collecting ship information, distributing data during inspections, verifying scores and comments, drafting final reports, and uploading files to SharePoint. This is a sole source contract awarded to Kern Technology Group, an SDVOSB, in accordance with FAR Subpart 19.14.

View the file

Other files for this federal contract opportunity

Other files attached to INSURV Logistician and Writer Recorder, newest first.
File Type Posted
Attachment VI Clauses and Provisions 0001.pdf PDF
Combined Synopsis and Solicitation 0001.pdf PDF
Government Furnished Equipment Estimate.pdf PDF
Attachment I Performance Work Statement.pdf PDF
Wage Determination.pdf PDF
Appendix C MI Post Inspection SOP.docx DOCX document
Attachment VI Clauses and Provisions.pdf PDF
QUALITY ASSURANCE SURVEILLANCE PLAN AND QASP MATRIX.pdf PDF
Appendix D Surface Recorder Checklist.xlsx XLSX spreadsheet
Combined Synopsis and Solicitation.pdf PDF
Appendix B Writing Guide.xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DECKS:

AS _____

AW _____

CC _____

IS _____

MN _____

NV _____

OP _____

WP _____

AX _____

DC _____

EL _____

MP _____

DK _____

AV _____

HB _____

SP _____

EP _____

MD _____

OH _____

VT _____

PR _____

DEMOS:

UW______

SD______

AD______

MBLF____

LRD_____

ANC_____

ST______

FP______

QR/A____

AMPH____

MS______

MH______

BMD_____

WRITER CHECKLIST (MI)Reviewed: JAN 23
WRITER: ___________________________Updated: JAN 23
Ship: ___________________Date: ____________Inspection Type: ________

*PRIOR TO INSPECTION:

_____Create file structure on your laptop (and portable) hard drive that matches portal upload structure (see Writer Post-Inspection SOP)
_____Download and save most current versions of all deck IIGs, EOCs, JFMM weights, PRISMS files, and Surface Ship Self-Assessment Sheets
_____Open PRISMS file, verify your name and “Writer” box (on overview tab) are checked and there are no errors (if so contact N3 Collective)
_____Obtain and collect following from PRE-INSPECTION WORKBOOK (‘Ship Information’ tab) and from historical inspection files to populate SI SAC and message:
____ Type Commander

____ Group Commander ____ Ship commissioning date (also available at http://www.nvr.navy.mil)

*START OF INSPECTION:

____Receive CSMP.CMP file from ship and distribute to each caucus room
_____Collect updated CASREP/DFS/TSO list

*END OF INSPECTION:

_____ Receive Export2writer file and EOC scoresheet from each FA lead ____ Verify PRISMS card count, message comments, EOC and DEMO scores and their associated comments ____ For any overall deck score of DEG (yellow) or UNSAT (red), collect (from the Deck Leads) the 3 subsystem areas that drove the score (document on reverse)

_____Fill out Senior Inspector, OFRP, and Last Deployment tabs
_____Give SI the IFOM and CSMP Effectiveness scores and BZ list
_____Click Populate SI SAC for SI Review Report Generation
_____In SI SAC ‘AREAS’ tab, fill in cyan colored areas and Save (will force generate a new file with proper file naming convention; if not, ensure proper naming convention is utilized)
_____Fill out CARESP, DFS, and TSO tabs (compare to the PRE-INSPECTION WORKBOOK)
_____Compare Numerical Data, Senior Member Notes, Stoplight Values FA-Systems, Subsystem Values, Stoplight Chart, and Surface IFOM Grade tabs to the data received in the imported PRISMS file
_____Fill update PLAD tab IAW the directions on the PLAD tab of the report
_____Get the names/titles of senior personnel present at out-brief

*CREATE / ROUTE THE MESSAGE:

_____Click Create Final Report
____Ensure naming convention is “(X)_INSURV_REPORT_FOR_USS_SHIP_XXX_MI_YYYY”
_____Search draft report for any identifying information (ship name, hull number, dates, location) and remove
_____Proofread the message (conduct message read) to ensure correct format IAW Message Input Guide and that all

intended comments made it into the message

_____Email Draft Report to SI and note any deficiencies that must be corrected by N3
_____Email Self Assessment Grade Sheet to military Senior Writer

*UPLOAD FILES TO SHAREPOINT (MUST BE COMPLETED WITHIN 3 DAYS OF INSPECTION):

_____ Upload files to applicable ship inspection Case File on INSURV SharePoint Portal (see Writer Post-Inspection SOP) *Send an e-mail to INSURV_LTLC_ANALYSIS_PLANS_REPORTS@us.navy.mil and CC the Senior Writer and SI to notify that files are uploaded and their location

File details come from the government source that posted it. Updated .