Hanford Mission Integration Solutions
General Materials or Services for L -612, Condition Assessment HEW-1 Line
RFP Number: 349693 Rev 0
Date: 5/5/2021
Submittal Register Instructions and Definitions
AP =
APW =
DWG =
MFC =
PDF =
P3 =
MPP =
A =
BO =
KO =
CD =
DD =
30%, 60%, 90% =
SC =
EC =
A = B = C =
Appendix A - Submittal Register
The Subcontractor shall meet all the required schedule and provide the documents specified in accordance with the following submittals.
1. SUB. NO.: Numerical submittal sequence number. The XXXXX-XXX shall be updated to the contract release number upon award.
2. Version (VER.): part of the submittal number.
3. SOW SECTION NO.: Cross reference to the subcontract requirement that defines this submittal.
Example: 10.2 (see SOW section 10.2 for detailed requirements).
Date of Subcontract Award
4. DESCRIPTION / DOCUMENT TITLE: Title or general description of the document / deliverable.
5. SUBMITTAL TYPE:
Approval Required (Buyer must approve the Subcontractor's submittal, however, work associated with the submittal may proceed prior to Buyer approval).
Approval Required Prior to Work (Buyer must approve the Subcontractor's submittal prior to the Subcontractor being authorized to proceed with any activity/work associated with the submittal).
6. FORMAT: Describes the type of submittal required:
An AutoCAD drawing using the Hanford Standard formatting (See HNF-14660, Offsite Vendor Instructions for Preparation and Control of Engineering Drawings) Microsoft Format Compatible application (Word, Excel, Access, PowerPoint).
Adobe Acrobat (Portable Document Format).
A Primavera Project Planner Microsoft Project
7. Subcontractor DUR.: Actual date or number of working days before or after a milestone that a submittal is due from the Subcontractor. Example: June 1, 2019 or CD + 32d (32 working days after Conceptual Design is Complete)
End of Construction
8. BUYER REVIEW DUR.: Number of working days the Buyer has to review the submittal.
Example: 4d (4 working days)
Date of Subcontract Bid Option Award Subcontract Kick-Off Meeting Conceptual Design Complete Definitive Design Complete 30%, 60% or 90% Design Complete Start of Construction
10. REVIEWERS: (To be filled in after subcontract award) List the names of the required approvers after the A- and the names of individuals to be copied for information only after the I -.
Example: A - Smith, Jones, Miller; I - Johnson, Ellis
Revise and resubmit Minor comments, approved with exceptions as corrected Conforms to the subcontract requirements
9. STATUS CODE: Submittal review status code. For use primarily by Project Document Control.
General Materials or Services - SOW Page A-1 of A-4 5/5/2021
General Materials or Services
L-612 Condition Assessment of HEW-1 Transmission Line RFP Number: 349693, Rev 0
Date: 5/5/2021Contract No:
Submittal Register Revision: 0
1. 2. 3. 4. 5. 6. 7. 8. 9. 10.
SUB. NO. VER.
SOW
SECTION
NO.
DESCRIPTION / DOCUMENT TITLE
SUBMITTAL
TYPE
FORMAT DUR.
BUYER
REVIEW DUR.
STATUS
CODE
REVIEWERS/ COMMENTS
XXXXXX-XXX-SUB-001 001 3.0, 7.0 Project Schedule AP PDF, MFC KO + 8d 4d A - BTR
I - DA
I - PE
I - CM
I - QA
A - PM
I - EU
I - DA MNGR
XXXXXX-XXX-SUB-002 001 5.1.2 Required Qualifications / Documentation and Organization Chart for Project Team Personnel including Lower Tier Subcontractors
AP PDF, MFC KO + 8d 4d A - BTR
A - DA
I- PE
I - CM
I - QA
A- PM
I - EU
I - DA MNGR
XXXXXX-XXX-SUB-003 001 4.6 Quality Assurance Program (QAP) & Lower Tier Subcontractor QAP AP PDF, MFC KO + 8d 4d A - BTR
A - DA
I - PE
A - CM
A - QA
A - PM
I - EU
I - DA MNGR
XXXXXX-XXX-SUB-004 001 8.9 Work Execution Plan AP PDF, MFC KO + 8d 4d A - BTR
A - DA
I - PE
A - CM
A - QA
A - PM
I - EU
I - DA MNGR
XXXXXX-XXX-SUB-005 001 5.1 Training Records APW PDF, MFC SC 4d A - BTR
A - DA
I - PE
A - CM
A - QA
A - PM
I - EU
I - DA MNGR
A - ES&H
A/E Subcontractor Name:
XXXXXX-XXX
General
General Materials or Services - SOW Page A-2 of A-4 5/5/2021
L-612 Condition Assessment of HEW-1 Transmission Line RFP Number: 349693, Rev 0
Date: 5/5/2021
Submittal Register Revision: 0
1. 2. 3. 4. 5. 6. 7. 8. 9. 10.
SUB. NO. VER.
SOW
SECTION
NO.
DESCRIPTION / DOCUMENT TITLE
SUBMITTAL
TYPE
FORMAT DUR.
BUYER
REVIEW DUR.
STATUS
CODE
REVIEWERS/ COMMENTS
A/E Subcontractor Name:
XXXXXX-XXX-SUB-006 001 4.3 Hazard Communication Training Records APW PDF, MFC EC 4d A - BTR
A - DA
I - PE
A - CM
A - QA
A - PM
I - EU
I - DA MNGR
A - ES&H
XXXXXX-XXX-SUB-007 001 4.3 Chemical Inventory Worksheet AP PDF, MFC KO + 5d 4d A - BTR
A - DA
I - PE
A - CM
A - QA
A - PM
I - EU
I - DA MNGR
A - ES&H
XXXXXX-XXX-SUB-008 001 8.5 Team Task Lead Qualifications AP PDF, MFC KO + 5d 4d A - BTR
A - DA
I - PE
A - CM
A - QA
A - PM
I - EU
I - DA MNGR
I - ES&H
XXXXXX-XXX-SUB-009 001 4.3 Verification Letter of Current EJTA (Ready to Work) AP PDF, MFC SC 4d A - BTR
A - DA
I - PE
A - CM
A - QA
A - PM
I - EU
I - DA MNGR
A - ES&H
XXXXXX-XXX-SUB-010 001 4.3 Job Hazard Analysis AP PDF, MFC SC 4d A - BTR
A - DA
I - PE
A - CM
A - QA
A - PM
I - EU
I - DA MNGR
General Materials or Services - SOW Page A-3 of A-4 5/5/2021
L-612 Condition Assessment of HEW-1 Transmission Line RFP Number: 349693, Rev 0
Date: 5/5/2021
Submittal Register Revision: 0
1. 2. 3. 4. 5. 6. 7. 8. 9. 10.
SUB. NO. VER.
SOW
SECTION
NO.
DESCRIPTION / DOCUMENT TITLE
SUBMITTAL
TYPE
FORMAT DUR.
BUYER
REVIEW DUR.
STATUS
CODE
REVIEWERS/ COMMENTS
A/E Subcontractor Name:
3.1.2 Task 2 - Prepare Condition Assessment Report
XXXXXX-XXX-SUB-011 001 3.2 Draft Condition Assessment Report AP PDF, MFC, DWG
KO + 65d 8d A - BTR
A - DA
A - PE
A - CM
A - QA
I - PM
A - EU
A - DA MNGR
XXXXXX-XXX-SUB-012 001 3.2 Final Condition Assessment Report AP PDF, MFC Draft Approved + 12d
8d A - BTR
A - DA
A - PE
A - CM
A - QA
I - PM
A- EU
A- DA MNGR
General Materials or Services - SOW Page A-4 of A-4 5/5/2021