appendix A-Equpiment List Apache Facility.pdf
PDF 194 KB Posted
- Attached to
- MAINTENANCE AND SUPPORT CONTRACT - APACHE SUPPORT FACILITIES ALI AL SALEM AIR BASE, KUWAIT Federal contract opportunity
- Solicitation number
- W912ER20R0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 13- QC room.pdf | ||
| 17- Break Room.pdf | ||
| 16- Apache Hanger Roof Fans.pdf | ||
| Inquiry ID 8577704 - Lights.pdf | ||
| 8- Apache Hanger 20 T Crane.pdf | ||
| 18- Squdran Bldg Simulator Room.pdf | ||
| 9- MTTP Training.pdf | ||
| Inquiry ID 8577246 - IMG_4307.jpg | JPG image | |
| AMENDMENT TO FAR CLAUSE 52.212-2 Version 2.pdf | ||
| Labor Category Chart Amendment.pdf | ||
| Combined Synopsis Solicitation-Apache Amendment 2.pdf | ||
| Combined Synopsis Solicitation-Apache Amendment 1.pdf | ||
| Site Visit Information-Apache Amend 1.pdf | ||
| Combined Synopsis Solicitation-Apache Final.pdf | ||
| Apache Base Award PWS.pdf | ||
| AMENDMENT TO FAR CLAUSE 52.212-2.pdf | ||
| Apache Task Order 1 PWS.pdf | ||
| Apache Bid Schedule.pdf | ||
| Site Overview.pdf | ||
| Labor Category Chart.pdf | ||
| Site Visit Information Apache.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING Room ITEMS DESCRIPTION QTY. REMARKS
Apache Hangar Multiple Hangar Exit access single doors with panic lock 5 Nos.
Apache Hangar Multiple Hangar Ceiling 1000 Watts 61 Nos.
Apache Hangar Multiple Hangar Ceiling 400 Watts 59 Nos.
Flourescent Lamp 5 feet long 58 Watts fixtures 14 Nos.
Single Metal Door with normal handle 01 No.
Double Metal door with Panic bar 01 No.
Flourescent Lamp 5 feet long 58 Watts 20 Nos.
Single Metal Door with Padlock 01 No.
Double Metal door with PadLock 01 No.
Roller Up Door 02 Nos.
Flourescent Lamp 5 feet long 58 Watts 06 Nos.
Single Metal Door with Padlock 2 Nos.
Flourescent Lamp 5 feet long 58 Watts 13 Nos.
APACHE HANGAR
LIST OF ITEMS IN APACHE FACILITY 2020
Apache Hangar
Apache Hangar
Apache Hangar
Gsc/Paint Shop
Tool Crib
Supply Room
Single Metal Door with Padlock 02 Nos.
Roller Up Door 02 Nos.
Flourescent Lamp 5 feet long 58 Watts 15 Nos.
Single Metal Door with Padlock 02 Nos.
Roller Up Door 02 Nos.
Single Metal Door with normal handle 01 No.
Single Metal Door with Panic Bar 02 Nos.
Double Metal door with Panic bar 02 Nos.
Double Metal door Panic Bar & Padlock 01 No.
Single Metal Door with normal handle 01 No.
Single Metal Door with Padlock 01 No.
Flourescent Lamp 5 feet long 58 Watts 08 Nos.
Double Metal door with Panic bar 01 No.
Double Metal door with Pablock 01 No.
Flourescent Lamp 5 feet long 58 Watts 18 Nos.
Single Metal Door with Padlock 02 Nos.
Roller Up Door 02 Nos.
Apache Hangar Metal Sheet
Shop
Apache Hangar
Apache Hangar
Apache Hangar
Apache Hangar Arm Shop
Avionics Shop
MTP Training
Apache Hangar
First Hallway
Second Hallway
Third Hallway
Apache Hangar
Flourescent Lamp 5 feet long 58 Watts 15 Nos.
Single Metal Door with Padlock 01 No.
Roller Up Door 02 Nos.
Flourescent Lamp 5 feet long 58 Watts 6 Nos.
Single Metal Door with normal handle 01 No.
Double Metal door with Panic bar 01 No.
Flourescent Lamp 5 feet long 58 Watts 02 Nos.
Double Metal door with Panic bar 01 No.
Apache Hangar Fire Extinguishers throughout the facility 24 Nos.
Wooden Door with normal handle 29 Nos.
Wooden Door with Padlock 10 Nos.
Apache Hangar Multiple Metal Door with normal handle 01 No.
Metal Door with Padlock 03 Nos.
Metal Door with Panic Bar 03 Nos.
Multiple Halogen lights 250 Watts 24 Nos.
Sodium Discharge Lamp 400 Watts 06 Nos.
Apache Hangar Multiple Air Condition Units (Hitachi) 11 Nos.
Apache Hangar Multiple Air Condition Units (Carrier) 16 Nos.
Apache Hangar
AFFF Mech.
Room
Elect. Room No. 12
Apache Hangar Power Train
Shop
Apache Hangar
Apache Hangar
Apache Hangar Multiple Air Pressure Regulator 17 Nos.
Apache Hangar Multiple Frequency Converter 400Hz 02 Nos.
Apache Hangar Frequency Converter 120KVA 60Hz 110/220V 01 No.
Apache Hangar Frequency Converter 100KVA 60Hz 110V 01 No.
Apache Hangar Multiple Flourescent Lamp Fixtures 2 Feet long 30 Nos.
Apache Hangar Multiple Flourescent Lamp Fixtures 2 Feet long 95 Nos.
Apache Hangar Multiple Main Hangar Electrical Sliding Doors 04 Nos.
Apache Hangar Multiple Overhead Demag Crane 10 ton 03 Nos.
Apache Hangar Multiple Industrial water heaters 02 Nos.
Apache Hangar Multiple Toilets (ground floor) 09 Nos.
Apache Hangar Multiple Toilets (first floor admin area for public) 04 Nos.
Apache Hangar Multiple Toilets (first floor admin area for officers) 02 Nos.
Apache Hangar Multiple Shower 03 Nos.
Apache Hangar Multiple Break Room with sink 02 Nos.
Apache Hangar Multiple Aluminium Windows 58 Nos.
Apache Hangar Ansul form with water fire fighting system 01 No.
Squadron 17/20
Frequency Converter 120KVA 60Hz 110/220V 01 No.
Squadron 17/20
Frequency Converter 60KVA 60Hz 110V 01 No.
Squadron 17/20
Multiple Industrial water heaters 02 Nos.
Squadron 17/20
Multiple Break Room with sink 02 Nos.
Squadron 17/20
Fire Fighting System 01 No.
Squadron 17/20
Longbow Crew Trainer
FM-200 fire fighting system 01 No.
Squadron 17/20
Multiple Dry Wall / Paint Repair at Diff. locations. 16 Nos.
Squadron 17/20
Multiple Aluminium Windows 60 Nos.
Squadron 17/20
Multiple Toilets 14 Nos.
Squadron 17/20
Multiple Shower 12 Nos.
Squadron 17/20
Multiple Main Aluminium Door/Sub Door 02 Nos.
Squadron 17/20
Multiple Main Aluminium Door/Sub Door 02 Nos.
Squadron 17/20
Longbow Crew Trainer
Main Aluminium Door 01 No.
SQUADRON 17/20
Electrical Sub- Station
Transfer 1250KVA 02 Nos.
Electrical Sub- Station
H.T (High Tension) Panel 01 No.
Electrical Sub- Station
L.T (Low Tension) Panel 01 No.
Grounds Electric Jockey pump 01 No.
Grounds Electrical Main pump 01 No.
Grounds Diesel pump 01 No.
ELECTRICAL SUB-STATION
APACHE FACILITY GROUNDS
File details come from the government source that posted it. Updated .