Apache Task Order 1 PWS.pdf
PDF 454 KB Posted
- Attached to
- MAINTENANCE AND SUPPORT CONTRACT - APACHE SUPPORT FACILITIES ALI AL SALEM AIR BASE, KUWAIT Federal contract opportunity
- Solicitation number
- W912ER20R0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 13- QC room.pdf | ||
| 17- Break Room.pdf | ||
| 16- Apache Hanger Roof Fans.pdf | ||
| 9- MTTP Training.pdf | ||
| Inquiry ID 8577246 - IMG_4307.jpg | JPG image | |
| 18- Squdran Bldg Simulator Room.pdf | ||
| Inquiry ID 8577704 - Lights.pdf | ||
| 8- Apache Hanger 20 T Crane.pdf | ||
| AMENDMENT TO FAR CLAUSE 52.212-2 Version 2.pdf | ||
| Labor Category Chart Amendment.pdf | ||
| Combined Synopsis Solicitation-Apache Amendment 2.pdf | ||
| Combined Synopsis Solicitation-Apache Amendment 1.pdf | ||
| Site Visit Information-Apache Amend 1.pdf | ||
| Combined Synopsis Solicitation-Apache Final.pdf | ||
| Labor Category Chart.pdf | ||
| Site Visit Information Apache.pdf | ||
| Site Overview.pdf | ||
| appendix A-Equpiment List Apache Facility.pdf | ||
| Apache Base Award PWS.pdf | ||
| AMENDMENT TO FAR CLAUSE 52.212-2.pdf | ||
| Apache Bid Schedule.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
MAINTENANCE AND SUPPORT CONTRACT, TASK ORDER 1
APACHE SUPPORT FACILITIES, ALI AL SALEM AIR BASE, KUWAIT
The Government hereby orders the services provided for in paragraph 5.2 of the base contract Performance Work Statement (PWS) for the Anticipated Facilities, specifically the following systems and equipment in the Anticipated Facilities, including but not limited to those more specifically identified in Appendix A to this PWS, for the base performance period of the base contract:
Mechanical Systems and Plumbing
(Note: Existing HVAC systems are present and operational. Technical inspection of the larger central systems is required in order to determine if repair is tenable, or if replacement is necessary. This should be determined as part of the initial inspection and report.)
All Chillers and air handling units Central water and sewer connections All wash basins and water heaters Domestic water jockey pump Complete Inspection and Preventive Maintenance Replace Window type and split unit
AC units (5) Reverse osmosis water purifying system
Fire Protection
(Note: Existing system documentation reports that the fire suppression system appears complete, but it is not in operation. Technical inspection of the pumps, controllers, suppression components, and fire alarm system is required in order to determine if repair is tenable, or if replacement is necessary. This effort will be part of the initial inspection of the Scheduled Inspections.)
Fire Protection/Fire Alarm Inspections
All interior fire suppression components, including fire pumps, piping, and controls All fire alarm controls and devices and other fire alarm system components
Electrical Power
(Note: An internal power distribution system is present and generally operational. Standby power generation is present, but the conditions of the generators are unknown. Interior lighting is present.
Technical inspection of the power system and stand by generators is required in order to determine if repair is tenable. This effort will be part of the initial inspection of the Scheduled Inspections.)
Electrical Repair Scope
All generators and automatic transfer switches All elevators and associated equipment Replace interior fluorescent lighting All interior distribution panels, breakers, grounding systems, and other electrical devices
INSPECTION REPORT
The contractor shall provide the Contracting Officer, Program Manager, and Contracting Officer’s Representative with electronic copies of the Inspection Report as soon as it has been completed.
*** END OF PWS FOR TASK ORDER #1***