This pre-solicitation notice seeks responses from contractors interested in dredging the boat basin and access channel at the U.S. Coast Guard Station in Grand Isle, Louisiana. The project includes dredging the areas to a design depth of -10.71 feet NAVD88 (-10.36 feet MLLW) and transporting dredged materials via submerged pipeline to Fifi Island in Grand Isle. The total estimated value is between $500,000 to $1,000,000. Responses are required by May 9th and the solicitation will be issued on June 20th. Bids are due in July and contract performance must be completed by December. The project is set aside for total small business concerns under NAICS code 237990 with a $30 million annual revenue standard. Bid, payment and performance bonds are required. Interested contractors must provide evidence of experience, bonding capability, and SAM registration to be considered for the set aside.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

Appendix A Department of the Army Regulatory Permit

DEPARTMENT OF THE ARMY

CORPS OF ENGINEERS, NEW ORLEANS DISTRICT

7400 LEAKE AVENUE

NEW ORLEANS, LOUISIANA 70118

REPLY TO

ATTENTION OF

November 20, 2018

Operations Division Eastern Evaluation Section

Subject: MVN 2007-04560 ES

U.S. Coast Guard Civil Engineering Unit Miami Attn: Enrique San 15608 S.W. 117th Ave.

Miami, FL 33177

Dear Mr. San:

The proposed work to dredge the boat basin and access channel for the USCG Station and deposit dredged material on Fifi Island in Grand Isle, Jefferson Parish, Louisiana as shown on the enclosed drawings, is authorized under Category II of the Programmatic General Permit provided that all conditions of the permit are met.

In addition, you must comply with following conditions:

1. Permittee must comply with the attached: “STANDARD MANATEE

CONDITIONS FOR IN-WATER ACTIVITIES”.

2. Our Real Estate Division has indicated that your project is located in an area over which the federal government holds real estate interest. No work may be performed under this permit until a real estate instrument is issued by our Real Estate office. If you require further information regarding real estate matters, email Judith.y.gutierrez@usace.army.mil. The real estate instrument will be initiated by our Real Estate office without further action required on your part.

3. The Operations Manager for the Barataria Bay Waterway, Bayou Rigaud has required the permittee to investigate the existing spill box located in alternative disposal area and determine if it needs to be closed prior to commencing dredging operations and take precautions not to block or damage. Please contact Jane Brown at (504)862-1297 or Jane.L.Brown@usace.army.mil for concerns in this matter.

This authorization has a blanket water quality certification from the Louisiana

Department of Environmental Quality; therefore, no additional authorization from DEQ is required.

However, prior to commencing work on your project, you must obtain approvals from state and local agencies as required by law and by terms of this permit. These approvals include, but are not limited to, a permit, consistency determination or mailto:Judith.y.gutierrez@usace.army.mil mailto:Jane.L.Brown@usace.army.mil

-2-determination of “no direct or significant impact (NDSI) on coastal waters” from the Louisiana Department of Natural Resources, Office of Coastal Management.

This approval to perform work is valid for 5 years from the date of this letter.

Permittee is aware that this office may reevaluate its decision on this permit at any time the circumstances warrant.

Should you have any further questions concerning this matter, please contact Ben

Sherman at (504) 862-2041.

Sincerely, for Martin S. Mayer Chief, Regulatory Branch

Enclosures

STANDARD MANATEE CONDITIONS FOR IN-WATER ACTIVITIES

During in-water work in areas that potentially support manatees, all personnel associated with the project shall be instructed and aware of the potential presence of manatees, manatee speed zones, and the need to avoid collisions with, and injury to, manatee. All personnel shall be advised that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine Mammal Protection Act of 1972 and the Endangered Species Act of 1973. Additionally, personnel shall be instructed not to attempt to feed or otherwise interact with the animal.

All on-site personnel are responsible for observing water-related activities for the presence of manatee(s). To minimize potential impacts to manatees in areas of their potential presence, the permittee shall insure the following are adhered to:

All work, equipment, and vessel operation shall cease if a manatee is spotted within a 50-foot radius (buffer zone) of the active work area. Once the manatee has left the buffer zone on its own accord (manatees must not be herded or harassed into leaving), or after 30 minutes have passed without additional sightings of manatee(s) in the buffer zone, in-water work can resume under careful observation for manatee(s).

If a manatee(s) is sighted in or near the project area, all vessels associated with the project shall operate at “no wake/idle” speeds within the construction area and at all times while in waters where the draft of the vessel provides less than a four-foot clearance from the bottom. Vessels shall follow routes of deep water whenever possible.

If used, siltation or turbidity barriers shall be properly secured, made of material in which manatees cannot become entangled, and be monitored to avoid manatee entrapment or impeding their movement.

Temporary signs concerning manatees shall be posted prior to and during all in-water project activities and removed upon completion. Each vessel involved in construction activities shall display at the vessel control station or in a prominent location, visible to all employees operating the vessel, a temporary sign at least 8½ " X 11" reading language similar to the following: “CAUTION BOATERS: MANATEE AREA/ IDLE SPEED IS

REQUIRED IN CONSTRUCTION AREA AND WHERE THERE IS LESS THAN FOUR

FOOT BOTTOM CLEARANCE WHEN MANATEE IS PRESENT”. A second temporary sign measuring 8½ " X 11” shall be posted at a location prominently visible to all personnel engaged in water-related activities and shall read language similar to the following: “CAUTION: MANATEE AREA/ EQUIPMENT MUST BE SHUTDOWN

IMMEDIATELY IF A MANATEE COMES WITHIN 50 FEET OF OPERATION”.

Collisions with, injury to, or sightings of manatees shall be immediately reported to the U.S. Fish and Wildlife Service’s, Louisiana Ecological Services Office (337/291-3100) and the Louisiana Department of Wildlife and Fisheries, Natural Heritage Program (225/765-2821). Please provide the nature of the call (i.e., report of an incident, manatee sighting, etc.); time of incident/sighting; and the approximate location, including the latitude and longitude coordinates, if possible.

CEMVN-PGP SPECIAL CONDITIONS 16 May 2017

1. Activities authorized under this general permit shall not be used for piecemeal work and shall be applied to single and complete projects. All components of a single and complete project shall be treated together as constituting one single and complete project. All planned phases of multi-phased projects shall be treated together as constituting one single and complete project. This general permit shall not be used for any activity that is part of an overall project for which an individual permit is required.

2. No activity is authorized under this general permit which may adversely affect significant cultural resources listed or eligible for listing in the National Register of Historic Places until the requirements for Section 106 of the National Historic Preservation Act are met. Upon discovery of the presence of previously unknown historic and/or prehistoric cultural resources, all work must cease and the permittee must notify the State Historic Preservation Office and the

Corps of Engineers. The authorization is suspended until it is determined whether or not the activity will have an adverse effect on cultural resources. The authorization may be reactivated or modified through specific conditions if necessary, if it is determined that the activity will have no adverse effect on cultural resources. The PGP authorization will be revoked if it is determined that cultural resources would be adversely affected, and an individual permit may be necessary.

3. There shall be no unreasonable interference with navigation by the existence or use of the activity authorized herein. The permittee will, at his or her expense, install and maintain any safety lights, signals, and signs prescribed by the United States Coast Guard, through regulations or otherwise, on authorized facilities or on equipment used in performing work under the authorization.

4. No activity may substantially disrupt the movement of those species of aquatic life indigenous to the water body, including those species which normally migrate through the area, unless the activity's primary purpose is to block or impound water.

5. If the authorized activity involves the installation of aerial transmission lines, submerged cable, or submerged pipelines across navigable waters of the United States the following is applicable:

The National Ocean Service (NOS) has been notified of this authorization. You must notify NOS and this office in writing, at least two weeks before you begin work and upon completion of the activity authorized by this permit. Your notification of completion must include a drawing which certifies the location and configuration of the completed activity (a certified permit drawing may be used). Notification to NOS will be sent to the following address: National Ocean Service, Office of Coast

Survey, N/CS261, 1315 East West Highway, Silver Spring, Maryland 20910-3282.

6. For pipelines under an anchorage or a designated fairway in the Gulf of Mexico the following is applicable: The NOS has been notified of this authorization. You must notify

NOS and this office in writing, at least two weeks before you begin work and upon completion of the activity authorized by this permit. Within 30 days of completion of the pipeline, 'as built' drawings certified by a professional engineer registered in Louisiana or by a registered surveyor shall be furnished to this office, the Commander (dpw), Eighth Coast Guard District, Hale Boggs Federal Building, 500 Poydras Street, Room 1230, New Orleans, Louisiana

70130, and to the Director, National Ocean Service, Office of Coast Survey, N/CS261, 1315

East West Highway, Silver Spring, Maryland 20910-3282. The plans must include the location, configuration and actual burial depth of the completed pipeline project.

7. If the authorized project, or future maintenance work, involves the use of floating construction equipment (barge mounted cranes, barge mounted pile driving equipment, floating dredge equipment, dredge discharge pipelines, etc.,) in the· waterway, you are advised to notify the Eighth Coast Guard District so that a Notice to Mariners, if required, may be prepared. Notification with a copy of your permit approval and drawings should be mailed to the Commander (dpw), Eighth Coast Guard District, Hale Boggs Federal Building, 500

Poydras Street, Room 1230, New Orleans, Louisiana 70130, about 1 month before you plan to start work. Telephone inquiries can be directed to the Eighth Coast Guard District, Waterways

Management at (504) 671-2107.

8. All activities authorized herein shall, if they involve, during their construction or operation, any discharge of pollutants into waters if the United States, be at all times consistent with applicable water quality standards, effluent limitations and standards of performance, prohibitions, pretreatment standards and management practices established pursuant to the

Clean Water Act (PL 92-500: 86 Stat 816), or pursuant to applicable state and local laws.

9. Substantive changes to the Louisiana Coastal Resources Program may require immediate suspension and revocation of this permit in accordance with 33 CFR 325.7.

10. Irrespective of whether a project meets the other conditions of this permit, the Corps of

Engineers retains discretionary authority to require an individual Department of the Army permit when circumstances of the proposal warrant this requirement.

11. Any individual authorization granted under this permit may be modified, suspended, or revoked in whole or in part if the Secretary of the Army or his authorized representative determines that there has been a violation of any of the terms or conditions of this permit or that such action would otherwise be in the public interest.

12. The Corps of Engineers may suspend, modify, or revoke this general permit if it is found in the public interest to do so.

13. Activities proposed for authorization under the PGP must comply with all other necessary federal, state, and/or local permits, licenses, or approvals. Failure to do so would result in a violation of the terms and conditions of PGP.

14. The permittee shall permit the District Commander or his authorized representative(s) or designee(s) to make periodic inspections of the project site(s) and disposal site(s) if different from the project site(s) at any time deemed necessary in order to assure that the activity being performed under authority of this permit is in accordance with the terms and conditions prescribed herein.

15. This general permit does not convey any property rights, either in real estate or material, or any exclusive privileges; and it does not authorize any injury to property or invasion of rights or any infringement of federal, state, or local laws or regulations nor does it obviate the requirements to obtain state or local assent required by law for the activity authorized herein.

16. In issuing authorizations under this permit, the federal government will rely upon information and data supplied by the applicant. If, subsequent to the issuance of an authorization, such information and data prove to be false, incomplete, or inaccurate, the authorization may be modified, suspended, or revoked, in whole or in part.

17. For activities resulting in sewage generation at the project site, such sewage shall be processed through a municipal sewage treatment system or, in areas where tie-in to a municipal system is not practical, the on-site sewerage system must be approved by the local parish sanitarian before construction.

18. Any modification, suspension, or revocation of the PGP, or any individual authorization granted under this permit, will not be the basis for any claim for damages against the United

States.

19. Additional conditions deemed necessary to protect the public interest may be added to the general permit by the District Commander at any time. If additional conditions are added, the public will be advised by public notice. Individual authorizations under the PGP may include special conditions deemed necessary to ensure minimal impact and compliance with the PGP.

20. The PGP is subject to periodic formal review by MVN and OCM in coordination with the

Environmental Protection Agency, US Fish and Wildlife Service, the National Marine Fisheries

Service, and the Louisiana Department of Wildlife and Fisheries. Comments from reviewing agencies will be considered in determination as to whether modifications to the general permit are needed. Should the District Commander make a determination not to incorporate a change proposed by a reviewing agency, after normal negotiations between the respective agencies, the

District Commander will explain in writing to the reviewing agency the basis and rationale for his decision.

21. CEMVN retains discretion to review the PGP, its terms, conditions, and processing procedures, and decide whether to modify, reissue, or revoke the permit. If the PGP is not modified or reissued within 5 years of its effective date, it automatically expires and becomes null and void.

22. The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.

23. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party as described in Special Condition 25 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area.

24. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and State coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the

National Register of Historic Places.

25. If you sell the property associated with this permit, you must provide this office with a copy of the permit and a letter noting your agreement to transfer the permit to the new owner and the new owner's agreement to accept the permit and abide by all conditions of the permit.

This letter must be signed by both parties.

26. Many local governing bodies have instituted laws and/or ordinances in order to regulate dredge and/or fill activities in floodplains to assure maintenance of floodwater storage capacity and avoid disruption of drainage patterns that may affect surrounding properties. Your project involves dredging and/or placement of fill; therefore, you must contact the local municipal and/or parish governing body regarding potential impacts to floodplains and compliance of your proposed activities with local floodplain ordinances, regulations or permits.

27. In issuing authorizations under this permit, the federal government does not assume any liability for: damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes; damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest; damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit, and; design or construction deficiencies associated with the permitted work.

LOCATION MAP

T E X A S

A R K A N S A S

M I S S I S S I P P I

BATON ROUGE

SHREVEPORT

NEW ORLEANS

HOUMA

LAKE CHARLES

LAFAYETTE

MONROE

SURVEY NOTES

0 1500' 750'

GRAPHIC SCALE

750'

LOCATION

OF WORK

Fifi Island

Grande Isle

Beauregard Island

Isle

Grande Terre

Bay Des Ilettes

Bayou Beauregard

GULF OF MEXICO

A

D

M

I

R

L

C

K

S

E

P

T

B

V

H

U

N

K

O

Y

X

G

W

W

Grande Islae State Park

SHT C-01

SHT C-02 SHT C-03

GAGE ID 88410

"USCG GRAND ISLE BAYOU RIGAUD"

U.S.C.G. STA.

GRANDE ISLE

"872 1724 TIDAL 11"

1. REFER TO SURVEY NO. 16-081.

2. ALL ELEVATIONS ARE BELOW THE CHART DATUM UNLESS PRECEDED BY

A (+) SIGN.

3. PLANE COORDINATES ARE BASED ON THE TRANSVERSE MERCATOR

PROJECTION FOR THE SOUTH ZONE OF LOUISIANA (SPC-LA-S-1702) AND

REFERENCED TO NORTH AMERICAN DATUM OF 1983 (NAD83).

4. DEPTHS DEPICTED BY THIS SURVEY ARE REFERENCED TO MEAN LOWER

LOW WATER (MLLW), MODIFIED TIDAL EPOCH OF 2007-2011 AS REPORTED

BY THE NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA).

5. THIS SURVEY WAS PERFORMED UTILIZING LSU'S VIRTUAL REFERENCE

NETWORK (VRN) FOR HORIZONTAL AND VERTICAL CORRECTIONS FOR THE

ENTIRE PROJECT. TIDE STAFF 88410 "USCG GRAND ISLE BAYOU RIGAUD",

LOCATED ON-SITE, WAS USED TO CALIBRATE VRS TIDE DURING SURVEYING.

DATUM RELATIONSHIP FOR 88410:

0.0' NAVD88 (2009.55) = 0.08' MLLW = 1.33' MLG (JUL 2014)

STAFF GAGE CORRECTIONS FOR 88410:

0.0' GAGE DATUM = (-)0.47' MLLW = (-)0.55' NAVD88 = 0.78' MLG (JUL 2014)

PROJECT BENCHMARKS USED WERE:

"876 1899 B TIDAL" (PID: AU2310)

"OOO1" (PID: BBCG78)

"876 1724 TIDAL 11" (PID: AT0685)

6. VERTICAL MEASUREMENTS WERE MADE USING A HULL-MOUNTED ODOM

DUAL-FREQUENCY 24/200 KHZ TRANSDUCER W/ MKIII AND A POLE-MOUNTED

ODOM 200 KHZ TRANSDUCER W/ MKIII. ALL SOUNDINGS SHOWN ARE IN HIGH

FREQUENCY.

VESSEL DATE OF SURVEY CUT

MV OB-167 25-26 AUG 2016 USCG STA GRANDE ISLE

7. AIDS TO NAVIGATION WERE LOCATED DURING THIS SURVEY.

8. THE INFORMATION DEPICTED ON THIS MAP REPRESENTS THE RESULTS OF

SURVEYS MADE ON THE DATES INDICATED ABOVE AND CAN ONLY BE

CONSIDERED AS INDICATING THE GENERAL CONDITIONS AT THAT TIME.

THIS CHART IS SOLELY FOR THE DISTRIBUTION OF AVAILABLE DEPTHS AT

THE TIME OF THE SURVEY.

9. SURVEY ACCURACY PERFORMANCE STANDARDS, QUALITY CONTROL, AND

QUALITY ASSURANCE REQUIREMENTS WERE FOLLOWED DURING THIS

SURVEY IN ACCORDANCE WITH USACE EM 1110-2-1003, HYDROGRAPHIC

SURVEYING, 30 NOV 13.

MONUMENT

GREEN DAYBEACON

RED DAYBEACON

TIDE STAFF

LEGEND

RED LIGHTED BUOY

LIGHTED BEACON

GREEN LIGHTED BUOY

CAN BUOY

NUN BUOY

PROJECT DEPTH

U.S.C.G. STATION GRANDE ISLE

JEFFERSON PARISH, LOUISIANA

HYDROGRAPHIC EXAM SURVEY FY16

NAVD88

MLLW

1.33 feet

0.08 feet

MLG

Relationship between NAVD 1988 and Mean Lower Low Water (MLLW) and Mean Low Gulf (MLG)

IL A

NG

NE

RI

NI EE UNIT

VI

SA

UG

AutoCAD SHX Text

CONSULTANTS

REVIEWED BY:

TECH. DIRECTOR

DATE

DRAWING NUMBER

SHEET OF

PROJECT ENG.

APPROVING OFFICER

PROJECT NUMBER

DISCIPLINE/SHT NO

BRANCH CHIEF

CHECKED BY:

EDITED BY:

DRAWN BY:

DESIGNED BY:

A/E PROJECT NO:

CAD FILE NAME:

SHEET TITLE

SCALE:

PLOT SCALE:

MARK

ISSUE

DESCRIPTION

U. S. COAST GUARD

CIVIL ENGINEERING UNIT

MIAMI

USCG. CEU MIAMI

15608 SW 117TH AVE

MIAMI, FLORIDA 33177

M2297T01.dwg

ES

KEP

AS SHOWN

1:1

DREDGE STATION GRAND ISLE

STATION GRAND ISLE

GRAND ISLE

LA

GENERAL

COVER SHEET

9642171

M2297-D

T-01

Y= 281600

Y= 281400

Y= 281200

Y= 281000

Y= 280800

Y= 280600

Y= 280400

MATCHLINE SHEET NO. C-01

Q

PARATUS PL

U.S.C.G. STATION GRANDE ISLE

DEPTH COLOR CODE

<3.9

4.0-7.9

8.0-11.9

12.0-15.9

>16.0

G"3"

"USCG_GRAND_ISLE_STA3719514.80

"GREEN_DM-3"

"RED_DM-4"

"NW_ROOF_COR"

"NE_ROOF_COR"

"SW_ROOF_COR"

"GREEN_BUOY-3A"

R"4"

G"3A"

LONGITUDELATITUDE

PLANE COORDINATES

YX

AIDS TO NAVIGATION

TS 88410 "USCG GRAND ISLE BAYOU RIGAUD"

DBN-3 (08/16) 3,718,948 281,244 29°15'58.04" 89°57'33.47"

LT. BUOY-3A (08/16) 3,719,155 280,861 29°15'54.22" 89°57'31.18"

DBN-4 (08/16) 3,718,846 281,218 29°15'57.79" 89°57'34.63"

TIDESTAFF (08/16) 3,719,514 280,747 29°15'53.05" 89°57'27.14"

NOTES:

1. REFER TO SURVEY NO. 16-081.

2. SEE SHEET NO. 1 FOR SURVEY NOTES.

0 130' 65'

GRAPHIC SCALE

65'

IL A

NG

RI

NI EE UNIT

VI

SA

UG

15608 SW 117TH AVE

M2297C03.dwg

KEP

1:1

CIVIL

HYDROGRAPHIC SURVEY 3

C-03

800’0 400’

SCALE:1"=400’

X 3711227.103

Y 278872.820

X 3714658.920

Y 280680.325

X 3717931.970

Y 281620.716

U.S COAST

GUARD STATION

FIFI

ISLAND

ESan

Text Box

APPENDIX (A)

Line

PREFERRED DISPOSAL LOCATION OPTION1: LAT 29.264086 LONG -89.964013

Line

ALTERNATIVE DISPOSAL LOCATION OPTION 2: LAT 29.259855 LONG -89.983786

GUO

TI

EEIG

GNIR NU

IV

LI

A TS

COAST

GUARD

STATION

BAYOU RIGAUD

COAST GUARD

BOAT BASIN

CONCRETE BULKHEAD

CONCRETE BULKHEAD

APPROXIMATE SHORELINE (RIP RAP AND CONCRETE)

FIXED PIER

BULKHEAD

BULKHEAD

MUD FLAT IN

THIS AREA

COVERED BOAT HOUSE

BOAT RAMP

BENCHMARK - ELEVATION 3.91 (NAVD)

STA.17+25.29

STA. 10+00

STA. 11+00

STA. 12+00

STA. 13+00

STA. 14+00

STA. 15+00

STA. 16+00

STA. 18+00

STA. 19+00

STA. 20+00

STA. 21+00

STA. 22+00

STA. 17+00

STA. 23+00

STA. 24+00

STA. 25+00

STA. 26+00

PI-10

PI-8

PI-9

PI-6

PI-3

PI-5

PI-4

PI-1

PI-7

PI-2

PI-12

LIMITS OF DREDGING

PL

APPROX. LOCATION

FREEPORT 6" GAS LINE

SCALE: 1 INCH = 60 FEET

1" = 1"

DREDGE LIMITS

C-04

15608 S.W. 117TH AVENUE

BMW

3A 3719136.88 280875.57 29 15 54.3738 N 089 57 31.4011 W 3 3718924.60 281289.78 29 15 58.4992 N 089 57 33.7415 W 4 3718826.63 281211.05 29 15 57.7315 N 089 57 34.8582 W 1 3718936.17 281705.17 29 16 2.6097 N 089 57 33.5547 W 2 3718815.70 281644.39 29 16 2.0224 N 089 57 34.9230 W

%%UBUOY LOCATIONS

NORTHING

EASTING

LATITUDE

LONGITUDE

BUOY

GENERAL NOTES: HORIZONTAL POSITIONING WAS OBTAINED USING A REAL TIME SUB-METER DGPS SYSTEM INCORPORATING USCG BEACON CORRECTIONS. HORIZONTAL COORDINATES ARE IN FEET REFERENCED TO U.S. STATE PLANE COORDINATE SYSTEM, NAD 1983, LOUISIANA SOUTH ZONE. POSITIONING CHECKED AGAINST BENCHMARK 876 1724 TIDAL 10. HORIZONTAL AND VERTICAL BENCHMARK IS A BRONZE DISK LOCATED ON THE CONCRETE BULKHEAD STAMPED "10" AND WITH A REFERENCE ELEVATION OF 3.91FT, NAVD 88 DATUM. BASE MAP INFORMATION SHOWN ON THIS DRAWING FOR REFERENCE ONLY. UNDERGROUND IMPROVEMENTS, UTILITIES AND/OR FOUNDATIONS WERE NOT LOCATED.

2.

3.

1.

MHW

MTL

NGVD 29

MLLW (0.00)

NAVD 88

%%UDATUM RELATIONSHIPS

MAGNETIC

0.4317%%d

NORTH

00%%d07'47"

GRID

TRUE

X = 3718846.225 Y = 281686.812

X = 3718860.467 Y = 281212.315

X = 3719272.784 Y = 280615.556

X = 3718796.253 Y = 281685.315

X = 3718810.937 Y = 281196.052

X = 3719231.621 Y = 280587.184

X = 3718896.208 Y = 281688.315

X = 3718910.005 Y = 281228.586

X = 3719171.781 Y = 280849.708

PI-9

PI-8

PI-7

PI-6

PI-5

PI-4

PI-3

PI-2

PI-1

STATION 22+00

STA. 17+25.29

STA. 10+00

STA. 22+00 50' LT

STA. 17+25.29 50' LT

STA. 10+00 50' LT

STA. 22+00 50' RT

STA. 17+25.29 50' RT

STA. 12+50 50' RT

NAIL

STA. 10+00 (BASELINE)

STA. 9+32.44

COORDINATES BASED ON NAD83

X = 3719557.673 Y = 280812.462

X = 3719343.769 Y = 280968.539

PI-11

PI-10

PI-12

X = 3719436.839 Y = 280646.859

%%UCHANNEL COORDINATES

Distance Measurement

889.55

100.11

859.97

460.52

739.99

213.71

318.69

196.80

268.73

190.07

EXISTING WATER BOTTOM

CONSTRUCTED MARSH FILL EL. = 2.0' MAX

EARTHEN CONTAINMNET DIKE

CROSS SECTION

DREDGE PLACEMENT AREA

CROSS SECTION

X: 3719222.45

X: 3719592.67

Y: 280556.48

Y: 280812.27

0.00

100.00

200.00

300.00

22.00

72.00

384.00

5.00

10.00

15.00

X: 3719165.60

X: 3719535.82

Y: 280638.75

Y: 280894.56

372.00

X: 3719108.76

X: 3719478.98

Y: 280721.02

Y: 280976.83

342.00

X: 3719051.91

X: 3719175.32

Y: 280803.29

Y: 280888.56

122.00

166.00

X: 3718995.07

X: 3719118.48

Y: 280885.57

Y: 280970.83

X: 3718938.23

X: 3719061.64

Y: 280967.84

Y: 281053.11

X: 3718881.38

X: 3719004.79

Y: 281050.11

Y: 281135.38

X: 3718824.54

X: 3718947.95

Y: 281132.38

Y: 281217.65

X: 3718783.86

X: 3718933.80

Y: 281264.71

Y: 281269.21

X: 3718780.86

19+00.TIN

X: 3718930.80

Y: 281364.66

Y: 281369.16

X: 3718777.86

X: 3718927.80

Y: 281464.62

Y: 281469.12

X: 3718774.86

X: 3718924.80

Y: 281564.57

Y: 281569.07

1" = 5' VERTICAL

SCALE: 1" = 50' HORIZONTAL

%%uSECTION 10+00

%%uSECTION 11+00

%%uSECTION 12+00

%%uSECTION 14+00

%%uSECTION 13+00

%%uSECTION 15+00

%%uSECTION 16+00

%%uSECTION 17+00

%%uSECTION 21+00

%%uSECTION 20+00

%%uSECTION 19+00

%%uSECTION 18+00

POTENTIAL OVERDREDGE GRADE

PROPOSED DREDGE GRADE

EXISTING GRADE

1" = 1"

M2297CO3.DWG

SURVEY CROSS SECTIONS

C-05

15608 S.W. 117TH AVENUE

X: 3718771.87

X: 3718921.80

Y: 281664.53

Y: 281669.03

X: 3718768.87

X: 3718918.80

Y: 281764.48

Y: 281768.98

X: 3718765.87

X: 3718915.80

Y: 281864.44

Y: 281868.93

X: 3718762.87

X: 3718912.80

Y: 281964.39

Y: 281968.89

X: 3718759.87

X: 3718909.81

Y: 282064.35

Y: 282068.84

%%uSECTION 24+00

%%uSECTION 23+00

%%uSECTION 22+00

%%uSECTION 26+00

%%uSECTION 25+00

AutoCAD SHX Tex

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .