Appendix A - Cost Breakdown.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Convert B452 Wash Rack into 4-bay T-7A Hangar
- Solicitation number
- FA302225R0005
About this file
The file is a Cost Breakdown template (Appendix A) for a construction project at Columbus Air Force Base. The solicitation (FA302225R0005) seeks a contractor to convert Building 452 from a wash rack into a 4-bay T-7A hangar, with a project value between $5 million and $10 million. The document provides a detailed cost proposal breakdown template requiring vendors to itemize expenses across categories including bonds and insurance, mobilization, architecture and engineering design, materials, equipment, labor, and miscellaneous charges.
Key project details include a site visit scheduled for 26 June 2025 with mandatory pre-registration by 23 June 2025, and Request for Information (RFI) submissions due by 1:00 PM CST on 01 July 2025. The project is issued by the Department of the Air Force Air Education and Training Command, with contractor entry requiring completion of Controlled Unclassified Information (CUI) training and submission of an Entry Authorization Listing. Funding for the contract is contingent upon appropriation availability, and proposals must be submitted electronically with comprehensive supporting documentation demonstrating cost reasonableness.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAFB
| Appendix A - COLUMBUS AIR FORCE BASE | |||||
| INSTRUCTIONS: Please provide information that properly reflects the total cost of the project. Refer to the Statement of Work and Sections L and M in the solicitation to ensure that your proposal meets the requirementsof this project. | |||||
| SOLICITATION NUMBER: | |||||
| CONSTRUCTION PRICE PROPOSAL BREAKDOWN | |||||
| VENDOR'S INFORMATION | |||||
| Name: | |||||
| Address: | |||||
| Phone Number: | |||||
| Email: | |||||
| NAICS Code | |||||
| Cage Code: | |||||
| SOLICITATION INFORMATION | |||||
| Title of Project: | |||||
| Solicitation Number: | |||||
| Proposed Period of Performance | |||||
| Number of Days Proposal and Price are Valid: | |||||
| BONDS AND INSURANCE | QTY | UNIT OF ISSUE | PRICE | TOTAL | |
| Certificate of Insurance | 1 | ||||
| Performance Bonds | 1 | ||||
| Payment Bonds | 1 | ||||
| Bid Bonds | 1 | ||||
| subtotal | |||||
| MOBILIZATION | QTY | UNIT OF ISSUE | PRICE | TOTAL | |
| subtotal | |||||
| ARCHITECTURE AND ENGINEERING DESIGN | QTY | UNIT OF ISSUE | PRICE | TOTAL | |
| 35% Design | |||||
| 65% Design | |||||
| 95% Design | |||||
| 100% Design (Construction Set) | |||||
| subtotal | |||||
| MATERIAL | QTY | UNIT OF ISSUE | PRICE | TOTAL | |
| subtotal | |||||
| EQUIPMENT | QTY | UNIT OF ISSUE | PRICE | TOTAL | |
| subtotal | |||||
| LABOR | HOURS | UNIT OF ISSUE | RATE | AMOUNT | |
| subtotal | |||||
| MISCELLANEOUS CHARGES | QTY | UNIT OF ISSUE | PRICE | TOTAL | |
| Misissippi State Tax | |||||
| subtotal | |||||
| CONSTRUCTION PROJECT | TOTAL PROJECT PRICE |
| GENERAL INFORMATION |
| The purpose of the requested information in the attached worksheets is to assist government personnel in the review and evaluation of proposals submitted by offerors. Offerors are reminded that the responsibility for providing adequate supporting data and attachments lies solely with them. Further, the offeror must also bear the burden of proof in establishing reasonableness of proposed pricing; therefore, it is in the offeror’s best interest to submit a fully supportable and well-prepared cost proposal that reflects the total cost of the project. The basis and rationale for all proposed costs should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate. |