Appendix A_Construction Drawings_SWB-RIB-002B_30PCT_PINNACLE B_ELECTRICAL_REVISION_A.pdf
PDF 6 MB Posted
- Attached to
- Electrical Infrastructure Installation Federal contract opportunity
- Solicitation number
- 00595
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PINNACLE HILL RT Power Construction SOW Ver A 08-23-2022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
COVER SHEET
SWB-RIB-002B-G001
UNITED STATES BORDER PATROL
CUSTOMS AND BORDER PROTECTION
DEPARTMENT OF HOMELAND SECURITY
30% SUBMITTAL
RVSS PROGRAM
SECTOR
SWANTON
A
T OF TRANSPO
R T A T
IO
N
M
E R
IC
A
OF
STATES
U N
IT
E D
D E P A
R
TM
EN
AV
IA
T
IO
N
L A
R E
D E
F
TRAT
IO
N
SI
NI
M
D A
NOT TO SCALE
LOCATION
PROJECT
USA
CANADA
DECEMBER 01, 2020
DR
LG
KG
DATE
APPROVED
F
IL
E S
S A
F E
T Y
Q
U A
L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORT SERVIC
E
S C
O N
T R
A C
T
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
CUSTOMS AND BORDER PROTECTION
DEPARTMENT OF HOMELAND SECURITY
RELEASED TO:
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
D
A T
E
T
IM
E
N
A M
E
REMOTE VIDEO SURVEILLANCE SYSTEM
SWANTON SECTOR
PROJECT ENGINEER
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
RELEASED FOR:
FOR REVIEW PURPOSES ONLY
30% SUBMITTAL - 12/01/2020
MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA
VT
MGR: ENGINEERING - OKLAHOMA CITY
FAALC-OSB
AML-4010
RICHFORD
626-440-2000
Pasadena, CA 91124
100 W. Walnut Street
PTSI Managed Services Inc.
T190000027
PINNACLE B
INDEX, LEGEND AND
ABBREVIATIONS SHEET
DESCRIPTION SHEET NO.
LEGEND ABBREVIATIONSINDEX
1.7
10"
269.50X
OH
UG
PP
P
GGROUND CONDUCTOR
ELECTRICAL CONDUIT
ABOVE GROUND
POWER CONDUIT
UNDERGROUND
OVERHEAD POWER
GUARD RAIL
CENTER LINE
SILT/CONSTRUCTION FENCE
NEW TREE LINE
EXISTING TREE LINE
NEW FENCE
EXISTING FENCE
PERMANENT EASEMENT
MAX LIMITS OF DISTURBANCE
TEMPORARY EASEMENT
PROPOSED MINOR CONTOUR
PROPOSED MAJOR CONTOUR
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
TO BE REMOVED
PROPOSED FLOW ARROW
EXISTING FLOW ARROW
NEW HANDHOLE
NEW POWER POLE
EXISTING POWER POLE
STANDARD BOLLARD
REMOVABLE BOLLARD
NEW SPOT ELEVATION
EXISTING SPOT ELEVATION
DECIDUOUS TREE
SOIL BORING
BENCH MARK FOUND/SET
REBAR FOUND
SET CONTROL POINT
PROPOSED GATE
NEW GRAVEL
PREPARED SUBGRADE
AGGREGATE SURFACE
ENGINEERED FILL
NEW CONCRETE
NEW RIP RAP
TEST WELL
GROUNDING ELECTRODE
GROUNDING ELECTRODE
EXOTHERMIC WELD
2-POLE SWITCH
LIGHTING FIXTURE
DUPLEX RECEPTACLE
TREE TO BE REMOVED
APPROX........... APPROXIMATE
BF........................ BACK FACE
BM...................... BENCH MARK
BOR................... BUREAU OF RECLAMATION
BOT................... BOTTOM
BTWN............... BETWEEN
CLR.................... CLEAR
CJ........................ CONSTRUCTION JOINT
CST.................... CONSTRUCTION
CL....................... CENTERLINE OR CHAIN LINK FENCE
DIA..................... DIAMETER
D......................... DEPTH
DHS.................... DEPARTMENT OF HOMELAND SECURITY
E.......................... EAST
ELEV................... ELEVATION
EQ...................... EQUAL
ETC.................... ET CETERA
FT....................... FEET/FOOT
FND................... FOUNDATION
GA...................... GAUGE
GALV................. GALVANIZED
H......................... HEIGHT/HIGH
HORZ................ HORIZONTAL
IN........................ INCHES
INT..................... INTERMEDIATE
INFO.................. INFORMATION
LBS..................... POUNDS
LWC.................. LOW WATER CROSSING
P&P..................... PLAN AND PROFILE
PCC.................... PORTLAND CEMENT CONCRETE
PL........................ PLATE
POE.................... PORT OF ENTRY
PSI....................... POUNDS PER SQUARE INCH
PTFE................... POLYTETRAFLUOROETHYLENE
PVI...................... POINT OF VERTICAL INTERSECTION
R......................... RADIUS
RD...................... ROAD
REQD................ REQUIRED
RFP..................... REQUEST FOR PROPOSAL
ROW................. RIGHT OF WAY
SHT.................... SHEET
STA.................... STATION
SPECS................ SPECIFICATIONS
TYP.................... TYPICAL
TBD................... TO BE DETERMINED
VF....................... VEHICULAR FENCE
W....................... WEST
WSE................... WATER SURFACE ELEVATION
WTR.................. WATER MAIN
&......................... AND
BLM.................... BUREAU OF LAND MANAGEMENT
RE....................... RESIDENT ENGINEER
RMC................... RIGID METAL CONDUIT
CMU.................. CONCRETE MASONRY UNIT
EW..................... EACH WAY
N......................... NORTH
S.......................... SOUTH
W /..................... WITH
GP...................... GROUND POINT
PB........................ PULL BOX
ACI..................... AMERICAN CONCRETE INSTITUTE
CBP.................... CUSTOMS AND BORDER PROTECTION
DOT................... DEPARTMENT OF TRANSPORTATION
@....................... AT
FAA.................... FEDERAL AVIATION ADMINISTRATION
SST..................... SELF SUPPORTING TOWER
LP....................... LOW POINT
LT....................... LEFT
OC..................... ON CENTER
NTS.................... NOT TO SCALE
TH...................... THICKNESS
EG....................... ENGINE GENERATOR
BMP.................... BEST MANAGEMENT PLAN/PRACTICES
CONT............... CONTINUATION/CONTINUOUS
EP........................ EDGE OF PAVEMENT
REINF................ REINFORCED/REINFORCEMENT
AGL.................... ABOVE GROUND LEVEL
AWG................. AMERICAN WIRE GAUGE
CU...................... COPPER
Db....................... DECIBEL
DSC.................... DISCONNECT
EES...................... EARTH ELECTRODE SYSTEM
GND................. GROUND
GFI...................... GROUND FAULT INTERRUPTING
HP....................... HIGH POINT
Hz....................... HERTZ
MIN.................... MINIMUM
MAX................... MAXIMUM
MCB................... MAIN CIRCUIT BREAKER
MDP................... MAIN DISTRIBUTION PANEL
OH.................... OVERHEAD ELECTRICAL LINES
PVC..................... POLYVINYL CHLORIDE
RGS.................... RIGID GALVANIZED STEEL
UG..................... UNDERGROUND
UNO................. UNLESS NOTED OTHERWISE
V....................... VOLT
VA..................... VOLT-AMPS
VERT................. VERTICAL
WP..................... WEATHERPROOF
PF........................ POWER FACTOR
DAR................... DESIGN ANALYSIS REPORT TXDOT............ TEXAS DEPARTMENT
OF TRANSPORTATION
UFGS................. UNIFIED FACILITIES
GUIDE SPECIFICATIONS
UPS.................... UNINTERRUPTIBLE
POWER SUPPLY
SWPPP.............. STORM WATER POLLUTION
PREVENTION PLAN
ASTM................. AMERICAN SOCIETY FOR
TESTING MATERIALS
SYSTEM
RVSS.................. REMOTE VIDEO SURVEILLANCE
IEEE.................... INSTITUTE OF ELECTRICAL
ENGINEERS
LPI...................... LIGHTNING PROTECTION
INSTITUTE
MLOD................ MAX LIMIT OF DISTURBANCE
DATUM
ASSOCIATION
NAVD................ NORTH AMERICAN VERTICAL
NFPA.................. NATIONAL FIRE PROTECTION
NAD.................. NORTH AMERICAN DATUM
OTIA................. OFFICE OF TECHNOLOGY
INNOVATION AND ACQUISITION
COR................... CONTRACTING OFFICER'S
REPRESENTATIVE
GFE..................... GOVERNMENT FURNISHED EQUIPMENT
ATS.................... AUTOMATIC TRANSFER SWITCH
TIA..................... TELECOMMUNICATION
INDUSTRY ASSOCIATION
NO..................... NUMBER
HVAC................ HEATING, VENTILATION AND
HRAIL................ HANDRAIL
AIR CONDITIONING
KW..................... KILOWATT
KVA.................... KILOVOLT AMPERES
CONN.............. CONNECTOR
RSC.................... RIGID STEEL CONDUIT
SA........................ SUBCONTRACT ADMINISTRATOR
STR.................... STRUCTURAL
SPD.................... SURGE PROTECTIVE DEVICE
UL...................... UNDERWRITERS LABORATORIES
USACE.............. UNITED STATES ARMY CORPS
OF ENGINEERS
VAC.................. VOLTS, ALTERNATING CURRENT
CKT................... CIRCUIT
EXIST................. EXISTING
EA....................... EACH OR ENVIRONMENTAL ASSESSMENT
OD..................... OUTSIDE DIAMETER
RCP.................... REINFORCED CONCRETE PIPE
SWB-RIB-002B-G002
ACCESS PLAN TO TOWER SITE
GENERAL NOTES
INDEX, LEGEND AND ABBREVIATIONS SHEET
COVER SHEET
G004
G003
G002
G001
C401
C400
C004
C003
C002
C001
CIVIL DETAILS SHEET 2 OF 2
CIVIL DETAILS SHEET 1 OF 2
EROSION AND SEDIMENT CONTROL NOTES
SITE GRADING/DRAINAGE PLAN
SITE LAYOUT PLAN
SITE PLAN
DR
LG
S100
S020
S001
E603
E601
E502
E501
E012
E011
E010
E002
E001
* TO BE PROVIDED IN FUTURE SUBMITTAL
TYPICAL ONE-LINE DIAGRAM AND PANEL SCHEDULE
TYPICAL RISER DIAGRAM
TYPICAL ELECTRICAL DETAILS SHEET 2 OF 2
TYPICAL ELECTRICAL DETAILS SHEET 1 OF 2
AND LIGHTNING PROTECTION PLAN
TYPICAL TOWER SIDE ELEVATION POWER, GROUNDING,
LIGHTNING PROTECTION PLAN FOR RVSS 120' MONOPOLE
GROUNDING AND LIGHTNING PROTECTION PLAN
UTILITY POWER PLAN
ELECTRICAL NOTES, LEGEND, AND ABBREVIATIONS
KG
USPOE.............. UNITED STATES PORT OF ENTRY
FOUNDATION DETAILS
120' MONOPOLE TOWER ELEVATION
STRUCTURAL NOTES
DATE
APPROVED
F
IL
E S
S A
F E
T Y
Q
U A
L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORT SERVIC
E
S C
O N
T R
A C
T
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
CUSTOMS AND BORDER PROTECTION
DEPARTMENT OF HOMELAND SECURITY
RELEASED TO:
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
D
A T
E
T
IM
E
N
A M
E
REMOTE VIDEO SURVEILLANCE SYSTEM
SWANTON SECTOR
PROJECT ENGINEER
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
RELEASED FOR:
FOR REVIEW PURPOSES ONLY
30% SUBMITTAL - 12/01/2020
MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA
VT
MGR: ENGINEERING - OKLAHOMA CITY
FAALC-OSB
AML-4010
RICHFORD
626-440-2000
Pasadena, CA 91124
100 W. Walnut Street
PTSI Managed Services Inc.
T190000027
PINNACLE B
GENERAL NOTES
SWB-RIB-0001-G003
GENERAL NOTES EXISTING UTILITIES EXCAVATION
CLEARING AND GRUBBING
SEDIMENT CONTROL
DESIGN CODES & CRITERIA
PROJECT DATUMS
DRAINAGE
AS DIRECTED BY THE RE.
UNLESS SHOWN OTHERWISE ON THE DRAWINGS OR
PREVENTION BMP'S WITHIN THE DELINEATED MLOD
LIMIT PLACEMENT OF STORM WATER POLLUTION
TERM OF THE WORK COVERED BY THIS CONTRACT.
WITH CONTRACT DOCUMENTS THROUGHOUT THE
MANAGEMENT PRACTICES (BMP'S) IN ACCORDANCE
PROVIDE AND MAINTAIN SEDIMENT CONTROL BEST 1.
IN FINAL CONDITION.
POSITIVE DRAINAGE FROM THE SITE MUST BE PROVIDED 2.
TO LEAVING THE SITE.
BMP AND/OR RECEIVE APPROPRIATE TREATMENT PRIOR
LADEN DRAINAGE MUST BE DIRECTED TO AN INSTALLED
NON-EROSIVE VELOCITIES. DURING CONSTRUCTION, SEDIMENT
WHERE POSSIBLE, CONTROL STORMWATER RUNOFF TO 1.
DR
LG
SUBGRADE PER SPECIFICATION 31 00 00.
WITH SUB-BASE OR BASE MATERIAL AND COMPACTED UP TO
THE ENTIRE STUMP MUST BE REMOVED AND THE AREA BACKFILLED
BUT ENSURE THIS DOES NOT POND RUNOFF. WITHIN THE FENCE,
ABOVE ADJACENT GROUND TO ALLOW FOR FUTURE SETTLEMENT,
COMPACT WITH NATIVE SOIL SUCH THAT THE FILL IS 1" TO 3"
STUMPS A MINIMUM OF 12" BELOW GRADE. BACKFILL AND
BE REMOVED. OUTSIDE THE FENCE, TREE REMOVAL INCLUDES
INDICATED OTHERWISE ON SITE PLANS, WITHIN THE MLOD MUST
BASED ON BEST AVAILABLE INFORMATION. ALL TREES, UNLESS
EXISTING TREES INSIDE THE MLOD ARE APPROXIMATE AND4.
EXPENSE AND FACILITATE EARTHWORK OPERATIONS.
REDUCE EXCESSIVE SOIL MOISTURE AT THE SUBCONTRACTOR'S
SUBJECT TO THE APPROVAL OF THE CONTRACTING OFFICER TO
GEOTEXTILE FABRIC OR OTHER METHODS MAY BE IMPLEMENTED
REPLACEMENT WITH DRIER MATERIAL, STABILIZATION WITH A
FACTOR, DISKING FOR AERATION, CHEMICAL TREATMENT,
CONTENTS WITHIN 1 TO 2 DAYS. IF TIME IS A CRITICAL
SITE WILL BE TYPICALLY DRY TO WORKABLE MOISTURE
COMPACTION CRITERIA, DURING MOST OF THE YEAR, THE
AND EFFORTS TO COMPACT SITE SOILS TO THE RECOMMENDED
THIS CONDITION COULD HAMPER EQUIPMENT MANEUVERABILITY
WITH MOISTURE CONTENTS SIGNIFICANTLY ABOVE OPTIMUM.
WET WEATHER MAY RESULT IN NEAR-SURFACE SITE SOILS
THE SITE GRADING PERFORMED DURING OR SUBSEQUENT 3.
SECTION.
REQUIREMENTS FROM ENGINEERED FILL SPECIFICATION
USED AS ENGINEERED FILL PROVIDED IT MEETS THE
WITH ENGINEERED FILL. REMOVED MATERIAL MAY BE
(IF APPLICABLE) MUST BE REMOVED AND REPLACED
ALL UNSUITABLE SOILS AND UNCONTROLLED FILLS 2.
MUST BE OBTAINED.
ALL PERMITS REQUIRED FOR OFF-SITE DISPOSAL
APPLICABLE REGULATORY AGENCY REQUIREMENTS.
OFF-SITE DISPOSAL AREA IN ACCORDANCE WITH
BE EXCAVATED AND DISPOSED OF AT AN APPROVED
DELETERIOUS MATERIALS. THESE MATERIALS MUST
CRUSHED STONE, COBBLES, BOULDERS AND OTHER
LOOSE OR EXCESSIVELY ORGANIC MATERIALS,
OF 4" OF ANY EXISTING VEGETATION AND ALL
AREA MUST BE STRIPPED TO A MAXIMUM DEPTH
PRIOR TO GRADING THE SITE (IF REQUIRED), THE 1.
PRIOR TO INSTALLATION.
CODES AND STANDARDS FOR ALL EQUIPMENT AND DEVICES
BY THE MANUFACTURERS RECOMMENDATIONS AND APPLICABLE
FIELD VERIFY PROPER ACCESS AND CLEARANCES AS DEFINED11.
APPROVAL OF THE RE.
THE MLOD MUST ONLY BE DONE WITH PRIOR WRITTEN
MUST BE REMOVED. ANY ADDITIONAL CLEARING INSIDE
VEGETATION OR INFRASTRUCTURE OUTSIDE OF THE MLOD
TO THE START OF CONSTRUCTION. NO EXISTING FEATURES,
MUST PROVIDE A CLEARING PLAN FOR APPROVAL PRIOR
AND CONSTRUCT THE SITE AND TOWER. THE SUBCONTRACTOR
THE EXTENT NECESSARY TO ESTABLISH A STAGING AREA
THE MLOD SHOWN ON THE DRAWINGS MAY BE CLEARED TO10.
AUTHORIZED REPRESENTATIVE.
TO DO OTHERWISE BY THE OWNER OR THE OWNER'S
MLOD UNLESS SPECIFICALLY AUTHORIZED IN WRITING
CONFINE ALL WORK EFFORTS WITHIN THE DELINEATED 9.
OF CBP, FAA, RE, AND PARSONS.
ALL WORK MUST BE COMPLETED TO THE SATISFACTION 8.
MUST APPLY.
AND CONSTRUCTION DOCUMENTS, TECHNICAL SPECIFICATIONS
IN CASE OF DISCREPANCY BETWEEN THE SPECIFICATIONS 7.
APPLICABLE SAFETY REGULATIONS.
MAINTAIN COMPLIANCE WITH AND ENFORCEMENT OF ALL 6.
SUBCONTRACTOR.
FOR THE OFF-SITE DISPOSAL MUST BE OBTAINED BY THE
REGULATORY AGENCY REQUIREMENTS. ALL PERMITS REQUIRED
SITE DISPOSAL AREA IN ACCORDANCE WITH APPLICABLE
MATERIAL OFF THE PROJECT SITE AT AN APPROVED OFF-
DISPOSE OF ALL CONSTRUCTION DEBRIS AND OTHER WASTE 5.
COMMENCING THAT WORK FEATURE.
THE ATTENTION OF THE SA FOR CLARIFICATION PRIOR TO
AND DISCREPANCIES MUST BE IMMEDIATELY BROUGHT TO
TO THE START OF CONSTRUCTION. ANY UNCERTAINTIES
AND ELEVATIONS SHOWN ON THE THESE DRAWINGS PRIOR
VERIFY AND CHECK ALL DIMENSIONS, LOCATIONS, DETAILS 4.
CONSTRUCTION.
AND STREETS, PAVED OR UNPAVED, AT ALL TIMES DURING
PROVIDE SAFE ACCESS TO AND FROM ALL DRIVEWAYS 3.
EXPENSE.
POLLUTION RESULTING FROM WORK AT THE SUBCONTRACTOR'S
RESPOND TO COMPLAINTS REGARDING THE DUST AND NOISE 2.
AT THE SUBCONTRACTOR'S EXPENSE.
TO THE SATISFACTION OF THE RE AND GOVERNMENT
AND REPAIRED TO ORIGINAL CONDITION OR BETTER, AND
FROM CONSTRUCTION ACTIVITIES MUST BE REPLACED
FENCE AND ALL OTHER EXISTING STRUCTURES RESULTING
ANY AND ALL DAMAGES TO EXISTING ROADS, UTILITIES, 1.
AND VERTICAL VALUES ARE DEPICTED IN US SURVEY FEET.
REFERENCE STATION (NGS CORS) NETWORK. THE HORIZONTAL
THE NATIONAL GEODETIC SURVEY CONTINUOUSLY OPERATING
IS NAVD 88 PER OBSERVATIONS OF SELECTED STATIONS IN
IS VERMONT (NAD 83). THE BASIS OF ELEVATIONS HEREON
THE BASIS OF MEASURED HORIZONTAL DATUM SHOWN HEREON 2.
DATE OF FIELD SURVEY.
CONDITIONS SHOWN HEREON WERE CURRENT AS OF THE
COLLECTED BY SURVEYING & DESIGN, LLC. ON 10/14/2020,
THE FIELD DATA UPON WHICH THIS SURVEY IS BASED WAS 1.
INFRASTRUCTURE & ACQUISITION (OTIA) DESIGN GUIDES.
STANDARDS AND ADDENDA. OFFICE OF TECHNOLOGY
US BORDER PATROL TACTICAL INFRASTRUCTURE DESIGN 11.
IN FUTURE DESIGN LEVELS.
ASSESSMENT FOR RVSS TOWER UPGRADE TO BE PROVIDED
US CUSTOMS AND BORDER PROTECTION, ENVIRONMENTAL 10.
GUIDE 2015.
OTIA TOWER SITE GEOTECH INVESTIGATION AND REPORTING 9.
OTIA TOWER SITE DESIGN GUIDE 2014. 8.
DATED 24 JUNE 2015.
OTIA MEMO REQUIREMENTS FOR ENGINEERING DRAWINGS, 7.
OTIA MEMO P.E. SEAL REQUIREMENT, APRIL 3, 2015. 6.
FOR CBP/OTIA FIXED TOWER SITES.
OTIA MEMO MINIMUM PHYSICAL SECURITY REQUIREMENTS 5.
GUIDE 2014.
OTIA FACILITIES ENGINEERING STUDIES REPORTING 4.
OTIA DESIGN SUBMITTAL GUIDE 2014. 3.
OTIA CONSTRUCTION QUALITY MANAGEMENT GUIDE 2014. 2.
OTIA CONSTRUCTION PLANNING GUIDE 2014. 1.
TO THE FOLLOWING GUIDELINES:
THE CIVIL/SITE DESIGN WAS COMPLETED IN ACCORDANCE
OR USE PORTAL WWW.DIGSAFE.COM
DIG SAFE AT 811 FOR VERMONT (1-888-344-7233).
OF 72-HOURS PRIOR TO INITIATING FIELD WORK. CALL
CONTACT THE STATE ONE-CALL CENTER A MINIMUM 4.
WHEN APPLICABLE UPON COMPLETION OF CONSTRUCTION.
UTILITY TO ITS ORIGINAL CONDITION AND LOCATION
DISRUPT SERVICE. RESTORE, RELOCATE, OR DIVERT
WITH PROPOSED CONSTRUCTION SO AS NOT TO
TO RELOCATE OR DIVERT ANY UTILITY IN CONFLICT
COORDINATE WITH THE APPROPRIATE UTILITY COMPANY 3.
HAND EXCAVATION MAY BE REQUIRED.
AS REQUIRED IN THE CONTRACT SPECIFICATIONS.
AND PROTECT THE INTEGRITY OF THESE LINES
ON THE CONSTRUCTION DRAWINGS. LOCATE, MAINTAIN
SERVICE LINES MAY EXIST THAT ARE NOT SHOWN
PUBLIC AND PRIVATE UTILITY LINES AND CUSTOMER 2.
WITH WORK IN THE AREA OF FOUND UTILITIES.
RESIDENT ENGINEER (RE) PRIOR TO PROCEEDING
MUST BE CALLED TO THE ATTENTION OF THE
OF THE INFORMATION PROVIDED. ANY DEVIATION
AND PARSONS DOES NOT WARRANT THE ACCURACY
CBP FACILITIES MANAGEMENT, ENGINEERING DIVISION
THE TIME THESE PLANS WERE PREPARED. THE
ARE FROM BEST INFORMATION AVAILABLE AT
LOCATIONS OF UNDERGROUND UTILITIES SHOWN 1.
BY LOADING OR HAULING OPERATIONS.
AS DIRECTED BY THE SA REPRESENTATIVE, CAUSED
REPAIR ANY HAUL ROAD SURFACE IRREGULARITIES, 3.
STATE LAW. ALL TRUCKS MUST UTILIZE TARPS.
THEREOF DURING TRANSPORT IN ACCORDANCE WITH
AVOID LOSS OF LOADED MATERIAL OR ANY PORTION
TRUCKS MUST BE LOADED IN A MANNER SO AS TO 2.
FOR USE AS BACKFILL MATERIAL.
LOCATION, UNLESS OTHERWISE NOTED OR APPROVED
AREAS AND DISPOSED OF AT AN APPROVED OFF-SITE
THE PROJECT, PERMANENT EASEMENTS AND STAGING
ALL EXCAVATED MATERIAL IS TO BE REMOVED FROM 1.
KG
DATE
APPROVED
F
IL
E S
S A
F E
T Y
Q
U A
L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORT SERVIC
E
S C
O N
T R
A C
T
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
CUSTOMS AND BORDER PROTECTION
DEPARTMENT OF HOMELAND SECURITY
RELEASED TO:
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
D
A T
E
T
IM
E
N
A M
E
REMOTE VIDEO SURVEILLANCE SYSTEM
SWANTON SECTOR
PROJECT ENGINEER
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
RELEASED FOR:
FOR REVIEW PURPOSES ONLY
30% SUBMITTAL - 12/01/2020
MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA
VT
MGR: ENGINEERING - OKLAHOMA CITY
FAALC-OSB
AML-4010
RICHFORD
626-440-2000
Pasadena, CA 91124
100 W. Walnut Street
PTSI Managed Services Inc.
H‐FRAME LOCATION
STUB POLE FOR
ELECTRICAL METER
VEC UTILITY
TRANSFORMER
UNDERGROUND POWER
UNDERGROUND CONDUIT
FIBER
EXISTING VAULT
DATE
APPROVED
F
IL
E S
S A
F E
T Y
Q
U A
L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORT SERVIC
E
S C
O N
T R
A C
T
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
CUSTOMS AND BORDER PROTECTION
DEPARTMENT OF HOMELAND SECURITY
RELEASED TO:
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
D
A T
E
T
IM
E
N
A M
E
REMOTE VIDEO SURVEILLANCE SYSTEM
SWANTON SECTOR
PROJECT ENGINEER
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
RELEASED FOR:
FOR REVIEW PURPOSES ONLY
30% SUBMITTAL - 12/01/2020
MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA
VT
MGR: ENGINEERING - OKLAHOMA CITY
FAALC-OSB
AML-4010
RICHFORD
626-440-2000
Pasadena, CA 91124
100 W. Walnut Street
PTSI Managed Services Inc.
T190000027
PINNACLE B
E
SWB-RIB-002B-C001
N
SITE PLAN
NOTESDATA
USA
CANADA
DR
LG
XXX
SITE PLAN
030' 30' 60'
SCALE: 1" = 30'
MLOD CORNER
MLOD CORNER
MLOD CORNER
MLOD CORNER
MLOD CORNER
'x
S T
A G
IN
G
A R
E A
USPOE
AREA
EASEMENT
~30,305 SF
REMOVED
TO BE
TREES
(FT)
TOWER
FIXED
E 1588575.756
N 917012.110
E 1588725.729
N 917009.268
E 1588755.728
N 916971.454
E 1588744.732
N 916902.574
E 1588578.680
N 916807.125
E 1588518.878
N 916911.162
E 1588574.448
N 916943.105
8 MLOD CORNER
MLOD CORNER
MLOD CORNER
E 1588750.880
N 916968.238
FENCE
CHAINLINK
EXISTING
DRAINAGE
EXISTING
ELECTRIC
EXISTING
FIBEROPTIC
EXISTING
100'x100'
SITE
TOWER
AND GOVERNMENT WILL COORDINATE THAT.
POWER TO THE SITE WILL BE PROVIDED BY OTHERS 5.
EXHIBITS INCLUDED IN THE CONTRACT DOCUMENTS.
EASEMENTS TO THE LIMITS DESCRIBED IN REAL ESTATE
MLOD SHOWN ON THIS PLAN IS WITHIN THE TEMPORARY
PRIOR TO BEGINNING ANY SITE WORK, ENSURE THAT THE 4.
CROSSING ACCESS POINT.
INSTALLATION MUST BE CONTINUOUS EXCEPT WHERE
WHERE APPLICABLE. CONSTRUCTION AND SILT FENCE
WHERE SILT FENCE IS NOT PROPOSED PER SHEET C003,
CONSTRUCTION FENCE (SILT FENCE WITH FABRIC ONLY)
AND INITIAL TOWER SITE WILL BE PROVIDED WITH
DELINEATION OF MAXIMUM LIMITS OF DISTURBANCE (MLOD) 3.
TIME OF CONSTRUCTION.
WITH LOCAL JURISDICTIONS TO BE PROVIDED AT THE
PROPOSED LAYOUT IS SUBJECT TO FINAL COORDINATION 2.
DOES NOT INCLUDE PROPERTY LINES.
FROM WOOLPERT SURVEY PERFORMED 05/2020 AND
THE EXISTING INFORMATION SHOWN ON THIS PLAN IS 1.
F
IL
E S
S A
F E
T Y
Q
U A
L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORT SERVIC
E
S C
O N
T R
A C
T
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
CUSTOMS AND BORDER PROTECTION
DEPARTMENT OF HOMELAND SECURITY
RELEASED TO:
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
D
A T
E
T
IM
E
N
A M
E
REMOTE VIDEO SURVEILLANCE SYSTEM
SWANTON SECTOR
PROJECT ENGINEER
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
RELEASED FOR:
FOR REVIEW PURPOSES ONLY
30% SUBMITTAL - 12/01/2020
MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA
VT
MGR: ENGINEERING - OKLAHOMA CITY
FAALC-OSB
AML-4010
RICHFORD
626-440-2000
Pasadena, CA 91124
100 W. Walnut Street
PTSI Managed Services Inc.
T190000027
PINNACLE B
SWB-RIB-002B-C002
N
010' 10' 20'
SCALE: 1" = 10'
SITE LAYOUT PLAN
SITE LAYOUT PLAN
NOTES
USA
CANADA
FLAGS
FIXED TOWER (FT), SEE SHEET S020
CONCRETE UTILITY PAD, SEE SHEET S100
DATA
SEE NOTE 1
FIXED TOWER (FT)
DR
LG
E 1588601.043
N 916945.255
POWER RACK, SEE SHEET E601
UTILITY TRENCH, SEE SHEET E501
2'
LON -72.977712
LAT 45.014307
CENTER OF FTSEE NOTE 2
SEE NOTE 3
GRADES.
SEE DRAWING C003 FOR LOW WATER CROSSING AND 3.
TO ALLOW CONSTRUCTION VEHICLE ACCESS.
TO FIELD CONDITIONS MAYBE AUTHORIZED BY THE RE
MINOR ADJUSTMENT ON THE CONSTRUCTION EXIT DUE 2.
BEST VISUAL VIEWSHED AS DIRECTED BY CBP.
TOWER COORDINATE. ORIENT THE TOWER TO PROVIDE
THE FIXED TOWER (FT) IS TO BE CENTERED ON THE 1.
KG
H‐FRAME LOCATION
45.015345, ‐72.700353
REMOVE ALL TREES AND
BUSHES WITHIN RED
DASH LINES
EROSION AND SEDIMENT
CONTROL NOTES
SWB-RIB-0001-C004
TO MINIMIZE EXHAUST EMISSIONS.
ESTABLISHED CONTAINMENT ZONE BY THE SUBCONTRACTOR
SHALL BE PROPERLY TUNED AND MAINTAINED WITHIN AN
THE STORMWATER SYSTEM. ALL CONSTRUCTION EQUIPMENT
PANS SHALL BE MOVED, TO PREVENT ANY SPILLAGE INTO
CLEANED PERIODICALLY. DURING RAIN EVENTS THESE DRIP
ALL POTENTIAL LEAKAGE. THESE DRIP PANS SHALL BE
UNDER EQUIPMENT OR VEHICLES TO CONTAIN AND COLLECT
PARKED OR STATIONARY, SHALL HAVE DRIP PANS PLACED
EQUIPMENT AND VEHICLES NOT BEING OPERATED, EITHER 7.
WATERS OF THE US.
A REASONABLE MANNER TO ELIMINATE ANY DISCHARGE TO
OR OTHER EARTHEN MATERIALS SHALL BE PROTECTED IN
ALL LOOSE PILES OF SOIL, SILT, CLAY, SAND, DEBRIS 6.
ANY DISCHARGE FROM PROJECT AND STAGING AREAS.
SUITABLE FOR THE STOCK PILED MATERIAL TO ELIMINATE
WITH SHEETING, CATCH DEVICES OR OTHER MEANS AS
SITE. STOCKPILED MATERIALS SHALL BE PROTECTED
AND SHALL BE PROTECTED UNTIL REMOVAL FROM THE
DEMOLITION SHALL NOT BE PLACED IN DRAINAGE WAYS
SURPLUS OR WASTE MATERIAL FROM THE CONSTRUCTION/ 5.
FROM THE PROJECT.
SILT AND/OR DIRT AND OTHER MATERIALS GENERATED
VACUUMING OR OTHER SUITABLE METHODS TO REMOVE
SHALL BE CONDUCTED DAILY BY MEANS OF SWEEPING,
VISIBLE SOIL/SILT IS REMOVED. CONTINUOUS MAINTENANCE
AREA SHALL BE CONTINUOUSLY MAINTAINED SUCH THAT
PARKING AREAS AND STAGING AREA WITHIN THE PROJECT
CHANNELS, ALL PAVED ACCESS ROADS, ADJACENT STREETS, 4.
MATERIALS GENERATED FROM THE PROJECT.
CAPTURE AND CONTAIN SEDIMENT, DEBRIS AND OTHER
EROSION CONTROL DEVICES SHALL BE INSTALLED TO
THE STRAW WATTLES, SILT FENCE OR OTHER SUITABLE 3.
FOR STORMWATER MANAGEMENT FOR CONSTRUCTION ACTIVITIES.
AND IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS
SHALL BE SWEPT OR VACUUMED AND DISPOSED OF PROPERLY
BE GENERATED BY THE PROJECT. ALL CAPTURED MATERIAL
CAPTURE AND CONTAIN DEBRIS AND MATERIAL THAT MAY
CATCH DEVICES AND SHEETING SHALL BE UTILIZED TO
DISPOSED OF IN ACCORDANCE WITH LOCAL REGULATIONS.
PRESSURE WASHING MAY BE COLLECTED IN SUMP PITS AND
IN ACCORDANCE WITH LOCAL REGULATIONS. WATER FROM
HIGHER PORTIONS OF THE SITE AND DISPOSED OF PROPERLY
BE STORED IN CLOSED ON-GROUND CONTAINERS ON THE
WASH WATER MUST BE DISCHARGED INTO A STORM DRAIN.
WASH WATER GENERATED FROM THE PROJECT SHALL NOT 2.
MATERIALS AND STORE EQUIPMENT.
AND CONSTRUCTION STAGING AREA USED TO STOCKPILE
INCLUDE AREAS ADJACENT TO TOWER SITE CONSTRUCTION
MAINTAINED ON THE PROJECT AT ALL TIMES AND SHALL
BEST MANAGEMENT PRACTICES SHALL BE INSTALLED AND 1.
AND SHALL BE REVISED AS NEEDED TO REFLECT ANY CHANGES OR FIELD DECISIONS:
THE FORMAL SWPPP IF REQUIRED, SHALL AT A MINIMUM INCLUDE THE ITEMS BELOW,
ADDITIONAL BMP(S) AS CONDITIONS WARRANT.
THE RE MAY DIRECT THE SUBCONTRACTOR TO INSTALL10.
END OF WORK AND SUBMIT SWPPP TO THE RE.
GOVERNMENT INSPECTION. REMOVE CONTAINER AT THE
AS A MAILBOX, ON THE TOWER SITE AT ALL TIMES FOR
BE MAINTAINED IN A WEATHER PROOF CONTAINER, SUCH
THE RE BUT A COPY OF THE UPDATED SWPPP PLAN MUST
DOCUMENTS RELATED TO THE SWPPP MAY BE KEPT WITH
ON-SITE AND READILY AVAILABLE. OFFICIAL VERSIONS OR
RELATED STORM WATER POLLUTION PREVENTION PLAN (SWPPP)
MAINTAIN ALL DOCUMENTS, INSPECTIONS AND OTHER DOCUMENTS
AND APPROVED BY THE RE. THE SUBCONTRACTOR SHALL
IMPLEMENTATION OF ANY CHANGES SHALL BE COORDINATED
MAINTENANCE AND REPLACEMENT (WHEN REQUIRED) OF BMP(S).
THE RIGHT TO INSPECT AND DIRECT THE INSTALLATION,
OTHER GOVERNMENT INSPECTORS AND AGENCIES RESERVE 9.
BOARD.
COVERED AND/OR MAINTAIN AT LEAST TWO FEET OF FREE-
ALL TRUCKS HAULING ANY LOOSE MATERIALS SHALL BE 8.
A 10 MIL POLYETHYLENE LINER.
THE CAPACITY OF THE PIT. PIT SHALL BE LINED WITH
NO TIME SHALL WASH WATER BE ALLOWED TO EXCEED
NEEDED AND AT THE END OF ALL CONCRETE WORK. AT
WATER AND CONCRETE SHALL BE REMOVED OFF SITE AS
SIZED TO ACCOMMODATE ALL CONCRETE WASH OUT WATER.
WASH OUT PIT IN THE VICINITY OF THE STAGING AREA,
PRIOR TO ANY CONCRETE WORK, ESTABLISH A CONCRETE 16.
STARTING WORK EACH DAY.
PROJECT SITE ARE ALLOWED TO ESCAPE PRIOR TO
ENSURE ANY WILDLIFE SPECIES FOUND WITHIN THE15.
MAXIMUM LIMITS OF DISTURBANCE.
CONSTRUCTION LIMITS. THIS MUST BE DONE WITHIN THE
ESTABLISH A PERIMETER AND RESTRICT TRAFFIC WITHIN
SHALL BE INSTALLED TO SUPPLEMENT SILT FENCE TO
CONSTRUCTION FENCE (SILT FENCE WITH FABRIC ONLY)14.
BY A LOCAL WASTE DISPOSAL CONTRACTOR.
WASTE. THE WASTE WILL BE REGULARLY DISPOSED OF
THE CONSTRUCTION STAGING AREA FOR NONHAZARDOUS
SOLID WASTE RECEPTACLES WILL BE MAINTAINED AT13.
AS DIRECTED BY THE RE.
REDUCE SOIL DISTURBANCE IN DRY CONDITIONS AND/OR
SOIL WATERING MUST BE USED TO CONTROL DUST AND12.
WORK DAY.
UP AND PROPERLY DISPOSED OF AT THE END OF EACH
METAL SLAG/RESIDUE/SHAVINGS ETC SHALL BE SWEPT
FROM ENTERING THE WATER OR DRAIN SYSTEM. ALL
TO PREVENT THOSE WASTE MATERIALS OR POLLUTANTS
WASTE MATERIAL, MEASURES SHALL BE PUT IN PLACE
STAGING AREA SITE AND/OR THE TOWER SITE PRODUCE
IF METAL CUTTING, GRINDING OR WELDING AT THE11.
EROSION AND SEDIMENT CONTROL NOTES
DR
LG
XXX
DATE
APPROVED
F
IL
E S
S A
F E
T Y
Q
U A
L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORT SERVIC
E
S C
O N
T R
A C
T
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
CUSTOMS AND BORDER PROTECTION
DEPARTMENT OF HOMELAND SECURITY
RELEASED TO:
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
D
A T
E
T
IM
E
N
A M
E
REMOTE VIDEO SURVEILLANCE SYSTEM
SWANTON SECTOR
PROJECT ENGINEER
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
RELEASED FOR:
FOR REVIEW PURPOSES ONLY
30% SUBMITTAL - 12/01/2020
MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA
VT
MGR: ENGINEERING - OKLAHOMA CITY
FAALC-OSB
AML-4010
RICHFORD
626-440-2000
Pasadena, CA 91124
100 W. Walnut Street
PTSI Managed Services Inc.
SWB-RIB-002B-S001
PN
LG
AB
STRUCTURAL NOTES
DRAWINGS OR ACCEPTED IN ADVANCE BY THE ENGINEER.
10. WELDING OF REINFORCING BAR IS NOT PERMITTED UNLESS DETAILED ON THE
9. WELDING IS PROHIBITED ON REINFORCING STEEL AND EMBEDMENT.
THE SUBCONTRACTOR MUST FORM THE SIDES.
LOOSE CUTTINGS. IN THE EVENT THAT THE SIDES DO NOT REMAIN VERTICAL
CONCRETE PLACEMENT. SIDES OF EXCAVATION MUST BE ROUGH AND FREE OF
8. LOOSE MATERIAL MUST BE REMOVED FROM BOTTOM OF EXCAVATION PRIOR TO
STRENGTH OR DURABILITY OF THE FOUNDATION.
OF CONCRETE MATERIALS AND OTHER OCCURRENCES WHICH MAY DECREASE THE
7. CONCRETE MUST BE PLACED IN A MANNER THAT MUST PREVENT SEGREGATION
BEARING ON SOIL.
6. CONCRETE MUST BE PLACED AGAINST UNDISTURBED SOIL WHEN FOUNDATION IS
THE OUTSIDE EDGE A MINIMUM OF ‚ PER FOOT. PROVIDE A FLOATED FINISH.
OF FOUNDATION EXPOSED TO WEATHER MUST BE SLOPED FROM THE CENTER TO
5. EXPOSED EDGES OF CONCRETE MUST BE CHAMFERED 3/4" X 3/4" MINIMUM TOP
C. REINFORCED CONCRETE (CONTINUED)
COMPACTED UNIT WEIGHT OF 120 POUNDS PER CUBIC FOOT.
WITH ASTM D698. ADDITIONALLY, STRUCTURAL BACKFILL MUST HAVE A MINIMUM
OF MAXIMUM DRY DENSITY AT OPTIMUM MOISTURE CONTENT IN ACCORDANCE
4. THE BACKFILL MUST BE PLACED IN 8" LAYERS AND COMPACTED TO 95%
b. THE FOUNDATION DESIGN IS BASED ON 100% CAPACITY LOADED TOWER.
THE CURRENT LOADS.
a. THE FOUNDATION SIZE IS BASED PROVIDING ADDITIONAL CAPACITY BEYOND
RECOMMENDATION OF THE GEOTECHNICAL REPORT.
3. FOUNDATION FOR THE TOWER MUST BE DESIGNED IN ACCORDANCE WITH THE
RETENTION SYSTEM PREPARED BY P.E.
DETAILED PLAN TO THE RE FOR APPROVAL SHOWING DESIGN OF SOIL AND
TRENCHES WHERE DEPTH EXCEED 4 FEET, SUBCONTRACTOR MUST SUBMIT A
EXCAVATION, AND COMPACTION IN ACCORDANCE WITH OSHA SAFETY MANUALS. IN
2. COORDINATE, MAINTAIN AND PROVIDE A SAFE ENVIRONMENT DURING TRENCHING,
UTILITIES, LINES OR OBSTRUCTIONS.
TO ANY EXCAVATION AND IDENTIFY AND PROTECT ANY EXISTING UNDERGROUND
1. ESTABLISH BENCHMARKS ON SURROUNDING STRUCTURES AND PAVEMENT PRIOR
D. EXCAVATION AND FOUNDATION
c. CONCRETE NOT PERMANENTLY EXPOSED TO GROUND OR WEATHER - 1 •"
b. CONCRETE IN CONTACT WITH GROUND OR EXPOSED TO WEATHER - 2"
a. CONCRETE CAST AGAINST GROUND - 3"
4. CONCRETE COVER - CONCRETE CLEAR COVER FOR REINFORCING BARS MUST BE AS FOLLOWS:
MUST NOT BE ALLOWED UNLESS OTHERWISE INDICATED.
GRADE 60 WITH A MINIMUM YIELD STRENGTH OF FY = 60000 PSI. SPLICES IN REINFORCEMENT
3. ALL REINFORCEMENT MUST BE NEW BILLET STEEL, DEFORMED BARS, CONFORMING TO ASTM A615, DETAILING REINFORCED CONCRETE STRUCTURES (ACI315), LATEST EDITION.
NOTED OTHERWISE, MUST BE IN ACCORDANCE WITH THE MANUAL OF STANDARD PRACTICE FOR
2. REINFORCING STEEL - ALL DETAILING, FABRICATION AND ERECTION OF REINFORCING BARS, UNLESS
HAVE A MINIMUM COMPRESSIVE STRENGTH OF F'C=4000 PSI AT 28 DAYS (NORMAL WEIGHT).
ALL CAST-IN-PLACE STRUCTURAL CONCRETE MUST BE IN ACCORDANCE WITH ACI AND MUST
1. CONCRETE CONSTRUCTION MUST CONFORM TO THE LATEST EDITION OF ACI 301 AND ACI 318.
C. REINFORCED CONCRETE
PLATES MUST BE WELDED ALL AROUND.
9. COLUMN BASE PLATES, CAP PLATES, BEARING PLATES, CONNECTION PLATES, AND STIFFENER
TORQUING THE STRUCTURAL BOLT.
8. ALL BOLTS INCLUDING ANCHOR BOLTS MUST HAVE LOCKING/JAM NUTS INSTALLED AFTER
STRENGTH BOLTS UNLESS OTHERWISE NOTED. THE MINIMUM BOLT DIAMETER MUST BE 1/2 INCH.
7. ALL BOLTS MUST BE ASTM A325 HOT DIP GALVANIZED IN ACCORDANCE WITH ASTM A153 HIGH
WITH ASTM A153.
AN ORDINARY SPUD WRENCH. ANCHOR BOLTS MUST BE HOT DIP GALVANIZED IN ACCORDANCE
105 AND MUST BE TIGHTENED TO A SNUG TIGHT CONDITION (FULL EFFORT OF A MAN USING
6. ANCHOR BOLTS MUST MEET OR EXCEED THE REQUIREMENTS OF ASTM F1554-S2, S5 GRADE
KSI EXCEPT AS OTHERWISE NOTED.
5. STRUCTURAL STEEL PIPE MUST CONFORM TO ASTM A53, TYPE "E" OR "S", GRADE B, Fy=42
ASTM A36, Fy=50 KSI EXCEPT AS OTHERWISE NOTED.
4. STRUCTURAL STEEL FOR WIDE FLANGE, PLATES, ANGLES, CHANNELS MUST CONFORM TO
WITH SURFACE PREPARATION PER ANNEX A1.
FOR REPAIRS MUST MEET THE REQUIREMENTS OF ASTM A-780 USING ZINC-BASED ALLOYS
FIELD APPLIED GALVANIZING UNLESS INDICATED ON THE APPROVED CONSTRUCTION DRAWINGS.
CUTS, BORING AND GRINDING IS NOT PERMITTED AFTER THE APPLICATION OF THE GALVANIZING
WELDING, FIELD STANDARD A123. THE GALVANIZING MUST BE APPLIED AFTER FABRICATION.
3. ALL STRUCTURAL STEEL MUST BE HOT DIP GALVANIZED IN ACCORDANCE WITH ASTM
THE PROVISIONS OF AISC MUST GOVERN.
PROVISIONS OR REQUIREMENTS THAT MUST FACILITATE THE STEEL CONSTRUCTION THEN
BETWEEN THE AISC AND TIA-222-H. IF HOWEVER THE TIA-222-H DOES NOT INCLUDE
2. THE PROVISIONS OF TIA-222-H MUST GOVERN IN THE EVENT THAT CONFLICTS ARISE
SUBSTANTIATE REQUIRED PROPERTIES AND ACTUAL MODULUS OF ELASTICITY.
OF STRUCTURAL STEEL FOR BUILDINGS". SUBMIT CERTIFIED MILL TEST REPORTS TO
WITH THE 14th EDITION OF AISC "SPECIFICATIONS FOR DESIGN, FABRICATION AND ERECTION
1. ALL STRUCTURAL STEEL MUST BE DETAILED, FABRICATED AND ERECTED IN ACCORDANCE
B. STRUCTURAL STEEL
IS PERFORMED BY THE SUBCONTRACTOR.
ALL FIELD CONSTRUCTION AND STEEL ERECTION FOR THE TOWER AND FOUNDATION6.
SUBCONTRACTOR ENGINEERS MUST CERTIFY ALL DOCUMENTS.5.
SUBCONTRACTOR MUST PROVIDE THE TOWER STRUCTURE.4.
FOUNDATION CONSTRUCTION.
SUBCONTRACTOR MUST PROVIDE DRAWINGS/SHOP DRAWINGS FOR THE TOWER AND3.
SUBCONTRACTOR.
THE DESIGN OF THE TOWER AND FOUNDATION MUST BE PERFORMED BY THE 2.
PARSONS DRAWINGS S001, S020 AND S100 WERE ISSUED FOR BID PURPOSES ONLY.1.
CONSTRUCTION:
STRUCTURAL NOTES
APPROVAL.
6. SUBCONTRACTOR MUST SUBMIT SAFETY CLIMBING LADDER DETAIL FOR
AND/OR INSTRUCTIONS.
RUNG, AS SPECIFIED IN THE LSS MANUFACTURER'S INSTALLATION DRAWINGS
EXTEND THE MAXIMUM ALLOWABLE DISTANCE ABOVE THE TOP LADDER
AS PER THE MANUFACTURER'S INSTRUCTIONS. EACH LSS INSTALLED MUST
5. THE RESPECTIVE LADDER SAFETY SYSTEMS (LSS) MUST BE INSTALLED
OFF LADDERS.
4. THE INSTALLED LADDERS MUST BE OSHA AND OTIA COMPLIANT STAND-
A SMOOTH, SNAG-FREE FINISH AT THE TOP OF THE LADDER SYSTEM.
3. THE TOP OF EACH LADDER SIDE RAIL MUST BE ROUNDED TO PROVIDE
THE LOCATIONS MUST BE AT SAME LEVEL AS THE EQUIPMENT.
THE "D-RING" ANCHOR MUST BE SOLID AND NOT A ROTATING TYPE.
ANY DIRECTION WHICHEVER IS THE MORE SEVERE FOR DESIGN AND
THE ANCHORAGE MUST HAVE AT LEAST A 5,000 POUND RATING IN
2. THERE MUST BE A PERMANENT "ANCHORAGE ASSEMBLY" INSTALLED.
AND ATTACHED DIRECTLY TO ONE SIDE OF THE TOWER STRUCTURE.
1. THE LADDER MUST BE INSTALLED OUTSIDE OF THE TOWER FRAME
G. THE LADDER MUST MEET THE FOLLOWING REQUIREMENTS:
MUST BE PLACED AS SHOWN ON THE ELECTRICAL DWG.
BE COMPATIBLE WITH THE TOWER MATERIALS. THE GROUNDING AND CONDUIT
F. GROUNDING - THE MATERIALS USED FOR THE GROUNDING SYSTEM MUST
PROVIDED AND APPROVED PRIOR TO MANUFACTURING/INSTALLATION.
E. LADDER SAFETY SYSTEMS (LSS) WITH TROLLIES FOR CLIMBING MUST BE
e. SEISMIC - PER LOCATION REQUIREMENTS
d. ICE THICKNESS PER LOCATION REQUIREMENTS
c. WIND SPEED WITH ICE PER LOCATION REQUIREMENTS
b. EXPOSURE CATEGORY C
a. ULTIMATE WIND SPEED 118 MPH (TO BE CONFIRMED BY TOWER DESIGNER)
7. DESIGN CRITERIA FOR TOWER:
6. WIND EXPOSURE CATEGORY AND APPLICABLE ADJUSTMENT MUST BE MADE FOR TOPOGRAPHY.
FORCE PROCEDURE (METHOD 1). SITE CLASS C, IMPORTANCE FACTOR=1.5, Fa=1.6, Fv=2.4.
5. SEISMIC ANALYSIS PROCEDURE METHOD MUST BE IN ACCORDANCE WITH EQUIVALENT LATERAL
4. TOWER MUST BE ANALYZED IN ACCORDANCE WITH NONLINEAR (P-LARGE DELTA) METHOD.
3. TOWER MUST BE CLASSIFIED AS TYPE IV - ESSENTIAL COMMUNICATION.
INCLUDE THE EFFECTS OF THE CABLES AND OTHER APPURTENANCES ATTACHED TO THE TOWER.
2. ALL TOWER MUST BE SELF-SUPPORTING. THE DESIGN VERTICAL AND LATERAL LOADS MUST
INSTALLING ANY EQUIPMENT.
OF THE TOWER AS PER TIA-222-H REQUIREMENTS AFTER CONSTRUCTION AND PRIOR TO
AND SMALL WIND TURBINES." SUBCONTRACTOR MUST SURVEY AND CHECK TWIST AND PLUMB
TIA-222-H "STANDARD FOR ANTENNAS AND THE SUPPORTING STRUCTURES FOR ANTENNAS
GROUNDING MUST BE IN ACCORDANCE WITH THE LATEST REQUIREMENTS OF TIA STANDARD,
1. ALL WORK INCLUDING BUT NOT LIMITED TO STRUCTURAL, LINEARITY, PLUM, TWIST AND
A. CODE AND DESIGN REQUIREMENTS
I. RE=RESIDENT ENGINEER, TBD
OF RECORD REGISTERED IN THE STATE OF THE PROJECT SITE.
STRUCTURAL CALCULATIONS DULY CHECKED AND CERTIFIED BY THE ENGINEER
c. THE SUBCONTRACTOR MUST PROVIDE TO THE OWNER THE COMPLETE SET OF
FROM THE 100% TOWER RATING MUST BE USED FOR THE FOUNDATION DESIGN.
THESE REACTIONS LOWEST LISTED ELEVATION TO THE TOP OF THE TOWER.
ACHIEVED. THE APPURTENANCES MUST BE EVENLY DISTRIBUTED FROM THE
APPURTENANCES LISTED IN THE TABLE UNTIL THE TOWER RATING OF 100% IS
LOAD THE TOWER FRAME. THE SUBCONTRACTOR MUST INCREASE THE NUMBER OF
b. THE SECOND DESIGN MUST BE AT 100% USING ADDITIONAL APPURTENANCES TO
MUST BE BASED ON THE APPURTENANCES LISTED IN THE CORRESPONDING TABLE.
CRITERIA TO DEMAND/CAPACITY FACTOR OF 50% (0.5) OR LESS. THE DESIGN
a. DESIGN ALL MEMBERS FOR EACH TOWER IN ACCORDANCE WITH THE LISTED
5. THE TOWER DESIGN ENGINEER MUST PROVIDE TWO COMPLETE DESIGN AS FOLLOWS:
TOWER CENTERLINE.
SUMMARY AND LOAD COMBINATIONS OF THE TOWER REACTION CORRESPONDING TO THE
4. THE TOWER ENGINEER MUST PROVIDE TO THE FOUNDATION ENGINEER A MATHEMATICAL
TOWER LEG AT THE BOTTOM OF BASE PLATE.
COMBINATION AND CORRESPONDING LOADS IN EACH ORTHOGONAL DIRECTION FOR EACH
3. THE TOWER ENGINEER MUST PROVIDE TO THE FOUNDATION ENGINEER THE LOAD
PLACEMENTS ARE CORRECT.
SUBCONTRACTOR MUST PROVIDE FIELD ENGINEER TO CERTIFY THAT THE ANCHOR BOLT
THE FOUNDATION SUBCONTRACTOR FOR THE CONSTRUCTION OF THE MAT. THE TOWER
2. THE TOWER SUBCONTRACTOR MUST PROVIDE THE ANCHOR BOLTS AND TEMPLATE TO
FOUNDATION.
1. THE SUBCONTRACTOR MUST DESIGN AND CONSTRUCT THE STEEL TOWER AND CONCRETE
H. DESIGN REQUIREMENTS
DATE
APPROVED
F
IL
E S
S A
F E
T Y
Q
U A
L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORT SERVIC
E
S C
O N
T R
A C
T
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
CUSTOMS AND BORDER PROTECTION
DEPARTMENT OF HOMELAND SECURITY
RELEASED TO:
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
D
A T
E
T
IM
E
N
A M
E
REMOTE VIDEO SURVEILLANCE SYSTEM
SWANTON SECTOR
PROJECT ENGINEER
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
RELEASED FOR:
FOR REVIEW PURPOSES ONLY
30% SUBMITTAL - 12/01/2020
MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA
VT
MGR: ENGINEERING - OKLAHOMA CITY
FAALC-OSB
AML-4010
RICHFORD
626-440-2000
Pasadena, CA 91124
100 W. Walnut Street
PTSI Managed Services Inc.
SWB-RIB-002B-S020
LG
NOTES
SCALE: 1/8" = 1'-0"S020
PN
AB
FOUNDATION
MONOPOLE
08' 8' 16'
SCALE: 1/8" = 1'-0"
HANDRAILS
PLATFORM WITH
12' TRIANGULAR
ENGINEER OF RECORD FOR REVIEW AND APPROVAL.
APPURTENANCE AND CABLE CLAMPING SYSTEMS TO THE
MISCELLANEOUS STEEL PARTS, FIBERGLASS MAST, CABLE
THE TOWER STEEL MEMBERS, ANCHOR BOLTS AND OTHER
CONSTRUCTION,TOWER MANUFACTURER MUST PROVIDE
TOWER FOUNDATION. PRIOR TO ANY FABRICATION AND
TOWER MANUFACTURER MUST DESIGN THE TOWER AND6.
THE TOWER MANUFACTURER.
TOWER AND TOWER FOUNDATION WILL BE DESIGNED BY5.
GALVANIZATION AT ALL CONNECTIONS PRIOR TO BOLTING.
SUBCONTRACTOR MUST CLEAN AND REMOVE EXCESS 4.
ORIENTATION OF TOWER IS SHOWN ON CIVIL DRAWINGS.3.
AND AIR TERMINAL LOADING.
REFER TO ELECTRICAL DRAWINGS FOR LIGHTNING ROD 2.
FOR STRUCTURAL NOTES, SEE DRAWING S001.1.
*LOADING TABLE PENDING COMFIRMATION FROM FAA/CBP
LADDER
CLIMBING
120' MONOPOLE TOWER ELEVATION
120' MONOPOLE TOWER
ELEVATION
DATE
APPROVED
F
IL
E S
S A
F E
T Y
Q
U A
L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORT SERVIC
E
S C
O N
T R
A C
T
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
CUSTOMS AND BORDER PROTECTION
DEPARTMENT OF HOMELAND SECURITY
RELEASED TO:
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
D
A T
E
T
IM
E
N
A M
E
REMOTE VIDEO SURVEILLANCE SYSTEM
SWANTON SECTOR
PROJECT ENGINEER
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
RELEASED FOR:
FOR REVIEW PURPOSES ONLY
30% SUBMITTAL - 12/01/2020
MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA
VT
MGR: ENGINEERING - OKLAHOMA CITY
FAALC-OSB
AML-4010
RICHFORD
626-440-2000
Pasadena, CA 91124
100 W. Walnut Street
PTSI Managed Services Inc.
LG
AB
FOUNDATION DETAILS
PN
NOTES
FINISHED GRADE
4" RGS WITH TOP CAP
DIA
1'-6"
PLAN
SECTION A
SEE NOTE 1
4" RGS FLANGE PLATE
B
S100
PLAN
SECTION B
SWB-RIB-002B-S100
S100 NOT TO SCALE
H-FRAME SUPPORT
WITH NO.3 TIES 12" O.C.
(6) NO.6 VERTICAL REBARS
WITH 4" EMBEDMENT
(4) 3/8" ANCHOR BOLTS
(4) NO.3 TIES 3" O.C. AT TOP
METAL PROTECTION.
SHALL BE COATED WITH ASPHALT COMPOUND OF
FLOOR FLANGE SURFACE RESTING ON CONCRETE 1.
10'-0"
A
S100
FINISHED GRADE
3" CLEAR COVER (TYP)EA. WAY (TYP)
TOP AND BOTTOM
NO.6 @ 8" O.C.
COMPACTED SUBGRADE
FOUNDATION BEARING ON
NOT TO SCALE
S100
POWER MANAGEMENT SYSTEM FOUNDATION
DATE
APPROVED
F
IL
E S
S A
F E
T Y
Q
U A
L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORT SERVIC
E
S C
O N
T R
A C
T
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
CUSTOMS AND BORDER PROTECTION
DEPARTMENT OF HOMELAND SECURITY
RELEASED TO:
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
D
A T
E
T
IM
E
N
A M
E
REMOTE VIDEO SURVEILLANCE SYSTEM
SWANTON SECTOR
PROJECT ENGINEER
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
RELEASED FOR:
FOR REVIEW PURPOSES ONLY
30% SUBMITTAL - 12/01/2020
MIKE MONRONEY AERONAUTICAL CENTER OKLAHOMA CITY, OKLAHOMA
VT
MGR: ENGINEERING - OKLAHOMA CITY
FAALC-OSB
AML-4010
RICHFORD
626-440-2000
Pasadena, CA 91124
100 W. Walnut Street
PTSI Managed Services Inc.
SWB-RIB-002B-E001
SKM
ABBREVIATIONS
ELECTRICAL NOTES, LEGEND AND
FC
KAH
ELECTRICAL ABBREVIATIONS:
UG UNDERGROUND
RGS
EES
EMT
J-BOX
MTS
NEC
CCS
RF
PVC
SER
SPD
MDP
BFL
C
E/G
GFCI
GFE
LFM
SCH
TYP
COMM
MLO
SUPP-GP
XFMR
NO.
WP
BSC
MPGP
BARE STRANDED COPPER
MAIN GROUND PLATE
MULTI-POINT GROUND PLATE
EARTH ELECTRODE SYSTEM
ELECTRICAL METALLIC TUBING
RIGID GALVANIZED STEEL CONDUIT
JUNCTION BOX
MANUAL TRANSFER SWITCH
RADIO FREQUENCY
SERVICE ENTRANCE RATED
MAIN DISTRIBUTION PANEL
BELOW FROST LINE
CONDUIT
EMERGENCY GENERATOR
GOVERNMENT FURNISHED EQUIPMENT
GROUND FAULT CIRCUIT INTERRUPTER
SCHEDULE
TYPICAL
SURGE PROTECTIVE DEVICE
LIQUIDTIGHT FLEXIBLE METAL CONDUIT
POLYVINYL CHLORIDE CONDUIT
COMMUNICATION
COPPER-CLAD STEEL
MAIN LUG ONLY
SUPPLEMENTAL GROUND PLATE
NUMBER
NATIONAL ELECTRIC CODE
WATERPROOF
TRANSFORMER
LPS
OSHA
LIGHTNING PROTECTION SYSTEM
OPERATIONAL SAFETY AND HEALTH ADMINISTRATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
MTS
MGP
MGP SUPP MAIN GROUND PLATE SUPPLEMENTAL
MANUAL TRANSFER SWITCH
AWG AMERICAN WIRE GAGE
ATS AUTOMATIC TRANSFER SWITCH
FT
FRWK FRAMEWORK
FEET
FFL
FSF
FAIL-SAFE FLOOD LIGHT
FLOOD LIGHT SLIP FITTER
BWG BOLT-ON WIRE GUARD
UNV UNIVERSAL
WITH EXOTHERMIC WELD
GROUND ROD 3/4"x 10’-0"
TRANSFORMER
EXIT SIGN WITH EMERGENCY LIGHT
QUAD RECEPTACLE
OUTDOOR LIGHT
FUSE
ABOVE GROUND, GROUND CONDUCTOR
EXOTHERMIC WELD
UNDERGROUND, GROUND CONDUCTOR
GROUND ACCESS WELL
DUPLEX GFCI RECEPTACLE
EX
MOLDED CASE CIRCUIT BREAKER (MCCB)
AIR TERMINAL (LIGHTNING ROD)
CONDUIT STUB DOWN
CONDUIT STUB UP
UNDERGROUND POWER CONDUIT
DOWN CONDUCTOR
EES (BURIED) GROUND CONDUCTOR
HALO GROUND CONDUCTOR
UG
D
G
HG
EXIT SIGN, SINGLE FACE WALL MOUNTED
MAY BE USED ON THIS PROJECT
NOT ALL SYMBOLS AND ABBREVIATIONS
AG ABOVE GROUND POWER CONDUIT
OH OVERHEAD POWER LINE
P PROPANE LINE
ELECTRICAL LEGEND:
ELECTRICAL NOTES
REQUIRED FOR COMPLETE AND OPERATIVE SYSTEMS.
TRADES TO CONFIRM ALL REQUIREMENTS AND DETAILS WHICH AFFECT ELECTRICAL WORK. PROVIDE MATERIAL, EQUIPMENT, LABOR, AND WIRING AS
OTHERS IS SHOWN ON THE DRAWINGS OF OTHER TRADES. PRIOR TO INSTALLATION, REFER TO SHOP DRAWINGS AND THE DRAWINGS OF OTHER
ELECTRICAL REQUIREMENTS REGARDING CONTROLS, CONTROL WIRING, DEVICES, DIMENSIONS, AND LOCATIONS OF EQUIPMENT FURNISHED BY 2.3.
SUBCONTRACTOR IS RESPONSIBLE FOR COMPLETE COORDINATION BETWEEN ALL DISCIPLINES.2.2.
COORDINATE AND SCHEDULE WORK OF ALL TRADES.2.1.
ACCEPTED INDUSTRY STANDARDS ORGANIZATION.
ALL COMPONENTS AND MATERIAL MUST BE LISTED AND LABELED FOR THEIR APPLICATION AND USE BY UL, NEC, OR OTHER GENERALLY5.3.
ALL ELECTRICAL EQUIPMENT MUST BE MARKED WITH THE APPROPRIATE SAFETY AND WARNING LABELING.5.2.
INSTALLATION, BALANCE THE PANEL LOAD UNDER NORMAL OPERATING CONDITIONS AND PROVIDE A CURRENT TYPED/WRITTEN PANEL DIRECTORY.
IN THE PANELS. A MAXIMUM OF THREE (3) SINGLE PHASE CIRCUITS MUST BE INSTALLED IN ANY CONDUIT. ON COMPLETION OF THE
CIRCUIT NUMBERS ARE FOR IDENTIFICATION CONVENIENCE ONLY. THE SUBCONTRACTOR IS RESPONSIBLE FOR CORRECTLY PHASING THE CIRCUITS5.1.
6.13.ALL CONDUIT MUST BE SUPPORTED FROM STRUCTURE ONLY. NO CONDUIT MUST BE SUPPORTED FROM OTHER PIPING OR DUCTWORK.
6.12.ALL EXPOSED CONDUIT MUST BE INSTALLED EITHER PARALLEL OR PERPENDICULAR TO THE STRUCTURAL MEMBERS.
6.11.ALL CONDUIT MUST BE PVC COATED RIGID GALVANIZED STEEL NO SMALLER THAN 3/4" IN DIAMETER WITH COMPRESSION FITTINGS.
SPRINGS AND METALLIC BUSHINGS.
6.10.ALL EXTERIOR CONDUITS ENTERING BUILDING AND DISTRIBUTION BOXES MUST HAVE EXPANSION/DEFLECTION COUPLINGS WITH INTERNAL BONDING
FOR A COMPLETE SYSTEM.
MAKE FINAL POWER CONNECTIONS TO ALL EQUIPMENT AND SYSTEMS FURNITURE. PROVIDE ALL REQUIRED FITTINGS, BUSHINGS, AND WIRE CONNECTORS 6.9.
PERMITTED.
PROVIDE AN INSULATED COPPER GROUND WIRE WITH ALL CIRCUITRY. USE OF CONDUIT OR METALLIC SHEATH OF CABLE FOR GROUNDING MUST NOT BE 6.8.
WIRING INSTALLED IN AIR HANDLING PLENUMS MUST BE PLENUM RATED.6.7.
SINGLE PHASE CIRCUITS SERVING LIGHTING, RECEPTACLES, FANS, AND/OR SIMILAR LOADS MUST BE 20A, UNLESS OTHERWISE NOTED.6.6.
LOCATIONS WHERE PERMITTED BY THE LATEST EDITION OF ALL CODES AND FAA ORDERS.
WIRING MUST BE INSTALLED IN MINIMUM 1/2" CONDUIT. SUBCONTRACTOR MAY USE TYPE MC CABLE IN LIEU OF CONDUIT AND WIRE IN INTERIOR DRY 6.5.
ELECTRICAL SUBCONTRACTOR MUST SIZE EACH WIRE AS REQUIRED TO LIMIT VOLTAGE DROP TO 3%.6.4.
CONNECTIONS TO SWITCHES AND RECEPTACLES MUST BE TAPED WITH SCOTCH NO.33 ELECTRICAL TAPE OR EQUIVALENT.6.3.
WIRING MUST BE MINIMUM NO.12 AWG, UNLESS OTHERWISE NOTED.6.2.
NO.14 AWG UNLESS OTHERWISE REQUIRED BY MANUFACTURER OR NOTED ON THE DRAWINGS.
WITH NEC TYPE THHN/THWN HEAT-RESISTANT THERMOPLASTIC INSULATION RATED AT 75 DEGREES C. CONTROL WIRE MUST BE SIZED, AT A MINIMUM
HEAT-RESISTANT THERMOPLASTIC INSULATION AND CLEAR NYLON JACKET RATED 90 DEGREES C. CONDUCTORS NO.8 AND LARGER MUST BE STRANDED
CONDUCTORS MUST BE COPPER. CONDUCTORS NO.12 AWG AND SMALLER MUST BE SOLID COPPER NO.10 AWG WITH NEC TYPE THHN/THWN 6.1.
6. WIRING METHODS
5. IDENTIFICATION
4. RECORD AS-BUILT DRAWINGS
3. CODE PERMITS AND INSPECTIONS
2. COORDINATION AND SCHEDULING
1. GENERAL NOTES
7. GROUNDING NOTES
POWER CABLES WITH ANY PROPANE LINE PER FAA-C-1391 (LATEST EDITION).
MAINTAIN A 5’-6" SPACING FOR PARALLEL POWER CABLES AND 2’-6" SPACING FOR PERPENDICULAR 6.14.
COMPLY WITH RULES AND REGULATIONS OF ALL AFFECTED UTILITY COMPANIES.3.5.
COMPLY WITH ALL OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) AND ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUIREMENTS.3.4.
AND STANDARDS, INFORM ARCHITECT/ENGINEER, IN WRITING, PRIOR TO QUOTE.
DOCUMENTS WILL TAKE PRECEDENCE OVER ALL REFERENCED CODES AND STANDARDS. IF CONTRACT DOCUMENTS CONFLICT WITH CODES
CODES AND STANDARDS LISTED ARE MINIMUM STANDARDS. WHERE CONTRACT DOCUMENTS CALL FOR HIGHER STANDARDS, CONTRACT 3.3.
3.2.7. NFPA 70E
3.2.13. OIT NATIONAL CABLING STANDARDS FOR IT INFRASTRUCTURE3.2.6. NFPA 70 (NEC)
3.2.12. OTIA06-ORG-08-000053.2.5. NFPA 780
3.2.11. MOTOROLA R563.2.4. FAA AC 70/7460-1
3.2.10. IEEE 813.2.3. FAA-C-1391
3.2.9. IEEE C95.13.2.2. FAA-C-1217
3.2.8. IEEE C23.2.1. FAA-STD-019
PERFORM ALL WORK IN ACCORDANCE WITH THE LATEST EDITION OF THE FOLLOWING CODES, REGULATIONS, AND STANDARDS:3.2.
NECESSARY PERMITS AND ARRANGE ALL INSPECTIONS AS REQUIRED BY THE CBP.
ALL WORK MUST BE DONE IN ACCORDANCE WITH LATEST APPLICABLE CODES, REGULATIONS, AND STANDARDS. OBTAIN AND PAY FOR ALL 3.1.
DIMENSIONED ON THE RECORD DRAWINGS. PROVIDE AUTOCAD LATEST VERSION AS-BUILT DRAWINGS AT THE COMPLETION OF THE PROJECT.
AND COMPLETE RECORD OF THE WORK, AS INSTALLED. ALL DUCTWORK, EQUIPMENT, PIPING, AND AIR DISTRIBUTION DEVICES MUST BE SHOWN AND
REPRODUCIBLE RECORD DRAWINGS MUST BE SUPPLIED BY CONTRACTOR, UPON WHICH CORRECTIONS MUST BE MADE, TO PROVIDE AN ACCURATE4.1.
PROVIDE CORROSION PROTECTION FOR GROUNDING BY SEALING THE BOND CONNETION WITH A MOISTURE POINT, SILICONE, OR PETROLEUM BASE.7.5.
USE PVC CONDUITS FOR THE INSTALLATION OF DOWN CONDUCTORS TO THE EES TO A DEPTH OF 1’-0" BELOW FINISHED GRADE.7.4.
ALL CONNECTIONS. ANY DAMAGED GALVANIZED AREAS MUST BE REPAIRED.
INSTALL NO.2 AWG BSC FROM RGS PVC COATED CONDUITS TO THE EES WHERE THE RGS CONDUITS CROSS THE EES EXOTHERMICALLY WELD 7.3.
1’-0" BELOW THE FROSTLINE.
RODS MUST BE AS SHOWN IN THE DRAWINGS. TOP OF THE GROUND ROD (3/4" X 10’-0" LONG, COPPER CLAD STEEL) MUST BE A MINIMUM OF
PROVIDE NO.4/0 AWG BARE-STRANDED COPPER AND GROUND RODS AS REQUIRED. THE EES MUST BE 1’-6" BELOW THE FROST LINE AND GROUND 7.2.
EXOTHERMICALLY WELD ALL CONNECTIONS TO THE EES AND GROUND RODS PER FAA-STD-019 (LATEST EDITION).7.1.
PLATFORMS, ETC. SHALL BE DETERMINED WITH 150-FOOT RADIUS ROLLING SPHERE METHOD USING THE LATEST EDITION OF NFPA 780.
AIR TERMINAL LOCATIONS AND ASSOCIATED ZONES OF PROTECTION FOR SENSOR TOWERS AND EQUIPMENT SUCH AS CAMERAS, RADAR, MOUNTS, 1.11.
MOUNTS, PLATFORMS, ETC. SHALL BE DETERMINED WITH 45 DEGREE ANGLE METHODOLOGY.
AIR TERMINAL LOCATIONS AND ASSOCIATED ZONES OF PROTECTION FOR COMMUNICATION TOWERS AND EQUIPMENT SUCH AS ANTENNA, RADIOS, 1.10.
DISCIPLINES. IMPACT ON THESE GROUPS MUST BE MINIMIZED.
EQUIPMENT AND SYSTEMS. ALL ELECTRICAL EQUIPMENT AND DEVICE INSTALLATIONS MUST BE PERFORMED ONLY AFTER COORDINATION WITH OTHER
PROVIDE ALL JUNCTION BOWES, PULL BOXES, CONDUIT BODIES AND FITTINGS AND SUPPORT HARDWARE FOR THE INSTALLATION OF ELECTRICAL 1.9.
ELECTRICAL OUTAGE. OUTAGES SHOULD BE COORDINATED WITH CBP AND REQUIRE A MINIMUM OF 72 HOURS OF ADVANCE NOTICE.
LOCKOUT/TAGOUT (LOTO) PROCEDURES MUST BE STRICTLY ENFORCED THROUGHOUT THIS PROJECT. REVIEW THESE PROCEDURES PRIOR TO EACH 1.8.
COVER THE ENTIRE LEASED SPACE WITH WIRELESS LAN ACCESS.1.7.
ALL SPECIFIED EQUIPMENT AND SYSTEMS MUST BE INSTALLED IN ACCORDANCE WITH FAA ORDER AND MANUFACTURERS RECOMMENDATIONS.1.6.
THE AREA THOROUGHLY CLEAN, CLEAR, AND READY FOR OCCUPANCY.
AT PROJECT COMPLETION, CLEAN THE ENTIRE JOB SITE (INCLUDING ALL NEW AND EXISTING SURFACES OF BUILDING, EQUIPMENT AND SYSTEMS) 1.5.
AND UNOBSTRUCTED. AT PROJECT COMPLETION, REMOVE ALL TOOLS, APPLIANCES, SURPLUS MATERIAL, AND SCRAP FROM THE JOB SITE.
CLEAN UP ALL WASTE AND DEBRIS AT THE END OF THE EACH WORKING DAY AND AS REQUIRED TO KEEP ALL BUILDING AREAS CLEAN, CLEAR, 1.4.
EQUIPMENT MUST BE NEW, OF FIRST QUALITY AND COMPATIBLE WITH EXISTING SYSTEMS OR MATERIAL WHERE THEY INTERFACE.
IT IS THE INTENTION OF THE CONTRACT DOCUMENTS TO CALL FOR FINISHED WORK, TESTED AND READY FOR OPERATION. ALL MATERIALS AND 1.3.
FOR A SOUND, SECURE AND COMPLETE INSTALLATION, AT NO ADDITIONAL COST TO THE OWNER.
DOCUMENTS. FURNISH AND INSTALL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .