Appendix A-4 WB_fuel tank-1 SHOP drawing2.pdf
PDF 155 KB Posted
- Solicitation number
- W91QVN22R0261
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
O
Sheet of
S E
O U
L
T H
O M
A S J
D A
V
IS
I
N C
J
U N
G I L A
S S
O C
IA
T E
D A
R C
H
IT
E C
T S
E
N G
IN
E E
R S a u t o s c a le a u t o s h o r t d e s ig n a u t o s y t im e
W A
R R
IO
R B
A S
E A
N D S
T O
R Y L
F C
A R
E A I
K O
R E
A
F Y O
M A
R A
N G
E S
U P
P O
R T F
A C
IL
IT
IE
S P
H A
S E I I, A N
S I
D
W
U M
C
FAR EAST DISTRICT
S E
O U
L ,K
O R
E A
RETURN LINE
MECH ROOM
WRAPING TAPE
PANEL
TO MONITORING
ACCESS PIPE
WALL OF MECH ROOM
FILTER
CARTRIDGE TYPE
REPLACEABLE
FLARED FITTING
COMPRESSION
TO BURNER
CONNECT
CHECK VALVE
BALL
M I
N
GATE VALVE
FIN. FLOOR
LOOP
TRANSITION ASSEMBLY
GENERAL NOTES FOR FUEL OIL SYSTEM :
MANUFACTURER.
LISTED IN COMPLIANCE WITH UL 971 & NFPA 30. INSTALLATION SHALL BE PERFORMED BY INDIVIDUALS TRAINED BY THE ABOVEGROUND PIPING SHALL BE STEEL. UNDERGROUND PIPING SHALL BE FLEXIBLE, SECONDARILY CONTAINED THAT IS DESIGNED AND
WITH APPLICABLE OSHA STANDARD AND BUILDING CODES.
AN EXTERNAL LADDER SHALL BE PROVIDED TO ALLOW ACCES TO TOP OF TANK FOR FILLING AND MAINTENANCE THAT COMPLIES
TANK MANWAY SHALL BE 762mm MINIMUM.
THAN 18,925 L (5,000 GALLONS). TANK MANWAY SHALL BE PROVIDEDWITH A MANWAY COVER AND AN INTERRIOR TANK LADDER.
PROVIDE ONE (1) TANK MANWAY FOR TANKS 3785 L (1,000 GALLONS) AND LARGER AND TWO (2) TANK MANWAYS FOR TANKS LARGER
SHALL BE DELIVERED AS A COMPLETE UL LISTED UNIT. A LEGIBLE UL 142 AND STI LABEL SHALL BE AFFIXED TANK LADDER.
SHALL BE MANUFACTURED IN ACCORDANCE WITH STEEL TANK INSTITUTE PUBLICATION NO. F921. THE STORAGE TANKS AND SUPPORTS TANKS SHALL BE CYLINDRICAL OR RECTANGULAR DOUBLE-WALL CONSTRUCTION AS SPECIFIED. THE PRIMARY AND SECONDARY TANKS
COLLISION IN ACCORDANCE WITH PARA 4.3.7.2 OF NFPA 30A (2000 EDITION).
THE BARRIERS SHALL BE PROVIDED, AS INDICATED OR REQUIRED, AROUND TANKS TO PROTECT THE TANK AGAINST VEHICULAR
SYSTEM FOR APPROVAL BEFORE COMMENCING CONSTRUCTION.
NFPA 30 & 31, AND MANUFACTURER'S WRITTEN INSTRUCTIONS. THE CONTRACTOR SHALL PROVIDE SHOP DRAWINGS OF THE FUEL OIL
THE FUEL OIL SYSTEM SHALL BE DESIGNED, INSTALLED, TESTED AND CLEANED IN ACCORDANCE WITH THE REQUIREMENTS OF THE
6.
5.
4.
3.
2.
1.
INSTALL SHALL MEET UFC 3-460-01
3 METERS (10 FEET).
THE TANKS SHALL BE SEPARATED FROM THE NEAREST LINE ADJOINING PROPERTY BY THE MINIMUM DISTANCE OF
AND WITHIN CLOSE PROXIMITY OF THE VALVE INSIDE THE TANK.
PILOT MOUNTED ON THE CETERLINE 80mm (3") BELOW DESIRED SHUT-OFF LEVEL, IN OR NEAR THE ACCESS HATCH
THE HYDRAULICALLY OPERATED, DIAPHRAGM-ACTUATED GLOBE PATTERN VALVE IS CONTROLLED BY A FLOAT ACTUATED
THE ALARM AND HALT THE TANK FILLING PROCEDURE.
DIRECTED BY COR. AN AUDIBLE WEATHERPROOF ALARM HORN SHALL BE LOCATED SO THAT THE PERSON FILLING THE TANK CAN HEAR PROVIDE ALL ASSOCIATED CONDUITS AND WIRING TIED INTO THE MONITORING AND GAUGING SYSTEM LOCATED AS INDICATED OR
FOR SINGLE-STAGE PUMP AND 381mm Hg (15" Hg) FOR TWO-STAGE PUMP.
APPROVED FOR A HIGHER INLET PRESSURE. THE VACUUM READING ON THE FUEL UNITS SHALL BE NO MORE THAN 254mm Hg (10" Hg)
THE PRESSURE AT THE OIL SUPPLY INLET TO BURNER OIL PUMPS SHALL BE GREATER THAN 21 kPa (3 PSIG) UNLESS THE PUMPS ARE
IDENTIFICATION OF BURIED PIPING.
DETECTABLE ALUMINUM FOIL PLASTIC-BACK TAPE OR DETECTABLE MAGNETIC PLASTIC TAPE SHALL BE PROVIDED FOR WARNING AND
NOT TO SCALE
7.
8.
9.
10.
11.
12.
NOT TO SCALE
BURNER FUEL OIL PIPING DETAIL
S E C T I O N
ACCESS PIPE
TEST BOOT ASS'Y
TRANSITION ASSEMBLY
DOUBLE WALL PIPE
(FASTEN TO WALL OR FOUNDATION)
COUPLINGS/ADAPTORS
FUEL OIL SYSTEM INSTALLATION DETAIL
PRESSURE GAUGE
FOS
FOR
INSTALL THE PRESSURE GAUGE AT BLOWER SECTION
NOTES:
NOTE:
FUEL OIL STORAGE TANK
FLOOR
MECH ROOM
WALL OF MECH ROOM
TO BURNER
S K
S K
D A
G
S K
P-502
B U
R N
E R F
U E
L O
IL
P
IP
IN
G D
E T
A
IL
F U
E L O
IL
S
Y S
T E
M I
N S
T A
L L
A T
IO
N D
E T
A
IL
a u t o d e s ig n a u t o u s e r n a m e
S E
T
ID
MECH RM
AT
BURNER
SPILL CONTAINMENT
FILL PIPE LOCKING CAP
FILL PIPE ADAPTER
EXOTHERMIC WELDING
#4 BARE COPPER WIRE
FUSION WELDING
SIGNAGE
MANWAY
TO MONITOR PANEL
DROP TUBE
NORMAL ATMOSPHERIC VENT
OVERFILL PREVENTION ALARM
ANTI-SIPHON VALVE
(SEE ELECT'L DWG E1103)
TO MONITOR PANEL
SUPPLY LINE
FUEL OIL
EMERGENCY VENT
SECONDARY TANK
FOR PRIMARY TANK
EMERGENCY VENT
LIQUID LEVEL GAUGE (AUTOMATIC)
OVERFILL PREVENTION ALARM AND
PROTECTION (AUTOMATIC)
INTERSTITIAL LEAK
FITTING
ANTI-SPLASH DEFLECTOR
o 20mm x 3000mm LG
COPPER CLAD GROUND ROD(CYLINDER OR RECTANGULAR)
STI F921 TANK
AS REQUIRED
FOOT VALVE
RETURN LINE
FUEL OIL
CONTAINMENT SUMP
CONTAINMENT SUMP
FUEL OIL PIPE
UNDERGROUND
1. FOR COMPLETE TANK ACCESSORIES SPECIFICATION, SEE SPECS SECTION 13202.
2. TANK PIPING CONNECTION AND OTHER ACCESSORIES SHALL BE NEW.
PLUMBING PLAN FOR EACH BLDG.
3. THIS IS SCHEMATIC ONLY. FOR EXACT NUMBER OF FUEL OIL PIPES, SEE
File details come from the government source that posted it. Updated .