Appendix 8 - 2026 RFP Deliverabls - Addendum (1).docx

DOCX document 24 KB Posted

Attached to
Lottery Central Monitoring and Control System and Related Service
Solicitation number
BPM057747
Issued by
Baltimore County, Maryland

About this file

This file is an Appendix to a Request for Proposals (RFP) issued by the Department of General Services on behalf of the Maryland Lottery and Gaming Control Agency (MLGCA) for a comprehensive lottery central monitoring and control system. The RFP seeks a contractor to provide full installation, implementation, operation, maintenance, and related services for the system. The deliverables summary table outlines multiple required submissions across several categories including project management, operational procedures, security planning, and testing activities. Key deliverable due dates range from 30 days after the effective date for the Conversion Plan to 120 days after the Notice to Proceed (NTP) for Ticket Samples. Notable submissions include an Integrated Project Schedule due 45 business days after NTP with weekly updates, Standard Operating Procedures due 45 days prior to system start-up, a Disaster Recovery Plan due within 45 days of the effective date with annual updates thereafter, and a LCMCS Security Plan due no later than 90 days prior to start-up. Additional recurring deliverables include monthly preventative maintenance status reports due on the 5th of each month, weekly hotline call statistics, and annual penetration testing reports beginning 30 days after go-live.

The document establishes comprehensive quality and acceptance criteria that all deliverables must meet, including requirements for appropriate formatting, logical organization, factual accuracy, industry best practices compliance, and freedom from structural errors such as grammar and spelling mistakes. The Contract Monitor is responsible for reviewing final deliverables for compliance with specified acceptance criteria and may request draft versions prior to final submission. Contractors must subject all deliverables to internal quality-control processes before submission and are required to correct any deficiencies identified by the Contract Monitor within agreed-upon timeframes. Written deliverables must be compatible with Microsoft Office, Microsoft Project, PDF, or Microsoft Visio within two versions of the current software version. The document permits contractors to suggest additional subtasks, artifacts, or deliverables to enhance the quality and success of assigned tasks.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSALS (RFP) 2026-XX

LOTTERY CENTRAL MONITORING AND CONTROL SYSTEM AND RELATED SERVICES

Appendix 8

DELIVERABLES

Post Contract Award

1. Deliverable Submission

1. For every deliverable, the Contractor shall request the Contract Monitor confirm receipt of that deliverable by sending an e-mail identifying the deliverable name and date of receipt.

1. Unless specified otherwise, written deliverables shall be compatible with Microsoft Office, Microsoft Project, PDF or Microsoft Visio within two (2) versions of the current version. At the Contract Monitor’s discretion, the Contract Monitor may request one hard copy of a written deliverable.

1. For any written deliverable, the Contract Monitor may request a draft version of the deliverable, to comply with the minimum deliverable quality criteria listed in Section 3 Minimum Deliverable Quality.

2. Deliverable Acceptance

1. A final deliverable shall satisfy the scope and requirements of this RFP for that deliverable, including the quality and acceptance criteria for a final deliverable as defined in Section 4 Deliverable Descriptions/Acceptance Criteria.

1. The Contract Monitor shall review a final deliverable to determine compliance with the acceptance criteria as defined for that deliverable. The Contract Monitor is responsible for coordinating comments and input from various team members and stakeholders. The Contract Monitor is responsible for providing clear guidance and direction to the Contractor in the event of divergent feedback from various team members.

1. The Contract Monitor will issue to the Contractor a notice of acceptance or rejection of the deliverable in the DPAF (see online sample).

F. In the event of rejection, the Contract Monitor will formally communicate in writing any deliverable deficiencies or non-conformities to the Contractor, describing in those deficiencies what shall be corrected prior to acceptance of the deliverable in sufficient detail for the Contractor to address the deficiencies. The Contractor shall correct deficiencies and resubmit the corrected deliverable for acceptance within the agreed-upon time period for correction.

3. Minimum Deliverable Quality The Contractor shall subject each deliverable to its internal quality-control process prior to submitting the deliverable to the State.

Each deliverable shall meet the following minimum acceptance criteria:

1. Be presented in a format appropriate for the subject matter and depth of discussion.

1. Be organized in a manner that presents a logical flow of the deliverable’s content.

1. Represent factual information reasonably expected to have been known at the time of submittal.

1. In each section of the deliverable, include only information relevant to that section of the deliverable.

1. Contain content and presentation consistent with industry best practices in terms of deliverable completeness, clarity, and quality.

1. Meets the acceptance criteria applicable to that deliverable, including any State policies, functional or non-functional requirements, or industry standards.

1. Contains no structural errors such as poor grammar, misspellings or incorrect punctuation.

1. Must contain the date, author, and page numbers. When applicable for a deliverable, a revision table must be included.

1. A draft written deliverable may contain limited structural errors such as incorrect punctuation, and shall represent a significant level of completeness toward the associated final written deliverable. The draft written deliverable shall otherwise comply with minimum deliverable quality criteria above.

4. Deliverable Descriptions/Acceptance Criteria In addition to the items identified in the table below, the Contractor may suggest other subtasks, artifacts, or deliverables to improve the quality and success of the assigned tasks.

5. Deliverables Summary Table*

Deliverable
Acceptance Criteria
Due Date / Frequency
Integrated Project Schedule
Microsoft Project schedule demonstrating tasks, task estimates, resource assignments, and dependencies for both Agency and Contractor Personnel, with tasks no less than 8 hours and no greater than 80 hours.
Initial Delivery: NTP+ 45 Business Days

Updates: Weekly

Standard Operating Procedures
The Contractor shall create and document the procedures for computer operations staff, especially regarding failure situations
45 Days prior to Start-up Date
Disaster Recovery Plan
The Contractor shall develop a disaster recovery plan and submit it to MLGCA for approval. The Contractor shall maintain an up to date disaster recovery plan with annual updates
Within 45 Days of Effective Date
Preventative / Scheduled Maintenance Plan
The Contractor shall provide the MLGCA with monthly reports of the status of preventive maintenance as designed and requested by the MLGCA
Due: 5th of each month

Frequency: Monthly

Ticket Samples
The Contractor shall submit for approval by the MLGCA ten (10) Ticket samples of its Ticket stock for evaluation of anti-counterfeiting characteristics, graphics and durability
Within 120 days of NTP
Maintenance SOP – Retailer/Sales related equipment
The Contractor shall provide a detailed plan for establishing a field service schedule to maintain all Terminals, Monitors, and other Retailer location Hardware used for the sales, validations, and cashing of Tickets
60 Days prior to Start-up Date
Field Asset Inventory List
The Contractor shall produce a detailed inventory of all existing and newly installed Hardware
Initial: 60 Days prior to Start-up Date; then

Due: 5th of each month Frequency: monthly

Hotline Support Report
The Contractor shall provide weekly Hotline call statistics
Due: Within 5 Days of the End of the Business Week

Frequency: Weekly

Customer Support Training Program
Provide a Hotline Quality Assurance and Training Program, which is subject to approval by the MLGCA
60 Days prior to Start-up
Conversion Plan
The Contractor shall submit a detailed and final version of the Conversion Plan which, when approved by the MLGCA, shall become the basis for the Conversion.
Within 30 days of Effective Date
Data Conversion Plan
The Contractor shall provide the MLGCA with the plan for Conversion of all required data
Within 60 days of Effective Date
LCMCS Software SRS
Upon receiving MLGCA approval of its Business Requirements Documents, the Contractor shall develop corresponding Software Requirements Specification (“SRS”) documents
Within 45 days of approval of each Business Requirements Document
LCMCS Security Plan
The Contractor shall submit a detailed security plan to the MLGCA for approval
No Later than 90 Days prior to Start-up Date
Data Security Plan
The Contractor shall develop, document and implement a data security plan that is appropriate for the level of sensitivity/confidentiality of the information being processed
No Later than 90 Days prior to Start-up Date; then

Due: on the anniversary date of the first Data Security Plan Frequency: Annually

Penetration Test
The MLGCA requires external, independent penetration tests and security reviews to be conducted regularly. The Contractor shall provide for independent, professional and The Contractor shall provide for independent, professional and credible security firms offering such security and penetration testing services
No later than 30 days from go live date; then

Due: on the anniversary date of the first Penetration Test Frequency: Annually

Failover Report
A written report of failover testing shall be supplied to the Contract Manager
Due: Within 5 days of failover testing

Frequency: As tests are conducted

PEP
The Contractor shall provide the Problem Escalation Procedure
No later than 60 days after Contract award
Standard User Operating Procedures
User Manuals for all key functions, as agreed to by Contractor and the Agency
Completed no later than 90 days from Effective Date
Game and System Specifications
Specifications for all terminals, games, and processes. The list will be developed jointly by the Contractor and the Agency.
Completed no later than 120 prior to go-live date

*The Deliverables Summary Table may not list every contractually-required deliverable. Offerors and Contractors should read the RFP thoroughly for all Contract requirements and deliverables.