STORMWATER STUDY
CARGO APRON RECONSTRUCTION AND
REPLACEMENT FOR RUNWAY 9-27 WITH A
TAXIWAY
Prepared for:
Prepared by:
4 2 1 1 W . B O Y S C O U T B L V D . , S U I T E 5 0 0
T A M P A , F L 3 3 6 0 7
MAY 2022
CARGO APRON RECONSTRUCTION AND REPLACEMENT STORMWATER STUDY
FOR RUNWAY 9-27 WITH A TAXIWAY
CONTENTS
I. INTRODUCTION
PROJECT DESCRIPTIONS
REPORT OBJECTIVES AND LIMITATIONS
II. EXISTING DRAINAGE CONDITIONS
DRAINAGE OUTFALLS
SITE DESCRIPTION - PROJECT AREA 1
SITE DESCRIPTION - PROJECT AREA 2
DOCUMENT COMPARISON
DOCUMENT COMPARISON - PROJECT AREA 1
DOCUMENT COMPARISON - PROJECT AREA 2
III. STORMWATER MANAGEMENT CRITERIA
IV. PROPOSED DRAINAGE CONVEYANCE APPROACH
PROJECT AREA 1
PROJECT AREA 2 – TAXIWAY C (WEST)
PROJECT AREA 2 – TAXIWAY C (EAST)
PROJECT AREA 2 - TAXIWAY A4
V. STORMWATER MANAGEMENT ALTERNATIVES
ALTERNATIVE 1
ALTERNATIVE 2
ALTERNATIVES 1 AND 2
ALTERNATIVE 3
ALTERNATIVE 4
ALTERNATIVES 3 AND 4
VI. CONCLUSION AND RECOMMENDATIONS
EXHIBITS
Exhibit 3-1 - Existing Basin map
Exhibit 3-2 - Proposed Stormsewer Layout Changes
Exhibit 3-3 - Treatment Alternative 2
Exhibit 3-4 - Treatment Alternative 3
Exhibit 3-5 - Treatment Alternative 4A
Exhibit 3-6 - Treatment Alternative 4B
Exhibit 3-7 – Terminal Outfall – Pipe Depth Entering Pond 4A
Exhibit 3-8 – Groundwater Elevations
I. INTRODUCTION
Airfield improvements are being proposed at the St. Pete-Clearwater International Airport
(Airport). This includes reconstructing an existing aircraft parking apron (Project Area 1) and reconfiguring airfield pavements north of the terminal apron (Project Area 2) in preparation for a future east concourse terminal expansion (Figure 1.1).
Figure 1.1 – Project Areas
PROJECT DESCRIPTIONS
Project Area 1 will reconstruct the existing asphalt pavement and concrete hardstands north of the Allegiant Airlines building with new concrete.
Project Area 2 will demolish the decommissioned Runway 9-27 west of Runway 18-36 and
Taxiway D. Project Area 2 will also construct a new Taxiway C along the northern edge of, and parallel to, Runway 9-27. New Taxiway A4 will also be constructed as part of Project Area 2.
Taxiway A4 will be perpendicular to Runway 18-36 and Taxiway A, connecting between them.
The layout of Taxiway C and Taxiway A4 is in accordance with the approved 2020 Airport
Layout Plan (ALP).
REPORT OBJECTIVES AND LIMITATIONS
Michael Baker International, Inc. (Michael Baker) was contracted by the Airport to perform the final design and permitting phase for this project. The purpose of this study is to establish a conceptual drainage design approach to support this project that is cost-effective and technically viable. The approach will also be compatible with the future east concourse terminal expansion.
To accomplish this, we have:
• Reviewed and compared relevant data found in as-built drawings and other documents, establishing accurate existing conditions
• Established the governing stormwater design standards and permitting agency requirements
• Compared the existing site drainage patterns, basin boundaries, and stormwater layouts to the proposed and future condition, and
• Developed four (4) stormwater management alternatives, recommending the preferred alternative for the project.
A full analysis and calculations have not been completed for each alternative. However, enough analysis has been performed to indicate each alternative is feasible. A final analysis will be completed for the preferred stormwater management alternative.
II. EXISTING DRAINAGE CONDITIONS
DRAINAGE OUTFALLS
The project site currently drains to four (4) outfalls. For the purposes of this report, Michael
Baker has named each of these outfalls as the South Cross Bayou outfall, the Middle Cross
Bayou outfall, the North Cross Bayou outfall, and the Tampa Bay outfall (Figure 1.2).
Figure 1.2 – Cross Bayou and Tampa Bay Outfalls
SITE DESCRIPTION - PROJECT AREA 1
Project Area 1 is about 3.2 acres, all of which is impervious. This area consists of asphalt and concrete pavements north and east of the Allegiant Maintenance Facility (Figure 1.3). The surface elevations range from 9.5-ft to 10.8-ft in elevation (NAVD88).
Figure 1.3 – Project Area 1
MC Squared, Inc. performed a geotechnical investigation in February of 2022. At that time, the ground water table in Project Area 1 was observed 4-5 ft below existing ground and the seasonal high water table (SHWT) is estimated to be 2-3-ft below ground (Exhibit 3-8). The geotechnical report is available under separate cover.
There is a basin divide along the vehicle service road. Runoff north of the service road flows north across Taxiway T to the existing stormwater pond north of Taxiway T. Runoff south of the service road flows into a single inlet near the north-central part of the apron.
SITE DESCRIPTION - PROJECT AREA 2
Project Area 2 is about 13 acres (excluding any proposed pond footprint) and consists of both asphalt pavement and maintained turf. This area is bound by Taxiway B to the west and
Runway 18-36 to the east, and generally lies overtop existing Runway 9-27 (Figure 1.4). The existing surface elevations range from 8.0-ft to 9.8-ft in elevation.
Figure 1.4 – Project Area 2
In February 2022, the ground water table in Project Area 2 was observed at an average depth of
4 ft. below existing ground, and the seasonal high (SHWT) is estimated to be 2 ft. below ground
(Exhibit 3-8). This was estimated by reviewing historical monitoring well data from a nearby site to the north against the water table levels observed during the February investigation. The geotechnical report is available under separate cover.
Runoff from the western half of Project Area 2 is collected by several inlets on the north and south side of Runway 9-27. This system drains west, parallel to the runway.
The eastern half of Project Area 2 includes the eastern one-third of proposed Taxiway C and all of proposed Taxiway A4. This area is conveyed by a system of drainage pipes and structures and drains east under Taxiway A and Runway 18-36.
A Pre-Development Drainage Map of both project areas is included as Exhibit 3-1.
DOCUMENT COMPARISON
As part of this study, we reviewed the following documents from previous studies and nearby past projects including:
• As-Built Drawings o Taxiway A Relocation, 1994 o Taxiway Rehabilitation Phase 1, 2014 o Taxiway Rehabilitation Phase 2, 2015 o Allegiant Maintenance Facility, 2018
• Stormwater Master Plan (SWMP), 2020
The as-built drawings and the survey performed for this project were used to layout the existing drainage infrastructure in AutoCAD. The updated drainage layout and flow directions were compared to the SWMP nodal diagram and ICPR model, and the following discrepancies were identified.
DOCUMENT COMPARISON - PROJECT AREA 1
Runoff from Project Area 1 currently discharges without treatment. The Allegiant Facility plans show Basins 018190, 18180, and 18200 (Project Area 1) draining directly west around the north end of the Allegiant Building and then draining southwest to the South Cross Bayou outfall. The same basins are also shown to drain north though an 18-inch pipe that runs parallel to, and east of Taxiway B (redundant outfalls). This northward outfall continues north of Runway 9-27 until it intersects the east-west pipe network that drains to the Middle Cross Bayou Outfall (Figure 2.1).
The SWMP shows the same basins only draining to the South Cross Bayou outfall (as opposed to both the Middle and South Cross Bayou outfalls). However, the drainage route shown in the
SWMP to the South Cross Bayou outfall is different than the South Cross Bayou outfall route described in the prior paragraph. This route goes north briefly, draining into the existing pond north of Taxiway T, then discharging west out of the pond control structure (Figures 2.1). The
SWMP nodal diagram has been corrected to match the Allegiant Facility plans, the Taxiway
Rehabilitation Phase 2 plans, and the survey.
Figure 2.1 – Project Area 1 Model Discrepancies
DOCUMENT COMPARISON - PROJECT AREA 2
For Project Area 2, discrepancies also exist when comparing the Taxiway Rehabilitation Phase
1 and 2 plans and the survey performed for this project with the SWMP nodal diagram (and
ICPR model). In the SWMP nodal diagram, Basin 02146 is shown to drain both west to the existing pond and north across Taxiway A and Runway 18-36 to the Tampa Bay outfall
(redundant outfalls). Instead, this basin actually drains only north to the Tampa Bay outfall.
Additionally, in the SWMP, Basin 17070 (triangular infield area) is shown to drain both west and north as well (redundant outfalls). However, this area only drains west to the existing pond, discharging to the South Cross Bayou outfall. Finally, Basin B21145 is shown in the SWMP nodal diagram to drain north then west to a Cross Bayou outfall that is north of the North Cross
Bayou outfall. Instead, about half of this basin actually drains into an inlet just north of Taxiway
H then drains south under Taxiway H. From there, this area drains east under Taxiway A and
Runway 18-36 to the Tampa Bay outfall (Figure 2.2). The SWMP nodal diagram and ICPR model have been corrected accordingly.
Figure 2.2 – Project Area 2 Model Discrepancies
Most of the runoff from Project Area 2 discharges without treatment. A narrow, linear dry retention pond (about 2 ft. deep) exists south of Project Area 2. This pond treats only about ten
(10) percent of Project Area 2 (runoff from Taxiway D and the triangular infield area described above), a mainly treats runoff from Taxiway T. There is a control structure at the west end of the pond that discharges under Taxiway B. This pond was permitted and constructed in 1994.
Figure 2.3 – Existing Linear Pond
III. STORMWATER MANAGEMENT CRITERIA
This section presents the governing standards and permitting criteria for the proposed stormwater management alternatives. These criteria are based on our review of the SWFWMD
Applicant’s Handbook Volumes I and II, Pinellas County Stormwater Manual, and pre-application meetings with both these agencies. The pre-application meeting minutes are available under separate cover. The project-specific stormwater criteria are listed in Table 3.1 below.
Table 3.1 – STORMWATER MANAGEMENT CRITERIA
AGENCY DESIGN CRITERIA IMPORTANT MEETING NOTES
SWFWMD An on-line retention treatment system shall treat the first one-half inch of run-off.
Total treatment volume shall again be available within 72 hours, with a factor of safety of 2.
Projects discharging directly into Outstanding
Florida Waters (OFW) shall be required to provide treatment for a volume 50 percent more than required for the selected treatment system
A net increase in flow rates to the Bay is allowed as long as the hydraulic grade line in the model does not cause onsite or offsite flooding
No treatment is required if a net reduction in impervious area is achieved within the same Basin
Additional treatment or storage provided than what is required for this project can be documented and applied to a future project.
Pinellas
County
Impaired water treatment requires a 55% reduction in Nitrogen and 80% reduction in Phosphorus.
The pond bottom shall be at least 2 feet above the estimated SHGWT; unless the applicant demonstrates, based on plans, test results, calculations, or other information, that an alternative design is appropriate for the specific site conditions.
Ponds shall recover the treatment volume within
24 to 72 hours
Pond sides and bottoms shall be stabilized with vegetation or other approved materials.
Provide cup-for-cup floodplain compensation.
Watersheds within Pinellas County are considered impaired
The rate of runoff leaving the site shall not cause adverse off-site impacts
Water Quantity requirements: Post-
Development discharge rates cannot exceed Pre-Development rates.
FDOT
Statewide
Airport
Stormwater
BMP
Manual
Contributing pavement area is not more than 50% larger than the overland flow area.
Overland flow distance shall be 25 feet or greater.
Soils on the site are silty sands, or sands with organics, with stabilized infiltration rates greater than 0.5 inches/hour and horizontal hydraulic conductivities greater than 10 feet/day
Topography permits flat to moderate (0.5% -5%) transverse slopes
SHGWT elevations are between 2 feet beneath the ground surface
Discharge is available for underdrains, if needed and ground water contributions of nutrient load do not increase total nutrient loading significantly
N/A
FAA
Advisory
Circular
150/5320–
Airport
Drainage
Design
Avoid Wet Ponds
The dry stormwater detention facility shall be designed to follow FAA AC 150/5200-33C guidance for a maximum 48-hour detention period following a storm even and remain completely dry between storm events. The dry detention facility
(bottom and side slopes) will be mowed and maintained similar to the airfield turf.
N/A
SWFWMD criteria was used to preliminarily size and locate the ponds representing Alternatives
3 and 4 described later in the report. Ultimately, treatment requirements will be calculated for
SWFWMD and Pinellas County design criteria, and the most stringent volume requirement will be used as the basis of design.
During the pre-application meeting with Pinellas County, it was noted that treatment may be required for Project Area 1 as any “redevelopment” over 3,000 sq. ft. needs to be brought up to current standards set by Pinellas County. However, direct (or in-line) treatment for Project Area
1 is not viable because there is no place for a treatment facility downstream along the South
Cross Bayou outfall. Instead, an exemption for treating Project Area 1 is being sought under the
Pinellas County code. If an exemption is not granted for Project Area 1, compensating treatment or direct treatment will be considered under one of the proposed alternatives discussed later.
The Cross Bayou and Tampa Bay outfalls are considered Outstanding Florida Waters (OFWs) and Impaired Water Bodies. Consequently, SWFWMD requires that any future treatment volume meets the additional treatment requirements for an OFW which is 50% additional volume above the presumptive treatment requirement.
IV. PROPOSED DRAINAGE CONVEYANCE APPROACH
As part of this study, a conceptual inlet and pipe layout was developed for this project (Exhibit
3-2). A conceptual grading plan with proposed inlet and drainage pipe locations was also developed for the future east terminal concourse expansion (Exhibit 3-5). These layouts were used in developing the proposed drainage approach and the evaluation of the proposed stormwater management alternatives. The following section describes the proposed drainage approach which focuses more on stormwater conveyance. Section V. describes each of the proposed stormwater management alternatives.
PROJECT AREA 1
Proposed surface grading will generally match existing grades. However, minor grading changes may be made to meet NFPA 407 grading requirements for apron fueling operations.
Fueling operations in Project Area 1 would require a minimum slope of 1% for a minimum of 50-ft south and east of the Allegiant Building and the removal of the trench drains within 50-ft on the building. This would add a small amount of runoff area to the apron outfall piping. The redundant outfall pipe to the north could possibly be capped and abandoned or removed to make space for a new pond. However, a complex leg of the South Cross Bayou outfall would have to be modeled with this additional runoff area to confirm the removal of the redundant pipe will not cause onsite flooding. Instead, if a new pond is built over this pipe, the pipe could be trimmed and outfall into this pond, directly treating runoff from Project Area 1. In this case, the southwestern outfall pipe would likely remain as well to maintain the current water quantity capacity.
PROJECT AREA 2 – TAXIWAY C (WEST)
For Project Area 2, it is proposed to convey runoff from the entire length of Taxiway C west
(instead of the eastern one-third of Taxiway C being conveyed east). This will be accomplished by swales on the north and south sides of the Taxiway that may have ditch bottom inlets with piping beneath the swales (orange arrows, Figure 4.1). This is to avoid jack and bore beneath
Taxiway A that would be required to maintain the Tampa Bay outfall that currently serves the eastern portion of Project Area 2.
At the west end of Taxiway C, the drainage will be conveyed south under Taxiway C to a new pond and then on to the control structure at Node N17030 (or a new pond control structure).
This is proposed to avoid another jack and bore under Taxiway B by making use of the existing outfall pipe leaving the existing control structure (orange arrows, Figure 4.1).
Figure 4.1 – Proposed Westerly Conveyance
This change will result in an increased flow rate to the South Cross Bayou outfall and a decreased flow rate to the Middle Cross Bayou outfall. Therefore, drainage conveyances from the site to both of those outfalls will be modeled to confirm it will not cause onsite or offsite flooding.
PROJECT AREA 2 – TAXIWAY C (EAST)
North of Taxiway H, runoff from Basin 021145 will no longer be able to flow east under Taxiway
A and Runway 18-36. This is due to the removal of the eastward flowing pipe network. Instead, runoff from Basin 021145 will daylight to the proposed swale north of Taxiway C and flow west to a pond proposed for with this project.
PROJECT AREA 2 - TAXIWAY A4
In the proposed condition, Taxiway A4 will drain the same way as the predevelopment condition. Runoff will sheet flow north and south from Taxiway A4, draining to existing inlets located in the infield grassed areas (Basins 02070 and 02085) which convey stormwater to the
Tampa Bay outfall.
V. STORMWATER MANAGEMENT ALTERNATIVES
Four (4) alternatives for providing stormwater treatment and attenuation have been developed.
For each alternative, design criteria, environmental considerations, maintainability, compatibility with future development, and costs were considered. In our evaluation of costs, we considered the significant need for onsite borrow to replace the removed Runway 9-27 and Taxiway D pavements. The four alternatives are:
1. Demonstrate a net reduction in impervious area and do not provide a stormwater management facility.
2. Use overland flow for water quality treatment.
3. Construct a dry retention pond sized for the project.
4. Construct a dry retention pond sized for the project and the future terminal expansion project.
ALTERNATIVE 1
Alternative 1 was developed to provide no water quality treatment for the proposed improvements. For this alternative, the total amount of impervious area is being reduced, therefore improving water quality. Runoff from the site currently drains offsite with very little treatment. By reducing the pavement area in the proposed condition, the net pollutant loads are reduced. Per discussions with SWFWMD, no stormwater treatment is required for the project as long as there is a net reduction in impervious area (with similar land use).
However, for Pinellas County, proof of a net reduction in impervious area will not be sufficient.
Credit for the reduction in impervious area will only be accepted through pre- and post-development pollutant load calculations. Therefore, pollutant loading for the proposed net impervious area will be calculated. This will be compared against County criteria to confirm enough pavement was removed to meet a 55% and 80% reduction for Nitrogen and
Phosphorus. If the target reduction is not met, other BMPs will be added to meet the target pollutant load reductions.
ALTERNATIVE 2
Alternative 2 was developed in accordance with the guidelines for overland flow treatment as presented in the FDOT Statewide Airport Manual (Airport Manual) and allowed per General
Permit Rule 62-330.449. Typically, runways and taxiways are surrounded by large, grassed surfaces on both sides. This alternative would use overland flow as a BMP where runoff moves off the runway or taxiway and sheet flows over the adjacent grass, allowing some or all of the stormwater to infiltrate into the ground. Alternative 2 is a safe and environmentally friendly option for Taxiway A4, since construction of a retention pond near the runway is not permitted due to bird strike concerns. Both SWFWMD and Pinellas County consider overland flow an acceptable treatment method. The County refers to this BMP as a Vegetative Natural Buffer
(VNB).
Pinellas County requirements for overland flow are similar to the requirements outlined in the
Airport Manual. However, the Airport Manual has established Event Mean Concentrations
(EMC) of Total Nitrogen and Total Phosphorus for use in calculating stormwater pollutant loadings from airfield pavement. Airfield pavements are typically cleaner than commercial sites.
Therefore, Pinellas County agreed that the values listed in Airport Manual can be used in the pre/post pollutant loading analysis (Table 5.1).
Table 5.1 – Airside and Natural Nutrient
Event Mean Concentration (antilog mean log) mg/L
AIRSIDE TYPE OR FEATURE Total Nitrogen (TN) Total Phosphorus (TP)
General Aviation Apron 0.335 0.051
Airline Terminal Apron 0.398 0.057
T-Hangar Apron 0.551 1.836
Air Cargo Apron 0.259 0.053
General Aviation Runway 0.365 0.081
Air Carrier Runway 0.401 0.049
Taxiways 0.569 0.11
Natural Vegetative
Community
0.93 0.10
ALTERNATIVES 1 AND 2
For both Alternatives 1 and 2, the east-west pipe network currently north of Runway 9-27 will be removed to allow for construction of Taxiway C. As a result, the other pipes and drainage structures upstream of this system (south of Runway 9-27) will also be removed. Basin 02148
(one of the terminal apron basins) will then lose connectivity to the Tampa Bay outfall and runoff will instead be directed west. This will be achieved by shortening the pipe from Basin 02148 and discharging it into the existing linear treatment pond just north of Taxiway T, ultimately draining to the South Cross Bayou outfall.
ALTERNATIVE 3
Alternative 3 proposes a dry retention pond just south of Taxiway C. The pond would be sized to treat and attenuate runoff from Taxiway C only (no future development). Due to the high-water table, the pond could only be 1 foot deep without underdrains. Therefore, underdrains are being proposed to increase the pond depth up to 3.5-ft. The proposed pond under Alternative 3 would yield approximately 6,000 cubic yards borrow material at a depth of 3.5-ft.
As mentioned previously, Pinellas County may require compensating treatment for Project Area
1. This would be done by treating a portion of the Taxiway B expansion constructed under the taxiway rehabilitation project in 2015. This portion of the taxiway (Basin B17030) is currently not being treated. Direct treatment may also be possible by terminating and discharging the north outfall pipe from Project Area 1 into Pond 3.
Per Pinellas County, raising any site elevations or filling in the existing pond would require volume compensation cup-for-cup. Floodplain compensation would be at least partially provided with Alternative 3, if required.
ALTERNATIVE 4
Alternative 4 proposes a much larger dry retention pond, sized to treat, and attenuate runoff from Taxiway C and the future east concourse terminal expansion. Alternative 4 has been split up into Alternatives 4A and 4B, to evaluate two different large pond locations. These two locations have their own pros and cons which are outlined in Section VI.
The pond for Alternative 4A would occupy most of the green space bounded by Taxiway C, Taxiway B, Taxiway T, and the west side of the apron for the future terminal expansion (Exhibit
3-5). Project Area 1 would also discharge into and be treated by Pond 4A.
The pond for Alternative 4B would be located just west of the service road that lies west of
Taxiway B and north of the existing Strawberry Lot (Exhibit 3-6). One drawback to Alternative
4B is that it is cost-prohibitive to pursue treatment compensation or direct treatment for Project
Area 1.
A benefit to either Alternative 4A or 4B is that floodplain compensation would be provided, if required.
Like Alternative 3, the use of underdrains is recommended for Alternatives 4A and 4B to lower the water table, allowing for a deeper pond. For Pond 4A, the depth was estimated by the lowest underdrain elevation required to maintain a positive discharge. Based on the existing 29
X 45-in outfall pipe invert at Node N17030, it was determined that the pond’s maximum depth can be about 3.5 ft. (~ Elevation 4.5-ft NAVD88). This is based on underdrains being installed 1-ft below the pond bottom. In addition, the preliminary apron grades and piping system for the future terminal expansion were developed to estimate future pipe depths. The flow rate through the pipes outfalling to the new pond from the terminal expansion is estimated to require triple 29
X 45 elliptical pipes. A pond depth of 3.5-ft would allow these pipes to enter the pond without being sumped (Exhibit 3-7).
The proposed pond under Alternatives 4A and 4B would yield approximately 14,000 cubic yards of usable fill based on a depth of 3.5-ft.
ALTERNATIVES 3 AND 4
For both Alternatives 3 or 4, the same revised stormwater routing for Basin 02148 will be used that is described in the “Alternatives 1 and 2” section above. However, the existing linear pond would be converted to conveyance, discharging to the new larger pond to the west associated with Alternates 3, 4A, or 4B. Converting this existing pond to conveyance will avoid the need to provide more pond capacity with the future ERP Minor Modification associated with the terminal expansion. That is because the terminal expansion will require what is left of the existing pond
(after this project) to be removed.
Runoff from Taxiway A4 would not drain to the proposed pond associated with Alternatives 3, 4A, or 4B. Therefore, if stormwater treatment is required for Taxiway A4 it would be achieved using Alternative 2. Alternative 1 would be used in combination with Alternative 2 to take advantage of credits for the net reduction of impervious area.
VI. CONCLUSION AND RECOMMENDATIONS
The matrix below presents the advantages of each stormwater management alternative. Based on the number of advantages, a score was assigned to each alternative.
Table 6.1 – MATRIX OF STORMWATER TREATMENT ALTERNATIVES
As a result of this evaluation, Michael Baker recommends Alternative 4A in combination with Alternatives 1 and 2, where applicable. This recommendation is pending a complete stormwater analysis. Alternative 4A offers best balance of initial cost, long-term cost, operational impact during construction, and future permitting and construction efforts.
Runway 9-27 and Taxiway D will be removed with this project. This will result in a need for a large amount of borrow material (estimated at 27,000 cubic yards) to backfill this area.
Alternative 4A provides much of the fill needed for the project, generating a cost savings by minimizing the hauling of offsite borrow material. This alternative also reduces FOD risk and operational impacts associated with hauling large quantities of soil across Taxiway B.
Preliminary analysis indicates that Pond 4A will have the capacity to treat and attenuate runoff from this project and the future terminal expansion project. Additional treatment and attenuation capacity beyond this may be available for a future expansion of the Strawberry Lot. The pond volume available for the Strawberry Lot expansion would be quantified with the final analysis.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 X X X X X X X X X 9
2 X X X X X X X X 8
3 X X X X X X X X X 9
4A X X X X X X X X X X X X 12
4B X X X X X X X X X 9
LEGEND
1 Lower upfront cost. 9 Minimizes future terminal expansion permitting.
2 Lower long-term cost. 10 Provides cost-effective floodplain compensation.
3 Shorter construction duration. 11 Floodplain compensation possible.
4 Lower impact to aircraft operations. 12 Pond treats east terminal and Sheriff Hangar developments.
5 Lower FOD risk (less hauling across Taxiway B) 13 Direct or compensating treatment provided.
6 Lower maintenance requirements. 14 Does not conflict with east terminal expansion.
7 Easier to permit up front. 15 Does not conflict with west terminal expansion.
8 Airfield compatible, does not attract birds 16 Does not conflict with the Strawberry Lot expansion.
ADVANTAGE PROVIDED (INDICATED BY "X")
ALTERNATIVES SCORES
For Alternative 4A, the extra available treatment and attenuation would be catalogued using a ledger system.
Alternative 4A will result in a simple ERP Minor Modification through the SWFWMD when the future projects are implemented. Alternative 4A provides cost-effective compensating treatment or direct treatment for Project Area 1 if Pinellas County determines that to be required.
However, Airport staff has selected Alternative 3 for this project in combination with
Alternatives 1 and 2, where applicable. Alternative 3 will:
• Produce some of the borrow soil needed for the project
• Provide the minimum treatment and attenuation for the project to meet both SWFWMD and Pinellas County requirements
• Treat and attenuate runoff from Project Area 1 (if required by Pinellas County)
• Reduce the FOD risk and aircraft taxi impact associated with hauling material across Taxiway B
• Provide cost-effective floodplain compensation (if required by Pinellas County), and
• Will not conflict with the east terminal expansion or Strawberry Lot expansion
With Alternative 3, only the pond size represented by Alternative 3 will be permitted. The
Alternative 4A pond will not be permitted nor its attenuation and treatment credits recognized.
That is because there would be a 5-year time limit to build Alternative 4A to avoid a future major permit modification. Pond modeling and BMP trains calculations will need to be done in the future for Alternative 4A as part of that future major modification. Additional borrow material will be available at a later date for the east terminal expansion by expanding the pond like what was proposed for Alternative 4A.
EXHIBITS
24" RCP
18" RCP18
" R
C P
" R
C P
24" RCP 18" RCP
18" RCP
29"X45" RCP
42" RCP
" R
C P
" R
C P
24" RCP 24" RCP 18" RCP
" R
C P
18" RCP
15" RCP
15" RCP
18" RCP
" R
CP
" R C
P
24" RCP
18" RCP
" R
C P
" R
CP
18" RCP
12" RCP
12" RCP
B18160B
B17070 B17030
B18110
B19070
B02170
B02070
TAXIWAY T
TA
XI
W
AY
A
TA
XI
W
AY
B
EXISTING POND
B02085TA
XIW
AY D
MIDDLE CROSS
BAYOU OUTFALL
B18120BB18120A B02130
B18160A B18160C
B18160D
B02120A
B02120C
B02120B
DECOMISSIONED
RUNWAY 9-27
R U
N W
AY
8-
B21145
B02172B02146B18180 B02148B18200
B18190
NORTH CROSS
BAYOU OUTFALL
SOUTH CROSS
BAYOU OUTFALL
SOUTH CROSS
BAYOU OUTFALL
29"X45" RCP
29"X45" RCP
18" RCP
18" RCP
(2) 19"X30" RCP
" R
C P
18" RCP18" RCP
" R
CP
" R C
P
" R
CP
" R
CP
18" RCP
18" RCP
" R
CP
" R
C P
" R
C P
" R
C P
Existing Basin Map Exhibit 3-1 0
GRAPHIC SCALE IN FEET
20010050
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
BASIN OUTLINE
EXISTING STORM MANHOLE
EXISTING STORM PIPE
EXISTING STORM INLET
STORM FLOW DIRECTION
PIPE FLOW DIRECTION
Fi le
P at h:
Y
:\P ro je ct s\ St
. P et eC lw tr\
_C ar go A pr on a nd
R un w ay
C on ve rs io n\
D oc um en ts \2
D es ig n\ 2m
. S to rm w at er
\IC
PR
R un w ay
C on ve rs io n\
M ap
La ye rs \B as in
\3 -1
.d w g D at e:
/2
2/
2:
P M
EXISTING POND
MIDDLE CROSS
BAYOU OUTFALL
24" RCP
18" RCP18
" R
C P
24" RCP 18" RCP
18" RCP
29"X45" RCP
42" RCP
" R
C P
24" RCP 24" RCP 18" RCP
" R
C P
18" RCP
15" RCP
15" RCP
18" RCP
" R
CP
" R C
P
24" RCP
18" RCP
" R
C P
" R
CP
18" RCP
12" RCP
12" RCP
29"X45" RCP
29"X45" RCP
18" RCP
18" RCP
(2) 19"X30" RCP
" R
C P
18" RCP18" RCP
" R
CP
" R C
P
" R
CP
" R
C P
" R
CP
18" RCP
18" RCP
" R
CP
" R
C P
N19070
N19060
N19040
B02172B02146B02148B18200B18180
B17030
B18110
B02170
B02070
TA
XI
W
AY
A
TA
XI
W
AY
B
B02085TA
XIW
AY D
R U
N W
AY
8-
DECOMISSIONED
RUNWAY 9-27 TAXIWAY A4
PROPOSED SWALE
PROPOSED SWALE
B21145
B18190
B17030
B19070
B02170
B02070
TAXIWAY T
TA
XI
W
AY
A
TA
XI
W
AY
B
B02085TA
XIW
AY D
B18160A
B18160D
R U
N W
AY
8-
NORTH CROSS
BAYOU OUTFALL
SOUTH CROSS
BAYOU OUTFALL
SOUTH CROSS
BAYOU OUTFALL
B18120
TAMPA BAY
OUTLET
TAMPA BAY
OUTLET
PROJECT AREA 2
PROJECT AREA 1
NORTH CROSS
BAYOU OUTFALL
" R
C P
EXISTING POND
" R
C P
" R
C P
Proposed Stormsewer Layout Changes Exhibit 3-2 0
GRAPHIC SCALE IN FEET
20010050
Fi le
P at h:
Y
:\P ro je ct s\ St
. P et eC lw tr\
_C ar go A pr on a nd
R un w ay
C on ve rs io n\
D oc um en ts \2
D es ig n\ 2m
. S to rm w at er
\IC
PR
R un w ay
C on ve rs io n\
M ap
La ye rs \B as in
\3 -2 a nd
-3
.d w g D at e:
/2
2/
0:
A M
DEMO EXISTING STORM INLET
EXISTING STORM MANHOLE
EXISTING STORM PIPE
EXISTING STORM INLET
DRAINAGE FLOW DIRECTION
PIPE FLOW DIRECTION
PROPOSED SWALE
DEMO EXISTING STORM PIPE
PROPOSED STORM PIPE
PROPOSED STORM INLET
EXISTING POND
PROPOSED TAXIWAY
PAVEMENT
DEMOLISH TAXIWAY/
RUNWAY PAVEMENT
ASPHALT MILL & OVERLAY
OR FULL-DEPTH CONCRETE
HEAVY DUTY CONCRETE
LIGHT DUTY CONCRETE
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
BASIN OUTLINE
MIDDLE CROSS
BAYOU OUTFALL
24" RCP
18" RCP18
" R
C P
24" RCP 18" RCP
18" RCP
29"X45" RCP
42" RCP
24" RCP
18" RCP
15" RCP
15" RCP
" R
CP
" R C
P
24" RCP
18" RCP
" R
C P
18" RCP
12" RCP
12" RCP
29"X45" RCP
29"X45" RCP
18" RCP
18" RCP
" R
C P
" R
CP
" R
C P
" R
CP
18" RCP
18" RCP
" R
CP
" R
C P
B02172B02146B02148B18200B18180
B17030
B18110
B02170
B02070
TA
XI
W
AY
A
TA
XI
W
AY
B
B02085TA
XIW
AY D
R U
N W
AY
8-
DECOMISSIONED
RUNWAY 9-27 TAXIWAY A4
PROPOSED SWALE
PROPOSED SWALE
B21145
B18190
B17030
B19070
B02170
B02070
TAXIWAY T
TA
XI
W
AY
A
TA
XI
W
AY
B
B02085TA
XIW
AY D
B18160A
B18160D
R U
N W
AY
8-
NORTH CROSS
BAYOU OUTFALL
SOUTH CROSS
BAYOU OUTFALL
SOUTH CROSS
BAYOU OUTFALL
B18120
TAMPA BAY
OUTLET
TAMPA BAY
OUTLET
PROJECT AREA 2
PROJECT AREA 1
NORTH CROSS
BAYOU OUTFALL
EXISTING POND
" R
C P
" R
C P
Stormwater Management Alternative 2 Exhibit 3-3 0
GRAPHIC SCALE IN FEET
20010050
Fi le
P at h:
Y
:\P ro je ct s\ St
. P et eC lw tr\
_C ar go A pr on a nd
R un w ay
C on ve rs io n\
D oc um en ts \2
D es ig n\ 2m
. S to rm w at er
\IC
PR
R un w ay
C on ve rs io n\
M ap
La ye rs \B as in
\3 -2 a nd
-3
.d w g D at e:
/2
2/
0:
A M
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
BASIN OUTLINE
EXISTING STORM MANHOLE
EXISTING STORM PIPE
EXISTING STORM INLET
DRAINAGE FLOW DIRECTION
PIPE FLOW DIRECTION
PROPOSED SWALE
PROPOSED STORM PIPE
PROPOSED STORM INLET
EXISTING POND
PROPOSED TAXIWAY
PAVEMENT
DEMOLISH TAXIWAY/
RUNWAY PAVEMENT
ASPHALT MILL & OVERLAY
OR FULL-DEPTH CONCRETE
HEAVY DUTY CONCRETE
LIGHT DUTY CONCRETE
24" RCP
18" RCP18
" R
C P
24" RCP 18" RCP
18" RCP
29"X45" RCP
18" RCP
15" RCP
15" RCP
" R
CP
" R C
P
24" RCP
18" RCP
" R
C P
18" RCP
12" RCP
12" RCP
29"X45" RCP
29"X45" RCP
18" RCP
18" RCP
" R
C P
" R
CP42" RCP
" R
C P
" R
CP
18" RCP
18" RCP
" R
CP
N19070
N19060
N19040
B02172B02146B02148B18200B18180
B17030
B18110
B02170
B02070
TA
XI
W
AY
A
TA
XI
W
AY
B
B02085TA
XIW
AY D
R U
N W
AY
8-
DECOMISSIONED
RUNWAY 9-27
TAXIWAY A4
PROPOSED SWALE
PROPOSED SWALE
B21145
B18190
B17030
B19070
B02170
B02070
TAXIWAY T
TA
XI
W
AY
A
TA
XI
W
AY
B
B02085TA
XIW
AY D
B18160A
B18160D
R U
N W
AY
8-
NORTH CROSS
BAYOU OUTFALL
SOUTH CROSS
BAYOU OUTFALL
SOUTH CROSS
BAYOU OUTFALL
B18120
EXISTING POND
TAMPA BAY
OUTFALL
TAMPA BAY
OUTFALL
PROPOSED POND
1.73 ACRES
MIDDLE CROSS
BAYOU OUTFALL
24" RCP
" R
C P
" R
C P
" R
C P
Stormwater Management Alternative 3 Exhibit 3-4 0
GRAPHIC SCALE IN FEET
20010050
Fi le
P at h:
Y
:\P ro je ct s\ St
. P et eC lw tr\
_C ar go A pr on a nd
R un w ay
C on ve rs io n\
D oc um en ts \2
D es ig n\ 2m
. S to rm w at er
\IC
PR
R un w ay
C on ve rs io n\
M ap
La ye rs \B as in
\3 -4
.d w g D at e:
/2
2/
0:
A M
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
BASIN OUTLINE
EXISTING STORM MANHOLE
EXISTING STORM PIPE
EXISTING STORM INLET
DRAINAGE FLOW DIRECTION
PIPE FLOW DIRECTION
PROPOSED TAXIWAY
PAVEMENT
DEMOLISH TAXIWAY/
RUNWAY PAVEMENT
ASPHALT MILL & OVERLAY
OR FULL-DEPTH CONCRETE
HEAVY DUTY CONCRETE
LIGHT DUTY CONCRETE
PROPOSED SWALE
PROPOSED STORM PIPE
PROPOSED STORM INLET
PROPOSED POND
" R
C P
24" RCP
18" RCP18
" R
C P
24" RCP 18" RCP
18" RCP
29"X45" RCP
18" RCP
15" RCP
15" RCP
" R
CP
" R C
P
24" RCP
18" RCP
" R
C P
12" RCP
12" RCP
29"X45" RCP
29"X45" RCP
18" RCP
18" RCP
" R
C P
" R
C P
42" RCP
" R
C P
" R
CP
18" RCP
18" RCP
" R
CP
N19070
N19060
N19040
B02172B02146AB02148
B18200
B18180
B18110
B02170
B02070
TA
XI
W
AY
A
TA
XI
W
AY
B
B02085
R U
N W
AY
8-
TAXIWAY A4
PROPOSED SWALE
B21145
B18190
B19070
B02170
B02070
TAXIWAY T
TA
XI
W
AY
A
TA
XI
W
AY
B
B02085
B18160A
R U
N W
AY
8-
SOUTH CROSS
BAYOU OUTFALL
SOUTH CROSS
BAYOU OUTFALL
B18120
B30001P
B30002P
B30003P
B30004P
B30005P
B30006P
B30007P B30008P
PROPOSED POND
2.90 ACRES
B02146B
TAMPA BAY
OUTFALL
TAMPA BAY
OUTFALL
NORTH CROSS
BAYOU OUTFALL
MIDDLE CROSS
BAYOU OUTFALL
24" RCP
" R
C P
" R
C P
Stormwater Management Alternative 4A Exhibit 3-5 0
GRAPHIC SCALE IN FEET
20010050
Fi le
P at h:
Y
:\P ro je ct s\ St
. P et eC lw tr\
_C ar go A pr on a nd
R un w ay
C on ve rs io n\
D oc um en ts \2
D es ig n\ 2m
. S to rm w at er
\IC
PR
R un w ay
C on ve rs io n\
M ap
La ye rs \B as in
\3 -5
.d w g D at e:
/2
2/
1:
A M
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
BASIN OUTLINE
EXISTING STORM MANHOLE
EXISTING STORM PIPE
EXISTING STORM INLET
DRAINAGE FLOW DIRECTION
PIPE FLOW DIRECTION
PROPOSED TAXIWAY
PAVEMENT
DEMOLISH TAXIWAY/
RUNWAY PAVEMENT
ASPHALT MILL & OVERLAY
OR FULL-DEPTH CONCRETE
HEAVY DUTY CONCRETE
LIGHT DUTY CONCRETE
PROPOSED SWALE
PROPOSED STORM PIPE
PROPOSED STORM INLET
CFM56-7
CFM56-7
737-800W
737-800W
CFM56-7CFM56-7
737-800W
737-800W
" R
C P
24" RCP
18" RCP
" R
C P
24" RCP 18" RCP
18" RCP
29"X45" RCP
18" RCP
15" RCP
15" RCP
" R
CP
" R C
P
24" RCP
18" RCP
" R
C P
12" RCP
12" RCP
29"X45" RCP
29"X45" RCP
18" RCP
18" RCP
" R
C P
42" RCP
PROPOSED POND
2.86 ACRES
" R
CP
18" RCP
18" RCP
" R
CP
24" RCP
" R
C P
B02172B02146AB02148
B18200
B18180
B18110
B02170
B02070
TA
XI
W
AY
A
TA
XI
W
AY
B
B02085
R U
N W
AY
8-
TAXIWAY A4
PROPOSED SWALE
B21145
B18190
B19070
B02170
B02070
TAXIWAY T
TA
XI
W
AY
A
TA
XI
W
AY
B
B02085
B18160A
R U
N W
AY
8-
SOUTH CROSS
BAYOU OUTFALL
SOUTH CROSS
BAYOU OUTFALL
B18120
B30001P
B30002P
B30003P
B30004P
B30005P
B30006P
B30007P
B30008P
B02146B
TAMPA BAY
OUTFALL
TAMPA BAY
OUTFALL
NORTH CROSS
BAYOU OUTFALL
" R
C P
" R
C P
Stormwater Management Alternative 4B Exhibit 3-6 0
GRAPHIC SCALE IN FEET
20010050
Fi le
P at h:
Y
:\P ro je ct s\ St
. P et eC lw tr\
_C ar go A pr on a nd
R un w ay
C on ve rs io n\
D oc um en ts \2
D es ig n\ 2m
. S to rm w at er
\IC
PR
R un w ay
C on ve rs io n\
M ap
La ye rs \B as in
\3 -6
.d w g D at e:
/2
2/
2:
P M
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
BASIN OUTLINE
EXISTING STORM MANHOLE
EXISTING STORM PIPE
EXISTING STORM INLET
DRAINAGE FLOW DIRECTION
PIPE FLOW DIRECTION
PROPOSED TAXIWAY
PAVEMENT
DEMOLISH TAXIWAY/
RUNWAY PAVEMENT
ASPHALT MILL & OVERLAY
OR FULL-DEPTH CONCRETE
HEAVY DUTY CONCRETE
LIGHT DUTY CONCRETE
PROPOSED SWALE
PROPOSED STORM PIPE
PROPOSED STORM INLET
TAXIWAY T
TA
XIW
AY D
TA
X
IW
A
Y A
C
FM
-7
C
FM
-7 737-800W
7-
0W
C
FM
-7
C
FM
-7 737-800W
7-
0W
CFM
-7
CFM
-7
737-800W
737-800W
CFM56-7CFM56-7
737-800W
737-800W
CFM56-7
CFM56-7
737-800W
737-800W
C
FM
56-7 C
FM
56-773
7-
0W
737-800W
C
FM
56-7 C
FM
56-773
7-
0W
737-800W
9.60
9.00
10.00
9.
8.
.6
.0
9.40
11.00
8.60
8.
8.
8.40
7.20
7.60
9.60
8.00
8.00
8.
8.00
DECOMISSIONED RUNWAY 9-27
TO BE DEMOLISHED
TAXIWAY C
TAXIWAY T
0+00
1+00
1+81
BP: 0+00.00
EP: 1+81.07
STA 0+00.00
DESIG
N SPEED = 60 m i/h
A
A
POND INLET
PIPE FL 4.5'
PROP
INLET (TYP)
Terminal Outfall - Pipe Depth Entering Pond 4A Exhibit 3-7
Fi le
P at h:
Y
:\P ro je ct s\ St
. P et eC lw tr\
_C ar go A pr on a nd
R un w ay
C on ve rs io n\
D oc um en ts \2
D es ig n\ 2m
. S to rm w at er
\IC
PR
R un w ay
C on ve rs io n\
M ap
La ye rs \B as in
\3 -7
.d w g D at e:
5/
/2
:5
AM
0 30 60 120
HORIZONTAL SCALE IN FEET
0 3 6 12
VERTICAL SCALE IN FEET
SECTION A-A
PLAN
AutoCAD SHX Text
SD
AutoCAD SHX Text
SD
AutoCAD SHX Text
SD
AutoCAD SHX Text
SD
AutoCAD SHX Text
POND ELEV 4.5'
AutoCAD SHX Text
PROP GRADE
AutoCAD SHX Text
EXIST GROUND PROFILE (TYP)
AutoCAD SHX Text
PROP INLET
AutoCAD SHX Text
POND INLET PIPE
AutoCAD SHX Text
EXIST. ELEVATION (TYP)
AutoCAD SHX Text
PROP. ELEVATION (TYP)
AutoCAD SHX Text 8.38
AutoCAD SHX Text 8.09
TAXIWAY A4
TAXIWAY T
TA
XI
W
AY
A
TA
XI
W
AY
B
TA
XIW
AY D
PB-1
EXISTING GROUND EL= 10.23'
OBSERVED GWT EL=3.83'
ESTIMATED SHGWT EL= 5.93'
PB-2
EXISTING GROUND EL= 9.42'
OBSERVED GWT EL= 3.92'
ESTIMATED SHGWT EL= 6.02'
PB-6
EXISTING GROUND EL= 9.96'
OBSERVED GWT EL= 4.26'
ESTIMATED SHGWT EL= 6.36'
PB-3
EXISTING GROUND EL= 9.63'
OBSERVED GWT EL=3.93'
ESTIMATED SHGWT EL=6.03'
PB-5
EXISTING GROUND EL= 10.71'
OBSERVED GWT EL= 4.21'
ESTIMATED SHGWT EL= 6.31'
PB-9
EXISTING GROUND EL= 10.68'
OBSERVED GWT EL= 4.48'
ESTIMATED SHGWT EL= 6.58'
PB-10
EXISTING GROUND EL= 10.61'
OBSERVED GWT EL= 4.71'
ESTIMATED SHGWT EL= 6.81'
PB-11
EXISTING GROUND EL= 10.52'
OBSERVED GWT EL= 4.32'
ESTIMATED SHGWT EL= 6.52'
PB-7
EXISTING GROUND EL= 10.03'
OBSERVED GWT EL=4.73'
ESTIMATED SHGWT EL= 6.83'
PB-4
EXISTING GROUND EL= 10.43'
OBSERVED GWT EL=4.43'
ESTIMATED SHGWT EL= 6.53'
PB-8
EXISTING GROUND EL= 11.16'
OBSERVED GWT EL= 4.26'
ESTIMATED SHGWT EL= 6.36'
PB-12
EXISTING GROUND EL= 10.73'
OBSERVED GWT EL= 4.43'
ESTIMATED SHGWT EL= 6.53'
TB-2
EXISTING GROUND EL= 7.70'
OBSERVED GWT EL=3.41'
ESTIMATED SHGWT EL= 5.47'
TB-1
EXISTING GROUND EL= 7.71'
OBSERVED GWT EL=3.42'
ESTIMATED SHGWT EL= 5.56'
TB-3
EXISTING GROUND EL= 7.39'
OBSERVED GWT EL= 2.51'
ESTIMATED SHGWT EL= 4.60'
TB-4
EXISTING GROUND EL= 7.90'
OBSERVED GWT EL= 3.61'
ESTIMATED SHGWT EL= 5.71'
TB-5
EXISTING GROUND EL= 7.76'
OBSERVED GWT EL= 3.16'
ESTIMATED SHGWT EL= 5.28'
TB-6
EXISTING GROUND EL= 7.81'
OBSERVED GWT EL= 3.25'
ESTIMATED SHGWT EL= 5.31'
TB-7
EXISTING GROUND EL= 7.74'
OBSERVED GWT EL= 3.03'
ESTIMATED SHGWT EL= 5.14'
TB-8
EXISTING GROUND EL= 7.24'
OBSERVED GWT EL= 2.61'
ESTIMATED SHGWT EL= 4.74'
TB-9
EXISTING GROUND EL= 8.47'
OBSERVED GWT EL= 2.47'
ESTIMATED SHGWT EL= 4.58'
TB-10
EXISTING GROUND EL= 7.65'
OBSERVED GWT EL= 2.82'
ESTIMATED SHGWT EL= 4.94'
TB-11
EXISTING GROUND EL= 8.09'
OBSERVED GWT EL= 1.80'
ESTIMATED SHGWT EL= 3.88'
TB-12
EXISTING GROUND EL= 8.82'
OBSERVED GWT EL=4.01'
ESTIMATED SHGWT EL= 6.15'
TB-13
EXISTING GROUND EL= 7.82'
OBSERVED GWT EL= 3.90'
ESTIMATED SHGWT EL= 6.05'
TB-14
OBSERVED GWT EL= 4.73'
ESTIMATED SHGWT EL= 2.63'
PROPOSED TAXIWAY C
DECOMMISSIONED
RUNWAY 9-27
Groundwater Elevations Exhibit 3-8 0
GRAPHIC SCALE IN FEET
1608040
Fi le
P at h:
V
:\P ro je ct s\ St
. P et eC lw tr\
_C ar go A pr on a nd
R un w ay
C on ve rs io n\
C
AD
D -d w g\
G ro un dw at er
E le va tio ns
Ex hi bi t 3
-8 .d w g
D at e:
/2 0/
1:
A
M
PROPOSED TAXIWAY
PAVEMENT
DEMOLISH TAXIWAY/
RUNWAY PAVEMENT
ASPHALT MILL & OVERLAY
OR FULL-DEPTH CONCRETE
HEAVY DUTY CONCRETE
LIGHT DUTY CONCRETE
BORING LOCATION