Appendix 2 Tables of Individual Locations and Actions_53544.docx

DOCX document 30 KB Posted

Attached to
Mark Twain Recreation Areas Removal Action
Solicitation number
12445522Q0025
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX 2

Marble Creek and Silver Mines Recreational Areas on the Potosi/Fredericktown Ranger District, Mark Twain National Forest

Introduction to the Tables The Tables below provide the Recreation Area campsite or day use area identifying number, specific comments and action information. Comments and Actions are noted for individual campsites or day use areas consistent with the requirements in the body of the Statement of Work.

Marble Creek Recreation Area

USFS ID (campsite #, if applicable)
Approximate tonnage of aggregate
ACTION
16
2 Tons of 1 inch clean
Spread aggregate to marks
24
2 Tons of 1 inch clean
Spread aggregate to marks
26.2
2 Tons of 1 inch clean
Spread aggregate to marks
Day use/picnic
20 Tons of 1 inch clean
Spread aggregate to marks

Silver Mines Recreation Area

USFS ID (campsite #, if applicable)
COMMENTS
NOTES

Riverside Loop

12
1 Ton of 1 inch clean
Spread aggregate to marks

Summit Loop

13
2 Ton of 1 inch clean
Spread aggregate to marks

Prospect Loop

42
2 Tons 1 inch minus
Spread screenings to marks, compact
46
2 Tons 1 inch clean
Spread aggregate to marks
53
2 Tons 1 inch clean
Spread aggregate to marks

Group Site

Group remote (RS1) Water Bar

16.5 Tons 1 inch minus for 2 water bars
Clear vegetation for water bars, construct 2 water bars on marks, 1 water bar 30 ft long, 1 water bar 45 ft long as marked at location.
Group remote (RS1)
10 Tons 1 inch clean
Fill eroded path and pad with aggregate.

Group remote (RS2) Water Bar

33 Tons 1 inch minus for 2 water bars
Clear vegetation for water bars, construct 2 water bars on marks. 1 water bar 45 ft long, 1 water bar 105 ft long as marked at location.
Group remote (RS2)
10 Tons 1 inch clean
Fill eroded path and pad with aggregate.

Group remote (RS3) Water Bar

6.5 Tons 1 inch minus for 1 water bar
Clear vegetation for water bar, construct water bar on marks. 1 water bar 30 ft long as marked at location.
Group remote (RS3)
10 Tons 1 inch clean
Fill eroded path and pad with aggregate.

File details come from the government source that posted it. Updated .