Appendix 2 Lot Summary.pdf
PDF 105 KB Posted
- Attached to
- TRADITIONAL MOWING SUMTER-LEE-KERSHAW
- Solicitation number
- 5400026359
- Issued by
- Richland County, South Carolina
About this file
This is an Appendix 2 Lot Summary for a Traditional Mowing contract opportunity in South Carolina, covering Sumter, Lee, and Kershaw counties. The contract encompasses eight distinct mowing lots organized by route type (Interstate, Primary, and Secondary roads) and activity type (routine mowing, guardrail mowing, ditch mowing, and bridge mowing). Lot quantities range from 15 to 25 cycle times annually, with routine mowing covering approximately 3,370 total acres and guardrail mowing totaling over 570,000 linear feet. The contract requires a minimum of eight tractors, each with a minimum PTO output of 75 horsepower. The five-year contract total is estimated at approximately $16.6 million across all lots.
The production and equipment requirements specify minimum daily production rates and define cycle times per route type. Interstate routes (I, R, RS) operate on 15-cycle annual schedules, Primary routes (US, SC) on 25-cycle schedules, and Secondary routes (S, SF) on 25-cycle and 4-cycle schedules respectively. The contract structure indicates multiple performance cycles throughout the contract term, with estimated annual totals ranging from approximately $438,750 for Ditch Mowing to $9,313,980 for Guardrail Mowing on Interstate routes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Lee Primary.xlsx | XLSX spreadsheet | |
| Sumter Interstate.xlsx | XLSX spreadsheet | |
| Lee Interstate.xlsx | XLSX spreadsheet | |
| Appendix 3.pdf | ||
| SumterSecondCorrected.xlsx | XLSX spreadsheet | |
| Appendix 1.pdf | ||
| Kershaw Secondary.xlsx | XLSX spreadsheet | |
| Kershaw Primary.xlsx | XLSX spreadsheet | |
| Solicitation 5400026359.docx | DOCX document | |
| Sumter Primary.xlsx | XLSX spreadsheet | |
| Kershaw Interstate.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 2. LOT SUMMARY
1 Routine Mowing (Interstate: I, R, RS) 15 246.94 Acre 6 1,481.64 7,408.20 2 Guardrail Mowing (Interstate: I, R, RS) 15 310,466.00 Linear Feet 6 1,862,796.00 9,313,980.00 3 Ditch Mowing (Interstate: I, R, RS) 15 87.75 Acre 1 87.75 438.75 4 Bridge Mowing (Interstate: I, R, RS) 15 19.33 Acre 1 19.33 96.65 5 Routine Mowing (Primary: US, SC) 25 1,000.86 Acre 6 6,005.16 30,025.80 6 Guardrail Mowing (Primary: US, SC) 25 157,637.50 Linear Feet 6 945,825.00 4,729,125.00 7 Routine Mowing (Secondary: S, SF) 25 2,122.33 Acre 4 8,489.32 42,446.60 8 Guardrail Mowing (Secondary: S, SF) 25 101,983.50 Linear Feet 4 407,934.00 2,039,670.00
3,370.13 Acre 50 Acre
8 Tractors*
SUMTER (MOWING) + LEE & KERSHAW (RAIL ONLY)
Line Item
Annual Total Estimated Number of Cycles
Total Routine Acres (per cycle)
Cycle Time
ActivityRoute Type
I
P
S
*Each tractor shall have a minimum PTO output of 75 hp
Quantity Unit 5 Year Total
PRODUCTION & EQUIPMENT REQUIREMENTS
Minimum Daily Production Rate Minimum Equipment Requirement
File details come from the government source that posted it. Updated .