Appendix_1-Permits.pdf

PDF 137 KB Posted

Attached to
FY2025-2027 Countywide Pavement Preservation Step 2
Solicitation number
25-0112-ITB-C STEP 2
Issued by
Pinellas County, Florida

About this file

This document is an Appendix 1 Permits file for Pinellas County's Fiscal Years 2025-2027 Countywide Pavement Preservation project, identified by Contract No. 25-0112. The document outlines permit requirements for the construction project, indicating that no specific agency permits are currently applicable. The County will obtain and provide all known Federal and State permits for construction, while the contractor will be responsible for securing additional permits such as dewatering and tree removal permits.

The contractor will receive a Pinellas County Habitat Management Permit application during the pre-construction meeting, which must be approved by the County before work can commence. The contractor will be required to comply with all terms and conditions of the Habitat Management Permit, which can be referenced in the Pinellas County Code of Ordinances, specifically Part III, Land Development Code, Chapter 166, Article II, Division 2. The specific details of permit conditions can be found on the referenced municode website for Pinellas County.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX 1

PERMITS

FY 2025 – 2027 COUNTYWIDE

PAVEMENT PRESERVATION

Contract No. 25-0112

PERMIT INDEX

AGENCY PERMIT No. PAGE No.(s)

NOT APPLICABLE

Prior to issuance of work, the County shall obtain (and provide to the contractor) all known Federal and State permits required for construction. The Contractor shall secure and maintain all other permits required for construction, including (but not limited to), dewatering permits and permits required for tree removal or relocation.

The awarded Contractor will be provided with a Pinellas County Habitat Management Permit application at the pre-construction meeting. Upon County approval of said application, the Habitat Management Permit will be issued and the Contractor will be required to comply with all terms and conditions of the permit. For more information on the terms and conditions that may be required by the Habitat Management Permit, refer to the Pinellas County Code of Ordinances, Part III, Land Development Code, Chapter 166, Article II, Division 2, Permits located at http://www.municode.com/Library/FL/Pinellas_County.

http://www.municode.com/Library/FL/Pinellas_County