APPENDIX_1_-_Permits.pdf
PDF 40 KB Posted
- Solicitation number
- 24-0644-ITB-C
- Issued by
- Pinellas County, Florida
About this file
This document is an Appendix 1 Permits file for the Pinellas County ARPA Sidewalk, ADA, Drainage, & Paving - Package 2 contract (Contract No. 24-0644). The document outlines permit requirements for the construction project, with no specific agency permits currently listed as applicable. The County is responsible for obtaining known Federal and State permits for construction, while the awarded Contractor must secure and maintain additional permits, including dewatering and tree removal/relocation permits.
The Contractor will receive a Pinellas County Habitat Management Permit application at the pre-construction meeting, which must be approved by the County before issuance. Upon approval, the Contractor will be required to comply with all permit terms and conditions as specified in the Pinellas County Code of Ordinances, specifically the Land Development Code, Chapter 166, Article II, Division 2. The permit details are available online at the provided municode.com link, and the contractor must adhere to all specified requirements for habitat management during the project's implementation.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 1
PERMITS
ARPA SIDEWALK, ADA, DRAINAGE, & PAVING -
PACKAGE 2
Contract No. 24-0644
PERMIT INDEX
AGENCY PERMIT No. PAGE No.(s)
NOT APPLICABLE
Prior to issuance of work, the County shall obtain (and provide to the contractor) all known Federal and State permits required for construction. The Contractor shall secure and maintain all other permits required for construction, including (but not limited to), dewatering permits and permits required for tree removal or relocation.
The awarded Contractor will be provided with a Pinellas County Habitat Management Permit application at the pre-construction meeting. Upon County approval of said application, the Habitat Management Permit will be issued and the Contractor will be required to comply with all terms and conditions of the permit. For more information on the terms and conditions that may be required by the Habitat Management Permit, refer to the Pinellas County Code of Ordinances, Part III, Land Development Code, Chapter 166, Article II, Division 2, Permits located at http://www.municode.com/Library/FL/Pinellas_County.
http://www.municode.com/Library/FL/Pinellas_County
File details come from the government source that posted it. Updated .