App D - A E PRS.pdf

PDF 100 KB Posted

Attached to
A/E Design for repair and renovation of building 4330 for future MWR HQ
Solicitation number
W911S2-21-R-8106
Issued by

About this file

This document contains a federal contract opportunity notice for architectural and engineering design services. The U.S. Army seeks a firm to provide design services for repair and renovation of Building 4330 at Fort Drum, New York to serve as a future Morale, Welfare and Recreation headquarters. Interested service-disabled veteran-owned small businesses must submit a Standard Form 330 by July 23, 2021 to be considered for the firm-fixed price contract award. The design period of performance is 240 calendar days, and estimated construction period is 365 calendar days from notice to proceed. The construction value is between $5-10 million. The selected firm will not be eligible for subsequent construction contract awards.

View the file

Other files

File Type Posted
App A1- S1 FOUNDATION PLAN.pdf PDF
App A1- S2 FOUNDATION SECTIONS.pdf PDF
App A1-A2-Floor Plan.pdf PDF
App A1- Exterior elevations.pdf PDF
App C1 - Area Utility Map 1.pdf PDF
App A1- PE1 Site plan.pdf PDF
App A1- S4 ROOF FRAMING PLAN.pdf PDF
App A5 - SFAC Addition 2008.pdf PDF
App C3 - Area Utility Map 3.pdf PDF
App B2 - Proposed Functional Areas.pdf PDF
App A1- H3-Detail Schematic.pdf PDF
SF 330 Architect-Engineer Qualifications.pdf PDF
App A1- H1-Floor Plan.pdf PDF
App A1- H2-Schedule Plan Section Schematic.pdf PDF
App A1- S6 FRAMING.pdf PDF
App A1- A8-Wall Sections Section Details.pdf PDF
App A4 - Transfer Switch Replacement 1996.pdf PDF
App A3 - 4330 Additions Phase 1 and 2.pdf PDF
App A1- A7-Wall Section Section Details.pdf PDF
App A1- A9-Window Plan Detail.pdf PDF
21-R-8106 Synopsis BA-20004-0JA.pdf PDF
App A1- S3 CONCRETE DETAILS.pdf PDF
PWS Summary (Kickoff 20210510).pdf PDF
App A1- A11-Interior Details.pdf PDF
App A2 - Original Site plan.pdf PDF
App A1 - Original Floor Plan Drawings.pdf PDF
App B3 - Mountain Peak Place concepts.pdf PDF
App B1 - Existing Floor Plan with Proposed Functional Areas.pdf PDF
App A1- S5 COLLUMN SCHED.pdf PDF
App C2 - Area Utility Map 2.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. PERFORMANCE REQUIREMENTS SUMMARY (PRS): The following Performance Requirements Summary (PRS) indicates the desired outcomes, performance objectives, performance standards, and Acceptable Quality Levels (AQLs). Refer to the Performance Work Statement for the actual descriptions.

Paragraphs Specific Task AQL Consideration

Part 4.4, 6, 7, 8, 9, 10

The Contractor shall provide deliverables IAW Design Charrette and progress schedule.

95%

Trends of less than acceptable performance will result in resubmission of deliverables, and could result in reductions in payments at the discretion of the Contracting Officer.

Additionally a negative past performance review of the Contractor could affect future contract awards.

Part 4.4, 5.5, 6, 7, 8, 9, 10

The Contractor shall provide deliverables IAW Concept Design and progress schedule.

95%

Trends of less than acceptable performance will result in resubmission of deliverables, and could result in reductions in payments at the discretion of the Contracting Officer.

Additionally a negative past performance review of the Contractor could affect future contract awards.

Part 4.4, 5.6, 6, 7, 8, 9, 10

The Contractor shall provide deliverables IAW Intermediate Design and progress schedule.

95%

Trends of less than acceptable performance will result in resubmission of deliverables, and could result in reductions in payments at the discretion of the Contracting Officer.

Additionally a negative past performance review of the Contractor could affect future contract awards.

Part 4.4, 5.7, 6, 7, 8, 9, 10

The Contractor shall provide deliverables IAW Final Progress Design and progress schedule.

95%

Trends of less than acceptable performance will result in resubmission of deliverables, and could result in reductions in payments at the discretion of the Contracting Officer.

Additionally a negative past performance review of the Contractor could affect future contract awards.

Part 4.4, 5.9 & 5.10, 6, 7, 8, 9, 10

The Contractor shall provide deliverables IAW Final Design and progress schedule.

95%

Trends of less than acceptable performance will result in resubmission of deliverables, and could result in reductions in payments at the discretion of the Contracting Officer.

Additionally a negative past performance review of the Contractor could affect future contract awards.

Part 1.3, 4.4, 5, 6, 7, 8, 9, The Contractor shall provide deliverables IAW RFI and progress schedule.

95%

Trends of less than acceptable performance will result in resubmission of deliverables, and could result in reductions in payments at the discretion of the Contracting Officer.

Additionally a negative past performance review of the Contractor could affect future contract awards.