App A3 - 4330 Additions Phase 1 and 2.pdf

PDF 387 KB Posted

Attached to
A/E Design for repair and renovation of building 4330 for future MWR HQ
Solicitation number
W911S2-21-R-8106
Issued by

About this file

This document summarizes the requirements for architectural and engineering design services for the repair and renovation of Building 4330 at Fort Drum, New York. The Mission and Installation Contracting Command is seeking these services for the renovation and design of an activity center, with an estimated construction cost between $5-10 million. Interested firms must submit Standard Form 330 qualifications by July 23, 2021 for consideration. The contract will have a design period of no more than 240 days and an estimated construction period of 365 days. Selection will be based on qualifications and experience with similar projects. The requirement is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses. The agency is the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Drum. Responses to any questions must be submitted by July 12, 2021.

View the file

Other files

File Type Posted
App A1- S1 FOUNDATION PLAN.pdf PDF
App A1- S2 FOUNDATION SECTIONS.pdf PDF
App A1-A2-Floor Plan.pdf PDF
App A1- Exterior elevations.pdf PDF
App C1 - Area Utility Map 1.pdf PDF
App A1- PE1 Site plan.pdf PDF
App A1- S4 ROOF FRAMING PLAN.pdf PDF
App A5 - SFAC Addition 2008.pdf PDF
App C3 - Area Utility Map 3.pdf PDF
App B2 - Proposed Functional Areas.pdf PDF
App A1- H3-Detail Schematic.pdf PDF
SF 330 Architect-Engineer Qualifications.pdf PDF
App A1- H1-Floor Plan.pdf PDF
App A1- H2-Schedule Plan Section Schematic.pdf PDF
App A1- S6 FRAMING.pdf PDF
App A1- A8-Wall Sections Section Details.pdf PDF
App A4 - Transfer Switch Replacement 1996.pdf PDF
App A1- A7-Wall Section Section Details.pdf PDF
App A1- A9-Window Plan Detail.pdf PDF
21-R-8106 Synopsis BA-20004-0JA.pdf PDF
App A1- S3 CONCRETE DETAILS.pdf PDF
App D - A E PRS.pdf PDF
PWS Summary (Kickoff 20210510).pdf PDF
App A1- A11-Interior Details.pdf PDF
App A2 - Original Site plan.pdf PDF
App A1 - Original Floor Plan Drawings.pdf PDF
App B3 - Mountain Peak Place concepts.pdf PDF
App B1 - Existing Floor Plan with Proposed Functional Areas.pdf PDF
App A1- S5 COLLUMN SCHED.pdf PDF
App C2 - Area Utility Map 2.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELECTRICAL NOTES ( PHASE 1)

1. Provided and installed new ceiling and wall lights in room 107, per customer choice.

2. Provided and installed duplex wall receptacles in the new addition.

3. Provided and installed new light switches for the new office rooms.

4. Provided and installed new ceiling mounted, recessed, 2-T8 tube ceiling fluorescent lights with electric ballasts in the new addition.

5. Provided and installed new smoke detectors in the new addition.

6. Provided and installed new battery powered emergency lights.

7. Provided and installed new LED type exit lights.

8. Provided and installed 1 new exterior horn/strobe unit and relocate 1 existing.

9. Provided and installed new thermostats and wiring for power and controls for the HVAC system.

10. Connected power for new addition to existing 100 amp panel.

11. All circuits are fed from panel EP 7 in room 128.

ELECTRICAL NOTES (PHASE 2)

1. Provided and installed duplex wall receptacles in the new addition.

2. Provided and installed new light switches for the new office rooms.

3. Provided and installed new ceiling mounted, recessed, 2-T8 tube ceiling fluorescent lights with electric ballasts in the new addition.

4. Provided and installed new smoke detectors in the new addition.

5. Provided and installed new battery powered emergency lights.

6. Provided and installed new LED type exit lights.

7. Removed and relocated existing exterior horn/strobe unit.

8. Provided and installed one new interior strobe unit.

9. Provided and installed new thermostats and wiring for power and controls for the heating system.

10. Provided and install ed1 new 100 amp, 20 circuit branch panel w/breakers for new addition.

11. Provided and installed circuit breakers as necessary for additional circuits.

12. Provided and installed new power/COM/tel drops in the new office rooms.

13. All circuits are fed from panel EP 7 in room 128.

PHASE 1-GENERAL NOTES:

1. Provided and installed 24”O.C. wood trusses for roof framing

2. Provided and installed ¾” CDX plywood sheathing for roof decking.

3. Provided and installed ½” CDX plywood sheathing for exterior walls.

4. Provided and installed 3” fiberglass sound insulation in all new interior partitions.

5. Provided and installed 6” R-19 fiberglass batt insulation and moisture barriers in new exterior walls.BA0

6. Provided R-44 insulation in the ceiling of new addition and room 129.

7. Provided and installed 2” rigid foam insulation on inside of frost wall.

8. Provided and install moisture barriers inside and outside on new exterior walls.

9. Provided and installed steel sidewall and end wall flashings into masonry cuts on existing walls

10. Provided and installed steel siding, eave, rake and ridge on new extension.

11. Provided and installed new standing seam roof to match existing roof on storage addition.

12. Roof received new elastomeric waterproofing (ice & water) beneath steel.

13. Provided and installed new gutter and downspouts.

14. Provided and installed new countertop laminate in room 111 & 126.

15. Replaced damaged hardwood flooring in the ramp in room 127 and refinish the entire ramp and side step seating to match existing as closely as possible and sealed with two coats of high gloss polyurethane.

16. Provided and installed a transition strip between the ramp and room 129.

17. Provided and installed 6 new vinyl clad windows to match existing as close as possible.

18. Windows are 4.5’x3.5’ insulated double hung with insect screens.

19. Provided and installed one new solid birch door, frame and lockset in each office and room 128.

20. Provided and installed new load bearing, 2” x 6” metal stud exterior office walls, covered with 5/8” GWB on interior.

21. GWB is spackled, finished, primed and painted with 2 coats.

22. Provided and installed 3 5/8” metal stud office partition walls - 16” OC

23. Provided and installed 5/8” GWB on both sides of office partitions. Top tracks to be fastened to suspended ceiling framing and sheetrock to be capped at top with vinyl “J” bead.

24. GWB is spackled, finished, primed and painted with 2 coats.

25. Provides and installws new 5/8” GWB in room 114.

26. GWB is spackled, finished, primed and painted with 2 coats.

27. Provided and installed new 5/8” GWB and prep for painting/wall covering in room 116.

28. Provided and installed new ¼” GWB and prep for painting/wall covering in room 107.

29. Provided and installed new laminated wood plank flooring in rooms 111, 114, 115, 116, 117, 119, 129, 133 and new office areas.

30. Provided and installed new tile floor in 107.

31. Chemically cleaned and washed walls and floors in room 109.

32. Painted doors/frames 2 coats in rooms 107, 109, 111, 114, 116, 117 & 119.

33. Constructed new wall in 114.

34. New wall includes: 2”x4” steel stud construction, insulated, 5/8” GWB.

35. Provided and installed new suspended ceiling grid/tiles in rooms 107, 114, 116, 129, 133 and new office areas

PHASE 2-GENERAL NOTES:

1. Provided and installed new wainscoting along hallway extension to entrance doors, to match existing.

2. Provided and installed 24”O.C. wood trusses for roof framing

3. Provided and installed ¾” CDX plywood sheathing for roof decking.

4. Provided and installed 5/8” wall sheathing on new building addition.

5. Provided and installed 3” fiberglass sound insulation in all new interior partitions.

6. Provided and installed 6” R-19 fiberglass batt insulation and moisture barriers in new exterior walls.

7. Provided R-44 insulation in the ceiling of new addition and room 129.

8. Provided and installed 2” rigid foam insulation on inside of frost wall.

9. Provided and installed moisture barriers inside and outside on new exterior walls.

10. Provided and installed steel sidewall and end wall flashings into masonry cuts on existing walls.

11. Provided and installed one new exterior aluminum store front glass door, anodized color, frame, lockset and all panic hardware to the stage area.

12. Provided and installed one new solid birch door, frame and lockset in each office and closet, total of 6.

13. Provided and installed new load bearing, 2” x 6” wood stud exterior office walls and

2x4 metal stud partition walls, covered with 5/8” GWB on interior.

14. Top tracks to be fastened to suspended ceiling framing and sheetrock to be capped at top with vinyl “J” bead.

15. All GWB is spackled, finished, primed and painted with 2 coats.

16. Provided and installed 5/8” GWB wall sheathing on new building addition.

17. Provided and installed new suspended ceiling grid system in new addition.

18. Tile floor and wainscoting (both to match existing) continue straight along new hallway extension, to entrance doors, with a transition strip into new office area.

19. New office areas are painted GWB in hallways and offices.

20. All interior doors and frames received 2 finish coats per each side.

21. Provided and complete infilling, patching and painting on the window areas of the adjoining wall and the two windows in the new hallway.

22. Existing and new sheetrock received two coats of paint to match existing.

23. Existing suspended ceiling grid and tile was removed and replaced as necessary.

24. Provided and installed new vinyl base to the interior of new addition. Color to be

Johnsonite #47 Brown.

25. Provided and installed new laminated wood plank flooring throughout new addition, including closet

PHASE 1-MECHANICAL NOTES

1. Connect existing HW baseboard heating system in the adjoining room and extend throughout the new addition.

2. Provided fiberglass insulation on all new hot water piping.

3. Provided and installed non electric water valves on baseboard for temp control in new offices.

4. Provided and installed 2 new mini-split air conditioning systems for the new offices.

a. Compressors are located outside.

5. Provided and installed10” round air ducts and diffusers and extend into new offices and hallway in room 129.

6. Extended existing fire sprinkler system into new addition and extended all existing fire suppression heads into new suspended ceiling.

PHASE 2-MECHANICAL NOTES

1. Connect existing HW baseboard heating system in the adjoining room and extend throughout the new addition.

2. Provided fiberglass insulation on all new hot water piping.

3. Provided and installed non electric water valves on new baseboards for temp control in new offices.

4. Provided and installed (1) new Trane split air conditioning system for the new offices.

a. Compressor is located on roof.

b. Installed new 1” PVC condensate line for Air Handling Unit.Ttied into relocated sanitary line.

5. Provided and installed all necessary round air ducts and diffusers for new office area. Insulated new ductwork with 1-1/2 fibrous blanket.

6. Extended existing fire sprinkler system into new addition.

PHASE 1-GENERAL NOTES:

1. Provided and installed 24”O.C. wood trusses for roof framing

2. Provided and installed ¾” CDX plywood sheathing for roof decking.

3. Provided and installed ½” CDX plywood sheathing for exterior walls.

4. Provided and installed 3” fiberglass sound insulation in all new interior partitions.

5. Provided and installed 6” R-19 fiberglass batt insulation and moisture barriers in new exterior walls.BA0

6. Provided R-44 insulation in the ceiling of new addition and room 129.

7. Provided and installed 2” rigid foam insulation on inside of frost wall.

8. Provided and install moisture barriers inside and outside on new exterior walls.

9. Provided and installed steel sidewall and end wall flashings into masonry cuts on existing walls

10. Provided and installed steel siding, eave, rake and ridge on new extension.

11. Provided and installed new standing seam roof to match existing roof on storage addition.

12. Roof received new elastomeric waterproofing (ice & water) beneath steel.

13. Provided and installed new gutter and downspouts.

14. Provided and installed new countertop laminate in room 111 & 126.

15. Replaced damaged hardwood flooring in the ramp in room 127 and refinish the entire ramp and side step seating to match existing as closely as possible and sealed with two coats of high gloss polyurethane.

16. Provided and installed a transition strip between the ramp and room 129.

17. Provided and installed 6 new vinyl clad windows to match existing as close as possible.

18. Windows are 4.5’x3.5’ insulated double hung with insect screens.

19. Provided and installed one new solid birch door, frame and lockset in each office and room 128.

20. Provided and installed new load bearing, 2” x 6” metal stud exterior office walls, covered with 5/8” GWB on interior.

21. GWB is spackled, finished, primed and painted with 2 coats.

22. Provided and installed 3 5/8” metal stud office partition walls - 16” OC

23. Provided and installed 5/8” GWB on both sides of office partitions. Top tracks to be fastened to suspended ceiling framing and sheetrock to be capped at top with vinyl “J” bead.

24. GWB is spackled, finished, primed and painted with 2 coats.

25. Provides and installws new 5/8” GWB in room 114.

26. GWB is spackled, finished, primed and painted with 2 coats.

27. Provided and installed new 5/8” GWB and prep for painting/wall covering in room 116.

28. Provided and installed new ¼” GWB and prep for painting/wall covering in room 107.

29. Provided and installed new laminated wood plank flooring in rooms 111, 114, 115, 116, 117, 119, 129, 133 and new office areas.

30. Provided and installed new tile floor in 107.

31. Chemically cleaned and washed walls and floors in room 109.

32. Painted doors/frames 2 coats in rooms 107, 109, 111, 114, 116, 117 & 119.

33. Constructed new wall in 114.

34. New wall includes: 2”x4” steel stud construction, insulated, 5/8” GWB.

35. Provided and installed new suspended ceiling grid/tiles in rooms 107, 114, 116, 129, 133 and new office areas

PHASE 2-GENERAL NOTES:

1. Provided and installed new wainscoting along hallway extension to entrance doors, to match existing.

2. Provided and installed 24”O.C. wood trusses for roof framing

3. Provided and installed ¾” CDX plywood sheathing for roof decking.

4. Provided and installed 5/8” wall sheathing on new building addition.

5. Provided and installed 3” fiberglass sound insulation in all new interior partitions.

6. Provided and installed 6” R-19 fiberglass batt insulation and moisture barriers in new exterior walls.

7. Provided R-44 insulation in the ceiling of new addition and room 129.

8. Provided and installed 2” rigid foam insulation on inside of frost wall.

9. Provided and installed moisture barriers inside and outside on new exterior walls.

10. Provided and installed steel sidewall and end wall flashings into masonry cuts on existing walls.

11. Provided and installed one new exterior aluminum store front glass door, anodized color, frame, lockset and all panic hardware to the stage area.

12. Provided and installed one new solid birch door, frame and lockset in each office and closet, total of 6.

13. Provided and installed new load bearing, 2” x 6” wood stud exterior office walls and

2x4 metal stud partition walls, covered with 5/8” GWB on interior.

14. Top tracks to be fastened to suspended ceiling framing and sheetrock to be capped at top with vinyl “J” bead.

15. All GWB is spackled, finished, primed and painted with 2 coats.

16. Provided and installed 5/8” GWB wall sheathing on new building addition.

17. Provided and installed new suspended ceiling grid system in new addition.

18. Tile floor and wainscoting (both to match existing) continue straight along new hallway extension, to entrance doors, with a transition strip into new office area.

19. New office areas are painted GWB in hallways and offices.

20. All interior doors and frames received 2 finish coats per each side.

21. Provided and complete infilling, patching and painting on the window areas of the adjoining wall and the two windows in the new hallway.

22. Existing and new sheetrock received two coats of paint to match existing.

23. Existing suspended ceiling grid and tile was removed and replaced as necessary.

24. Provided and installed new vinyl base to the interior of new addition. Color to be

Johnsonite #47 Brown.

25. Provided and installed new laminated wood plank flooring throughout new addition, including closet

ELECTRICAL NOTES ( PHASE 1)

1. Provided and installed new ceiling and wall lights in room 107, per customer choice.

2. Provided and installed duplex wall receptacles in the new addition.

3. Provided and installed new light switches for the new office rooms.

4. Provided and installed new ceiling mounted, recessed, 2-T8 tube ceiling fluorescent lights with electric ballasts in the new addition.

5. Provided and installed new smoke detectors in the new addition.

6. Provided and installed new battery powered emergency lights.

7. Provided and installed new LED type exit lights.

8. Provided and installed 1 new exterior horn/strobe unit and relocate 1 existing.

9. Provided and installed new thermostats and wiring for power and controls for the HVAC system.

10. Connected power for new addition to existing 100 amp panel.

11. All circuits are fed from panel EP 7 in room 128.

ELECTRICAL NOTES (PHASE 2)

1. Provided and installed duplex wall receptacles in the new addition.

2. Provided and installed new light switches for the new office rooms.

3. Provided and installed new ceiling mounted, recessed, 2-T8 tube ceiling fluorescent lights with electric ballasts in the new addition.

4. Provided and installed new smoke detectors in the new addition.

5. Provided and installed new battery powered emergency lights.

6. Provided and installed new LED type exit lights.

7. Removed and relocated existing exterior horn/strobe unit.

8. Provided and installed one new interior strobe unit.

9. Provided and installed new thermostats and wiring for power and controls for the heating system.

10. Provided and install ed1 new 100 amp, 20 circuit branch panel w/breakers for new addition.

11. Provided and installed circuit breakers as necessary for additional circuits.

12. Provided and installed new power/COM/tel drops in the new office rooms.

13. All circuits are fed from panel EP 7 in room 128.

PHASE 1-MECHANICAL NOTES

1. Connect existing HW baseboard heating system in the adjoining room and extend throughout the new addition.

2. Provided fiberglass insulation on all new hot water piping.

3. Provided and installed non electric water valves on baseboard for temp control in new offices.

4. Provided and installed 2 new mini-split air conditioning systems for the new offices.

a. Compressors are located outside.

5. Provided and installed10” round air ducts and diffusers and extend into new offices and hallway in room 129.

6. Extended existing fire sprinkler system into new addition and extended all existing fire suppression heads into new suspended ceiling.

PHASE 2-MECHANICAL NOTES

1. Connect existing HW baseboard heating system in the adjoining room and extend throughout the new addition.

2. Provided fiberglass insulation on all new hot water piping.

3. Provided and installed non electric water valves on new baseboards for temp control in new offices.

4. Provided and installed (1) new Trane split air conditioning system for the new offices.

a. Compressor is located on roof.

b. Installed new 1” PVC condensate line for Air Handling Unit.Ttied into relocated sanitary line.

5. Provided and installed all necessary round air ducts and diffusers for new office area. Insulated new ductwork with 1-1/2 fibrous blanket.

6. Extended existing fire sprinkler system into new addition.