APHIS Global Request for Lease Proposal (RLP) R100 (May 2026).pdf
PDF 348 KB Posted
- Solicitation number
- 57-6395-25-007
About this file
RLP No. 57-6395-25-007 – USDA Real Property Lease in Bethel, Ohio
This is a General Services Administration (GSA) Request for Lease Proposals (RLP) issued by the U.S. Department of Agriculture (USDA), APHIS division, seeking office space in Bethel, Ohio. The Government requires a minimum of 11,256 to a maximum of 11,849 American National Standards Institute/Building Owners and Managers Association (ANSI/BOMA) Occupant Area (ABOA) square feet of contiguous ground floor space. The lease term must be up to 20 years with 10 years firm and Government termination rights effective after the firm term with 90 days' notice. The required area of consideration is bounded by US Highway 32 (north), US Highway 52 (south), Clermont County Line (east), and State Route 132 to Ohio Pike to Route 132 to Haskell Lane (west). Offerors must provide 0 structured/inside parking spaces and 50 surface/outside parking spaces reserved exclusively for Government use. The building must be modern, well-constructed with permanent facade materials (stone, marble, brick, stainless steel, or aluminum), or if not new, must undergo modernization or adaptive reuse prior to occupancy.
Proposals are due by 9:00 AM Central Time on August 12, 2026, submitted either by email to Grace.connolly@usda.gov or in person to USDA, APHIS, MRPBS, Realty, 250 Marquette Avenue, Suite 410, Minneapolis, Minnesota 55401. The lease is a fully serviced, turnkey offering with rent covering all lessor costs including shell upgrades, tenant improvements (TI), operating costs, real estate taxes, and security upgrades. Pricing must be submitted on GSA Form 1364 (Proposal to Lease Space) and GSA Form 1217 (Lessor's Annual Cost Statement), itemizing building shell rental, TI rate, Building Specific Amortized Capital (BSAC) rate, and operating costs per ABOA and rentable square foot (RSF). Award will be made to the lowest priced technically acceptable offer following present value price evaluation. The building must meet Energy Independence and Security Act (EISA) requirements, including ENERGY STAR® certification or applicable statutory exceptions. Comprehensive requirements include fire protection and life safety compliance (GSA Form 12000 submittal), accessibility standards, asbestos-free or undamaged non-friable conditions, environmental due diligence Phase I ESA, and NEPA compliance. The lease Contracting Officer is Brenda Santelman (Brenda.k.santelman@usda.gov, 612-336-3231); the alternate government contact is Grace Connolly (grace.connolly@usda.gov, 612-336-3259).
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSA TEMPLATE R100 (5/26)
GOVERNMENT
REQUEST FOR
LEASE PROPOSALS
NO. 57-6395-25-007
Bethel, Ohio
Offers due by
08/12/2026
In order to be considered for award, offers conforming to the requirements of the RLP must be received no later than 9 AM Central Time on the date above. See “Receipt Of Lease Proposals” herein for additional information.
This Request for Lease Proposals ("RLP") sets forth instructions and requirements for proposals for a Lease described in the RLP documents.
Proposals conforming to the RLP requirements will be evaluated in accordance with the Method of Award set forth herein to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions herein.
The information collection requirements contained in this Solicitation/Contract, that are not required by regulation, have been approved by the Office of Management and Budget pursuant to the Paperwork Reduction Act and assigned the OMB Control No. 3090-0086.
GLOBAL RLP
TABLE OF CONTENTS
GLOBAL RLP
SECTION 1 STATEMENT OF REQUIREMENTS
1.01 GENERAL INFORMATION (FEB 2026)
1.02 AMOUNT AND TYPE OF SPACE, LEASE TERM, AND OCCUPANCY DATE (FEB 2026)
1.03 AREA OF CONSIDERATION (OCT 2021)
1.04 UNIQUE REQUIREMENTS (OCT 2021)
1.05 NEIGHBORHOOD, PARKING, LOCATION AMENITIES, AND PUBLIC TRANSPORTATION (FEB 2026) INTENTIONALLY DELETED
1.06 LIST OF RLP DOCUMENTS (FEB 2026)
1.07 AMENDMENTS TO THE RLP (JUN 2012)
1.08 LEASE DESCRIPTION (FEB 2026)
1.09 RELATIONSHIP OF RLP BUILDING MINIMUM REQUIREMENTS AND LEASE OBLIGATIONS (OCT 2016)
1.10 PRICING OF SECURITY REQUIREMENTS (FEB 2026)
1.11 SECURITY LEVEL DETERMINATION FOR FACILITY HOUSING OTHER FEDERAL TENANTS (APR 2011)
1.12 AUTHORIZED REPRESENTATIVES (FEB 2026)
1.13 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE STANDARD (OCT 2023)
SECTION 2 ELIGIBILITY AND PREFERENCES FOR AWARD
2.01 EFFICIENCY OF LAYOUT (AUG 2011)
2.02 FLOODPLAINS (FEB 2026)
2.03 SEISMIC SAFETY – MODERATE SEISMICITY (FEB 2026) INTENTIONALLY DELETED
2.04 SEISMIC SAFETY – HIGH SEISMICITY (FEB 2026) INTENTIONALLY DELETED
2.05 ASBESTOS (FEB 2026)
2.06 ACCESSIBILITY (SEP 2013)
2.07 FIRE PROTECTION AND LIFE SAFETY (SEP 2013)
2.08 ENERGY INDEPENDENCE AND SECURITY ACT (FEB 2026)
2.09 ENVIRONMENTAL CONSIDERATIONS (SEP 2013)
2.10 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS - RLP (OCT 2023)
2.11 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - RLP (FEB 2026) INTENTIONALLY DELETED
SECTION 3 HOW TO OFFER
3.01 INSTRUCTIONS FOR OFFEROR AND SUBMITTALS (FEB 2026)
3.02 RECEIPT OF LEASE PROPOSALS (FEB 2026)
3.03 PRICING TERMS (FEB 2026)
3.04 BUDGET SCOREKEEPING; OPERATING LEASE TREATMENT (APR 2011)
3.05 TENANT IMPROVEMENTS INCLUDED IN OFFER (FEB 2026)
3.06 TURNKEY PRICING WITH DESIGN INTENT DRAWINGS PRIOR TO AWARD (FEB 2026) INTENIONALLY DELETED
3.07 SECURITY IMPROVEMENTS INCLUDED IN OFFER (FEB 2026) INTENTIONALLY DELETED
3.08 OPERATING COSTS REQUIREMENTS INCLUDED IN OFFER (FEB 2026)
SECTION 4 METHOD OF AWARD
4.01 NEGOTIATIONS (FEB 2026)
4.02 HUBZONE SMALL BUSINESS CONCERN PRICE PREFERENCE WAIVER (FEB 2026)
4.03 AWARD BASIS (FEB 2026)
4.04 PRESENT VALUE PRICE EVALUATION (FEB 2026)
4.05 AWARD (FEB 2026)
SECTION 5 ADDITIONAL TERMS AND CONDITIONS
5.01 MODIFIED RLP PARAGRAPHS (OCT 2016)
RLP NO. 57-6395-25-007, PAGE 1 GSA TEMPLATE R100 (5/26)
REQUEST FOR LEASE
PROPOSALS NO. 57-6395-25-007
07/13/2026
GLOBAL RLP GSA TEMPLATE R100 (FEB 2026)
SECTION 1 STATEMENT OF REQUIREMENTS
1.01 GENERAL INFORMATION (FEB 2026)
A. This Request for Lease Proposals (RLP) sets forth instructions and requirements for proposals for a Lease described in the RLP documents.
The Government will evaluate proposals conforming to the RLP requirements in accordance with the Method of Award set forth below to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions below.
B. Included in the RLP documents is a lease template setting forth the lease term and other terms and conditions of the Lease contemplated by this RLP and a GSA Proposal to Lease Space (GSA Form 1364) on which Offeror must submit its offered rent and other price data, together with required information and submissions. The Lease paragraph titled “Definitions and General Terms” must apply to the terms of this RLP.
C. Do not attempt to complete the lease template. Upon selection for award, the Government will transcribe the successful Offeror’s final offered rent and other price data included on the GSA Form 1364 into the lease and transmit the completed Lease, including any appropriate attachments, to the successful Offeror for execution. Neither the RLP nor any other part of an Offeror’s proposal must be part of the Lease except to the extent expressly incorporated therein. The Offeror should review the completed Lease for accuracy and consistency with his or her proposal, sign and date the first page, initial each subsequent page of the Lease, and return it to the Lease Contracting Officer (LCO).
D. The Offeror's executed Lease must constitute a firm offer. No Lease must be formed until the LCO executes the Lease and delivers a signed copy to the Offeror.
E. Offeror may not use Federal agency name(s) and/or acronym(s), e.g., General Services Administration, GSA, in the entity name that owns and/or leases the Space to the Government.
1.02 AMOUNT AND TYPE OF SPACE, LEASE TERM, AND OCCUPANCY DATE (FEB 2026)
A. The Government is seeking a minimum of 11,256 to a maximum of 11,849 of American National Standards Institute/Building Owners and
Managers Association (ANSI/BOMA) Occupant Area (ABOA) square feet (SF) of contiguous space within the Area of Consideration set forth below. See Section 2 of the Lease for applicable ANSI/BOMA standards.
B. The Space shall be located in a modern quality Building of sound and substantial construction with a facade of stone, marble, brick, stainless steel, aluminum or other permanent materials in good condition and acceptable to the LCO. If not a new Building, the Space offered shall be in a Building that has undergone, or will complete by occupancy, modernization or adaptive reuse for the Space with modern conveniences.
C. The Government requires 0 structured/inside parking spaces and 50 surface/outside parking spaces, reserved for the exclusive use of the
Government. These spaces must be secured and lit in accordance with the Security Requirements set forth in the Lease. Offeror must include the cost of this parking as part of the rental consideration.
D. As part of the rental consideration, the Government may require use of part of the Building roof for the installation of antenna(s). If antenna space is required, specifications regarding the type of antenna(s) and mounting requirements are included in the agency requirements information provided with this RLP.
E. The Government may provide vending machines within the Government's leased area under the provisions of the Randolph-Sheppard Act
(20 UC 107 et. seq.). If the Government chooses to provide vending facilities, the Government will control the number, kind, and locations of vending facilities and will control and receive income from all automatic vending machines. Offeror must provide necessary utilities and make related alterations. The cost of the improvements is part of Tenant Improvement (TI) costs. The Government will not compete with other facilities having exclusive rights in the Building. The Offeror must advise the Government if such rights exist.
F. The lease term must be up to 20 Years, 10 Years Firm, with Government termination rights, in whole or in parts, effective at any time after the Firm Term of the Lease by providing not less than 90 days’ prior written notice. Should the Government make the determination to modify the term, an amendment to the RLP will be issued.
1.03 AREA OF CONSIDERATION (OCT 2021)
The Government requests Space in an area bounded as follows:
North: US Hwy 32 South: US Hwy 52 East: Clermont County Line West: State Route 132 to Ohio Pike to Route 132 to Haskell LN
Buildings with Property boundary(ies) on the boundary streets are deemed to be within the delineated Area of Consideration.
RLP NO. 57-6395-25-007, PAGE 2 GSA TEMPLATE R100 (5/26)
1.04 UNIQUE REQUIREMENTS (OCT 2021)
The offered Building and/or Property must have the following features as a minimum requirement:
A. The Government’s suite must be on the ground floor
1.05 NEIGHBORHOOD, PARKING, LOCATION AMENITIES, AND PUBLIC TRANSPORTATION (FEB 2026) INTENTIONALLY DELETED
1.06 LIST OF RLP DOCUMENTS (FEB 2026)
A. The following documents are attached to and included as part of this RLP package:
DOCUMENT NAME NO. OF PAGES
Lease No. 57-6395-25-007 (Template L100) 41 Agency Specific Requirements (ASR) 10 Security Requirements for Level I 5 GSA 3516, Solicitation Provisions 8 GSA 3517B, General Clauses 33 Proposal to Lease Space (GSA Form 1364) 3 GSA Form 1217, Lessor's Annual Cost Statement 3 GSA Form 12000 for Prelease Fire Protection and Life Safety Evaluation for an Office Building (Part A or Part B) (See Section 3 for applicable requirements)
Representation Regarding Certain Telecommunications and Video Surveillance Services 4 USDA Wiring and Cabling Requirements 6 USDA APHIS Lenel Security System Requirements 1
B. INTENTIONALLY DELETED
1.07 AMENDMENTS TO THE RLP (JUN 2012)
This RLP may be amended by notice from the LCO. Amendments may modify the terms of this RLP, or the terms, conditions, and requirements of the Lease contemplated by the RLP.
1.08 LEASE DESCRIPTION (FEB 2026)
A. Offeror must examine the Lease template included in the RLP documents to understand the Government's and the Lessor's respective rights and responsibilities under the contemplated Lease.
B. The Lease contemplated by this RLP includes:
1. The term of the Lease, and renewal option, if any.
2. Terms and Conditions of the Lease, including Definitions, Standards, and Formulas applicable to the Lease and this RLP.
3. Building Shell standards and requirements.
4. Information concerning the tenant agency's buildout requirements, to be supplemented after award.
5. Security Requirements.
6. A description of all services to be provided by the Lessor.
C. Should the Offeror be awarded the Lease, the terms of the Lease must be binding upon the Lessor without regard to any statements contained in this RLP.
D. The Lease contemplated by this RLP is a fully serviced, turnkey Lease with rent that covers all Lessor costs, including all shell upgrades, TIs, operating costs, real estate taxes, and security upgrades. Rent must be based upon a proposed rental rate per Rentable Square Foot (RSF), limited by the offered rate and the maximum ABOA SF solicited under this RLP. The Tenant Improvements to be delivered by the Lessor must be based upon information provided with this RLP and Lease, including Agency Specific Requirements (ASR). The Lessor must design and build the TIs and will be compensated for the TI costs based upon turnkey pricing established under the Lease.
After award, the Lessor must prepare Design Intent Drawings (DIDs) for the leased Space conforming to the Agency Specific Requirements.
The Government will have the opportunity to review the Lessor's DIDs to determine that the Lessor's design meets the requirements of the Lease. Only after the Government approves the DIDs will the Lessor be released to proceed with buildout. The Lease also provides that the Government may modify the TI requirements, subject to the Lessor's right to receive compensation for such changes.
E. The security pricing process is described in a separate paragraph.
F. Upon completion and acceptance of the leased Space, the lease term must commence. In instances involving an incumbent Lessor where the
Government commences the lease term pending completion of TI and/or BSAC alterations, the Government must withhold TI and/or BSAC rent
RLP NO. 57-6395-25-007, PAGE 3 GSA TEMPLATE R100 (5/26)
pursuant to Section 1 of the Lease until such time as the TI and/or BSAC is completed and accepted by the Government. During the term of the Lease, rent will be adjusted for changes to the Lessor's operating costs and real estate taxes, pursuant to paragraphs set forth in the Lease.
G. Offerors are advised that doing business with the Government carries special responsibilities with respect to fire protection and life safety, and security, as well as other requirements not typically found in private commercial leases. These are set forth both in the lease template and in the GSA 3517B, General Clauses, and will be made part of the Lease.
1.09 RELATIONSHIP OF RLP BUILDING MINIMUM REQUIREMENTS AND LEASE OBLIGATIONS (OCT 2016)
The Lease establishes various requirements relating to the Building shell. Such requirements are not deemed TIs. There are certain Building requirements that are established as minimum requirements in this RLP. If the Lessor's Building does not meet the requirements at the time of award, the Lessor may still be awarded the Lease. However, as a condition of award, the Government will require Lessor to identify those Building improvements that will bring the Building into compliance with RLP requirements. Upon award of the Lease, completion of those Building improvements will become Lease obligations.
1.10 PRICING OF SECURITY REQUIREMENTS (FEB 2026)
A. The proposed Lease contains an attachment with the security requirements and obligations for the Building, which are based on the facility security level (FSL). The Federal Government determines the facility’s FSL rating, which ranges from FSL I to FSL IV. The FSL is based on client agency mix, required size of space, number of employees, use of the space, location, configuration of the site and lot, and public access into and around the facility.
B. The security requirements attached to this Lease includes a list of security countermeasures that must be installed in the leased Space.
C. There must be no charge to the Government for any items that already exist in the offered Building or facility.
1.11 SECURITY LEVEL DETERMINATION FOR FACILITY HOUSING OTHER FEDERAL TENANTS (APR 2011)
If an Offeror is offering Space in a facility currently housing a Federal agency, the security requirements of the facility may be increased and the Offeror may be required to adhere to a higher security standard than other Offerors competing for the same space requirement. If two or more Federal space requirements are being competed at the same time, an Offeror submitting on both or more space requirements may be subject to a higher security standard if the Offeror is determined to be the successful Offeror on more than one space requirement. It is incumbent upon the Offeror to prepare the Offeror’s proposal accordingly.
1.12 AUTHORIZED REPRESENTATIVES (FEB 2026)
With respect to all matters relating to this RLP, only the Government's LCO designated below must have the authority to amend the RLP and award a Lease. The Government must have the right to substitute its LCO by notice, without an express delegation by the prior LCO.
Lease LCO:
Brenda Santelman 250 Marquette Ave, Suite 410, Minneapolis, MN 55401 Phone: 612-336-3231
Email Address Brenda.k.santelman@usda.gov
As to all other matters, Offerors may contact the Alternate Government Contact designated below.
Alternate Government Contact:
Grace Connolly 250 Marquette Ave, Suite 410, Minneapolis, MN 55401 Phone: 612-336-3259 Email Address grace.connolly@usda.gov
1.13 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE STANDARD (OCT 2023)
A. The North American Industry Classification System (NAICS) code for this acquisition is 531120 (Exception).
B. The small business size standard for the applicable NAICS code is found HTTPS://WWW.SBA.GOV/SIZE-STANDARDS/.
https://www.sba.gov/size-standards/
RLP NO. 57-6395-25-007, PAGE 4 GSA TEMPLATE R100 (5/26)
SECTION 2 ELIGIBILITY AND PREFERENCES FOR AWARD
2.01 EFFICIENCY OF LAYOUT (AUG 2011)
A. In order to be acceptable for award, the offered Space must provide for an efficient layout as determined by the LCO.
B. To demonstrate potential for efficient layout, the Government may request the Offeror to provide a test fit layout at the Offeror’s expense. The
Government will advise the Offeror if the test fit layout demonstrates that the Government's requirement cannot be accommodated within the Space offered. The Offeror will have the option of increasing the ABOA square footage offered, if it does not exceed the maximum ABOA square footage in this RLP offer package. If the Offeror is already providing the maximum ABOA square footage and cannot house the Government's space requirements efficiently, then the Government will advise the Offeror that the offer is unacceptable.
2.02 FLOODPLAINS (FEB 2026)
A Lease will not be awarded for any offered Property located within a 1-percent-annual-chance floodplain (formerly referred to as 100-year floodplain) unless the Government has determined that there is no practicable alternative. An Offeror may offer less than its entire site in order to exclude a portion of the site that falls within a floodplain, so long as the portion offered meets all the requirements of this RLP and does not impact the Government’s full use and enjoyment of the Premises. If an Offeror intends that the offered Property that will become the Premises for purposes of this Lease will be something other than the entire site as recorded in tax or other property records the Offeror must clearly demarcate the offered Property on its site plan/map submissions and must propose an adjustment to property taxes on an appropriate pro rata basis. For such an offer, the Government may determine that the offered Property does not adequately avoid development in a 1-percent-annual-chance floodplain.
In addition, a Lease will not be awarded for any offered Property adjacent to a 1-percent-annual-chance floodplain, where such an adjacency would, as determined by the Government, restrict ingress or egress to the Premises in the event of a flood, unless there is no practicable alternative.
2.03 SEISMIC SAFETY – MODERATE SEISMICITY (FEB 2026) INTENTIONALLY DELETED
2.04 SEISMIC SAFETY – HIGH SEISMICITY (FEB 2026) INTENTIONALLY DELETED
2.05 ASBESTOS (FEB 2026)
A. The Government requires space with no asbestos-containing materials (ACM), or with undamaged, nonfriable ACM. For purposes of this paragraph, “space” includes the 1) space offered for lease; 2) common building area; 3) ventilation systems and zones serving the space offered;
and 4) the area above suspended ceilings and engineering space in the same ventilation zone as the space offered. Notwithstanding the preceding, if no offers are received for such space, the Government may consider space with thermal system insulation ACM (e.g., wrapped pipe or boiler lagging), which is not damaged or subject to damage by routine operations.
B. ACM is defined as any material with a trace or more of asbestos quantity present.
C. Space with ACM of any type or condition may be upgraded by the Offeror to meet conditions described in sub-paragraph A by abatement
(removal, enclosure, encapsulation, or repair) of ACM not meeting those conditions. If any offer involving abatement of ACM is accepted by the Government, the successful Offeror will be required to successfully complete the abatement in accordance with OSHA (29 CFR § 1910.1001, 29 CFR § 1926.1101), EPA (40 CFR Part 61 - National Emission Standards for Hazardous Air Pollutants and Part 763), state, and local regulations and guidance prior to occupancy.
D. Management Plan and Reinspection Report Submittals. If space is offered which contains ACM, the Offeror must submit a current asbestos management plan or operations and maintenance plan, along with a current asbestos re-inspection report (performed within the past 5 years) that includes a list of all ACM and their condition for acceptance by the Government prior to lease award. The management plan or operations and maintenance plan, and re-inspection report must conform to generally accepted industry practice in accordance with OSHA (29 CFR § 1910.1001, 29 CFR § 1926.1101), EPA (40 CFR Part 61 - National Emission Standards for Hazardous Air Pollutants and Part 763).
E. The Government reserves the right to review Offeror’s existing records for compliance.
2.06 ACCESSIBILITY (SEP 2013)
The Lease contemplated by this RLP contains requirements for Accessibility. In order to be eligible for award, Offeror must either:
A. Verify in the Lease proposal that the Building, offered Space, and areas serving the offered Space meet the Lease accessibility requirements, or
B. Include as a specific obligation in its Lease proposal that improvements to bring the Building, offered Space, and areas serving the offered
Space into compliance with Lease accessibility requirements will be completed prior to acceptance of the Space.
2.07 FIRE PROTECTION AND LIFE SAFETY (SEP 2013)
The Lease contemplated by this RLP contains Building requirements for Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System. In order to be eligible for award, Offeror must either:
RLP NO. 57-6395-25-007, PAGE 5 GSA TEMPLATE R100 (5/26)
A. Verify in the Lease proposal that the Building in which Space is offered meets the Means of Egress, Automatic Fire Sprinkler System, and Fire
Alarm System requirements of the Lease; or
B. Include as a specific obligation in its Lease proposal that improvements to bring the Building into compliance with Lease requirements will be completed prior to acceptance of the Space.
2.08 ENERGY INDEPENDENCE AND SECURITY ACT (FEB 2026)
A. The Energy Independence and Security Act (EISA) establishes requirements for Government leases relating to energy efficiency standards and potential cost-effective energy efficiency and conservation improvements.
B. Subject to the exceptions below, unless one of the statutory exceptions listed in sub-paragraph C below applies, the Government may award a lease for a Building only if the Building has earned the ENERGY STAR® label conferred by the U.S. Environmental Protection Agency (EPA) within the most recent year prior to the due date for final proposal revisions. The term “most recent year” means that the date of award of the ENERGY STAR® label by EPA must not be more than 1 year prior to the due date of final proposal revisions. For example, an ENERGY STAR® label awarded by EPA on October 1, 2023, is valid for all lease procurements where final proposal revisions are due on or before September 30, 2024. Notwithstanding the above, buildings that meet any of the following are considered as equivalent to having an Energy Star label in the most recent year, provided they achieve an ENERGY STAR® label within 18 months after occupancy by the Government:
1. All new Buildings being specifically constructed for the Government, provided they achieve an ENERGY STAR® label within 18 months after occupancy by the Government, and received the “Designed to Earn the Energy Star®” certification prior to construction;
2. All existing Buildings that have had an Energy Star® label but are unable to obtain a label in the most recent year (i.e., within 12 months prior to the due date for final proposal revisions) because of insufficient occupancy;
3. Newly built Buildings that have used Energy® Star’s Target Finder tool and either achieved a “Designed to Earn the Energy Star®” certification or received an unofficial score (in strict adherence to Target Finder’s usage instructions, including the use of required energy modeling) of 75 or higher prior to the due date for final proposal revisions and who are unable to obtain a label in the most recent year because of insufficient occupancy; or
4. An existing Building that is unable to obtain a label because of insufficient occupancy but that can produce an indication, through the use of energy modeling or past utility and occupancy data input into Energy Star’s® Portfolio Manager tool or Target Finder, that it can receive an unofficial score of 75 or higher using all other requirements of Target Finder or Portfolio Manager, except for actual data from the most recent year.
C. Subject to subparagraph D below, EISA allows a Federal agency to lease Space in a Building that does not have an ENERGY STAR® Label if:
1. No Space is offered in a Building with an ENERGY STAR® Label that meets RLP requirements, including locational needs;
2. The agency will remain in a Building it currently occupies;
3. The Lease will be in a Building of historical, architectural, or cultural significance listed or eligible to be listed on the National Register of
Historic Places; or
4. The Lease is for 10,000 RSF or less.
D. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, Offerors are required to include in their lease proposal an agreement to renovate the Building for all energy efficiency and conservation improvements that it has determined would be cost effective over the Firm Term of the Lease, if any, prior to acceptance of the Space (or not later than one year after the Lease Award Date of a succeeding or superseding lease). Such improvements may consist of, but are not limited to, the following:
1. Heating, Ventilating, and Air Conditioning (HVAC) upgrades, including boilers, chillers, and Building Automation System (BAS)
/Monitoring/Control System (EMCS).
2. Lighting Improvements.
3. Building Envelope Modifications.
E. The term "cost effective" means an improvement that will result in substantial operational cost savings to the landlord by reducing electricity or fossil fuel consumption, water, or other utility costs. The term "operational cost savings" means a reduction in operational costs to the landlord through the application of Building improvements that achieve cost savings over the Firm Term of the Lease sufficient to pay the incremental additional costs of making the Building improvements.
F. Instructions for obtaining an ENERGY STAR® Label are provided at HTTP://WWW.ENERGYSTAR.GOV/BUILDINGS/FACILITY-OWNERS-
AND-MANAGERS/EXISTING-BUILDINGS/EARN-RECOGNITION/ (use “Portfolio Manager” to apply). The ENERGY STAR® Building Upgrade Manual (HTTP://WWW.ENERGYSTAR.GOV/BUILDINGS/FACILITY-OWNERS-AND-MANAGERS/EXISTING-BUILDINGS/SAVE-ENERGY/) http://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/earn-recognition/energy-star-certification http://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/earn-recognition/energy-star-certification http://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/save-energy/comprehensive-approach/energy-star
RLP NO. 57-6395-25-007, PAGE 6 GSA TEMPLATE R100 (5/26)
and Building Upgrade Value Calculator (HTTP://WWW.ENERGYSTAR.GOV/BUILDINGS/TOOLS-AND-RESOURCES/BUILDING-UPGRADE- VALUE-CALCULATOR) are tools which can be useful in considering energy efficiency and conservation improvements to Buildings.
G. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, the successful Offeror will be excused from performing any agreed-to energy efficiency and conservation renovations, and benchmarking with public disclosure (as provided in (I) below, if it obtains the ENERGY STAR® Label prior to the Government’s acceptance of the Space (or not later than one year after the Lease Award Date for succeeding and superseding leases).
H. If no improvements are proposed, the Offeror must demonstrate to the Government using the ENERGY STAR® Online Tools why no energy efficiency and conservation improvements are cost effective. If such explanation is unreasonable, the offer may be rejected.
I. As described in Section 3 of the Lease, successful Offerors meeting one of the statutory exceptions above must agree to benchmark and publicly disclose the Building’s current ENERGY STAR® score, using EPA’s Portfolio Manager online software application. See the Lease for additional details.
J. All new Buildings being specifically constructed for the Government must achieve the ENERGY STAR® Label within 18 months after occupancy by the Government.
2.09 ENVIRONMENTAL CONSIDERATIONS (SEP 2013)
A. The Government requests space with no known hazardous conditions or recognized environmental conditions that would pose a health and safety risk or environmental liability to the Government.
B. Upon request by the Government, Offeror must provide all known previous use of the Building.
C. Offeror must indicate in its written offer any known hazardous conditions or environmental releases with/from the offered Space, Building or
Property.
2.10 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS - RLP (OCT 2023)
A. Environmental Due Diligence.
1. At the direction of the LCO, the Offeror must provide, at the Offeror’s sole cost and expense, a current Phase I Environmental Site Assessment (ESA), using the American Society for Testing and Materials (ASTM) Standard E1527-21 and timeline, as such standard may be revised from time to time. In accordance with ASTM standards, the study must be performed by an environmental professional with qualifications that meet ASTM standards. This Phase I ESA must be prepared with a focus on the Government being the “user” of the Phase I, as the term “user” is defined in E1527-21. Failure to submit the required study may result in dismissal from consideration.
2. If the Phase I ESA identifies any recognized environmental conditions (RECs), the Offeror will be responsible for addressing such RECs, at its sole cost and expense, including performing any necessary Phase II ESA (using ASTM Standard E1903-11), performing any necessary cleanup actions in accordance with federal and state standards and requirements and submitting a proposed schedule for complying with these obligations. The Government will evaluate whether the nature of any of the RECs, the results of the Phase II, any completed cleanup, and the proposed schedule meet the Government’s needs.
B. National Environmental Policy Act.
1. While the Offeror is responsible for performing all environmental due diligence studies of the offered Property, the Government is responsible for compliance with NEPA, whether in whole or in part, on its own or with the assistance of the Offerors. NEPA requires federal agencies to consider the effects of their actions on the quality of the human environment as part of the federal decision-making process and, to that end, the Government’s obligations may, and in some cases will, be augmented by the Offerors as described in greater detail in the RLP.
2. The Government may either request information from the Offerors to help it meet its obligations under NEPA or share information provided in response to this provision with federal, state and local regulatory agencies as part of its compliance responsibilities under NEPA and other applicable federal, state and local environmental laws and regulations. Further consultation with these regulatory agencies may be necessary as part of the NEPA process.
3. The Offerors are advised that the Government may be required to release the location of each offered site and other building specific information in public hearings or in public NEPA documents. By submitting an offer in response to this RLP and without the need for any further documentation, the Offeror acknowledges and consents to such release.
4. The Government reserves the right to reject any offer where (i) the NEPA-related documentation provided by the Offeror for the offered
Property is inadequate, (ii) the offer entails unacceptably adverse impacts on the human environment, (iii) the identified adverse impacts cannot be readily mitigated, or (iv) the level of NEPA analysis is more extensive than is acceptable to the Government.
5. An Offeror must allow the Government access to the offered Property to conduct studies in furtherance of NEPA compliance. This requires research and field surveys to assess the potential impacts to the natural, social and cultural environments. Any recent studies previously conducted by the Offeror may be submitted to be included in the NEPA process.
http://www.energystar.gov/buildings/tools-and-resources/building-upgrade-value-calculator http://www.energystar.gov/buildings/tools-and-resources/building-upgrade-value-calculator
RLP NO. 57-6395-25-007, PAGE 7 GSA TEMPLATE R100 (5/26)
6. The Government will not proceed with Lease award until the NEPA process is complete as evidenced by the Government’s issuance of a completed CATEX, EA or Environmental Impact Statement (EIS). Upon Lease award, any mitigation measures, whether optional or mandatory, identified and adopted by the Government will become Lease obligations. All costs and expenses for development of design alternatives, mitigation measures and review submittals for work to be performed under the Lease will be the sole responsibility of Lessor.
2.11 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - RLP (FEB 2026) INTENTIONALLY DELETED A.
SECTION 3 HOW TO OFFER
3.01 INSTRUCTIONS FOR OFFEROR AND SUBMITTALS (FEB 2026)
A. Offeror shall prepare a complete offer, using the forms provided with this RLP, and submit the completed lease proposal package to the
Government as indicated below. The Government will evaluate the offers received as outlined below and further described in this section.
B. Offeror shall also submit with its offer the following:
SUBMITTAL RLP REFERENCE
Proposal to Lease Space (GSA Form 1364) 3.03 B
Lessor’s Annual Cost Statement (GSA Form 1217) 3.03 A
Authorization to Represent Ownership (required if Offeror is not the owner) 3.01 C
Conditional Commitment of Funds 3.01 D
Local Zoning Compliance 3.01 E
Ownership Evidence 3.01 F
Agreement to Acquire an Interest in Property (required if Offeror does not have vested interest in Property) 3.01 G
Signing Authority Proof 3.01 H
Conflict of Interest, if required 3.01 I
SAM Registration 3.01 J
Fire Protection and Life Safety 3.01 K
Legal Property Description and Tax ID 3.01 L
Parking Plan and Narrative, if required 3.01 M
Architectural Plans for Building Modernization, if required 3.01 N
Asbestos Submittals, i.e., management plan, reinspection report, if required 2.05 D
Scaled Floorplan of Offered Space(s) 3.01 O
Test Fit Layout (if requested by the Government) 2.01
Disclosure of any Known Hazardous Conditions or Environmental Releases with/from Offered Space, Building or Property, if required
2.09
Vending Facilities Statement 3.01 P
Energy Star or Other Efficiency Improvements Supporting Documentation 3.01 R
Environmental Due Diligence and NEPA Documentation, if required 2.10
NHPA Documentation, if required 2.11
Hydrology Statement, if required 3.01 S
Representation Regarding Certain Telecommunications and Related Services or Equipment 3.01 T
Construction Schedule 3.01 V
Small Business Subcontracting Plan, if required for Other Than Small Business above the threshold (FAR 19.109(a)(1) (GSA Class Deviation RFO-2025-19))
1.13 & SAM
Registration
Hourly Overtime HVAC Rates, if applicable L100, Paragraph entitled “HOURLY
OVERTIME HVAC
RATES”
RLP NO. 57-6395-25-007, PAGE 8 GSA TEMPLATE R100 (5/26)
Periodic Lease Above Standard Services Rates (Other than HVAC), if applicable L100, Paragraph entitled
“PERIODIC
LEASE ABOVE-
STANDARD
SERVICES
(LASS) RATES –
OTHER THAN
HVAC”
C. Authorization to Represent Ownership. If the offeror is not the owner of the Property, authorization from the ownership entity to submit an offer on the ownership entity’s behalf.
D. Conditional Commitment of Funds. Satisfactory evidence of at least a conditional commitment of funds in an amount necessary to prepare the Space, including Shell, TI, and BSAC improvements. Such commitments shall be signed by an authorized bank officer, or other legally authorized financing official, and at a minimum shall state: amount of loan, term in years, annual percentage rate, and length of loan commitment. Alternatively, if the Offeror is self-financing, Offeror must demonstrate, to the satisfaction of the LCO, that it has adequate financial resources to self-finance the necessary improvements, e.g., income statements, cash flow statements, balance sheets, three (3) months of bank statements showing sufficient on hand stable cash reserves to fund the improvements, letter from the entity’s financial officer.
E. Local Zoning Compliance. Evidence that the Property is zoned in compliance with local zoning laws, including evidence of variances, if any, approved by the proper local authority.
F. Ownership Evidence. Evidence of ownership or control of Building or site. If the Offeror owns the Property being offered or has a long-term leasehold interest, the deed or lease must be submitted to the LCO evidencing the Offeror's stated interest in the Property and any encumbrances on the Property.
G. Agreement to Acquire an Interest in Property. If the Offeror does not yet have a vested interest in the Property, but rather has a written agreement to acquire an interest, then the Offeror shall submit a fully executed copy of the written agreement with its offer, together with a statement from the current owner that the agreement is in full force and effect and that the Offeror has performed all conditions precedent to closing, or other form of documentation satisfactory to the LCO prior to award. These submittals must remain current. The Offeror is required to submit updated documents as required.
H. Signing Authority Proof. As a condition of lease award, the Government will require one of the following forms of proof of signing authority before the Government executes the Lease:
1. Corporation. Copy of Articles of Incorporation and bylaws. In addition, a copy of the resolution, signed by the necessary directors of the corporation authorizing the corporate officer who will sign the lease to bind the corporation to the Lease.
2. Partnership. Copy of Partnership Agreement, Statement of Partnership, or Statement of Limited Partnership and evidence of authority of signatory to bind the partnership if not expressly authorized by the Partnership Agreement.
3. Limited Liability Company. Copy of the Articles of Organization and Operating Agreement. Also, evidence of the authority of the signing manager (if company is manager owned) or member (if the company is member managed) to sign, if not expressly authorized by the Articles of Organization and/or Operating Agreement.
4. Joint Venture. Copy of Joint Venture Agreement and evidence of authority of signatory to bind the Joint Venture to the Lease.
I. Conflict of Interest. If there is a potential for conflict of interest because of a single agent representing multiple owners, present evidence that the agent disclosed the multiple representation to each entity and has authorization from each ownership entity offering in response to this RLP package. Owners and agents in conflicting interest situations are advised to exercise due diligence with regard to ethics, independent pricing, and Government procurement integrity requirements. In such cases, the Government reserves the right to negotiate with the owner directly.
J. SAM Registration. The Offeror must have an active registration in the System for Award Management (SAM), via the Internet at
HTTPS://WWW.SAM.GOV/SAM/ prior to the Lease Award Date. Offerors must be registered for purposes of “All Awards,” including completion of all required representations and certifications within SAM. This registration service is free of charge.
K. Fire Protection and Life Safety (FPLS). The Offeror must submit the FPLS Information in subparagraph 1, unless the Building meets either exemption in subparagraphs 2 or 3 below.
1. FPLS Submittal Information.
a. Completed GSA Form 12000, Prelease Fire Protection and Life Safety Evaluation for an Office Building (Part A or Part B, as applicable).
b. A copy of the previous year’s fire alarm system maintenance record showing compliance with the requirements in NFPA 72 (if a system is installed in the Building).
c. A copy of the previous year’s automatic fire sprinkler system maintenance record showing compliance with the requirements in NFPA 25 (if a system is installed in the Building).
https://www.sam.gov/SAM/ https://www.sam.gov/SAM/
RLP NO. 57-6395-25-007, PAGE 9 GSA TEMPLATE R100 (5/26)
d. A valid Building Certificate of Occupancy (C of O) issued by the local jurisdiction. If the Building C of O is not available or the local jurisdiction does not issue a Building C of O, provide either:
I. A report prepared by a licensed fire protection engineer with their assessment of the Building regarding compliance with all applicable local Fire Protection and Life Safety-related codes and ordinances or, II. For offers of new construction only, documentation indicating the Building Code (including edition) to which the Building is being constructed and a written commitment to meet all of the mandatory FPLS lease requirements in the Lease.
2. If the Space offered is 10,000 RSF or less in area and is located on the 1st floor of the Building, Offeror is not required to submit to the Government the Fire Protection and Life Safety (FPLS) Submittal Information listed in 1.a through 1.d above.
3. If the Offeror provides a Building C of O obtained under any edition of the International Building Code (IBC), and the offered Space meets or will meet all the requirements of the Lease with regard to Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System prior to occupancy, then the Offeror is not required to submit to the Government the FPLS Submittal Information listed in 1 above.
L. Legal Property Description and Tax ID. The legal description of the Property and tax ID number associated with the Property, copies of prior year tax notices and prior year tax bills, as well as any other information (such as a fact sheet, 5” wide x 3” high or larger color photograph, site plan, location map, and tax parcel map) in case of multiple tax parcels for an offered Building, or multiple buildings on a tax parcel, and any other information that may affect the assessed value, in order for the Government to perform a complete and adequate analysis of the offered Property. The Offeror is to provide a detailed overview and documentation of any Tax Abatements on the Property as outlined in the “Real Estate Tax Adjustment” paragraph of the Lease.
M. Parking Plan and Narrative. A plan and short narrative as necessary to explain how the Offeror will meet the parking requirements.
N. Architectural Plans for Building Modernization. The architectural plans for modernization, if the offered Building is not a modern office Building.
O. Scaled Floorplan of Offered Space(s). Computer generated plans set to 1/8" = 1'-0" (preferred meeting sub-paragraphs 1 through 5 noted below:
1. All plans submitted for consideration shall include floor plan(s) for which Space is being offered and floor plan(s) of the floor(s) of exit discharge (e.g., street level(s)). Each plan submitted shall include the locations of all exit stairs, elevators, and the Space(s) being offered to the Government. In addition, where Building exit stairs are interrupted or discontinued before the level of exit discharge, additional floor plans for the level(s) where exit stairs are interrupted or discontinued must also be provided.
2. INTENTIONALLY DELETED
3. All architectural features of the Space shall be accurately shown. If conversion or renovation of the Building is planned, alterations to meet this RLP shall be indicated.
4. Plans shall reflect corridors in place or the proposed corridor pattern for both a typical full (single tenant) floor and/or partial (multi-tenant) floor. The corridors in place or proposed corridors shall meet local code requirements for issuance of occupancy permits.
5. The Government will review all plans submitted to determine if an acceptable level of safety is provided. In addition, the Government will review the common corridors in place and/or proposed corridor pattern to determine whether these achieve an acceptable level of safety as well as to verify that the corridors provide public access to all essential Building elements. The Offeror will be advised of any adjustments that are required to the corridors for determining the ABOA Space. The required corridors may or may not be defined by ceiling-high partitions. Actual corridors in the approved layout for the successful Offeror's Space may differ from the corridors used in determining the ABOA square footage for the lease award. Additional egress corridors required by the tenant agency’s design intent drawings will not be deducted from the ABOA square footage that the most efficient corridor pattern would have yielded.
P. Vending Facilities Statement. A statement as to whether there are existing vending facilities in the offered Building which have exclusive rights in the Building.
Q. INTENTIONALLY DELETED
R. Energy Star or Other Efficiency Improvements Supporting Documentation. No later than the due date for final proposal revisions, the Offeror must submit to the LCO:
1. Evidence of an Energy Star® label obtained within the 12 months prior to the due date of final proposal revisions,
2. Offerors falling under a statutory exception must also indicate by the due date for final proposal revisions what cost effective energy efficiency and conservation improvements they are proposing to make.
3. If no cost-effective improvements can be made, the Offeror must demonstrate to the Government using the ENERGY STAR® Online
Tools referenced in the RLP paragraph, entitled “ENERGY INDEPENDENCE AND SECURITY ACT,” why no energy efficiency and conservation improvements are cost effective. This explanation will be subject to review by the LCO. If the explanation is considered unreasonable, the offer may be considered technically unacceptable.
4. If the Offeror is claiming eligibility for additional time to obtain the Energy Star® label per sub-paragraph B of the RLP paragraph entitled
“Energy Independence and Security Act,” then the Offeror shall provide such indication with its initial offer and also must provide by the
RLP NO. 57-6395-25-007, PAGE 10 GSA TEMPLATE R100 (5/26)
due date for final proposal revisions evidence substantiating their claim for additional time to obtain the Energy Star® label and substantiating their capability of earning the Energy Star®.
S. Hydrology Statement. If more than 5,000 square feet of land area is to be disturbed in order to meet the Government’s requirements, (as more fully described in the lease paragraph named ENERGY INDEPENDENCE AND SECURITY ACT, sub-paragraph, a statement from Offeror that the Offeror is aware of and will comply with the specific Lease requirements concerning maintenance and restoration of the real property’s hydrology.
T. Representation Regarding Certain Telecommunications and Related Services or Equipment. FAR 52.240-90, Representation Regarding Certain
Telecommunications and Video Surveillance Services or Equipment, as applicable.
U. INTENTIONALLY DELETED
V. Construction Schedule. A construction schedule giving the dates on which the various phases of permitting, design and construction (including principal categories of work) will be completed to coincide with the Government's required occupancy date and the milestones as outlined under the Lease.
3.02 RECEIPT OF LEASE PROPOSALS (FEB 2026)
A. Traditional method – Paper, E-mail.
1. Offeror is authorized to transmit its lease proposal as an attachment to an email. Offeror's email must include the name, address and telephone number of the Offeror, and identify the name and title of the individual signing on behalf of the Offeror. Offeror's signed lease proposal must be saved in a generally accessible format (such as portable document format (pdf)), which displays a visible image of all original document signatures and must be transmitted as an attachment to the email. Only emails transmitted to, and received at, the Government email address identified in the RLP will be accepted. Offeror submitting a lease proposal by email must retain in its possession, and make available upon the Government's request, its original signed proposal. Offeror choosing not to submit its proposal via email may still submit its lease proposal by United States mail or other express delivery service of Offeror's choosing.
2. In order to be considered for award, offers conforming to the requirements of the RLP must be received in one of the following ways:
a. No later than 9 AM central time on the date specified below at the following designated office and address:
Date: 08/12/2026
Office: USDA, APHIS, MRPBS, Realty
Address: 250 Marquette Ave, Suite 410, Minneapolis, MN 55401
b. No later than 9 AM Central Time on the date specified below at the following email address:
Date:
08/12/2026
Email Address: Grace.connolly@usda.gov
3. Offers sent by United States mail or hand delivered (including delivery by commercial carrier) must be deemed late if delivered to the address of the office designated for receipt of offers after the date and time established for receipt of offers.
4. Offers transmitted through email must be deemed late if received at the designated email address after the date and time established for receipt of offers unless it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one Working Day prior to the date specified for receipt of proposals.
5. Offers delivered through any means authorized by the RLP may be also deemed timely if there is acceptable evidence to establish that it was received at the Government installation designated for receipt of proposals and was under the Government’s control prior to the time set for receipt of proposals; or if it was the only proposal received.
B. There will be no public opening of offers, and all offers will be confidential until the Lease has been awarded.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .