L. Instructions Conditions and Notices to Offerors- A01.pdf
PDF 172 KB Posted
- Solicitation number
- AOCSSB26R0039
- Issued by
-
Architect of the Capitol
About this file
This document is Section L (Instructions, Conditions and Notices to Offerors) from a Request for Proposal (RFP) for Facilities Management, Maintenance and Support Services for the Library of Congress Packard Campus Audio Visual Conservation (PCAVC) facility. Proposals must be submitted in two separate electronic volumes—Technical Proposal and Price Proposal—via email to troy.dorsey@aoc.gov and lily.najera@aoc.gov, with a 10 MB file size limit per submission. The Technical Proposal consists of five evaluation factors: (1) Basic Services Technical Approach (40 pages maximum) covering facilities management, operations and maintenance, and landscaping/grounds maintenance; (2) Organization, Staffing, Key Personnel and Subcontractor Management (15–25 pages) requiring organizational charts, staffing plans with position crosswalks, resumes for the Project Manager and Chief Engineer, and subcontractor management procedures; (3) Reimbursable Services Technical Approach (10 pages) addressing snow removal and reimbursable project work; (4) Corporate Resources/Management Experience (10–16 pages) documenting three to six similar past projects as prime contractor within the last five years; and (5) Past Performance evaluated through direct reference questionnaires. The Price Proposal must include an introductory letter acknowledging Collective Bargaining Agreement pricing compliance, completed SF-33 form for firm fixed price line items (001, 002, 006, 010, 014, and 018), SF-30 amendments if applicable, Schedule B pricing, the pricing spreadsheet, representations and certifications, and a certificate of liability insurance.
All proposals must use single-sided, single-spaced formatting on standard 8.5" x 11" paper with 1" margins, Times New Roman or Calibri font (12-point minimum for text, 10-point for tables), and consecutive page numbering. Key personnel resumes, supporting documentation, and cover pages do not count against page limits. The site visit is scheduled for Monday, June 15 at 10:00 AM EDT at 19053 Mt Pony Road, Culpeper, VA 22701, with registration required by Thursday, June 11 at 4:00 PM EDT (maximum three individuals per company). Written questions must be submitted by Monday, June 22 at 4:00 PM EDT. Proposals are due no later than Tuesday, July 21/29 at 2:00 PM EDT; hard copy submissions will not be accepted. The Architect of the Capitol reserves the right to request detailed pricing breakdowns and worksheets, and all AOC drawings and electronic copies are considered Controlled Unclassified Information and Law Enforcement Sensitive (CUI/LES) requiring secure transmission via SFTP or encrypted email.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Facilities Management, Maintenance and Support Services for the Library of Congress Packard Campus Audio Visual Conservation (PCAVC)
Section L Instructions, Conditions and Notices to Offerors 1
L. INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERERS
L.1 PROPOSAL COMPOSITION
1. Proposals shall be submitted in two (2) separate volumes: Technical Proposal and Price Proposal.
The two volumes must conform to Section L.2. INSTRUCTIONS FOR PREPARING THE TECHNICAL PROPOSAL, Section L.3. INSTRUCTIONS FOR PREPARING THE PRICE PROPOSAL and Section L.5 PROPOSAL DELIVERY INSTRUCTIONS.
2. The Technical Proposal and the Price Proposal volumes of each shall be submitted electronically, via email, to troy.dorsey@aoc.gov and lily.najera@aoc.gov. File size is limited to 10 MB.
Submissions exceeding 10 MB must be broken into separate files less than 10 MB each, labeled 1-of-n, and emailed separately. Volumes shall be organized in the following manner:
V ol um e 1
Te ch ni ca l P ro po sa l
Factor Title Page Limit (Not to Exceed) NA Introductory Letter NA
Basic Services – Technical Approach narrative
40 Subfactor 1 – Facilities Management Subfactor 2 – Operations & Maintenance Subfactor 3 – Landscaping, Grounds and Plant Maintenance
Narrative, Organization, Staffing, Key Personnel and Subcontractor Management
1525 Subfactor 1 – Project Organization and Staffing Plan Subfactor 2 – Key Personnel Resumes Subfactor 3 – Subcontractor Management Plan
Reimbursable Services – Technical Approach narrative
10 Subfactor 1 – Snow Removal Subfactor 2 – Projects/Reimbursable Work Efforts
Corporate Resources/Management Experience narrative
1016 Subfactor 1 – Similar Project Experience Subfactor 2 – Support Infrastructure
5 Past Performance NA – to be provided directly from past performance references
Item Description
V ol um e 1
I Pr ic e
Pr op os al
Introductory Letter to include any Pricing Assumptions or Exceptions and statement acknowledging the proposed prices for the base year reflect the pricing in the Collective Bargaining Agreement (Section J.23) per FAR 52.222-41.
SOLICITATION, OFFER, AND AWARD SF-33 (with blocks 12 through 18 completed entirely) SOLICITATION AMENDMENTS (if any) signed SF-30 Schedule B SF33 form: Firm Fixed Price line items: 001, 002, 006, 010, 014, and 018. Note: The Offeror shall note complete the remaining line items, the reimbursable services, on the
SF33.
3 Section J.22 Pricing Spreadsheet
4 Section K, REPRESENTATIONS AND
CERTIFICATIONS
Section L Instructions, Conditions and Notices to Offerors 2
5 CERTIFICATE OF LIABILITY INSURANCE
Proposals are to be formatted for single sided, single spaced pages, using standard 8 ½” x 11” size paper with a minimum of 1” margins. Pages are to be numbered consecutively. Font size shall be Times New Roman or Calibri with a minimum of 12-point size for text and 10-point size for tables and graphics.
Any content exceeding allowable page count for a factor as shown in above chart will not be evaluated. Copies of resumes, degrees, letters of commitment, certifications and licenses held by key personnel, as described in H.15.3.1 and H.15.3.2, and submitted for consideration as part of Factor 2, Subfactor 2, will not count against the 25-page limit for Factor 2. Cover pages and tables of content do not count toward the page limits.
The proposal must not merely repeat the solicitation and request for proposal (RFP) requirements, but rather must provide convincing documentary evidence in support of conclusive statements of how contract requirements will be met. There shall be no consideration of information incorporated by reference or by reiteration of the RFP.
3. Each Offeror may submit more than one (1) proposal; however, each proposal shall be configured as described above, shall be considered on its own merits as to the completeness of submission and shall not share required documentation, bonding, or other requirements of submission with any other proposal submitted by the same Offeror.
L.2 INSTRUCTIONS FOR PREPARING THE TECHNICAL PROPOSAL
L.2.1 PROPOSAL ORGANIZATION
The Technical Proposal shall be organized in accordance with the following format to facilitate evaluation by the Government:
Introductory Letter to include the following:
• RFP Number & Title;
• Name and address of Offeror;
• Dun & Bradstreet number (DUNS Number) & cage code;
• NAICS;
• Name, telephone number & e-mail address of Offeror’s main point-of-contact;
• Date of submission;
• Name, title and signature of authorized representative;
• The Offeror shall identify and explain any exceptions or deviations taken or conditional assumptions made with respect to the technical requirements of the solicitation. All technical factor assumptions to the RFP and SOW shall be identified in this letter. All pricing assumptions or exceptions shall be identified in Volume II.
Exceptions identified in other areas of the proposal will not be considered.
Factor 1 – Basic Services - Technical Approach Subfactor 1 – Facilities Management Subfactor 2 – Operations and Maintenance Subfactor 3 – Landscaping, Grounds and Plant Maintenance
Section L Instructions, Conditions and Notices to Offerors 3
Factor 2 – Organization, Staffing, Key Personnel & Subcontractor Management Subfactor 1 – Project Organization and Staffing Plan Subfactor 2 – Key Personnel Resumes Subfactor 3 – Subcontractor Management Plan
Factor 3 – Reimbursable Services - Technical Approach Subfactor 1 – Snow Removal Subfactor 2 – Projects/Reimbursable Work Efforts
Factor 4 – Corporate Resources/Management Experience Subfactor 1 – Similar Project Experience Subfactor 2 – Support Infrastructure
Factor 5 – Past Performance
L.2.2 FACTORS AND SUBFACTORS
L.2.2.1. FACTOR 1 – BASIC SERVICES - TECHNICAL APPROACH
The Offeror shall provide a narrative which discusses the processes it shall use in the implementation of the Basic Services requirements of this project. The narrative shall include specific tasks and any other items the firm deems critical to its technical approach as it relates to each performance requirement. The technical approach shall demonstrate an understanding of the range of work and describe at a minimum the general processes the firm will use to accomplish the tasks identified in the scope of work, including which tasks will be accomplished by subcontractors. The proposal shall address at a minimum each of the following performance requirements:
1. Subfactor 1 - Facilities Management (Specifically Sections C.8, C.9, C.11, C.12, C.13 & C.38): The Offeror shall explain how its team will perform facilities management for a facility of the size, scope, and complexity of the Packard Campus to include 24 hours/7 days a week/365 days per year for facility maintenance, operations, and repair as well as emergency operations, regulatory reporting, quality control, metrics and measurements, and a continuous improvement process.
2. Subfactor 2 - Operations and Maintenance (Specifically Sections C.21, C.22, C.23, C.24, C.32, C.33, C.38.19, & C.39): The Offeror shall explain how its team will perform operations and maintenance for a facility of the size, scope, and complexity of the Packard Campus to include preventative, predictive and corrective maintenance; service calls; building systems operations, monitoring and controlling to maintain critical environmental conditions; testing requirements for pressure vessels and all fire/life safety systems; indoor air quality; and operation of the waterworks.
3. Subfactor 3 - Landscaping, Grounds and Plant Maintenance (Section C.52): The offeror shall explain how its team will perform landscaping, grounds and plant maintenance to include: lawn/turf areas, meadows, sedum roofs, drainage swales, the fence line, vines, trees, shrubs, beds and decorative landscaping structures including the reflection pool and gravel/rock beds/rock walls.
L2.2.2. FACTOR 2 - ORGANIZATION, STAFFING, KEY PERSONNEL &
SUBCONTRACTOR MANAGEMENT
The Offeror shall provide an executive summary narrative which addresses the manner in which it will organize and manage the staff resources it will assign to undertake tasks performed under this contract
Section L Instructions, Conditions and Notices to Offerors 4 providing key management functions and managerial authority, including an organizational diagram. The Offeror shall include whether or not it plans to use subcontractors, include the names of subcontractors it proposes to use, and identify by discipline the services it anticipates it will subcontract.
In addition to the summarynarrative, the proposal shall specifically address, at a minimum, each of the following performance requirements:
1. Subfactor 1 - Project Organization and Staffing Plan: The Offeror shall provide an organizational chart diagram and staffing plan showing job titles, number of personnel, work days and hours, as well as absenteeism coverage.
The Offeror shall provide a crosswalk as part of its staffing plan submission. The crosswalk shall detail how the Offeror’s staffing plan meets the Government’s position requirements in Section H. The crosswalk shall include if the requirements in Section H are met by a position in the CBA, the SCA Wage determination or an Offeror’s unique labor category. If proposing to use an Offeror’s unique labor category, the Offeror shall include the position description which demonstrates how it meets the Government’s requirements. The Offeror shall initiate the conformance process after contract award for all of its unique labor categories. (For example, if the Offeror has a unique position titled “Elevator Technician” and it meets the requirements in Section H.15.4.5, then the Offeror shall detail such in its crosswalk.) See the conformance process instructions included in the SCA wage determination.
A crosswalk is required for all positions listed in H.15.4 that the Offeror will staff as part of its prime contract staff solution. For instance, if the Offeror chooses not to staff a position in Section H as prime contractor staff (J.22), then the Offeror shall not provide a crosswalk for that position.
The below table is an example of a crosswalk.
Section H Position Requirement
SCA Name and Occupation Code
CBA Name Offeror’s Position Name
Job Description if using an Offeror Position
Enter Section H Requirement
Enter None if no SCA position description fits Section H requirements. Enter Yes and SCA Name & Occupation Code if SCA position meets Section H requirements.
Enter None if no CBA position description fits Section H requirements. Enter Yes and CBA Name if CBA position meets Section H requirements.
Enter labor category name if an Offeror’s unique labor category meets the Section H requirement. Note:
The Conformance Process is required if an Offeror’s Position is used for positions in H.15.4.
Offeror fills in this block with its position description.
H.15.4.5 Elevator Repairer
None None Elevator Technician The individual proposed is a certified elevator technician (CET) by the National Association of Elevator Contractors (NAEC) and is licensed as a Certified Elevator Mechanic by the Commonwealth of VA.
H.15.4.9 General Maintenance Worker
None Yes, General Maintenance Worker
None None
Section L Instructions, Conditions and Notices to Offerors 5
H.15.4.16 Plumber, Maintenance
Plumber, Maintenance & 23810
None None None
2. Subfactor 2 - Key Personnel Resumes: The Offeror shall provide resumes for the Project Manager and Chief Engineer that will be assigned to this project. The resumes shall demonstrate the proposed staff experience and qualifications meet or exceed those identified in Section H.15.3. A signed letter of commitment must be included with the Offeror’s technical response to the RFP from the proposed Project Manager and Chief Engineer. In accordance with AOC52.211-1 the contractor shall attach the Key Personnel contract clause and the accompanying Approval of Substitute Personnel contract clause. The Key Personnel clause requires the accepted Key Personnel to remain on contract for the first 90 days, barring death, illness or termination of employment. The substitution clause requires advance approval of substitution of personnel prior.
3. Subfactor 3 - Subcontractor Management Plan: The Offeror shall provide a subcontractor management plan that includes detailed information on work to be subcontracted; procedures for monitoring and controlling the work; and effective subcontract management procedures and performance assurances.
L2.2.3. FACTOR 3 – REIMBURSABLE SERVICES – TECHNICAL APPROACH
The Offeror shall provide a narrative which discusses the processes it shall use in the implementation of the Reimbursable Services requirements of this project. The narrative shall include specific tasks and any other items the firm deems critical to its technical approach as it relates to each performance requirement.
The technical approach shall demonstrate an understanding of the range of work and describe at a minimum the general processes the firm will use to accomplish the tasks identified in the scope of work including which tasks will be accomplished by subcontractors. The proposal shall address at a minimum each of the following performance requirements:
1. Subfactor 1 - Snow and Ice Removal (Section C.51): The Offeror shall explain how its team will perform snow removal to include: snow and ice removal for roads, parking areas, sidewalks and landings; surface treatments; and snow stockpiling.
2. Subfactor 2 –Projects/Reimbursable Work Efforts (Section C.53.3): The Offeror shall explain how its team will implement reimbursable project work to include consulting services;
engineering studies; architect-engineer design services; commissioning; testing; construction or construction management; painting; equipment or system procurement, rental, repair, modification, alteration, replacement or disposal; and other reimbursable products or services.
L2.2.4. FACTOR 4 - CORPORATE RESOURCES/MANAGEMENT EXPERIENCE
1. Subfactor 1 - Similar Project Experience: The Offeror shall provide a narrative describing the experience and qualifications of the Offeror in managing and providing facilities management, maintenance and support services similar in scope, size, and complexity and involving tasks similar to those described in Section C of the RFP. The Offeror shall provide a listing of a minimum of three (3) but not more than six (6) past projects/contracts, where it has served as the prime contractor, during the last five (5) years. For each project/contract listed, provide the following:
• contract number;
• start date/completion date (dates - month/year);
• project/contract description;
Section L Instructions, Conditions and Notices to Offerors 6
• client agency/company;
• technical point of contact;
• current phone number and/or email address for point of contact;
• amount of contract (award amount and final amount); and
• relevance of experience to this project.
Each of the narratives shall correspond to references provided for Factor 5 Past Performance.
2. Subfactor 2- Support Infrastructure: The offeror shall provide evidence of corporate level infrastructure to ensure successful project startup and operations to include: project oversight by corporate sponsor; human resources; contract management; and safety program.
L2.2.5. FACTOR 5 - PAST PERFORMANCE
Section J, Attachment 21, AOC PAST PERFORMANCE QUESTIONNAIRE shall be provided to each of the companies/agencies submitted by the Offeror in response to Evaluation Factor 54. The completed questionnaire shall be sent directly to the Contracting Officer as indicated on the questionnaire by the date and time established for receipt of offers in order to be considered in the evaluation process. A neutral rating will be applied for those projects/contracts for which a questionnaire is not received.
The Government reserves the right to use other sources for past performance.
L.3 INSTRUCTIONS FOR PREPARING THE PRICE PROPOSAL
The Price Proposal will be submitted with the required documents in the following order:
1. Introductory letter to include the following:
a. Statement acknowledging the proposed prices for the base year reflect the pricing in the
Collective Bargaining Agreement (Attachment J.23) per FAR 52.222-41.
b. Any Pricing Assumptions or Exceptions.
2. The SF-33 “SOLICITATION, OFFER, AND AWARD” (with blocks 12 through 18 completed entirely )
3. SF-30 AMENDMENTS (if any) signed
4. Schedule B- Firm Fixed Price line items: 001, 002, 006, 010, 014 and 018. Note: The Offeror shall not complete the remaining line items- the reimbursable services, on Schedule B.
5. Completed PRICING SPREADSHEET (J.22)
6. Section K, REPRESENTATIONS AND CERTIFICATIONS; and
7. CERTIFICATE OF LIABILITY INSURANCE.
The Architect of the Capitol reserves the right to request from each Offeror information regarding the breakdown of all prices that are included in the total price, to include copies of all work sheets used in forming the proposed pricing.
Representations and certifications, with applicable information included in the spaces provided, shall be included as a part of the Price Proposal.
L.4. CONTROLLED UNCLASSIFIED INFORMATION AND LAW ENFORCEMENT
SENSITIVE (CUI/LES)
Section L Instructions, Conditions and Notices to Offerors 7
Unless otherwise directed in writing, the Contractor shall consider all AOC drawings and electronic copies at a minimum to be Controlled Unclassified Information and Law Enforcement Sensitive (CUI/LES). The Contractor may transmit documents electronically using secure file transfer protocol (SFTP) or encrypted electronic mail only if the AOC’s security specification is followed.
Section J Attachments marked //CONTROLLED// contain CUI/LES. To receive a copy of the Section J Attachments, Offerors shall send an email to troy.dorsey@aoc.gov and lily.najera@aoc.gov requesting access to the SFTP site. All contractors and individuals in receipt of CUI are bound by the handling and safeguarding procedures of AOC Order 42-4 Security of Controlled Unclassified Information (J Attachment J.31).
L.5 PROPOSAL DELIVERY INSTRUCTIONS
A site visit will be held at the Packard Campus on the day and time noted in the L.5.1 Proposal timeline table below. The site is located at 19053 Mt Pony Road, Culpeper, VA, 22701. In order to attend the site visit, the Offeror shall register with the Contracting Officer via email at troy.dorsey@aoc.gov and lily.najera@aoc.gov. There is a maximum of three (3) individuals per company. The information required to be submitted to the Contracting Officer shall be each individual’s name and company. This information is due to the Contracting Officer no later than the day and time noted in the L.5.1 Proposal timeline table below. On the day of the site visit, individuals are to report to the Packard Campus, go through the security check-in, and wait in the lobby. The site visit will commence from there.
Questions regarding the solicitation are due in writing to the Contracting Officer, via email at troy.dorsey@aoc.gov and lily.najera@aoc.gov, no later than the day and time noted in the L.5.1 Proposal timeline table below. Questions received after this time may not be answered. Verbal questions will not be answered. This date and time supersedes the date and time listed in AOC52.215-2.
The Contractor’s proposal shall be submitted in two separate volumes: Technical and Price. The proposals shall be submitted electronically, via email to troy.dorsey@aoc.gov and lily.najera@aoc.gov.
File size is limited to 10 MB. Submissions exceeding 10 MB must be broken into separate files less than 10 MB each, labeled 1-of-n, and emailed separately. Electronic copies of proposals are due no later than the day and time noted in the L.5.1 Proposal timeline table below. Hard copy proposals mailed or dropped off at the AOC will not be accepted.
L.5.1 Proposal timeline
Date: Time:
Site-visit registration No Later Than Thursday June 11 4:00PM EDT
Site-visit On Monday June 15 10:00AM EDT Requests for Information (RFI) submission No Later Than Monday June 22 4:00PM EDT Proposal submission No Later Than Tuesday July
2:00PM EDT
END OF SECTION L
File details come from the government source that posted it. Updated .