J.1.2 Quality Assurance Surveillance Plan.pdf

PDF 139 KB Posted

Attached to
Automatic Door Operator (ADO) Inspection and Maintenance Program
Solicitation number
Not on record
Issued by

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for the Automatic Door Operator (ADO) Inspection and Maintenance Program for the Architect of the Capitol (AOC) Senate Office Buildings.

The contract requires the contractor to inspect, calibrate, and perform preventive maintenance on automatic door operator units in the Hart, Dirksen, and Russell Senate Office Buildings once every twelve months following a government-approved rotation schedule. Each maintenance visit must include sensor alignment, force-gauge testing, firmware checks (if applicable), lubrication, visual inspection, and ADA functionality verification. Service Tickets must be submitted within forty-eight hours of visit completion. The contractor must ensure all ADO units remain fully operational and compliant with ADA Accessibility Guidelines (ADAAG 404), ANSI/BHMA A156.10 standards, and applicable AOC safety policies. The standard for downtime during scheduled maintenance is set at 99.2% operational availability. Preventive maintenance must be performed in accordance with manufacturer manuals one hundred percent of the time, and all warranty requirements must be met. The contractor must maintain sufficient parts availability to support continuous operation and provide documented preventive maintenance records, inspection reports, and parts inventory lists as deliverables.

The QASP establishes the government's surveillance methodology using a Surveillance Matrix that specifies inspection procedures, acceptance quality levels, and performance ratings (Exceptional, Very Good, Satisfactory, Marginal, or Unsatisfactory). Surveillance methods include 100% document review, continuous observation, on-site periodic inspections, visual inspections, and customer feedback analysis. The Contracting Officer is Tatjana Johnson (202.262.0934; tatjana.johnson@aoc.gov), and the Contracting Officer's Representative is Andre Curtis III (202.549.2408; andre.curtis@aoc.gov). The contractor's Program Manager and Lead Technician positions are designated as "TBD."

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

November 2026

Automatic Door Operator (ADO) Inspection and Maintenance Program

Quality Assurance Surveillance Plan (QASP)

Architect of the Capitol (AOC) Senate Office Buildings

Vision

The Architect of the Capitol (AOC) is responsible for ensuring that the Hart, Dirksen, and Russell Senate Office Buildings (SOBs) building systems are maintained in a safe, reliable, and compliant condition. ADO units must remain fully operational and compliant with ADA Accessibility Guidelines (ADAAG 404), ANSI/BHMA A156.10 standards, and all applicable AOC safety policies. A structured, performance-based maintenance program is required to reduce system downtime, ensure regulatory compliance, and protect occupant safety.

Mission

Inspect, calibrate, and perform preventive maintenance on each ADO once every twelve (12) months following the Government‑approved rotation schedule. Each visit must include sensor alignment, force‑gauge testing, firmware checks (if applicable), lubrication, visual inspection, and ADA functionality verification.

Submit Service Tickets within forty‑eight (48) hours of visit completion.

Purpose

This Quality Assurance Surveillance Plan is a government-developed document used to determine if the contractor’s performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the detailed process for a continuous oversight process:

• What will be monitored

• How monitoring will take place

• Who will conduct the monitoring

• How monitoring efforts and results will be documented

The contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QASP provides the structure for the government’s surveillance of the contractor’s performance and their Quality Assurance/Quality Control (QA/QC) actions to ensure they meet contract standards. It is the government’s responsibility to be objective, fair and consistent in evaluating contractor performance.

The QASP is not part of the contract nor is it intended to duplicate the contractor’s quality control plan. This QASP is a living document. Flexibility in QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.

The government may provide a copy of the QASP to the contractor to facilitate open communication. In addition, the QASP should recognize that unforeseen or uncontrollable circumstances might occur that are outside the control of the contractor.

Overall, the QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.

Roles and Responsibilities

The following personnel shall oversee and coordinate surveillance activities.

Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship.

The CO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.

Assigned CO: Tatjana Johnson Telephone: 202.262.0934 Email: tatjana.johnson@aoc.gov

Contracting Officer’s Representative (COR) The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR uses the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the CO. The COR is required to provide an annual performance assessment for the CO which will be used in documenting past performance. The QASP is the primary tool for surveillance of the contractor’s quality program and helps the COR to document contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.

Assigned COR: Andre Curtis III Telephone: 202.549.2408 Email: andre.curtis@aoc.gov

Other Key Government Personnel

John Livingston

202.225.4141/ 202.734.0359 John.Livingston@aoc.gov

Eugene Henry

202.297.9853 eugene.henry@aoc.gov

Contractor Representatives

The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract.

Contractor Program Manager (PM) - TBD

Contractor Lead Technician (LT) - TBD

1. Performance Requirements and Method of Surveillance

1.1. Contract Surveillance

The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The COR’s contribution is their professional, non-adversarial relationships with the KO and the contractor, which enables positive, open and timely communications. The foundation of this relationship is built upon objective, fair, and consistent COR evaluations of contractor performance against contract requirements. The COR uses the methods contained in this QASP to ensure the contractor is following contract requirements. The COR function is responsible for a range of surveillance requirements that effectively measure and evaluate the contractor’s performance. Additionally, this QASP is based on the premise that the contractor, not the government, is responsible for management and QC/QA actions to successfully meet the terms of the contract.

1.2. Surveillance Matrix

The Surveillance Matrix (see sample at Attachment 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance and frequency the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.

Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The Performance Requirement Summary (PRS) should be used to form the foundation of the COR’s inspection checklist.

1.3. Performance Rating Definitions

The performance ratings below reflect definitions at FAR 42.1503 Table 42-1. The COR will use these ratings to evaluate the quality of contractor’s performance.

Performance Rating

Definition

Exceptional Performance meets contractual requirements and exceeds many to the government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal Performance does not meet some contractual requirements.

The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements, and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

1.4. Methods of Surveillance include but are not limited to:

* 100% Inspection - This is an inspection method whereby all outputs are monitored. This method provides the best indication of contractor performance and the most documented basis for determining contract payment actions. However, it requires extensive COR resources, and therefore, is not practical for most service requirements. 100 percent inspection is preferred when the PWS requirement is so critical that nonperformance would pose a direct risk to the safety of personnel or property, or when the work occurs infrequently and the output population is small.

* Random Sampling - When a service is performed relatively frequently and a statistically valid sample can be selected for audit. The most appropriate method for frequently recurring tasks. Random Sampling is a means of evaluation by observing or inspecting some part (a sample), but not all, of a population or lot of the contract requirements, to assist the government with determining whether standards set forth in the contract have been met. This tool is not the Contracting Officer’s only option nor is it mandatory.

* Periodic Sampling - This method, sometimes called "planned inspection," consists of the evaluation of tasks selected on other than a 100 percent or random basis. It may be appropriate for tasks that occur infrequently, and where 100 percent inspection is neither required nor practical. A predetermined plan for inspecting part of the work is established using subjective judgment and analysis of agency resources to decide what work to inspect and how frequently to inspect it.

* Customer Feedback – Not necessarily a valid method of surveillance, but a good indicator for areas surveillance should be conducted or intensified. The COR may design a customer survey questionnaire to be used as an essential part of a well publicized customer complaint program. In time of resource constraints, the use of customer surveys provides an effective and efficient means of monitoring contractor performance. Customer surveys should only supplement other surveillance efforts and be analyzed by surveillance personnel trained in validating customer complaints. Customers should be made aware of minimal contractor performance requirements to be sure that customer responses to surveys are valid indicators of actual contractor performance. The COR must investigate each customer’s complaint and validate the accuracy before any action is taken.

Performance Reporting

• Inspection Reports

• Service Tickets

Appendix 1 - Surveillance Matrix

Statements Standards/AQLs Inspections Ratings C.3.1 Maintain and repair ADO doors for the Dirksen, Hart, Russell

C.3.1.1 The Contractor shall inspect, maintain, and test that all ADO doors remain fully operational and compliant with ADA Accessibility Guidelines.

Deliverables:

A01 Reports

a) Standard commercial practice for the specific ADO system, consistent with technical standards.

b) Downtime for required schedule maintenance is met AQL: 99.2% of the time

What: ADO door documents

How: 100% review of documents continuous observation

Customer feedback trouble reports

Who: Users, Technical engineers, and COR

C.3.1.2 The Contractor shall conduct preventive maintenance for ADO units.

a) Preventive maintenance performed IAW the manufacturer's manual 100% of the time

b) Meets all warranty requirements

What: Preventive Maintenance Records Reports Inspection Deficiency Write-up resolutions

How: Records and Visual Inspection On-site periodic inspections

Who: Contractor Technician

Inspection Metrologies:

M1: Inspection of Reports. All reports shall be reviewed upon receipt. The reviewer will report any flaws in the document and categorize the flaws (Editorial, Format, and/or Substance).

C.3.1.3 The Contractor shall assure parts availability for continuous operation.

Deliverables:

A02 Parts Inventory List

a) Sufficient parts are available to support the required and mandated parts list

What: Parts Inventories Availability Records

How: Records and Visual Inspection On-site periodic inspections

Frequency: After completion of each inventory

Who: Technicians for parts

Standard(s): Inspection applies to all standards

Vision
Mission
Purpose
Roles and Responsibilities
1. Performance Requirements and Method of Surveillance
1.1. Contract Surveillance
1.2. Surveillance Matrix
1.3. Performance Rating Definitions
1.4. Methods of Surveillance include but are not limited to:
Performance Reporting
Inspection Reports
Service Tickets
Appendix 1 - Surveillance Matrix