Annual Boiler Inventory and Testing Forms.xlsx
XLSX spreadsheet 2 MB Posted
- Attached to
- Preventative Annual Maintenance and Testing of Oil-fired Boilers and Water Heater Systems
- Solicitation number
- 70Z03525QKET0028
About this file
This file contains annual boiler inventory and testing forms for multiple oil-fired boilers and water heater systems at USCG Base Ketchikan, along with a related solicitation (70Z03525QKET0028) for preventative maintenance services.
The solicitation seeks preventative annual maintenance and testing services for these systems in accordance with manufacturer specifications, NFPA 31 and 40 CFR Part 63 Subpart J. The work is set aside 100% for small businesses under NAICS 238220 ($19M size standard). Quotes are due by January 29, 2025 at noon AKST, with award anticipated by February 3, 2025. This will be a firm-fixed-price purchase order awarded on a Lowest Price Technically Acceptable basis. The inventory forms detail approximately 20 boiler systems across various buildings including Administration, Clinic, Club/Galley, CO's Quarters, Armory, Industrial Building, Warehouse, and others, with specific information about each unit's make/model, serial numbers, burner assemblies, nozzle sizes, and filter elements. The forms also include NESHAP boiler tune-up procedures and emissions testing requirements for each unit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Clauses.pdf | ||
| SOW - Upper and Lower Base Annual Boiler Maintenence 2025.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Donavan May
OIL-FIRED EQUIPMENT
LOCATION UNIT ID HEAT EXCHANGING DEVICE MODEL / SERIAL BURNER ASSEMBLY MODEL / SERIAL NOZZLE SIZE FILTER HOUSING / ELEMENT
| Administration Building | Admin #1 | Weil‐McLain | 588 / Unknown | Gordon-Piatt | R8.2-0-07 / 040224-0000 | (2) 2.50 x 80° B | Racor 1050 / 2020PM-OR |
| Administration Building | Admin #2 | Weil‐McLain | 94 / Unknown | Gordon-Piatt | WR8.2-0-07 / 090128-0000 | (2) 2.75 x 80° B | SHARED WITH ABOVE |
| Clinic | Clinic #1 | Weil‐McLain | P-768 V-W / CP 2102700 | Beckett | AFG / MP1192 | (1) 2.00 x 60° B | General 2A-700A / 2A-710 |
| Clinic | Clinic #2 | Weil‐McLain | P-768 V-W / CP 2102699 | Beckett | AFG / AH25212 | (1) 2.00 x 60° B | SHARED WITH ABOVE |
| Club/Galley | Club/Galley #1 | Weil‐McLain | A/B 868 / CP 2019971 CP 2091085 | Beckett | AFG / CP 2098984 | (1) 1.50 x 60° B | Racor 1050 / 2020PM-OR |
| Club/Galley | Club/Galley #2 | Weil‐McLain | A/B 868 / CP 2019956 CP 2091105 | Beckett | AFG / CP 2098985 | (1) 1.50 x 60° B | SHARED WITH ABOVE |
| Club/Galley | Club/Galley #2 | Bradford White Corp. | CF-100-350-3A / HJ15499184 | Beckett | SF / 11050-10002 | (1) 2.50 x 80° B | SHARED WITH ABOVE |
CO's Quarters CO's #1 Weil‐McLain 68 / Unknown Beckett AFG / Unknown (1) .85 x 70° A General / RF-1
D17 Armory Armory #1 Weil‐McLain P-WTGO-3 / CP 4153849 Beckett AFG / 010328-95838 (1) .85 x 70° B General 2A-700 / 2A-710
| Industrial Building | Industrial #1 | Weil‐McLain | 580 / Unknown | Beckett | CF800 / 060724-92386 | (1) 3.50 x 60° B | Racor 1050 / 2020PM-OR |
| Industrial Building | Industrial #2 | Weil‐McLain | 580 / Unknown | Beckett | CF800 / 060418-96671 | (1) 3.50 x 60° B | SHARED WITH ABOVE |
| Industrial Building | Industrial #3 | Weil‐McLain | 580 / Unknown | Beckett | CF800 / 060309-50069 | (1) 3.50 x 60° B | SHARED WITH ABOVE |
| Industrial Paint Booth (Large) | Paint Booth #1 | Industrial Commercial Equipment | GIDM-500 / 6239A | Power Flame | CR2 / 010932577 | Unknown | Unknown / Baldwin BF915 |
| Industrial Paint Booth (Small) | Paint Booth #2 | Weather Rite | ID 125 HH / 54418 | Power Flame | CR2-OB / 109991625 | Unknown | Unknown / NAPA 4348 |
| MAT/HazWaste | MAT #1 | Burnham | V1104H / 65356987 | Power Flame | CR1-0 / 081454847 | Unknown | COMBU 70101 / Unknown |
| MAT/HazWaste | MAT #2 | Burnham | V1104H / 65356988 | Power Flame | CR1-0 / 081454848 | Unknown | COMBU 70101 / Unknown |
Station Boathouse Boathouse #1 Weil‐McLain P-WTGO-5 / Unknown Beckett AFG / 02025-33762 (1) 1.20 x 70° B General 2A-700 / 2A-710
| UPH | UPH #1 | Weil‐McLain | BL-476-WS / Unknown | Weil‐McLain | EH / Unknown | (1) 1.50 x 60° B | Goldenrod DN496-5 /Unknown |
| UPH | UPH #2 | Weil‐McLain | BL-476-WS / Unknown | Weil‐McLain | EH / Unknown | (1) 1.50 x 60° B | SHARED WITH ABOVE |
| Warehouse | Warehouse #1 | Burnham | V904 / 7595848 | Beckett | CF 500 / Unknown | (1) 2.0 x 60° B | General 2A-700 / 2A-710 |
| Warehouse | Warehouse #2 | Burnham | V904 / 7595850 | Beckett | CF 500 / Unknown | (1) 2.0 x 60° B | General 2A-700 / 2A-710 |
Boiler Inventory
| SAM ID No. | LOCATION | UNIT ID | HEAT EXCHANGING DEVICE (HED) | HED MODEL No. | HED SERIAL NUMBER | BURNER ASSEMBLY | BA MODEL | BA SERIAL No. | NOZZLE SIZE | FILTER HOUSING / ELEMENT |
| 117675 | Administration Building | Admin #1 | Weil‐McLain | 588 | Unknown | Gordon-Piatt | R8.2-0-07 | 040224-0000 | (2) 2.50 x 80° B | Racor 1050 / 2020PM-OR |
| 117679 | Administration Building | Admin #2 | Weil‐McLain | 94 | Unknown | Gordon-Piatt | WR8.2-0-07 | 090128-0000 | (2) 2.75 x 80° B | SHARED WITH ABOVE |
| 118007 | Clinic | Clinic #1 | Weil‐McLain | P-768 V-W | CP 2102700 | Beckett | AFG | MP1192 | (1) 2.00 x 60° B | General 2A-700A / 2A-710 |
| 118008 | Clinic | Clinic #2 | Weil‐McLain | P-768 V-W | CP 2102699 | Beckett | AFG | AH25212 | (1) 2.00 x 60° B | SHARED WITH ABOVE |
| 117866 | Club/Galley | Club/Galley #1 | Weil‐McLain | A/B 868 | CP 2019971 / CP 2091085 | Beckett | AFG | CP 2098984 | (1) 1.50 x 60° B | Racor 1050 / 2020PM-OR |
| 117865 | Club/Galley | Club/Galley #2 | Weil‐McLain | A/B 868 | CP 2019956 / CP 2091105 | Beckett | AFG | CP 2098985 | (1) 1.50 x 60° B | SHARED WITH ABOVE |
| 117864 | Club/Galley | Club/Galley #3 | Bradford White Corp. | CF-100-350-3A | HJ15499184 | Beckett | SF | 11050-10002 | (1) 2.50 x 80° B | SHARED WITH ABOVE |
| 117611 | CO's Quarters | CO's #1 | Weil‐McLain | 68 | Unknown | Beckett | AFG | Unknown | (1) .85 x 70° A | General / RF-1 |
| 117937 | D17 Armory | Armory #1 | Weil‐McLain | P-WTGO-3 | CP 4153849 | Beckett | AFG | 010328-95838 | (1) .85 x 70° B | General 2A-700 / 2A-710 |
| 118004 | Industrial Building | Industrial #1 | Weil‐McLain | 580 | Unknown | Beckett | CF800 | 060724-92386 | (1) 3.50 x 60° B | Racor 1050 / 2020PM-OR |
| 118013 | Industrial Building | Industrial #2 | Weil‐McLain | 580 | Unknown | Beckett | CF800 | 060418-96671 | (1) 3.50 x 60° B | SHARED WITH ABOVE |
| 118014 | Industrial Building | Industrial #3 | Weil‐McLain | 580 | Unknown | Beckett | CF800 | 060309-50069 | (1) 3.50 x 60° B | SHARED WITH ABOVE |
| 22667-1 | Industrial Paint Booth (Large) | Paint Booth #1 | Industrial Commercial Equipment | GIDM-500 | 6239A | Power Flame | CR2 | 10932577 | Unknown | Unknown / Baldwin BF915 |
| 22667-2 | Industrial Paint Booth (Small) | Paint Booth #2 | Weather Rite | ID 125 HH | 54418 | Power Flame | CR2-OB | 109991625 | Unknown | Unknown / NAPA 4348 |
| 194632 | MAT/HazWaste | MAT Boiler #1 | Burnham | V1104H | 65356987 | Power Flame | CR1-0 | 81454847 | Unknown | COMBU 70101 / Unknown |
| 194633 | MAT/HazWaste | MAT Boiler #2 | Burnham | V1104H | 65356988 | Power Flame | CR1-0 | 81454848 | Unknown | COMBU 70101 / Unknown |
| 117638 | Station Boathouse | Boathouse #1 | Weil‐McLain | P-WTGO-5 | Unknown | Beckett | AFG | 02025-33762 | (1) 1.20 x 70° B | General 2A-700 / 2A-710 |
| 116745 | UPH | UPH #1 | Weil‐McLain | BL-476-WS | Unknown | Weil‐McLain | EH | Unknown | (1) 1.50 x 60° B | Goldenrod DN496-5 /Unknown |
| 116757 | UPH | UPH #2 | Weil‐McLain | BL-476-WS | Unknown | Weil‐McLain | EH | Unknown | (1) 1.50 x 60° B | SHARED WITH ABOVE |
| 118353 | Warehouse | Warehouse #1 | Burnham | V904 | 7595848 | Beckett | CF 500 | Unknown | (1) 2.0 x 60° B | General 2A-700 / 2A-710 |
| 118355 | Warehouse | Warehouse #2 | Burnham | V904 | 7595850 | Beckett | CF 500 | Unknown | (1) 2.0 x 60° B | General 2A-700 / 2A-710 |
Industrial #1 Building: Industrial Boiler Room
Unit ID: Industrial #1
Make/Model: Weil-McLain, Series 80, 580 boiler
MMBtu/Hr: 0.62 MMBtu/hr
Nozzle Size: (1) 3.50 x 60° B
Filter/Element: Racor 1050 / 2020PM-OR
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary. | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler. | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
Warehouse #1 Building: Warehouse
Unit ID: Warehouse Boiler #1
Make/Model: Burnham Boiler
MMBtu/Hr: 0.49 MMBtu/hr
Nozzle Size: (1) 2.0 x 60° B
Filter/Element: General 2A-700/2A-710
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
Warehouse #2 Building: Warehouse
Unit ID: Warehouse Boiler #2
Make/Model: Burnham / V904
MMBtu/Hr: 0.49 MMBtu/hr
Nozzle Size: (1) 2.0 x 60° B
Filter/Element: General 2A-700 / 2A-710
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
Industrial #2 Building: Industrial Boiler Room
Unit ID: Industrial Boiler #2
Make/Model: Weil-McLain, Series 80, 580 boiler
MMBtu/Hr: 0.62 MMBtu/hr
Nozzle Size: (1) 3.50 x 60° B
Filter/Element: Racor 1050 / 2020PM-OR
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary. | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler. | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
Industrial #3 Building: Industrial Boiler Room
Unit ID: Industrial Boiler #3
Make/Model: Weil-McLain, Series 80, 580 boiler
MMBtu/Hr: 0.62 MMBtu/hr
Nozzle Size: (1) 3.50 x 60° B
Filter/Element: Racor 1050 / 2020PM-OR
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
Admin Bldg #1 Building: Admin Building Boiler Room
Unit ID: Admin Boiler #1
Make/Model: Weil-McLain, 588
MMBtu/Hr: 1.3 MMBtu/hr
Nozzle Size: (2) 2.75 x 80° B
Filter/Element: Racor 1050 / 202PM-OR
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
Admin Bldg #2 Building: Admin Building Boiler Room
Unit ID: Admin Boiler #2
Make/Model: Weil-McLain, 588
MMBtu/Hr: 1.3 MMBtu/hr
Nozzle Size: (2) 2.50 x 80° B
Filter/Element: Racor 1050 / 2020PM-OR
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary. | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
Barracks #1 Building: Barracks UPH Boiler Room
Unit ID: Barracks Boiler #1
Make/Model:
MMBtu/Hr:
Nozzle Size:
Filter Type:
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
Barracks #2 Building: Barracks UPH Boiler Room
Unit ID: Barracks Boiler #2
Make/Model:
MMBtu/Hr:
Nozzle Size:
Filter/Element:
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
Armory #1 Building: D17 Armory Boiler Room
Boiler ID: Armory Boiler #1
Make/Model: Weil-McLain GOLD / P-WTGO-3
MMBtu/Hr: 0.16 MMBtu/hr
Nozzle Size: (1) .85 x 70° B
Filter/Element: General 2A-700 / 2A-710
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
CO House #1 Building: CO Quarters Boiler Room
Unit ID: CO's Boiler #1
Model: Weil-McLain GOLD Boiler / #68
MMBtu/Hr: 0.18 MMBtu/hr
Nozzle Size: (1) 85 x 70° A
Filter/Element: General / RF-1
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
Boathouse #1 Building: Station Boathouse Boiler Room
Unit ID: Boathouse #1
Make/Model: Weil-McLain GOLD / P-WTGO-5
MMBtu/Hr: 0.18 MMBtu/hr
Nozzle Size: (1) 1.20 x 70° B
Filter/Element: General 2A-700 / 2A-710
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
Galley #1 Building: Galley/Club Boiler Room
Unit ID: Galley Boiler #1
Make/Model:
MMBtu/Hr:
Nozzle Size:
Filter/Element:
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
Galley #2 Building: Galley/Club Boiler Room
Unit ID: Galley Boiler #2
Make/Model:
MMBtu/Hr:
Nozzle Size:
Filter/Element:
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
Galley #3 Building:
Unit ID: Water Heater
Make/Model:
MMBtu/Hr:
Nozzle Size:
Filter/Element:
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
Medical #1 Building: Medical Boiler Room
Unit ID: Medical #1
Make/Model:
MMBtu/Hr:
Nozzle Size:
Filter/Element:
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
Medical #2 Building: Medical Boiler Room
Unit ID: Medical #2
Make/Model:
MMBtu/Hr:
Nozzle Size:
Filter/Element:
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
FRC Mat Bldg #1 Building: FRC MAT/Waste Building
Unit ID: Mat Boiler #1
Make/Model: Burnham / V1104H
MMBtu/Hr: MMBtu/hr
Nozzle Size: Unknown
Filter/Element: COMBU 70101 / Unknown
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
FRC Mat Bldg #2 Building: FRC MAT/Waste Building
Unit ID: Mat Boiler #2
Make/Model: Burnham / V1104H
MMBtu/Hr: MMBtu/hr
Nozzle Size: Unknown
Filter/Element: COMBU 70101 / Unknown
Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.
| Requirements | Description | Inspector Comments / Corrective Actions Taken | |||
| £ | Inspect the burner | Clean or replace any components of the burner, as necessary | |||
| £ | Inspect the flame pattern | Adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. | |||
| £ | Inspect air-to-fuel ratio control system | Ensure system is calibrated and functioning properly, if such a system is installed on the boiler | |||
| £ | Optimize emissions of carbon monoxide (CO) | Optimize emissions consistent with the manufacturer's specifications, if available. | |||
| £ | Measure CO and O2 levels in exhaust, before and after tune-upB | Parameter | Before | After | |
| Basis (wet or dry) | |||||
| CO (ppmv) | |||||
| O2 (% by volume) | |||||
| Stack | |||||
| Efficency | |||||
| CO2 |
B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.
Tune-Up Conducted By: Date:
&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES
Boiler Images Boiler Location Fuel Type Equipment Description
| Industrial | #2 Diesel | Weil-McLain Boiler #1 |
| Series 80, 580 boiler |
| I=B=R Input Lite Oil Gph 4.45 |
| I=B=R Gross Output Mbh 515 |
| Steam 1,608 sq. ft. |
| Steam Mbh 386 |
| Steam Mbh 448 |
| Nozzle: 3.50 x 60° B |
| 1-Rf2 Big Filter |
| Industrial | #2 Diesel | Weil-McLain Boiler #2 |
| Series 80, 580 boiler | ||
| I=B=R Input Lite Oil Gph 4.45 | ||
| I=B=R Gross Output Mbh 515 | ||
| Steam 1,608 sq. ft. | ||
| Steam Mbh 386 | ||
| Steam Mbh 448 | ||
| Nozzle: 3.50 x 60° B | ||
| 1-Rf2 Big Filter |
| Industrial | #2 Diesel | Weil-McLain Boiler #3 |
| Series 80, 580 boiler | ||
| I=B=R Input Lite Oil Gph 4.45 | ||
| I=B=R Gross Output Mbh 515 | ||
| Steam 1,608 sq. ft. | ||
| Steam Mbh 386 | ||
| Steam Mbh 448 | ||
| Nozzle: 3.50 x 60° B | ||
| 1-Rf2 Big Filter |
| Industrial Paint Booth | #2 Diesel | Furnance (large) |
| Power Flame Burner #010932577 | ||
| Model #CM 63,850,000 BTM | ||
| Diesel 5.5 Gph low and 22.0 Gph high |
| Industrial Paint Booth | #2 Diesel | Furnance (Small) |
| Weather Rite #109996625 | ||
| Burner G22-OB | ||
| Diesel 5.5 Gph low and 20.0 Gph high |
Warehouse #2 Diesel Burnham Boiler #1
| Nozzle 2.0 x 60° B |
| 1-Rf2 Big Filter |
| Gross Output Mbh 404 |
| Steam Sq. Ft. 1,263 |
| Steam Mbh 303 |
| Water Mbh 351 |
| Light Oil Gph 3.5 |
Warehouse #2 Diesel Burnham Boiler #2
| Nozzle: 2.0 x 60° B |
| 1-Rf2 Big Filter |
| Gross Output Mbh 404 |
| Steam Sq. Ft. 1,263 |
| Steam Mbh 303 |
| Water Mbh351 |
| Light Oil Gph 3.5 |
| Admin Building | #2 Diesel | Weil-McLain Boiler #1 |
| Model #588 | ||
| Nozzle: 2.50 x 80° B | ||
| 1-Rf2 Big Filter | ||
| I=B=R Input Lite Oil 9.4 | ||
| Gross I=B=R Output BTU/HR 1,084,000 | ||
| Water Mbh 943 | ||
| Steam Sq Ft 3,388 | ||
| Steam Mbh 813 |
| Admin Building | #2 Diesel | Weil-McLain Boiler #2 |
| Model #588 | ||
| Nozzle: 2.75 x 80° B | ||
| 1-Rf1 Filter | ||
| I=B=R Input Lite Oil 9.4 | ||
| Gross I=B=R Output BTU/HR 1,084,000 | ||
| Water Mbh 943 | ||
| Steam Sq Ft 3,388 | ||
| Steam Mbh 813 |
UPH Barracks #2 Diesel Weil-McLain Boiler #1
UPH Barracks #2 Diesel Weil-McLain Boiler #2
D17 Armory #2 Diesel Weil-McLain GOLD Boiler
| Nozzle: 1-85 x 70° B |
| 1-Rf2 Big Filter |
| I=B=R Burner 0.95 |
| DOE Heating Capacity MBH 115 |
| Net I=B=R Rating MBH 100 |
| Commanding Officer House | #2 Diesel | Weil-McLain GOLD Boiler #68 |
| Model #: P-468v-WT | ||
| Nozzle: 85 x 70° A | ||
| 1-Rf1 Small Filter | ||
| I=B=R Input Oil 1.25 Gph | ||
| Water Mbh 131 | ||
| I=B=R Burner 0.95 | ||
| DOE Heating Capacity MBH 115.000 | ||
| Net I=B=R Rating MBH 100 |
Boat House #2 Diesel Weil-McLain GOLD Boiler
| Nozzle: 1.20 x 70° B |
| 1-Rf2 Big Filter |
| I=B=R Burner 0.95 |
| DOE Heating Capacity MBH 115 |
| Net I=B=R Rating MBH 100 |
Galley #2 Diesel Weil-McLain Boiler #1
Galley #2 Diesel Weil-McLain Boiler #2
Galley #2 Diesel AquaKinetics Heater #1
Medical Building #2 Diesel Weil-McLain Boiler #1
Medical Building #2 Diesel Weil-McLain Boiler #2
&"Arial,Bold"&11USCG BSU Ketchikan &"Arial,Bold"&11Boiler & Furnace Inventory &"Arial,Bold"&11ELSA 2012
&P &D
HAP Measurements
| Emission | Equipment | Fuel | Annual Fuel | Speciation | Emiss. Fact. | Total Emissions | |
| Source Location | Description | Type | Usage (gal/yr) | Chemical | (lb/gal) | (lb/yr) | Reference |
| Industrial | Weil-McLain Boiler #1 | #2 Diesel | 9000 | VOC | 3.4E-4 | 3.060 | 1,6 |
| Series 80, 580 boiler | NOx | 0.02 | 180.000 | 2,6 | |||
| SOx | 0.072 | 648.000 | 3,6 | ||||
| I=B=R Input Lite Oil Gph 4.45 | CO | 0.005 | 45.000 | 2,6 | |||
| I=B=R Gross Output Mbh 515 | PM | 0.002 | 18.000 | 4,6 | |||
| Steam 1,608 sq. ft. | PM10 | 0.00108 | 9.720 | 4,6 | |||
| Steam Mbh 386 | Lead | 1.22E-06 | 0.011 | 5,6 | |||
| Steam Mbh 448 | |||||||
| Nozzle: 3.50 x 80° B | Formaldehyde | 5.55E-05 | 0.499 | 5,6 | |||
| 1-Rf2 Big Filter | POMs | 3.01E-06 | 0.027 | 5,6 | |||
| Arsenic | 5.75E-07 | 0.005 | 5,6 | ||||
| Beryllium | 3.43E-07 | 0.003 | 5,6 | ||||
| Cadmium | 1.51E-06 | 0.014 | 5,6 | ||||
| Chromium | 9.18E-06 | 0.083 | 5,6 | ||||
| Lead | 1.22E-06 | 0.011 | 5,6 | ||||
| Manganese | 1.92E-06 | 0.017 | 5,6 | ||||
| Mercury | 4.11E-07 | 0.004 | 5,6 | ||||
| Nickel | 2.33E-05 | 0.210 | 5,6 |
| Industrial | Weil-McLain Boiler #2 | #2 Diesel | 17730 | VOC | 3.4E-4 | 6.028 | 1,6 |
| Series 80, 580 boiler | NOx | 0.02 | 354.600 | 2,6 | |||
| SOx | 0.072 | 1276.560 | 3,6 | ||||
| I=B=R Input Lite Oil Gph 4.45 | CO | 0.005 | 88.650 | 2,6 | |||
| I=B=R Gross Output Mbh 515 | PM | 0.002 | 35.460 | 4,6 | |||
| Steam 1,608 sq. ft. | PM10 | 0.00108 | 19.148 | 4,6 | |||
| Steam Mbh 386 | Lead | 1.22E-06 | 0.022 | 5,6 | |||
| Steam Mbh 448 | |||||||
| Nozzle: 3.50 x 80° B | Formaldehyde | 5.55E-05 | 0.984 | 5,6 | |||
| 1-Rf2 Big Filter | POMs | 3.01E-06 | 0.053 | 5,6 | |||
| Arsenic | 5.75E-07 | 0.010 | 5,6 | ||||
| Beryllium | 3.43E-07 | 0.006 | 5,6 | ||||
| Cadmium | 1.51E-06 | 0.027 | 5,6 | ||||
| Chromium | 9.18E-06 | 0.163 | 5,6 | ||||
| Lead | 1.22E-06 | 0.022 | 5,6 | ||||
| Manganese | 1.92E-06 | 0.034 | 5,6 | ||||
| Mercury | 4.11E-07 | 0.007 | 5,6 | ||||
| Nickel | 2.33E-05 | 0.413 | 5,6 |
| Industrial | Weil-McLain Boiler #3 | #2 Diesel | 1379 | VOC | 3.4E-4 | 6.028 | 1,6 |
| Series 80, 580 boiler | NOx | 0.02 | 354.600 | 2,6 | |||
| SOx | 0.072 | 1276.560 | 3,6 | ||||
| I=B=R Input Lite Oil Gph 4.45 | CO | 0.005 | 88.650 | 2,6 | |||
| I=B=R Gross Output Mbh 515 | PM | 0.002 | 35.460 | 4,6 | |||
| Steam 1,608 sq. ft. | PM10 | 0.00108 | 19.148 | 4,6 | |||
| Steam Mbh 386 | Lead | 1.22E-06 | 0.022 | 5,6 | |||
| Steam Mbh 448 | |||||||
| Nozzle: 3.50 x 80° B | Formaldehyde | 5.55E-05 | 0.984 | 5,6 | |||
| 1-Rf2 Big Filter | POMs | 3.01E-06 | 0.053 | 5,6 | |||
| Arsenic | 5.75E-07 | 0.010 | 5,6 | ||||
| Beryllium | 3.43E-07 | 0.006 | 5,6 | ||||
| Cadmium | 1.51E-06 | 0.027 | 5,6 | ||||
| Chromium | 9.18E-06 | 0.163 | 5,6 | ||||
| Lead | 1.22E-06 | 0.022 | 5,6 | ||||
| Manganese | 1.92E-06 | 0.034 | 5,6 | ||||
| Mercury | 4.11E-07 | 0.007 | 5,6 | ||||
| Nickel | 2.33E-05 | 0.413 | 5,6 |
| Industrial Paint Booth | Furnance (large) | #2 Diesel | 1000 | VOC | 3.4E-4 | 6.028 | 1,6 |
| Power Flame Burner #010932577 | NOx | 0.02 | 354.600 | 2,6 | |||
| Model #CM 63,850,000 BTM | SOx | 0.072 | 1276.560 | 3,6 | |||
| Diesel 5.5 Gph low and 22.0 Gph high | CO | 0.005 | 88.650 | 2,6 | |||
| PM | 0.002 | 35.460 | 4,6 | ||||
| PM10 | 0.00108 | 19.148 | 4,6 | ||||
| Lead | 1.22E-06 | 0.022 | 5,6 |
| Formaldehyde | 5.55E-05 | 0.984 | 5,6 |
| POMs | 3.01E-06 | 0.053 | 5,6 |
| Arsenic | 5.75E-07 | 0.010 | 5,6 |
| Beryllium | 3.43E-07 | 0.006 | 5,6 |
| Cadmium | 1.51E-06 | 0.027 | 5,6 |
| Chromium | 9.18E-06 | 0.163 | 5,6 |
| Lead | 1.22E-06 | 0.022 | 5,6 |
| Manganese | 1.92E-06 | 0.034 | 5,6 |
| Mercury | 4.11E-07 | 0.007 | 5,6 |
| Nickel | 2.33E-05 | 0.413 | 5,6 |
| Industrial Paint Booth | Furnance (Small) | #2 Diesel | 1000 | VOC | 3.4E-4 | 6.028 | 1,6 |
| Weather Rite #109996625 | NOx | 0.02 | 354.600 | 2,6 | |||
| Burner G22-OB | SOx | 0.072 | 1276.560 | 3,6 | |||
| Diesel 5.5 Gph low and 20.0 Gph high | CO | 0.005 | 88.650 | 2,6 | |||
| PM | 0.002 | 35.460 | 4,6 | ||||
| PM10 | 0.00108 | 19.148 | 4,6 | ||||
| Lead | 1.22E-06 | 0.022 | 5,6 |
| Formaldehyde | 5.55E-05 | 0.984 | 5,6 |
| POMs | 3.01E-06 | 0.053 | 5,6 |
| Arsenic | 5.75E-07 | 0.010 | 5,6 |
| Beryllium | 3.43E-07 | 0.006 | 5,6 |
| Cadmium | 1.51E-06 | 0.027 | 5,6 |
| Chromium | 9.18E-06 | 0.163 | 5,6 |
| Lead | 1.22E-06 | 0.022 | 5,6 |
| Manganese | 1.92E-06 | 0.034 | 5,6 |
| Mercury | 4.11E-07 | 0.007 | 5,6 |
| Nickel | 2.33E-05 | 0.413 | 5,6 |
| Warehouse | Burnham Boiler #1 | #2 Diesel | 1823 | VOC | 3.4E-4 | 6.028 | 1,6 |
| NOx | 0.02 | 354.600 | 2,6 | ||||
| Nozzle 2.0 x 60° B | SOx | 0.072 | 1276.560 | 3,6 | |||
| 1-Rf2 Big Filter | CO | 0.005 | 88.650 | 2,6 | |||
| Gross Output Mbh 404 | PM | 0.002 | 35.460 | 4,6 | |||
| Steam Sq. Ft. 1,263 | PM10 | 0.00108 | 19.148 | 4,6 | |||
| Steam Mbh 303 | Lead | 1.22E-06 | 0.022 | 5,6 | |||
| Water Mbh 351 | |||||||
| Light Oil Gph 3.5 | Formaldehyde | 5.55E-05 | 0.984 | 5,6 | |||
| POMs | 3.01E-06 | 0.053 | 5,6 | ||||
| Arsenic | 5.75E-07 | 0.010 | 5,6 | ||||
| Beryllium | 3.43E-07 | 0.006 | 5,6 | ||||
| Cadmium | 1.51E-06 | 0.027 | 5,6 | ||||
| Chromium | 9.18E-06 | 0.163 | 5,6 | ||||
| Lead | 1.22E-06 | 0.022 | 5,6 | ||||
| Manganese | 1.92E-06 | 0.034 | 5,6 | ||||
| Mercury | 4.11E-07 | 0.007 | 5,6 | ||||
| Nickel | 2.33E-05 | 0.413 | 5,6 |
| Warehouse | Burnham Boiler #2 | #2 Diesel | 1823 | VOC | 3.4E-4 | 6.028 | 1,6 |
| NOx | 0.02 | 354.600 | 2,6 | ||||
| Nozzle: 2.0 x 60° B | SOx | 0.072 | 1276.560 | 3,6 | |||
| 1-Rf2 Big Filter | CO | 0.005 | 88.650 | 2,6 | |||
| Gross Output Mbh 404 | PM | 0.002 | 35.460 | 4,6 | |||
| Steam Sq. Ft. 1,263 | PM10 | 0.00108 | 19.148 | 4,6 | |||
| Steam Mbh 303 | Lead | 1.22E-06 | 0.022 | 5,6 | |||
| Water Mbh351 | |||||||
| Light Oil Gph 3.5 | Formaldehyde | 5.55E-05 | 0.984 | 5,6 | |||
| POMs | 3.01E-06 | 0.053 | 5,6 | ||||
| Arsenic | 5.75E-07 | 0.010 | 5,6 | ||||
| Beryllium | 3.43E-07 | 0.006 | 5,6 | ||||
| Cadmium | 1.51E-06 | 0.027 | 5,6 | ||||
| Chromium | 9.18E-06 | 0.163 | 5,6 | ||||
| Lead | 1.22E-06 | 0.022 | 5,6 | ||||
| Manganese | 1.92E-06 | 0.034 | 5,6 | ||||
| Mercury | 4.11E-07 | 0.007 | 5,6 | ||||
| Nickel | 2.33E-05 | 0.413 | 5,6 |
| Admin Building | Weil-McLain Boiler #1 | #2 Diesel | 1823 | VOC | 3.4E-4 | 6.028 | 1,6 |
| Model #588 | NOx | 0.02 | 354.600 | 2,6 | |||
| Nozzle: 2.50 x 80° B | SOx | 0.072 | 1276.560 | 3,6 | |||
| 1-Rf2 Big Filter | CO | 0.005 | 88.650 | 2,6 | |||
| I=B=R Input Lite Oil 9.4 | PM | 0.002 | 35.460 | 4,6 | |||
| Gross I=B=R Output BTU/HR 1,084,000 | PM10 | 0.00108 | 19.148 | 4,6 | |||
| Water Mbh 943 | Lead | 1.22E-06 | 0.022 | 5,6 | |||
| Steam Sq Ft 3,388 | |||||||
| Steam Mbh 813 | Formaldehyde | 5.55E-05 | 0.984 | 5,6 | |||
| POMs | 3.01E-06 | 0.053 | 5,6 | ||||
| Arsenic | 5.75E-07 | 0.010 | 5,6 | ||||
| Beryllium | 3.43E-07 | 0.006 | 5,6 | ||||
| Cadmium | 1.51E-06 | 0.027 | 5,6 | ||||
| Chromium | 9.18E-06 | 0.163 | 5,6 | ||||
| Lead | 1.22E-06 | 0.022 | 5,6 | ||||
| Manganese | 1.92E-06 | 0.034 | 5,6 | ||||
| Mercury | 4.11E-07 | 0.007 | 5,6 | ||||
| Nickel | 2.33E-05 | 0.413 | 5,6 |
| Admin Building | Weil-McLain Boiler #2 | #2 Diesel | 1823 | VOC | 3.4E-4 | 6.028 | 1,6 |
| Model #588 | NOx | 0.02 | 354.600 | 2,6 | |||
| SOx | 0.072 | 1276.560 | 3,6 | ||||
| Nozzle: 2.50 x 80° B | CO | 0.005 | 88.650 | 2,6 | |||
| 1-Rf2 Big Filter | PM | 0.002 | 35.460 | 4,6 | |||
| I=B=R Input Lite Oil 9.4 | PM10 | 0.00108 | 19.148 | 4,6 | |||
| Gross I=B=R Output BTU/HR 1,084,000 | Lead | 1.22E-06 | 0.022 | 5,6 | |||
| Water Mbh 943 | |||||||
| Steam Sq Ft 3,388 | Formaldehyde | 5.55E-05 | 0.984 | 5,6 | |||
| Steam Mbh 813 | POMs | 3.01E-06 | 0.053 | 5,6 | |||
| Arsenic | 5.75E-07 | 0.010 | 5,6 | ||||
| Beryllium | 3.43E-07 | 0.006 | 5,6 | ||||
| Cadmium | 1.51E-06 | 0.027 | 5,6 | ||||
| Chromium | 9.18E-06 | 0.163 | 5,6 | ||||
| Lead | 1.22E-06 | 0.022 | 5,6 | ||||
| Manganese | 1.92E-06 | 0.034 | 5,6 | ||||
| Mercury | 4.11E-07 | 0.007 | 5,6 | ||||
| Nickel | 2.33E-05 | 0.413 | 5,6 |
| UPH Barracks | Weil-McLain Boiler #1 | #2 Diesel | 646.0 | VOC | 3.4E-4 | 0.220 | 1,6 |
| NOx | 0.02 | 12.920 | 2,6 | ||||
| Nozzle 1.50 x 60° B | SOx | 0.072 | 46.512 | 3,6 | |||
| CO | 0.005 | 3.230 | 2,6 | ||||
| I=B=R Input | PM | 0.002 | 1.292 | 4,6 | |||
| Oil Fired Rate GPH 2.35 | PM10 | 0.00108 | 0.698 | 4,6 | |||
| I=B=R Output | Lead | 1.22E-06 | 0.001 | 5,6 | |||
| Gross Output BTU/H 229,600 | |||||||
| Formaldehyde | 5.55E-05 | 0.036 | 5,6 | ||||
| Steam Net | POMs | 3.01E-06 | 0.002 | 5,6 | |||
| I=B=R Output BTU/H 198,000 | Arsenic | 5.75E-07 | 0.000 | 5,6 | |||
| Net Sq Ft Water 1530 | Beryllium | 3.43E-07 | 0.000 | 5,6 | |||
| net Sq Ft Steam 835 | Cadmium | 1.51E-06 | 0.001 | 5,6 | |||
| Chromium | 9.18E-06 | 0.006 | 5,6 | ||||
| Lead | 1.22E-06 | 0.001 | 5,6 | ||||
| Manganese | 1.92E-06 | 0.001 | 5,6 | ||||
| Mercury | 4.11E-07 | 0.000 | 5,6 | ||||
| Nickel | 2.33E-05 | 0.015 | 5,6 |
| UPH Barracks | Weil-McLain Boiler #2 | #2 Diesel | 254.0 | VOC | 3.4E-4 | 0.086 | 1,6 |
| NOx | 0.02 | 5.080 | 2,6 | ||||
| Nozzle 1.50 x 60° B | SOx | 0.072 | 18.288 | 3,6 | |||
| CO | 0.005 | 1.270 | 2,6 | ||||
| I=B=R Input | PM | 0.002 | 0.508 | 4,6 | |||
| Oil Fired Rate GPH 2.35 | PM10 | 0.00108 | 0.274 | 4,6 | |||
| I=B=R Output | Lead | 1.22E-06 | 0.000 | 5,6 | |||
| Gross Output BTU/H 229,600 | |||||||
| Formaldehyde | 5.55E-05 | 0.014 | 5,6 | ||||
| Steam Net | POMs | 3.01E-06 | 0.001 | 5,6 | |||
| I=B=R Output BTU/H 198,000 | Arsenic | 5.75E-07 | 0.000 | 5,6 | |||
| Net Sq Ft Water 1530 | Beryllium | 3.43E-07 | 0.000 | 5,6 | |||
| Net Sq Ft Steam 835 | Cadmium | 1.51E-06 | 0.000 | 5,6 | |||
| Chromium | 9.18E-06 | 0.002 | 5,6 | ||||
| Lead | 1.22E-06 | 0.000 | 5,6 | ||||
| Manganese | 1.92E-06 | 0.000 | 5,6 | ||||
| Mercury | 4.11E-07 | 0.000 | 5,6 | ||||
| Nickel | 2.33E-05 | 0.006 | 5,6 |
| D17 Armory | Weil-McLain GOLD Boiler | #2 Diesel | 3576.0 | VOC | 3.4E-4 | 1.216 | 1,6 |
| NOx | 0.02 | 71.520 | 2,6 | ||||
| Nozzle: 1-.65 x 70° B | SOx | 0.072 | 257.472 | 3,6 | |||
| 1-Rf2 Big Filter 265-12 | CO | 0.005 | 17.880 | 2,6 | |||
| I=B=R Burner 0.95 | PM | 0.002 | 7.152 | 4,6 | |||
| DOE Heating Capacity MBH 115 | PM10 | 0.00108 | 3.862 | 4,6 | |||
| Net I=B=R Rating MBH 100 | Lead | 1.22E-06 | 0.004 | 5,6 |
| Formaldehyde | 5.55E-05 | 0.198 | 5,6 |
| POMs | 3.01E-06 | 0.011 | 5,6 |
| Arsenic | 5.75E-07 | 0.002 | 5,6 |
| Beryllium | 3.43E-07 | 0.001 | 5,6 |
| Cadmium | 1.51E-06 | 0.005 | 5,6 |
| Chromium | 9.18E-06 | 0.033 | 5,6 |
| Lead | 1.22E-06 | 0.004 | 5,6 |
| Manganese | 1.92E-06 | 0.007 | 5,6 |
| Mercury | 4.11E-07 | 0.001 | 5,6 |
| Nickel | 2.33E-05 | 0.083 | 5,6 |
| Commanding Officer House | Weil-McLain GOLD Boiler #68 | #2 Diesel | 3576.0 | VOC | 3.4E-4 | 1.216 | 1,6 |
| Model #: P-468v-WT | NOx | 0.02 | 71.520 | 2,6 | |||
| Nozzle: 1.20 x 80° A | SOx | 0.072 | 257.472 | 3,6 | |||
| 1-Rf2 Small Filter | CO | 0.005 | 17.880 | 2,6 | |||
| PM | 0.002 | 7.152 | 4,6 | ||||
| I=B=R Input Oil 1.25 Gph | PM10 | 0.00108 | 3.862 | 4,6 | |||
| Water Mbh 131 | Lead | 1.22E-06 | 0.004 | 5,6 | |||
| I=B=R Burner 0.95 | |||||||
| DOE Heating Capacity MBH 115.000 | Formaldehyde | 5.55E-05 | 0.198 | 5,6 | |||
| Net I=B=R Rating MBH 100 | POMs | 3.01E-06 | 0.011 | 5,6 | |||
| Arsenic | 5.75E-07 | 0.002 | 5,6 | ||||
| Beryllium | 3.43E-07 | 0.001 | 5,6 | ||||
| Cadmium | 1.51E-06 | 0.005 | 5,6 | ||||
| Chromium | 9.18E-06 | 0.033 | 5,6 | ||||
| Lead | 1.22E-06 | 0.004 | 5,6 | ||||
| Manganese | 1.92E-06 | 0.007 | 5,6 | ||||
| Mercury | 4.11E-07 | 0.001 | 5,6 | ||||
| Nickel | 2.33E-05 | 0.083 | 5,6 |
| Boat House | Weil-McLain GOLD Boiler | #2 Diesel | 3576.0 | VOC | 3.4E-4 | 1.216 | 1,6 |
| NOx | 0.02 | 71.520 | 2,6 | ||||
| Nozzle: 1.20 x 70° B | SOx | 0.072 | 257.472 | 3,6 | |||
| 1-Rf2 Big Filter | CO | 0.005 | 17.880 | 2,6 | |||
| I=B=R Burner 0.95 | PM | 0.002 | 7.152 | 4,6 | |||
| DOE Heating Capacity MBH 115 | PM10 | 0.00108 | 3.862 | 4,6 | |||
| Net I=B=R Rating MBH 100 | Lead | 1.22E-06 | 0.004 | 5,6 |
| Formaldehyde | 5.55E-05 | 0.198 | 5,6 |
| POMs | 3.01E-06 | 0.011 | 5,6 |
| Arsenic | 5.75E-07 | 0.002 | 5,6 |
| Beryllium | 3.43E-07 | 0.001 | 5,6 |
| Cadmium | 1.51E-06 | 0.005 | 5,6 |
| Chromium | 9.18E-06 | 0.033 | 5,6 |
| Lead | 1.22E-06 | 0.004 | 5,6 |
| Manganese | 1.92E-06 | 0.007 | 5,6 |
| Mercury | 4.11E-07 | 0.001 | 5,6 |
| Nickel | 2.33E-05 | 0.083 | 5,6 |
| Galley | Weil-McLain Boiler #1 | #2 Diesel | 3576.0 | VOC | 3.4E-4 | 1.216 | 1,6 |
| NOx | 0.02 | 71.520 | 2,6 | ||||
| Nozzle 3.50 x 60 | SOx | 0.072 | 257.472 | 3,6 | |||
| CO | 0.005 | 17.880 | 2,6 | ||||
| I=B=R Input | PM | 0.002 | 7.152 | 4,6 | |||
| Oil Fired Rate GPH 2.35 | PM10 | 0.00108 | 3.862 | 4,6 | |||
| I=B=R Output | Lead | 1.22E-06 | 0.004 | 5,6 | |||
| Gross Output BTU/H 229,600 | |||||||
| Formaldehyde | 5.55E-05 | 0.198 | 5,6 | ||||
| Steam Net | POMs | 3.01E-06 | 0.011 | 5,6 | |||
| I=B=R Output BTU/H 198,000 | Arsenic | 5.75E-07 | 0.002 | 5,6 | |||
| Net Sq Ft Water 1530 | Beryllium | 3.43E-07 | 0.001 | 5,6 | |||
| Net Sq Ft Steam 835 | Cadmium | 1.51E-06 | 0.005 | 5,6 | |||
| Chromium | 9.18E-06 | 0.033 | 5,6 | ||||
| Lead | 1.22E-06 | 0.004 | 5,6 | ||||
| Manganese | 1.92E-06 | 0.007 | 5,6 | ||||
| Mercury | 4.11E-07 | 0.001 | 5,6 | ||||
| Nickel | 2.33E-05 | 0.083 | 5,6 |
| Galley | Weil-McLain Boiler #2 | #2 Diesel | 2882.0 | VOC | 3.4E-4 | 0.980 | 1,6 |
| NOx | 0.02 | 57.640 | 2,6 | ||||
| Nozzle 3.50 x 60 | SOx | 0.072 | 207.504 | 3,6 | |||
| CO | 0.005 | 14.410 | 2,6 | ||||
| I=B=R Input | PM | 0.002 | 5.764 | 4,6 | |||
| Oil Fired Rate GPH 2.35 | PM10 | 0.00108 | 3.113 | 4,6 | |||
| I=B=R Output | Lead | 1.22E-06 | 0.004 | 5,6 | |||
| Gross Output BTU/H 229,600 | |||||||
| Formaldehyde | 5.55E-05 | 0.160 | 5,6 | ||||
| Steam Net | POMs | 3.01E-06 | 0.009 | 5,6 | |||
| I=B=R Output BTU/H 198,000 | Arsenic | 5.75E-07 | 0.002 | 5,6 | |||
| Net Sq Ft Water 1530 | Beryllium | 3.43E-07 | 0.001 | 5,6 | |||
| Net Sq Ft Steam 835 | Cadmium | 1.51E-06 | 0.004 | 5,6 | |||
| Chromium | 9.18E-06 | 0.026 | 5,6 | ||||
| Lead | 1.22E-06 | 0.004 | 5,6 | ||||
| Manganese | 1.92E-06 | 0.006 | 5,6 | ||||
| Mercury | 4.11E-07 | 0.001 | 5,6 | ||||
| Nickel | 2.33E-05 | 0.067 | 5,6 |
| Galley | AquaKinetics Heater #1 | #2 Diesel | 1682.0 | VOC | 3.4E-4 | 0.980 | 1,6 |
| NOx | 0.02 | 57.640 | 2,6 | ||||
| Brandford White Corporation | SOx | 0.072 | 207.504 | 3,6 | |||
| Model: CF-100-350-3A | CO | 0.005 | 14.410 | 2,6 | |||
| Serial #: HJ15499184 | PM | 0.002 | 5.764 | 4,6 | |||
| PM10 | 0.00108 | 3.113 | 4,6 | ||||
| Input: 350000 BTU/HR | Lead | 1.22E-06 | 0.004 | 5,6 | |||
| Rec: 355 GPH | |||||||
| Nozzle: 2.50/81° /B | Formaldehyde | 5.55E-05 | 0.160 | 5,6 | |||
| Cap 100 gal. | POMs | 3.01E-06 | 0.009 | 5,6 | |||
| Arsenic | 5.75E-07 | 0.002 | 5,6 | ||||
| Beryllium | 3.43E-07 | 0.001 | 5,6 | ||||
| Cadmium | 1.51E-06 | 0.004 | 5,6 | ||||
| Chromium | 9.18E-06 | 0.026 | 5,6 | ||||
| Lead | 1.22E-06 | 0.004 | 5,6 | ||||
| Manganese | 1.92E-06 | 0.006 | 5,6 | ||||
| Mercury | 4.11E-07 | 0.001 | 5,6 | ||||
| Nickel | 2.33E-05 | 0.067 | 5,6 |
| Medical Building | Weil-McLain Boiler #1 | #2 Diesel | 1622.0 | VOC | 3.4E-4 | 0.980 | 1,6 |
| NOx | 0.02 | 57.640 | 2,6 | ||||
| Nozzle 1-2.00 / 60° B | SOx | 0.072 | 207.504 | 3,6 | |||
| 1-Rf2 Big Filter | CO | 0.005 | 14.410 | 2,6 | |||
| I=B=R Input | PM | 0.002 | 5.764 | 4,6 | |||
| Oil Fired Rate GPH 2.35 | PM10 | 0.00108 | 3.113 | 4,6 | |||
| I=B=R Output | Lead | 1.22E-06 | 0.004 | 5,6 | |||
| Gross Output BTU/H 229,600 | |||||||
| Formaldehyde | 5.55E-05 | 0.160 | 5,6 | ||||
| Steam Net | POMs | 3.01E-06 | 0.009 | 5,6 | |||
| I=B=R Output BTU/H 198,000 | Arsenic | 5.75E-07 | 0.002 | 5,6 | |||
| Net Sq Ft Water 1530 | Beryllium | 3.43E-07 | 0.001 | 5,6 | |||
| Net Sq Ft Steam 825 | Cadmium | 1.51E-06 | 0.004 | 5,6 | |||
| Chromium | 9.18E-06 | 0.026 | 5,6 | ||||
| Lead | 1.22E-06 | 0.004 | 5,6 | ||||
| Manganese | 1.92E-06 | 0.006 | 5,6 | ||||
| Mercury | 4.11E-07 | 0.001 | 5,6 | ||||
| Nickel | 2.33E-05 | 0.067 | 5,6 |
| Medical Building | Weil-McLain Boiler #2 | #2 Diesel | 928.0 | VOC | 3.4E-4 | 0.980 | 1,6 |
| NOx | 0.02 | 57.640 | 2,6 | ||||
| Nozzle 1-2.00 / 60° B | SOx | 0.072 | 207.504 | 3,6 | |||
| 1-Rf2 Big Filter | CO | 0.005 | 14.410 | 2,6 | |||
| I=B=R Input | PM | 0.002 | 5.764 | 4,6 | |||
| Oil Fired Rate GPH 2.35 | PM10 | 0.00108 | 3.113 | 4,6 | |||
| I=B=R Output | Lead | 1.22E-06 | 0.004 | 5,6 | |||
| Gross Output BTU/H 229,600 | |||||||
| Formaldehyde | 5.55E-05 | 0.160 | 5,6 | ||||
| Steam Net | POMs | 3.01E-06 | 0.009 | 5,6 | |||
| I=B=R Output BTU/H 198,000 | Arsenic | 5.75E-07 | 0.002 | 5,6 | |||
| Net Sq Ft Water 1530 | Beryllium | 3.43E-07 | 0.001 | 5,6 | |||
| Net Sq Ft Steam 825 | Cadmium | 1.51E-06 | 0.004 | 5,6 | |||
| Chromium | 9.18E-06 | 0.026 | 5,6 | ||||
| Lead | 1.22E-06 | 0.004 | 5,6 | ||||
| Manganese | 1.92E-06 | 0.006 | 5,6 | ||||
| Mercury | 4.11E-07 | 0.001 | 5,6 | ||||
| Nickel | 2.33E-05 | 0.067 | 5,6 |
| References: | |
| 1.0 | Emission factor for volatile organic compounds (VOC) is from U.S. EPA AP-42, External Combustion Sources, |
| Chapter 1.3 Fuel Oil Combustion, Table 1.3-4, 1/95. | |
| 2.0 | Emission factors for nitrogen oxides (NOx) and carbon monoxide (CO) are from U.S. AP-42, External Combustion |
| Sources, Chapter 1.3 Fuel Oil Combustion, Table 1.3-2, 1/95. | |
| 3.0 | Emission factor for sulfur oxides (SOx) is from the U.S. AP-42, External Combustion Sources, Chapter 1.3 |
| Fuel Oil Combustion, Table 1.3-2, 1/95. Sulfur content in the fuel is assumed to be 0.5%. | |
| 4.0 | Emission factors for particulate matters (PM & PM10) are from the AP-42, External Combustion Sources, |
This is the start of the file's text. The full file is on GovTribe.