This file contains annual boiler inventory and testing forms for multiple oil-fired boilers and water heater systems at USCG Base Ketchikan, along with a related solicitation (70Z03525QKET0028) for preventative maintenance services.

The solicitation seeks preventative annual maintenance and testing services for these systems in accordance with manufacturer specifications, NFPA 31 and 40 CFR Part 63 Subpart J. The work is set aside 100% for small businesses under NAICS 238220 ($19M size standard). Quotes are due by January 29, 2025 at noon AKST, with award anticipated by February 3, 2025. This will be a firm-fixed-price purchase order awarded on a Lowest Price Technically Acceptable basis. The inventory forms detail approximately 20 boiler systems across various buildings including Administration, Clinic, Club/Galley, CO's Quarters, Armory, Industrial Building, Warehouse, and others, with specific information about each unit's make/model, serial numbers, burner assemblies, nozzle sizes, and filter elements. The forms also include NESHAP boiler tune-up procedures and emissions testing requirements for each unit.

View the file

Other files

File Type Posted
Clauses.pdf PDF
SOW - Upper and Lower Base Annual Boiler Maintenence 2025.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Donavan May

OIL-FIRED EQUIPMENT

LOCATION UNIT ID HEAT EXCHANGING DEVICE MODEL / SERIAL BURNER ASSEMBLY MODEL / SERIAL NOZZLE SIZE FILTER HOUSING / ELEMENT

Administration BuildingAdmin #1Weil‐McLain588 / UnknownGordon-PiattR8.2-0-07 / 040224-0000(2) 2.50 x 80° BRacor 1050 / 2020PM-OR
Administration BuildingAdmin #2Weil‐McLain94 / UnknownGordon-PiattWR8.2-0-07 / 090128-0000(2) 2.75 x 80° BSHARED WITH ABOVE
ClinicClinic #1Weil‐McLainP-768 V-W / CP 2102700BeckettAFG / MP1192(1) 2.00 x 60° BGeneral 2A-700A / 2A-710
ClinicClinic #2Weil‐McLainP-768 V-W / CP 2102699BeckettAFG / AH25212(1) 2.00 x 60° BSHARED WITH ABOVE
Club/GalleyClub/Galley #1Weil‐McLainA/B 868 / CP 2019971 CP 2091085BeckettAFG / CP 2098984(1) 1.50 x 60° BRacor 1050 / 2020PM-OR
Club/GalleyClub/Galley #2Weil‐McLainA/B 868 / CP 2019956 CP 2091105BeckettAFG / CP 2098985(1) 1.50 x 60° BSHARED WITH ABOVE
Club/GalleyClub/Galley #2Bradford White Corp.CF-100-350-3A / HJ15499184BeckettSF / 11050-10002(1) 2.50 x 80° BSHARED WITH ABOVE

CO's Quarters CO's #1 Weil‐McLain 68 / Unknown Beckett AFG / Unknown (1) .85 x 70° A General / RF-1

D17 Armory Armory #1 Weil‐McLain P-WTGO-3 / CP 4153849 Beckett AFG / 010328-95838 (1) .85 x 70° B General 2A-700 / 2A-710

Industrial BuildingIndustrial #1Weil‐McLain580 / UnknownBeckettCF800 / 060724-92386(1) 3.50 x 60° BRacor 1050 / 2020PM-OR
Industrial BuildingIndustrial #2Weil‐McLain580 / UnknownBeckettCF800 / 060418-96671(1) 3.50 x 60° BSHARED WITH ABOVE
Industrial BuildingIndustrial #3Weil‐McLain580 / UnknownBeckettCF800 / 060309-50069(1) 3.50 x 60° BSHARED WITH ABOVE
Industrial Paint Booth (Large)Paint Booth #1Industrial Commercial EquipmentGIDM-500 / 6239APower FlameCR2 / 010932577UnknownUnknown / Baldwin BF915
Industrial Paint Booth (Small)Paint Booth #2Weather RiteID 125 HH / 54418Power FlameCR2-OB / 109991625UnknownUnknown / NAPA 4348
MAT/HazWasteMAT #1BurnhamV1104H / 65356987Power FlameCR1-0 / 081454847UnknownCOMBU 70101 / Unknown
MAT/HazWasteMAT #2BurnhamV1104H / 65356988Power FlameCR1-0 / 081454848UnknownCOMBU 70101 / Unknown

Station Boathouse Boathouse #1 Weil‐McLain P-WTGO-5 / Unknown Beckett AFG / 02025-33762 (1) 1.20 x 70° B General 2A-700 / 2A-710

UPHUPH #1Weil‐McLainBL-476-WS / UnknownWeil‐McLainEH / Unknown(1) 1.50 x 60° BGoldenrod DN496-5 /Unknown
UPHUPH #2Weil‐McLainBL-476-WS / UnknownWeil‐McLainEH / Unknown(1) 1.50 x 60° BSHARED WITH ABOVE
WarehouseWarehouse #1BurnhamV904 / 7595848BeckettCF 500 / Unknown(1) 2.0 x 60° BGeneral 2A-700 / 2A-710
WarehouseWarehouse #2BurnhamV904 / 7595850BeckettCF 500 / Unknown(1) 2.0 x 60° BGeneral 2A-700 / 2A-710

Boiler Inventory

SAM ID No.LOCATIONUNIT IDHEAT EXCHANGING DEVICE (HED)HED MODEL No.HED SERIAL NUMBERBURNER ASSEMBLYBA MODELBA SERIAL No.NOZZLE SIZEFILTER HOUSING / ELEMENT
117675Administration BuildingAdmin #1Weil‐McLain588UnknownGordon-PiattR8.2-0-07040224-0000(2) 2.50 x 80° BRacor 1050 / 2020PM-OR
117679Administration BuildingAdmin #2Weil‐McLain94UnknownGordon-PiattWR8.2-0-07090128-0000(2) 2.75 x 80° BSHARED WITH ABOVE
118007ClinicClinic #1Weil‐McLainP-768 V-WCP 2102700BeckettAFGMP1192(1) 2.00 x 60° BGeneral 2A-700A / 2A-710
118008ClinicClinic #2Weil‐McLainP-768 V-WCP 2102699BeckettAFGAH25212(1) 2.00 x 60° BSHARED WITH ABOVE
117866Club/GalleyClub/Galley #1Weil‐McLainA/B 868CP 2019971 / CP 2091085BeckettAFGCP 2098984(1) 1.50 x 60° BRacor 1050 / 2020PM-OR
117865Club/GalleyClub/Galley #2Weil‐McLainA/B 868CP 2019956 / CP 2091105BeckettAFGCP 2098985(1) 1.50 x 60° BSHARED WITH ABOVE
117864Club/GalleyClub/Galley #3Bradford White Corp.CF-100-350-3AHJ15499184BeckettSF11050-10002(1) 2.50 x 80° BSHARED WITH ABOVE
117611CO's QuartersCO's #1Weil‐McLain68UnknownBeckettAFGUnknown(1) .85 x 70° AGeneral / RF-1
117937D17 ArmoryArmory #1Weil‐McLainP-WTGO-3CP 4153849BeckettAFG010328-95838(1) .85 x 70° BGeneral 2A-700 / 2A-710
118004Industrial BuildingIndustrial #1Weil‐McLain580UnknownBeckettCF800060724-92386(1) 3.50 x 60° BRacor 1050 / 2020PM-OR
118013Industrial BuildingIndustrial #2Weil‐McLain580UnknownBeckettCF800060418-96671(1) 3.50 x 60° BSHARED WITH ABOVE
118014Industrial BuildingIndustrial #3Weil‐McLain580UnknownBeckettCF800060309-50069(1) 3.50 x 60° BSHARED WITH ABOVE
22667-1Industrial Paint Booth (Large)Paint Booth #1Industrial Commercial EquipmentGIDM-5006239APower FlameCR210932577UnknownUnknown / Baldwin BF915
22667-2Industrial Paint Booth (Small)Paint Booth #2Weather RiteID 125 HH54418Power FlameCR2-OB109991625UnknownUnknown / NAPA 4348
194632MAT/HazWasteMAT Boiler #1BurnhamV1104H65356987Power FlameCR1-081454847UnknownCOMBU 70101 / Unknown
194633MAT/HazWasteMAT Boiler #2BurnhamV1104H65356988Power FlameCR1-081454848UnknownCOMBU 70101 / Unknown
117638Station BoathouseBoathouse #1Weil‐McLainP-WTGO-5UnknownBeckettAFG02025-33762(1) 1.20 x 70° BGeneral 2A-700 / 2A-710
116745UPHUPH #1Weil‐McLainBL-476-WSUnknownWeil‐McLainEHUnknown(1) 1.50 x 60° BGoldenrod DN496-5 /Unknown
116757UPHUPH #2Weil‐McLainBL-476-WSUnknownWeil‐McLainEHUnknown(1) 1.50 x 60° BSHARED WITH ABOVE
118353WarehouseWarehouse #1BurnhamV9047595848BeckettCF 500Unknown(1) 2.0 x 60° BGeneral 2A-700 / 2A-710
118355WarehouseWarehouse #2BurnhamV9047595850BeckettCF 500Unknown(1) 2.0 x 60° BGeneral 2A-700 / 2A-710

Industrial #1 Building: Industrial Boiler Room

Unit ID: Industrial #1

Make/Model: Weil-McLain, Series 80, 580 boiler

MMBtu/Hr: 0.62 MMBtu/hr

Nozzle Size: (1) 3.50 x 60° B

Filter/Element: Racor 1050 / 2020PM-OR

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary.
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler.
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

Warehouse #1 Building: Warehouse

Unit ID: Warehouse Boiler #1

Make/Model: Burnham Boiler

MMBtu/Hr: 0.49 MMBtu/hr

Nozzle Size: (1) 2.0 x 60° B

Filter/Element: General 2A-700/2A-710

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

Warehouse #2 Building: Warehouse

Unit ID: Warehouse Boiler #2

Make/Model: Burnham / V904

MMBtu/Hr: 0.49 MMBtu/hr

Nozzle Size: (1) 2.0 x 60° B

Filter/Element: General 2A-700 / 2A-710

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

Industrial #2 Building: Industrial Boiler Room

Unit ID: Industrial Boiler #2

Make/Model: Weil-McLain, Series 80, 580 boiler

MMBtu/Hr: 0.62 MMBtu/hr

Nozzle Size: (1) 3.50 x 60° B

Filter/Element: Racor 1050 / 2020PM-OR

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary.
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler.
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

Industrial #3 Building: Industrial Boiler Room

Unit ID: Industrial Boiler #3

Make/Model: Weil-McLain, Series 80, 580 boiler

MMBtu/Hr: 0.62 MMBtu/hr

Nozzle Size: (1) 3.50 x 60° B

Filter/Element: Racor 1050 / 2020PM-OR

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

Admin Bldg #1 Building: Admin Building Boiler Room

Unit ID: Admin Boiler #1

Make/Model: Weil-McLain, 588

MMBtu/Hr: 1.3 MMBtu/hr

Nozzle Size: (2) 2.75 x 80° B

Filter/Element: Racor 1050 / 202PM-OR

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

Admin Bldg #2 Building: Admin Building Boiler Room

Unit ID: Admin Boiler #2

Make/Model: Weil-McLain, 588

MMBtu/Hr: 1.3 MMBtu/hr

Nozzle Size: (2) 2.50 x 80° B

Filter/Element: Racor 1050 / 2020PM-OR

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary.
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

Barracks #1 Building: Barracks UPH Boiler Room

Unit ID: Barracks Boiler #1

Make/Model:

MMBtu/Hr:

Nozzle Size:

Filter Type:

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

Barracks #2 Building: Barracks UPH Boiler Room

Unit ID: Barracks Boiler #2

Make/Model:

MMBtu/Hr:

Nozzle Size:

Filter/Element:

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

Armory #1 Building: D17 Armory Boiler Room

Boiler ID: Armory Boiler #1

Make/Model: Weil-McLain GOLD / P-WTGO-3

MMBtu/Hr: 0.16 MMBtu/hr

Nozzle Size: (1) .85 x 70° B

Filter/Element: General 2A-700 / 2A-710

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

CO House #1 Building: CO Quarters Boiler Room

Unit ID: CO's Boiler #1

Model: Weil-McLain GOLD Boiler / #68

MMBtu/Hr: 0.18 MMBtu/hr

Nozzle Size: (1) 85 x 70° A

Filter/Element: General / RF-1

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

Boathouse #1 Building: Station Boathouse Boiler Room

Unit ID: Boathouse #1

Make/Model: Weil-McLain GOLD / P-WTGO-5

MMBtu/Hr: 0.18 MMBtu/hr

Nozzle Size: (1) 1.20 x 70° B

Filter/Element: General 2A-700 / 2A-710

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

Galley #1 Building: Galley/Club Boiler Room

Unit ID: Galley Boiler #1

Make/Model:

MMBtu/Hr:

Nozzle Size:

Filter/Element:

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

Galley #2 Building: Galley/Club Boiler Room

Unit ID: Galley Boiler #2

Make/Model:

MMBtu/Hr:

Nozzle Size:

Filter/Element:

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

Galley #3 Building:

Unit ID: Water Heater

Make/Model:

MMBtu/Hr:

Nozzle Size:

Filter/Element:

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

Medical #1 Building: Medical Boiler Room

Unit ID: Medical #1

Make/Model:

MMBtu/Hr:

Nozzle Size:

Filter/Element:

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

Medical #2 Building: Medical Boiler Room

Unit ID: Medical #2

Make/Model:

MMBtu/Hr:

Nozzle Size:

Filter/Element:

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

FRC Mat Bldg #1 Building: FRC MAT/Waste Building

Unit ID: Mat Boiler #1

Make/Model: Burnham / V1104H

MMBtu/Hr: MMBtu/hr

Nozzle Size: Unknown

Filter/Element: COMBU 70101 / Unknown

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

FRC Mat Bldg #2 Building: FRC MAT/Waste Building

Unit ID: Mat Boiler #2

Make/Model: Burnham / V1104H

MMBtu/Hr: MMBtu/hr

Nozzle Size: Unknown

Filter/Element: COMBU 70101 / Unknown

Check the applicable box when the procedure is completed. If the procedure does not apply to you, indicate 'not applicable' or 'NA' in the comments column.

RequirementsDescriptionInspector Comments / Corrective Actions Taken
£Inspect the burnerClean or replace any components of the burner, as necessary
£Inspect the flame patternAdjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available.
£Inspect air-to-fuel ratio control systemEnsure system is calibrated and functioning properly, if such a system is installed on the boiler
£Optimize emissions of carbon monoxide (CO)Optimize emissions consistent with the manufacturer's specifications, if available.
£Measure CO and O2 levels in exhaust, before and after tune-upBParameterBeforeAfter
Basis (wet or dry)
CO (ppmv)
O2 (% by volume)
Stack
Efficency
CO2

B Measurements may be made on either a dry or wet basis, as long as it is the same basis before and after the tune-up adjustments are made. CO concentration measurements must be made in units of parts per million by volume (ppmv). Oxygen (O2) concentration measurements must be made as percent by volume.

Tune-Up Conducted By: Date:

&"Calibri,Bold"&14RECORD OF NESHAP BOILER TUNE-UP PROCEDURES

Boiler Images Boiler Location Fuel Type Equipment Description

Industrial#2 DieselWeil-McLain Boiler #1
Series 80, 580 boiler
I=B=R Input Lite Oil Gph 4.45
I=B=R Gross Output Mbh 515
Steam 1,608 sq. ft.
Steam Mbh 386
Steam Mbh 448
Nozzle: 3.50 x 60° B
1-Rf2 Big Filter
Industrial#2 DieselWeil-McLain Boiler #2
Series 80, 580 boiler
I=B=R Input Lite Oil Gph 4.45
I=B=R Gross Output Mbh 515
Steam 1,608 sq. ft.
Steam Mbh 386
Steam Mbh 448
Nozzle: 3.50 x 60° B
1-Rf2 Big Filter
Industrial#2 DieselWeil-McLain Boiler #3
Series 80, 580 boiler
I=B=R Input Lite Oil Gph 4.45
I=B=R Gross Output Mbh 515
Steam 1,608 sq. ft.
Steam Mbh 386
Steam Mbh 448
Nozzle: 3.50 x 60° B
1-Rf2 Big Filter
Industrial Paint Booth#2 DieselFurnance (large)
Power Flame Burner #010932577
Model #CM 63,850,000 BTM
Diesel 5.5 Gph low and 22.0 Gph high
Industrial Paint Booth#2 DieselFurnance (Small)
Weather Rite #109996625
Burner G22-OB
Diesel 5.5 Gph low and 20.0 Gph high

Warehouse #2 Diesel Burnham Boiler #1

Nozzle 2.0 x 60° B
1-Rf2 Big Filter
Gross Output Mbh 404
Steam Sq. Ft. 1,263
Steam Mbh 303
Water Mbh 351
Light Oil Gph 3.5

Warehouse #2 Diesel Burnham Boiler #2

Nozzle: 2.0 x 60° B
1-Rf2 Big Filter
Gross Output Mbh 404
Steam Sq. Ft. 1,263
Steam Mbh 303
Water Mbh351
Light Oil Gph 3.5
Admin Building#2 DieselWeil-McLain Boiler #1
Model #588
Nozzle: 2.50 x 80° B
1-Rf2 Big Filter
I=B=R Input Lite Oil 9.4
Gross I=B=R Output BTU/HR 1,084,000
Water Mbh 943
Steam Sq Ft 3,388
Steam Mbh 813
Admin Building#2 DieselWeil-McLain Boiler #2
Model #588
Nozzle: 2.75 x 80° B
1-Rf1 Filter
I=B=R Input Lite Oil 9.4
Gross I=B=R Output BTU/HR 1,084,000
Water Mbh 943
Steam Sq Ft 3,388
Steam Mbh 813

UPH Barracks #2 Diesel Weil-McLain Boiler #1

UPH Barracks #2 Diesel Weil-McLain Boiler #2

D17 Armory #2 Diesel Weil-McLain GOLD Boiler

Nozzle: 1-85 x 70° B
1-Rf2 Big Filter
I=B=R Burner 0.95
DOE Heating Capacity MBH 115
Net I=B=R Rating MBH 100
Commanding Officer House#2 DieselWeil-McLain GOLD Boiler #68
Model #: P-468v-WT
Nozzle: 85 x 70° A
1-Rf1 Small Filter
I=B=R Input Oil 1.25 Gph
Water Mbh 131
I=B=R Burner 0.95
DOE Heating Capacity MBH 115.000
Net I=B=R Rating MBH 100

Boat House #2 Diesel Weil-McLain GOLD Boiler

Nozzle: 1.20 x 70° B
1-Rf2 Big Filter
I=B=R Burner 0.95
DOE Heating Capacity MBH 115
Net I=B=R Rating MBH 100

Galley #2 Diesel Weil-McLain Boiler #1

Galley #2 Diesel Weil-McLain Boiler #2

Galley #2 Diesel AquaKinetics Heater #1

Medical Building #2 Diesel Weil-McLain Boiler #1

Medical Building #2 Diesel Weil-McLain Boiler #2

&"Arial,Bold"&11USCG BSU Ketchikan &"Arial,Bold"&11Boiler & Furnace Inventory &"Arial,Bold"&11ELSA 2012

&P &D

HAP Measurements

EmissionEquipmentFuelAnnual FuelSpeciationEmiss. Fact.Total Emissions
Source LocationDescriptionTypeUsage (gal/yr)Chemical(lb/gal)(lb/yr)Reference
IndustrialWeil-McLain Boiler #1#2 Diesel9000VOC3.4E-43.0601,6
Series 80, 580 boilerNOx0.02180.0002,6
SOx0.072648.0003,6
I=B=R Input Lite Oil Gph 4.45CO0.00545.0002,6
I=B=R Gross Output Mbh 515PM0.00218.0004,6
Steam 1,608 sq. ft.PM100.001089.7204,6
Steam Mbh 386Lead1.22E-060.0115,6
Steam Mbh 448
Nozzle: 3.50 x 80° BFormaldehyde5.55E-050.4995,6
1-Rf2 Big FilterPOMs3.01E-060.0275,6
Arsenic5.75E-070.0055,6
Beryllium3.43E-070.0035,6
Cadmium1.51E-060.0145,6
Chromium9.18E-060.0835,6
Lead1.22E-060.0115,6
Manganese1.92E-060.0175,6
Mercury4.11E-070.0045,6
Nickel2.33E-050.2105,6
IndustrialWeil-McLain Boiler #2#2 Diesel17730VOC3.4E-46.0281,6
Series 80, 580 boilerNOx0.02354.6002,6
SOx0.0721276.5603,6
I=B=R Input Lite Oil Gph 4.45CO0.00588.6502,6
I=B=R Gross Output Mbh 515PM0.00235.4604,6
Steam 1,608 sq. ft.PM100.0010819.1484,6
Steam Mbh 386Lead1.22E-060.0225,6
Steam Mbh 448
Nozzle: 3.50 x 80° BFormaldehyde5.55E-050.9845,6
1-Rf2 Big FilterPOMs3.01E-060.0535,6
Arsenic5.75E-070.0105,6
Beryllium3.43E-070.0065,6
Cadmium1.51E-060.0275,6
Chromium9.18E-060.1635,6
Lead1.22E-060.0225,6
Manganese1.92E-060.0345,6
Mercury4.11E-070.0075,6
Nickel2.33E-050.4135,6
IndustrialWeil-McLain Boiler #3#2 Diesel1379VOC3.4E-46.0281,6
Series 80, 580 boilerNOx0.02354.6002,6
SOx0.0721276.5603,6
I=B=R Input Lite Oil Gph 4.45CO0.00588.6502,6
I=B=R Gross Output Mbh 515PM0.00235.4604,6
Steam 1,608 sq. ft.PM100.0010819.1484,6
Steam Mbh 386Lead1.22E-060.0225,6
Steam Mbh 448
Nozzle: 3.50 x 80° BFormaldehyde5.55E-050.9845,6
1-Rf2 Big FilterPOMs3.01E-060.0535,6
Arsenic5.75E-070.0105,6
Beryllium3.43E-070.0065,6
Cadmium1.51E-060.0275,6
Chromium9.18E-060.1635,6
Lead1.22E-060.0225,6
Manganese1.92E-060.0345,6
Mercury4.11E-070.0075,6
Nickel2.33E-050.4135,6
Industrial Paint BoothFurnance (large)#2 Diesel1000VOC3.4E-46.0281,6
Power Flame Burner #010932577NOx0.02354.6002,6
Model #CM 63,850,000 BTMSOx0.0721276.5603,6
Diesel 5.5 Gph low and 22.0 Gph highCO0.00588.6502,6
PM0.00235.4604,6
PM100.0010819.1484,6
Lead1.22E-060.0225,6
Formaldehyde5.55E-050.9845,6
POMs3.01E-060.0535,6
Arsenic5.75E-070.0105,6
Beryllium3.43E-070.0065,6
Cadmium1.51E-060.0275,6
Chromium9.18E-060.1635,6
Lead1.22E-060.0225,6
Manganese1.92E-060.0345,6
Mercury4.11E-070.0075,6
Nickel2.33E-050.4135,6
Industrial Paint BoothFurnance (Small)#2 Diesel1000VOC3.4E-46.0281,6
Weather Rite #109996625NOx0.02354.6002,6
Burner G22-OBSOx0.0721276.5603,6
Diesel 5.5 Gph low and 20.0 Gph highCO0.00588.6502,6
PM0.00235.4604,6
PM100.0010819.1484,6
Lead1.22E-060.0225,6
Formaldehyde5.55E-050.9845,6
POMs3.01E-060.0535,6
Arsenic5.75E-070.0105,6
Beryllium3.43E-070.0065,6
Cadmium1.51E-060.0275,6
Chromium9.18E-060.1635,6
Lead1.22E-060.0225,6
Manganese1.92E-060.0345,6
Mercury4.11E-070.0075,6
Nickel2.33E-050.4135,6
WarehouseBurnham Boiler #1#2 Diesel1823VOC3.4E-46.0281,6
NOx0.02354.6002,6
Nozzle 2.0 x 60° BSOx0.0721276.5603,6
1-Rf2 Big FilterCO0.00588.6502,6
Gross Output Mbh 404PM0.00235.4604,6
Steam Sq. Ft. 1,263PM100.0010819.1484,6
Steam Mbh 303Lead1.22E-060.0225,6
Water Mbh 351
Light Oil Gph 3.5Formaldehyde5.55E-050.9845,6
POMs3.01E-060.0535,6
Arsenic5.75E-070.0105,6
Beryllium3.43E-070.0065,6
Cadmium1.51E-060.0275,6
Chromium9.18E-060.1635,6
Lead1.22E-060.0225,6
Manganese1.92E-060.0345,6
Mercury4.11E-070.0075,6
Nickel2.33E-050.4135,6
WarehouseBurnham Boiler #2#2 Diesel1823VOC3.4E-46.0281,6
NOx0.02354.6002,6
Nozzle: 2.0 x 60° BSOx0.0721276.5603,6
1-Rf2 Big FilterCO0.00588.6502,6
Gross Output Mbh 404PM0.00235.4604,6
Steam Sq. Ft. 1,263PM100.0010819.1484,6
Steam Mbh 303Lead1.22E-060.0225,6
Water Mbh351
Light Oil Gph 3.5Formaldehyde5.55E-050.9845,6
POMs3.01E-060.0535,6
Arsenic5.75E-070.0105,6
Beryllium3.43E-070.0065,6
Cadmium1.51E-060.0275,6
Chromium9.18E-060.1635,6
Lead1.22E-060.0225,6
Manganese1.92E-060.0345,6
Mercury4.11E-070.0075,6
Nickel2.33E-050.4135,6
Admin BuildingWeil-McLain Boiler #1#2 Diesel1823VOC3.4E-46.0281,6
Model #588NOx0.02354.6002,6
Nozzle: 2.50 x 80° BSOx0.0721276.5603,6
1-Rf2 Big FilterCO0.00588.6502,6
I=B=R Input Lite Oil 9.4PM0.00235.4604,6
Gross I=B=R Output BTU/HR 1,084,000PM100.0010819.1484,6
Water Mbh 943Lead1.22E-060.0225,6
Steam Sq Ft 3,388
Steam Mbh 813Formaldehyde5.55E-050.9845,6
POMs3.01E-060.0535,6
Arsenic5.75E-070.0105,6
Beryllium3.43E-070.0065,6
Cadmium1.51E-060.0275,6
Chromium9.18E-060.1635,6
Lead1.22E-060.0225,6
Manganese1.92E-060.0345,6
Mercury4.11E-070.0075,6
Nickel2.33E-050.4135,6
Admin BuildingWeil-McLain Boiler #2#2 Diesel1823VOC3.4E-46.0281,6
Model #588NOx0.02354.6002,6
SOx0.0721276.5603,6
Nozzle: 2.50 x 80° BCO0.00588.6502,6
1-Rf2 Big FilterPM0.00235.4604,6
I=B=R Input Lite Oil 9.4PM100.0010819.1484,6
Gross I=B=R Output BTU/HR 1,084,000Lead1.22E-060.0225,6
Water Mbh 943
Steam Sq Ft 3,388Formaldehyde5.55E-050.9845,6
Steam Mbh 813POMs3.01E-060.0535,6
Arsenic5.75E-070.0105,6
Beryllium3.43E-070.0065,6
Cadmium1.51E-060.0275,6
Chromium9.18E-060.1635,6
Lead1.22E-060.0225,6
Manganese1.92E-060.0345,6
Mercury4.11E-070.0075,6
Nickel2.33E-050.4135,6
UPH BarracksWeil-McLain Boiler #1#2 Diesel646.0VOC3.4E-40.2201,6
NOx0.0212.9202,6
Nozzle 1.50 x 60° BSOx0.07246.5123,6
CO0.0053.2302,6
I=B=R InputPM0.0021.2924,6
Oil Fired Rate GPH 2.35PM100.001080.6984,6
I=B=R OutputLead1.22E-060.0015,6
Gross Output BTU/H 229,600
Formaldehyde5.55E-050.0365,6
Steam NetPOMs3.01E-060.0025,6
I=B=R Output BTU/H 198,000Arsenic5.75E-070.0005,6
Net Sq Ft Water 1530Beryllium3.43E-070.0005,6
net Sq Ft Steam 835Cadmium1.51E-060.0015,6
Chromium9.18E-060.0065,6
Lead1.22E-060.0015,6
Manganese1.92E-060.0015,6
Mercury4.11E-070.0005,6
Nickel2.33E-050.0155,6
UPH BarracksWeil-McLain Boiler #2#2 Diesel254.0VOC3.4E-40.0861,6
NOx0.025.0802,6
Nozzle 1.50 x 60° BSOx0.07218.2883,6
CO0.0051.2702,6
I=B=R InputPM0.0020.5084,6
Oil Fired Rate GPH 2.35PM100.001080.2744,6
I=B=R OutputLead1.22E-060.0005,6
Gross Output BTU/H 229,600
Formaldehyde5.55E-050.0145,6
Steam NetPOMs3.01E-060.0015,6
I=B=R Output BTU/H 198,000Arsenic5.75E-070.0005,6
Net Sq Ft Water 1530Beryllium3.43E-070.0005,6
Net Sq Ft Steam 835Cadmium1.51E-060.0005,6
Chromium9.18E-060.0025,6
Lead1.22E-060.0005,6
Manganese1.92E-060.0005,6
Mercury4.11E-070.0005,6
Nickel2.33E-050.0065,6
D17 ArmoryWeil-McLain GOLD Boiler#2 Diesel3576.0VOC3.4E-41.2161,6
NOx0.0271.5202,6
Nozzle: 1-.65 x 70° BSOx0.072257.4723,6
1-Rf2 Big Filter 265-12CO0.00517.8802,6
I=B=R Burner 0.95PM0.0027.1524,6
DOE Heating Capacity MBH 115PM100.001083.8624,6
Net I=B=R Rating MBH 100Lead1.22E-060.0045,6
Formaldehyde5.55E-050.1985,6
POMs3.01E-060.0115,6
Arsenic5.75E-070.0025,6
Beryllium3.43E-070.0015,6
Cadmium1.51E-060.0055,6
Chromium9.18E-060.0335,6
Lead1.22E-060.0045,6
Manganese1.92E-060.0075,6
Mercury4.11E-070.0015,6
Nickel2.33E-050.0835,6
Commanding Officer HouseWeil-McLain GOLD Boiler #68#2 Diesel3576.0VOC3.4E-41.2161,6
Model #: P-468v-WTNOx0.0271.5202,6
Nozzle: 1.20 x 80° ASOx0.072257.4723,6
1-Rf2 Small FilterCO0.00517.8802,6
PM0.0027.1524,6
I=B=R Input Oil 1.25 GphPM100.001083.8624,6
Water Mbh 131Lead1.22E-060.0045,6
I=B=R Burner 0.95
DOE Heating Capacity MBH 115.000Formaldehyde5.55E-050.1985,6
Net I=B=R Rating MBH 100POMs3.01E-060.0115,6
Arsenic5.75E-070.0025,6
Beryllium3.43E-070.0015,6
Cadmium1.51E-060.0055,6
Chromium9.18E-060.0335,6
Lead1.22E-060.0045,6
Manganese1.92E-060.0075,6
Mercury4.11E-070.0015,6
Nickel2.33E-050.0835,6
Boat HouseWeil-McLain GOLD Boiler#2 Diesel3576.0VOC3.4E-41.2161,6
NOx0.0271.5202,6
Nozzle: 1.20 x 70° BSOx0.072257.4723,6
1-Rf2 Big FilterCO0.00517.8802,6
I=B=R Burner 0.95PM0.0027.1524,6
DOE Heating Capacity MBH 115PM100.001083.8624,6
Net I=B=R Rating MBH 100Lead1.22E-060.0045,6
Formaldehyde5.55E-050.1985,6
POMs3.01E-060.0115,6
Arsenic5.75E-070.0025,6
Beryllium3.43E-070.0015,6
Cadmium1.51E-060.0055,6
Chromium9.18E-060.0335,6
Lead1.22E-060.0045,6
Manganese1.92E-060.0075,6
Mercury4.11E-070.0015,6
Nickel2.33E-050.0835,6
GalleyWeil-McLain Boiler #1#2 Diesel3576.0VOC3.4E-41.2161,6
NOx0.0271.5202,6
Nozzle 3.50 x 60SOx0.072257.4723,6
CO0.00517.8802,6
I=B=R InputPM0.0027.1524,6
Oil Fired Rate GPH 2.35PM100.001083.8624,6
I=B=R OutputLead1.22E-060.0045,6
Gross Output BTU/H 229,600
Formaldehyde5.55E-050.1985,6
Steam NetPOMs3.01E-060.0115,6
I=B=R Output BTU/H 198,000Arsenic5.75E-070.0025,6
Net Sq Ft Water 1530Beryllium3.43E-070.0015,6
Net Sq Ft Steam 835Cadmium1.51E-060.0055,6
Chromium9.18E-060.0335,6
Lead1.22E-060.0045,6
Manganese1.92E-060.0075,6
Mercury4.11E-070.0015,6
Nickel2.33E-050.0835,6
GalleyWeil-McLain Boiler #2#2 Diesel2882.0VOC3.4E-40.9801,6
NOx0.0257.6402,6
Nozzle 3.50 x 60SOx0.072207.5043,6
CO0.00514.4102,6
I=B=R InputPM0.0025.7644,6
Oil Fired Rate GPH 2.35PM100.001083.1134,6
I=B=R OutputLead1.22E-060.0045,6
Gross Output BTU/H 229,600
Formaldehyde5.55E-050.1605,6
Steam NetPOMs3.01E-060.0095,6
I=B=R Output BTU/H 198,000Arsenic5.75E-070.0025,6
Net Sq Ft Water 1530Beryllium3.43E-070.0015,6
Net Sq Ft Steam 835Cadmium1.51E-060.0045,6
Chromium9.18E-060.0265,6
Lead1.22E-060.0045,6
Manganese1.92E-060.0065,6
Mercury4.11E-070.0015,6
Nickel2.33E-050.0675,6
GalleyAquaKinetics Heater #1#2 Diesel1682.0VOC3.4E-40.9801,6
NOx0.0257.6402,6
Brandford White CorporationSOx0.072207.5043,6
Model: CF-100-350-3ACO0.00514.4102,6
Serial #: HJ15499184PM0.0025.7644,6
PM100.001083.1134,6
Input: 350000 BTU/HRLead1.22E-060.0045,6
Rec: 355 GPH
Nozzle: 2.50/81° /BFormaldehyde5.55E-050.1605,6
Cap 100 gal.POMs3.01E-060.0095,6
Arsenic5.75E-070.0025,6
Beryllium3.43E-070.0015,6
Cadmium1.51E-060.0045,6
Chromium9.18E-060.0265,6
Lead1.22E-060.0045,6
Manganese1.92E-060.0065,6
Mercury4.11E-070.0015,6
Nickel2.33E-050.0675,6
Medical BuildingWeil-McLain Boiler #1#2 Diesel1622.0VOC3.4E-40.9801,6
NOx0.0257.6402,6
Nozzle 1-2.00 / 60° BSOx0.072207.5043,6
1-Rf2 Big FilterCO0.00514.4102,6
I=B=R InputPM0.0025.7644,6
Oil Fired Rate GPH 2.35PM100.001083.1134,6
I=B=R OutputLead1.22E-060.0045,6
Gross Output BTU/H 229,600
Formaldehyde5.55E-050.1605,6
Steam NetPOMs3.01E-060.0095,6
I=B=R Output BTU/H 198,000Arsenic5.75E-070.0025,6
Net Sq Ft Water 1530Beryllium3.43E-070.0015,6
Net Sq Ft Steam 825Cadmium1.51E-060.0045,6
Chromium9.18E-060.0265,6
Lead1.22E-060.0045,6
Manganese1.92E-060.0065,6
Mercury4.11E-070.0015,6
Nickel2.33E-050.0675,6
Medical BuildingWeil-McLain Boiler #2#2 Diesel928.0VOC3.4E-40.9801,6
NOx0.0257.6402,6
Nozzle 1-2.00 / 60° BSOx0.072207.5043,6
1-Rf2 Big FilterCO0.00514.4102,6
I=B=R InputPM0.0025.7644,6
Oil Fired Rate GPH 2.35PM100.001083.1134,6
I=B=R OutputLead1.22E-060.0045,6
Gross Output BTU/H 229,600
Formaldehyde5.55E-050.1605,6
Steam NetPOMs3.01E-060.0095,6
I=B=R Output BTU/H 198,000Arsenic5.75E-070.0025,6
Net Sq Ft Water 1530Beryllium3.43E-070.0015,6
Net Sq Ft Steam 825Cadmium1.51E-060.0045,6
Chromium9.18E-060.0265,6
Lead1.22E-060.0045,6
Manganese1.92E-060.0065,6
Mercury4.11E-070.0015,6
Nickel2.33E-050.0675,6
References:
1.0Emission factor for volatile organic compounds (VOC) is from U.S. EPA AP-42, External Combustion Sources,
Chapter 1.3 Fuel Oil Combustion, Table 1.3-4, 1/95.
2.0Emission factors for nitrogen oxides (NOx) and carbon monoxide (CO) are from U.S. AP-42, External Combustion
Sources, Chapter 1.3 Fuel Oil Combustion, Table 1.3-2, 1/95.
3.0Emission factor for sulfur oxides (SOx) is from the U.S. AP-42, External Combustion Sources, Chapter 1.3
Fuel Oil Combustion, Table 1.3-2, 1/95. Sulfur content in the fuel is assumed to be 0.5%.
4.0Emission factors for particulate matters (PM & PM10) are from the AP-42, External Combustion Sources,