Annex 4 - Phase 2 Attachments

View the file

Other files

File Type Posted
ASHA FY23 RFA 720DD123RFA00001 - Q&A.pdf PDF
Changes to FY23 RFA 720DD123RFA00001 FINAL (3.30.23) CLEARED.pdf PDF
ANNEX 7 - PHASE 2 Acronyms for FY23 RFA.pdf PDF
ANNEX 6 - PHASE 2 Standard Provisions for FY23 RFA.pdf PDF
ANNEX 5 - Application Documents Layout for FY23 RFA.pdf PDF
ANNEX 3 - PHASE 2 Business Application Budget Template for FY23 RFA.xlsx XLSX spreadsheet
ANNEX 2 (CLEAN) - PHASE 2 Application for FY23 RFA.docx (UPDATED).docx DOCX document
ANNEX 1 - PHASE 1 App for FY23 RFA.docx DOCX document
FY23 RFA 720DD123RFA00001 FINAL (6.22.2023) CLEARED.pdf PDF
ASHA FY23 RFA 720DD123RFA00001 - Public Comment Responses.pdf PDF
ASHA Google Form Application Submission Guidance.pdf PDF
ASHA Google Form Application Submission Guidance.pdf PDF
ASHA Google Form Application Submission Guidance.pdf PDF
Changes to FY23 RFA 720DD123RFA00001 (01.19.2023).pdf PDF
FY23 RFA 720DD123RFA00001 DRAFT 1.19.23 CLEARED for Public Comment.pdf PDF
ANNEX 7 - PHASE 2 Acronyms for FY23 RFA.pdf PDF
ANNEX 6 - PHASE 2 Standard Provisions for FY23 RFA.pdf PDF
ANNEX 5 - Application Documents Layout for FY23 RFA.pdf PDF
ANNEX 4 - PHASE 2 Attachments for FY23 RFA.pdf PDF
ANNEX 3 - PHASE 2 Business Application Budget Template for FY23 RFA.xlsx XLSX spreadsheet
ANNEX 2 - PHASE 2 Application for FY23 RFA.docx DOCX document
ANNEX 1 - PHASE 1 App for FY23 RFA.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

American Schools and Hospitals Abroad Initiative Solicitation No.: 720DD123RFA00001

ANNEX 4 - MANDATORY ATTACHMENTS AND

MANDATORY AS APPLICABLE ATTACHMENTS

A. MANDATORY ATTACHMENTS:

The following attachments are mandatory for all applicants submitting a full application.

� M1 – USO Audited Financial Statements Maximum file size: 1 GB Applicants must include an attachment containing the most recent Single Audit (A-133 audit) and/or independently audited financial statements of the USO with accompanying letter of audit findings and management letter on internal controls. If both audits are available, please submit both. The audited financial statements must be from 2020 or later and be in English. ASHA will only accept independently audited financial statements of the USO. ASHA will not accept a financial review, compilation, tax return, independent accountant’s review or other materials in lieu of independently audited financial statements. The audited financial statements provided must be complete and cannot be missing the auditor’s opinion, auditor’s signature, commentary, or other components included in the original document provided by the independent auditing institution. ASHA will not accept drafts of audited financial statements. The audited financial statements may not be provided with supplemental attachments intended to provide information that should be included in the original audited financial statements such as excel sheets documenting the financial figures being reviewed in the audited financial statements (i.e., providing independent audited financial statements without the monetary figures, and instead providing them as a separate attachment). All financial figures, commentary, and facts contained within the audited financial statements should be presented in their original form, unedited, without additional attachments to supplement information that should be present but is otherwise missing. Audited financial statements with missing information, figures, or supplemental attachments (other than translations) will render the application ineligible. This information must be submitted as a separate attachment named “M1 - USO Audited Financial Statements.”

� M2 – OSI Audited Financial Statements Maximum file size: 1 GB Applicants must include an attachment containing the most recent independently audited financial statements of the OSI. The audited financial statements must be from 2020 or later. If originally completed in a language other than English, applicants must provide the English translation of the audited financial statements. If originally completed using a currency other than the U.S. dollar (USD), applicants must provide a version that converts local currency to U.S. dollars. ASHA will only accept independently audited financial statements of the OSI in English or with English translation provided, and in USD or with USD conversion provided. ASHA will not accept unaudited financial statements, OSI financial statements in a language other than English, or financial statements in a currency other than the U.S. Dollar. ASHA will not accept a financial review, compilation, tax return, independent accountant’s review or other materials in lieu of independently audited financial statements. The audited financial statements provided must be complete and cannot be missing the auditor’s opinion, auditor’s signature, commentary, or other components. ASHA will not accept drafts of audited financial statements. The audited financial statements may not be provided with supplemental attachments such as excel sheets documenting the financial figures being reviewed in the audited financial statements (other than USD conversion). All financial figures, commentary and facts contained within the audited financial statements should be presented in their original form, unedited without additional attachments to supplement information that should be present but is otherwise missing. Audited financial statements with missing information, figures, or supplemental attachments (other than translations or conversions to USD) will render the application ineligible. This information must be submitted as a separate attachment named “M2 - OSI Audited Financial Statements.” If the USO and OSI are the same entity, there is no need to submit independently audited financial statements for the OSI. If the USO and OSI are the same entity, please submit M2 stating "M2 - N/A since USO and OSI are the same legal entity."

� M3 – USO Project Manager Maximum file size: 10 MB Applicants must submit a 1-page resumé(s) of the Project Manager(s) (not the construction or renovation management) who will be responsible for managing this project at the USO. Information detailing licensure, certification and professional society memberships must be included. This information must be submitted as a separate attachment named “M3 - USO Project Manager.”

� M4 – OSI Project Manager Maximum file size: 10 MB Applicants must submit a 1-page resumé(s) of the Project Manager(s) who will be responsible for managing this project (not construction or renovation management) at the OSI. Information detailing licensure, certification and professional society memberships must be included. This information must be submitted as a separate attachment named “M4 - OSI Project Manager.” If the USO and OSI are the same legal entity, there is no need to submit a project manager for the OSI. If the USO and OSI are the same legal entity, please submit M4 stating "M4 - N/A since USO and OSI are the same legal entity."

� M5 – USO Board of Directors Maximum file size: 10 MB Applicants must submit a table showing the members of the USO’s Board of Directors, with columns for names, titles, and employers. This information must be submitted as a separate attachment named “M5

- USO Boards of Directors.” If the USO and OSI are the same legal entity, indicate if any board member was appointed by a foreign government.

� M6 – OSI Board of Directors Maximum file size: 10 MB Applicants must submit a table showing the members of the OSI’s Boards of Directors, with columns for names, titles, employers, and an indication for every board member stating whether they are appointed by the host country government. ASHA will not accept applications that fail to include in the M6 attachment statements indicating whether or not each member of the OSI board of directors is appointed by the host country government. This information must be submitted as a separate attachment named “M6 - OSI Board of Directors”. If the USO and OSI are the same legal entity there is no need to submit a board of directors for the OSI as they would be the same. If the USO and OSI are the same legal entity submit M6 stating "M6 - N/A since USO and OSI are the same legal entity."

B. MANDATORY AS APPLICABLE ATTACHMENTS:

The following attachments are required for applicants, as applicable:

� MA1 – Conceptual Construction Drawings (“1 of 3,” ‘2 of 3,” etc., as necessary) Maximum files: 10; Maximum file size: 1 GB

All projects that include construction or renovation must provide conceptual construction drawings as noted below. The construction drawings for the proposed construction/ renovation must provide sufficient detail to give the evaluation committee an idea of what the project entails and that primary elements of design have been identified. These drawings should be submitted using as few attachments as possible. Applicants submitting an application involving construction or renovation projects that fail to include a separate attachment for construction drawings will be deemed ineligible.

Note that all measurements must be in metric system units, per 2 CFR 700.6. All drawings must be drawn to an appropriate scale showing the scale on the drawing and each drawing must have a title. The drawings must be labeled in English, and must include the following as a minimum:

1. A Site Layout Plan describing approximate location of main features, and if available, property lines, utilities, easements and/or other land use restrictions, existing buildings or structures and any wetlands or other environmentally protected areas. The site layout plan must include major site elements such as sidewalks, parking, roads, etc.

2. If demolition is required, Site Demolition Drawing showing major structures and improvements to be demolished.

3. A Site Drainage Plan showing the general flow of drainage and possible major drainage feature locations.

4. A Utility Location Plan, that identifies existing utilities, required or suggested connection/ hookup points such as power supply, potable water supply, wastewater collection and disposal,

5. Conceptual Architectural Drawings showing typical floor plans (must label all rooms and show area of each floor), and typical side elevations both complying with Americans with Disabilities Act (ADA). Description of building materials.

6. Conceptual Structural Drawings showing foundations and structural elements of the design.

The drawings must also take into account the following:

● In the case of special facilities like preservation of historic buildings, large auditorium, multi-story libraries and such, the conceptual drawings must demonstrate awareness of structural, space and safety considerations. Likewise, in the case of unique civil features such as large retaining walls or off-grid utilities, the drawings must demonstrate the feasibility of what is proposed, to make sure that has been factored into the estimated costs.

● In the case of special equipment, additional drawings should be submitted to ensure adequate structure, electrical, mechanical considerations are incorporated into the project.

● List of additional documents that may be provided post-award. This list is presented to make applicants aware of additional considerations they may need to plan for.

a. The conceptual landscape plan that establishes a minimum level of landscaping for the project

b. Conceptual fire protection that indicates fire water tanks and whether sprinklers are pressurized or gravity fed.

c. Conceptual Mechanical drawings that show preliminary heating ventilation and air condition (HVAC) system description, locations of plumbing fixtures and gas, water and/or sewer service points. Mechanical rooms and vertical shafts or risers should be sized and shown on the conceptual floor plans. (Note that conceptual mechanical, electrical, and plumbing drawings may be combined if the situation warrants).

d. Conceptual Electrical drawings that show large features, distribution nodes, generators, etc.

If some required drawings are not required for your type of construction, please note this in the submission.

The file name of each attachment related to this requirement should begin with “MA1 - Conceptual Construction Drawings,” followed by an indication of each attachment’s order within all construction drawings. For example, an application with three construction drawings attached would name these attachments “MA1 - Conceptual Construction Drawings 1 of 3”, “MA1 - Conceptual Construction Drawings 2 of 3,” and “MA1 - Conceptual Construction Drawings 3 of 3.” The required construction drawings and additional optional construction drawings should utilize the same file-naming convention.

� MA2 – Conceptual Project Implementation Plan Maximum file size: 100 MB All projects that include construction or renovation must submit a Conceptual project Implementation Plan. This information must be submitted as a separate attachment named “MA2 - Conceptual Project Implementation Plan.”

● Milestones and preliminary plan for all mandatory ASHA approvals: monitoring & evaluation plan, final project implementation plan, environmental/Climate risk analysis and final construction documents.

● Implementation Schedule (provide a schedule, no Gantt Chart’s required)

○ Timeline to include but not limited to planning, permitting, procurement of A&E firm, procurement of construction firm, design phase, construction phase and projected completion date.

● Organizational Chart or Staffing Plan

● Timeline and plan for O&M Plan

Applicants submitting an application involving construction or renovations projects that fail to include a separate attachment for the Conceptual Project Implementation Plan will be deemed ineligible.

� MA3 – Land Ownership or Lease Maximum file size: 100 MB All projects that include construction or renovation must submit proof of land ownership or a lease for applications. If these documents are not in English, the applicant must provide an English translation of these documents. Applicants that submit land ownership or lease documents in a language other than English without an English translation will be deemed ineligible. The applicant must submit an official copy of a title, lease or similar official documentation recognized within the country where implementation will take place demonstrating a legal right to the land (to build, renovate, retrofit according to current building codes) ideally for a period of at least 20 years from the date of the application. While applications involving a legal right to the land of 20 years (or more) will be given a greater preference, USAID is willing to consider applications that include a title, lease or similar official documentation covering a shorter period of time, but such applications will be given a lower preference.

This information must be submitted as a separate attachment named “MA3 - Land Ownership or Lease” and a translation, if needed, should be included.

� MA4 – Construction Manager Maximum file size: 10 MB All projects that include construction or renovation must submit a 1-page resumé(s) of the Construction Manager(s) who will be responsible for managing the renovation/construction portion of the project.

This person cannot be the USO or OSI Project Manager. Information detailing licensure, certification and professional society memberships must be included. If the name of the Construction Manager is not known at this time, please document your process for identifying a Construction Manager. If the applicant is successful, submit the resumé of the Construction Manager post award, to your AOR. This information must be submitted as a separate attachment named “MA4 – Construction Manager”.

� MA5 – Proof of legal entity registration for Same Entities Maximum file size: 100 MB In cases where the OSI and the USO are the “same entity,” the applicant must provide proof with the Phase 2 Technical Application (not Phase 1) that it is registered as a legal entity in the U.S. and that it is authorized to operate in the foreign country.

The following types of documentation would be acceptable proof: 1) Letter of accreditation,

2) written statement from the Government-on-Government letterhead acknowledging the entity, or 3) the entity’s documentation showing a government stamp. *For OSIs operating in contexts where submission of proof is not possible, please provide an explanation under MA5 which must correspond with Annex I.