ANNEX 3 - PHASE 2 ENVIRONMENTAL for FY20 RFA (12.4.2019).pdf

PDF 1 MB Posted

Attached to
American Schools and Hospitals Abroad Program Worldwide
Opportunity number
72ASHA20RFA00001-PC
Issued by

About this file

Annex 3

View the file

Other files

File Type Posted
ASHA FY20 RFA Public Comment Responses _CLEARED 2(30Jan2020).pdf PDF
Global IEE Annex I_Template for Quarterly Progress Report.pdf PDF
Global IEE Annex H_Form for Hosting a Green Meeting.pdf PDF
Global IEE Annex G_Form for ASHA-Cleared A_E Service Provider Certification.pdf PDF
Global IEE Annex F_Template for Water Quality Assurance Plans.pdf PDF
Global IEE Annex E_Template for Construction SUAP.pdf PDF
Global IEE Annex D_Template and Guidance for Climate Risk Management.pdf PDF
Global IEE Annex C_Template for Environmental Mitigation and Monitoring Plan.pdf PDF
Global IEE Annex B_Template for Initial Environmental Examination.pdf PDF
Global IEE Annex A_Template for Environmental Capability Statement.pdf PDF
ASHA FY 2019-2023 Global IEE.pdf PDF
ASHA Q&A for FY20 RFA_72ASHA20RFA00001 - (1.21.2020).pdf PDF
ASHA FY20 RFA_72ASHA20RFA00001 - (12.04.2019).pdf PDF
ANNEXES 7 & 8 - PHASE 2 STANDARD PROVISIONS & ACRONYMS for FY20 RFA (12.4.2019).pdf PDF
ANNEX 6 - PHASE 2 MANDATORY & AS APPLICABLE for FY20 RFA (12.4.2019).pdf PDF
ANNEX 5 - PHASE 2 SAM for FY20 RFA(12.4.2019).pdf PDF
ANNEX 4 - PHASE 2 BUSINESS APPLICATION TEMPLATES for FY20 RFA (12.4.2019).docx DOCX document
ANNEX 4 - PHASE 2 BUSINESS APPLICATION COVER PAGE for FY20 RFA (12.4.2019).pdf PDF
ANNEX 2 - PHASE 2 TEMPLATE for FY20 RFA(12.4.2019).docx DOCX document
ANNEX 2 - PHASE 2 COVER PAGE for FY20 RFA (12.4.2019).pdf PDF
ANNEX 1 - PHASE 1 for FY20 RFA (12.4.2019).pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANNEX 3 – ENVIRONMENTAL CAPABILITY STATEMENT TEMPLATE1

Applicants must complete all questions below and submit to ASHA with the application.

USO/OSI Pair Name:

Commodities Only Construction with Commodities without Commodities

NOTE: Applicants are advised to review guidance for each question as in the ASHA Initial Environmental Examination (IEE) of ASHA environmental policies and procedures globally.

1. Institutional Arrangements: Is staffing in place to complete IEE and CRM analysis and implementation? (Yes/No): _______. Please describe:

2. Site Selection: Will the project be located in or near sensitive ecosystems and-or hazard-prone areas? (Yes/No): _______ Please describe corrective actions:________

3. Toxics: Will toxic construction materials be involved (e.g., asbestos)? (Yes/No/Not Applicable): __________________

4. Pesticides: Will the project need to address pest control and (if relevant) procure and or use pesticides? (Yes/No): _______ Are any pesticides that are needed already described in the USAID ASHA Construction Pesticide Evaluation and Safe Use Action Plan or PERSUAP?

(Yes/No): _______

5. Water Supply: Will the project ensure adequate water quality assurance (e.g., fecal coliforms, arsenic) to meet projected demand, and considering climate projections?

(Yes/No): _______. Please describe:

6. Solid Waste: How will the project dispose of solid waste (construction waste, electronic waste etc.) generated by its activities?

7. Sanitary Waste: How will the project dispose of sanitary waste streams generated by its activities?

- 2 -

8. Medical Waste: Will medical waste be generated? (Yes/No/Not Applicable):

_________________Please describe the disposal mechanisms for medical waste generated.

9. Energy: Will the project employ energy efficiency measures and/or non-fossil fuel energy sources (e.g., hydropower, wind and solar panels)? (Yes/No): _______ Please describe:

10. Climate Risks and Opportunities: Will climate risk and /or vulnerability assessments be used to inform project design in all issues listed above, particularly site selection, location of procured commodities (e.g., consideration of flood risk in basements), water supply, and construction materials? (Yes/No): _______ Please describe:

1This statement of capability is developed by the applicant at the pre-award stage only. Following award, successful awardees are required to submit additional environmental and climate analyses as described in the ASHA IEE.

2 Site Selection Will the project be located in or near sensitive ecosystems andor hazard:
Please describe:
3 Toxics Will toxic construction materials be involved eg asbestos YesNoNot:
Please describe corrective actions:
in the USAID ASHA Construction Pesticide Evaluation and Safe Use Action Plan or:
5 Water Supply Will the project ensure adequate water quality assurance eg fecal:
6 Solid Waste How will the project dispose of solid waste construction waste electronic:
Please describe_2:
sources eg hydropower wind and solar panels YesNo:
10 Climate Risks and Opportunities Will climate risk and or vulnerability assessments be:
Text2:
Type Project: Off
Check Box4: Off
Check Box5: Off
Text6:
Text8:
Text9:
Text10:
Text11:
Text12:
Text13:

File details come from the government source that posted it.