ANL-70 Request for Quotation.doc
DOC document 2 MB Posted
- Attached to
- Invasive Species Control Services
- Solicitation number
- 3-B175-Q-00668-00
- Issued by
-
Department of Energy Office of Science
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 0003.doc | DOC document | |
| Addendum 0002.doc | DOC document | |
| Addendum 0001.doc | DOC document | |
| SOW.docx | DOCX document | |
| On-Site Work (High)-16-MAY-2023.PDF | ||
| Appendix A-71COM-13-FEB-2023.PDF | ||
| Instructions for Bidders.doc.doc | DOC document | |
| ANL-70B Reps and Certs.docx | DOCX document | |
| PRICE SCHEDULE.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANL-70 (February 22, 2013)
UCHICAGO ARGONNE, LLC
OPERATOR OF
ARGONNE NATIONAL LABORATORY
BLDG. 201 OCF, 9700 S. Cass Ave., Lemont, IL 60439
(CONTRACT NO. DE-AC02-06CH11357)
REQUEST FOR QUOTATION
THIS IS NOT AN ORDER
NOTICE:
1. The right is reserved to accept or reject quotations on each item separately unless your quotation states otherwise.
2. The right is reserved to accept minor deviations from specifications herein listed or referenced.
3. Firm prices are requested. If other than firm prices are quoted, conditions of escalation are to be stated.
4. If material is packaged in returnable containers the amount of deposit, if any, is to be stated together with instructions for returning.
5. Terms and Conditions referenced below will apply to any resulting Purchase Order.
| Address Reply To: |
| Jenna Doria |
| PHONE: |
| (630)252-6988 |
| Date |
| 06/16/2023 |
| Inquiry No. |
| 3-B175-Q-00668-00 |
| Quotation must be received by: |
| 06/30/2023 |
| ITEM NO. |
| QUANTITY |
| DESCRIPTION |
| UNIT PRICE |
| TOTAL |
Please furnish a firm fixed price quotation to supply the materials and/or services as indicated on the pricing scheduled, attached hereto and made a part hereof. This is made in accordance with the Statement of Work entitled, NATURAL RESOURCES HABITAT RESTORATION and GREEN INFRASTRUCTURE, dated April 2023.
This contract is for a BPA of one base year and two (2) additional option years.
All applicable documentation to this solicitation is identified on page two (2)
Any inquiries are to be directed to Jenna Doria at (630) 252-6988 or jdoria@anl.gov
Please provide your response no later than 06/30/2023
Any resulting Purchase Order will be subject to the Argonne Terms and Conditions attached hereto and made part of hereof and will be exempt from Illinois Occupation and Use Taxes and from Manufacturers and Retailers Excise Taxes.
We quote you F.O.B. Destination. Shipment can be made in days from receipt of order.
| Cash Terms |
| Net 30 days |
| Will Ship Via* |
Date
*If Shipment will not be made via FedEX, UPS, or USPS, Please provide estimate of weight and volume _________________________________________ cft
COMPLETE AND RETURN ONE COPY
PLEASE MARK “NO BID” IF YOU CANNOT QUOTE
AUTHORIZED SIGNATURE
| ITEM |
| NAME |
| MODEL/PART# |
| QTY |
| UNIT |
| UNIT PRICE |
| EXTENDED PRICE |
| DESCRIPTION |
| 0001 |
| BPA - Invasive Species |
| n/a |
| 1 |
| Year |
Contractor to control invasive species on ANL Site per attached SOW.
| 0002 |
| BPA - Invasive Species - OP1 |
| n/a |
| 1 |
| Year |
Option Year 1
| 0003 |
| BPA - Invasive Species - OP2 |
| n/a |
| 1 |
| Year |
Option Year 2
High-Risk Applicable Documentation:
The following applicable documentation is attached hereto and made a part hereof:
1. Appendix "A" Argonne Terms and Conditions for Commercial Items and Services, ANL-71-COM, dated 02/13/2023 (Review and Accept)
2. High Risk Work by Contractors on the Argonne Site Supplemental Conditions, ANL-366H, dated 05/16/2023 (Review and Accept)
3. Instructions to Bidders, dated 06/16/2023 (Review)
4. Statement of Work entitled, NATURAL RESOURCES HABITAT RESTORATION and GREEN INFRASTRUCTURE, dated 04/2023 (Review)
5. High Risk Job Safety Analysis, ANL-209H, dated 03/25/2022 (Complete)
6. Reps & Certs, ANL-70B, dated 06/06/2022 (Complete)
7. Price Schedule, Natural Resources Habitat Restoration, and Green Infrastructure 2023 Cost Sheet (Complete)
All quotations shall be responsive to the terms and conditions made a part of this solicitation. Any exceptions taken shall be detailed and refer to specific Articles of the Applicable Documentation.
Contractor's work on the Argonne site is subject to compliance with the ES&H requirements identified in item 2.
The contractor’s installation/service personnel are responsible for the removal and off-site disposal of any debris resulting in the performance of this work.
Instructions for High Risk Service on the Argonne Site The High Risk Work By Contractors On The Argonne Site Supplemental Conditions is attached hereto and made a part hereof.
The following must be completed and returned per the instructions prior to issuance of any resulting award:
1. Completed High Risk Job Saftey Analysis Form, ESH-209, is to be sent to the Argonne Procurement Representative, Jenna Doria-Garner, via e-mail at jdoria@anl.gov. For site access and for coordination/scheduling of delivery, the Argonne Technical Representative must obtain a fully executed copy of the ESH-209 form.
1. Insurance Certificate, as noted in Section Three (3) of Form ANL-366H, is to be sent to the Argonne Procurement Representative, Jenna Doria-Garner, via e-mail at jdoria@anl.gov and shall provide by appropriate language that The UChicago Argonne, LLC, The University of Chicago and the US Government are additional insureds; that the insurance afforded by such policies is primary insurance and, that all rights of the insurer for contribution from other insurers of The UChicago Argonne, LLC, The University of Chicago and the US Government are waived.
No on-site work shall begin until a “Notice to Proceed” is received by the contractor from the Argonne Procurement Representative.
A “Notice to Proceed” will not be issued until both the High Risk Job Safety Analysis Form, ESH-209, and the required Insurance Certificate is obtained.
| SOURCE |
| TITLE AND DATE |
| On-Site Work (High) |
| High Risk Work by Contractors on the Argonne (05/16/23) |
| Appendix A-71COM |
| Appendix A Terms and Conditions for Commercia (02/13/23) |
BLANK PAGE
PAGE
File details come from the government source that posted it. Updated .