AMP 115 Andrews Square Water Damage Restoration – Invitation for Bid

This Invitation for Bid (IFB) document is issued by the Oklahoma City Housing Authority (OCHA) for water damage restoration services at Andrews Square, a residential complex located at 2101 S. Harvey Avenue, Oklahoma City, Oklahoma. The project scope encompasses comprehensive restoration of water-damaged dwelling units to safe, code-compliant, and move-in ready condition. Work includes selective demolition, drywall and insulation replacement, texture and painting, flooring repairs and replacement, installation of owner-furnished kitchen cabinets, countertop installation, plumbing fixture replacement, electrical device replacement, HVAC cleaning, finish carpentry, restoration of interior finishes, and final cleaning. The IFB was issued on July 30, 2026, and qualified contractors must provide all labor, supervision, materials (unless otherwise noted), equipment, tools, permits, transportation, disposal, incidentals, and related services necessary to complete the project.

The document establishes the requirements for bid submission and contractor qualifications necessary to execute water damage restoration work at the Andrews Square property. Interested contractors should review all technical specifications, site conditions, and project requirements detailed within the IFB package. OCHA will evaluate bids based on contractor qualifications, experience with similar restoration projects, proposed timelines, and pricing. Contractors are responsible for obtaining all necessary permits and ensuring compliance with applicable local, state, and federal codes and regulations throughout the project duration.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IFB 2026-006

AMP 115, Andrews Square Water Damage Restoration

INVITATION FOR BID (IFB)

Oklahoma City Housing Authority

Invitation for BID (IFB)

IFB # IFB2026-006, AMP 115, Andrews Square Water Damage Restoration Page 1 | 8

INVITATION FOR BIDS IFB NO. 2026-006

AMP 115, Andrews Square Water Damage Restora�on

Owner: Oklahoma City Housing Authority

1700 N.E. 4th St., Oklahoma City, OK 73117

Contact: Spencer Matheny, smatheny@ochanet.org Support: Misty Johnson, mjohnson@ochanet.org

1. INTRODUCTION

The Oklahoma City Housing Authority (OCHA) is soliciting sealed bids from qualified contractors for the Water Damage Restoration at AMP 115, Andrews Square, located at 2101 S. Harvey, Oklahoma City, OK.

All work shall be performed in accordance with the General Reconstruc�on/Moderniza�on Specifica�ons (Atachment H-1), Supplemental Water Damage Restora�on Requirements (Atachment H-2), Material Specifica�ons (Atachment H-3) and the A8RM4 OKC HA Scope of Damage prepared by Summit Claims (Atachment H-4).

All construction activities must be coordinated to allow for uninterrupted operation of the occupied property. The contractor is responsible for ensuring that all resident access points—building entries and exits—remain clear, safe and operational at all times throughout the duration of the project.

2. BID SUBMISSION

• Due Date: Thursday, October 1, 2026 @ 1:30 CST

• Bid Opening: Thursday, October 1, 2026 @ 1:30 CST Public – bidders may attend

• Pre-Bid Conference: Thursday, September 3, 2026 @ 09:00 CST

• Location: 1700 N.E. 4th Street, Oklahoma City, OK 73117

• Submission Format: One (1) original hard copy o It is the bidder’s sole responsibility to ensure delivery of the sealed bid by the deadline.

o Late deliveries, including delays by couriers or mail services, will not be accepted.

Ques�ons and Addenda

All questions or requests for clarification regarding this Invitation for Bids (IFB) must be submitted via the Housing Agency Market Place (HAM) website: https://www.housingagencymarketplace.com/

• Deadline for Questions:

All questions must be submitted no later than Thursday, September 17, 2026, at 12:00

CST.

• Addenda Issuance Deadline:

If necessary, a final addendum will be issued no later than Thursday, September 24, 2025.

Any responses or clarifications will be issued through formal written addenda and shared with all known prospective bidders. It is the bidder’s responsibility to ensure they have received and reviewed all issued mailto:smatheny@ochanet.org mailto:mjohnson@ochanet.org https://www.housingagencymarketplace.com/

IFB # IFB2026-006, AMP 115, Andrews Square Water Damage Restoration Page 2 | 8 addenda prior to bid submission. Failure to acknowledge any addenda may result in disqualification of the bid.

2.1 BID PACKAGE INSTRUCTIONS

Each bid package must include the documents listed below, organized in the order specified. This is a multi-step bidding process, and compliance with these instructions is mandatory for consideration.

Ini�al Bid Submission Requirements

All bidders are required to submit the following documents by the bid submittal deadline. Initial bid documents must be unfolded and enclosed in a sealed envelope clearly labeled with the IFB number and contractor information.

Required Documents (in order) for initial BID:

���� 1. OCHA 574 – IFB Contractor Contact Form ➤ Must be completed using the PDF fillable form.

���� 2. OCHA 571 – Pricing Worksheet (BID FORM)

���� 3. Certificate – BID Bond ➤ Equal to 5% of the total bid amount offered to complete the project.

���� 4. HUD 5369-A – Representations, Certifications, and Other Statements of Bidders

���� 5. Experience Summary (Résumé) ➤ Include a description of the contractor’s relevant qualifications and experience in performing similar work.

Failure to follow the specified formatting or omission of required documents may result in your bid being deemed non-responsive.

If you have any questions regarding document access or submission procedures, contact OCHA Contracting Officer prior to the bid deadline.

Each bid package must include the documents listed below, organized in the order specified.

This is a multi-step bidding process, as described:

• Step One – Required with Initial Bid Submission:

o Submit all documentation listed in Section A at the time of initial bidding.

• Step Two – Post-Bid Submission (Apparent Low Bidder Only):

o If determined to be the apparent low bidder, the contractor will be notified by OCHA and must submit or complete any additional required documentation outlined in Section B within 10 business days of notification.

• Step Three – Review:

IFB # IFB2026-006, AMP 115, Andrews Square Water Damage Restoration Page 3 | 8 o Apparent Low Bidder is expected to read and review the materials listed in Section C prior to submitting their required documents to the Contracting Officer.

• Step Four – For Use During the Project:

o The documents referenced in Section D are to be used throughout the duration of the project by the selected contractor.

A. Contractor to submit for initial BID.

1.1.1 OCHA 574 – IFB Contractor Contact Form

1.3 OCHA 571 – Pricing Worksheet

1.2 HUD 5369-A - Representations, Certifications, and Other Statements of Bidders Certificate BID Bond – 5% (entire amount - the contractor is offering to complete the project.)

Resume’ Experience Summary – (What experience do you have in providing such services requested)

Sealed bid packages must be delivered to:

Oklahoma City Housing Authority Attn: Technical Services Department 1700 NE 4th St.

Oklahoma City, OK 73117

B. Awarding of a Contract (apparent low bidder only) shall be conditioned on receipt of the following:

a. All documents listed below, along with any addi�onal documents requested by the Contrac�ng Officer, must be submited via email atachment to contractingoffice@ochanet.org.

b. All forms and documents provided as part of this Invitation for Bids (IFB) are fillable digital files. Contractors, please attempt to complete all documents electronically and submit them in digital format.

c. All required documents for this Invita�on for Bid (IFB) are included within the atached package, organized into four separate file folders for clarity and ease of reference.

d. Build America, Buy America Act (BABA) Compliance

TAB TITLE

1.1 OCHA 567 - Contractor Application

1.4 W-9 FORM - Request for Taxpayer Identification Number and Certification

1.5 F3881 ACH – Vendor / Miscellaneous Payment Enrollment Form

1.6 OCHA 569 – Contractor Requirements

1.7 OCHA 565 – Debarment and Suspension Certification

1.8 OCHA 566 – Section 3 Acknowledgment Form

1.9 HUD Form 5370 - General Conditions for Construction Contracts (Section 27 (3)

1.10 OCHA 570 – Non-Collusive Affidavit

mailto:contractingoffice@ochanet.org

IFB # IFB2026-006, AMP 115, Andrews Square Water Damage Restoration Page 4 | 8

1.11 OCHA 572 – Document Acknowledgement Form

1.12 HUD 4736B – Section 3 Employee – Employer Cert Form

Statement Financial Statement (within the past 60 days) Statement Submit a signed BABA Compliance Certification with their bid and must provide supporting documentation throughout the project to demonstrate adherence.

Statement Subcontractor List (if applicable) Certificate Certificate of Good Standing – State Level (Certificate of Existence or Certificate of

Status) Certificate Oklahoma Business License Certificate BID Bond 5%, Performance and Payment Bonds – 100% of the contract price Certificate Workers’ Comp, General Liability, and Automobile Insurance (Listing OCHA as additional insured) The apparent successful bidder will also direct its insurance broker or carrier to deliver directly to OCHA’s Contracting Officer (email is preferred)

NOTE: The apparent successful bidder will NOT deliver these certificates—the insurance broker or carrier will do so.

C. Awarding of Contract (Document Review) shall be reviewed before submitting:

TAB TITLE

2.1 HUD Form 5369 (Instructions to Bidders for Contracts)

2.3 HUD Form 2554 (Supplementary Conditions of the Contract for Construction)

2.4 HUD Form 4010 (Federal Labor Standards Provisions)

2.5 DBWD – (Building Wage Rates)

2.5.1 DBWD – (Residential Wage Rates)

2.6 OCHA 564 – Section 3 Information Pamphlet

2.7 Contract Sample only

D. The Awarded Contractor shall utilize throughout the duration of the project, including any additional items as required. Documentation must be provided upon request, as directed by the Contracting Officer.

TAB TITLE

3.1 OCHA 568 – Lien Waiver and Release Form (Last Payment Request – Final inspection approved))

3.2 HUD-51000 – Schedule of Amounts for Contract Payments

3.3 HUD-51001 – Periodic Estimate for Partial Payment

3.4 HUD-51002 – Schedule of Change Orders

3.5 HUD-51003 – Schedule of Materials Stored

3.6 HUD-51004 – Summary of Materials Stored

3.7 HUD-5372 – Construction Progress Schedule

3.8 WH-347 (Wage and Hour Division PAYROLL)

3.9 Section 3 Compliance Report

2.2 DAVIS BACON Federal Wage Rates

IFB # IFB2026-006, AMP 115, Andrews Square Water Damage Restoration Page 5 | 8

This work will be subject to all the requirements pertaining to Davis-Bacon work, including the applicable Federal forms and procedures (i.e., on-site interviews; cer�fied payrolls; etc.).

3. SCOPE OF WORK

The Oklahoma City Housing Authority (OCHA) is soliciting bids from qualified contractors to provide all labor, supervision, materials (unless otherwise noted), equipment, tools, permits, transportation, disposal, incidentals, and related services necessary to complete the water damage restoration of the affected dwelling units at Andrews Square, located at 2101 S. Harvey Avenue, Oklahoma City, Oklahoma.

The work generally consists of restoring water-damaged residential units to a safe, code-compliant and move-in ready condition. The project includes, but is not limited to, selective demolition, drywall and insulation replacement, texture and painting, flooring repairs and replacement, installation of Owner-furnished kitchen cabinets, countertop installation, plumbing fixture replacement, electrical device replacement, HVAC cleaning, finish carpentry, restoration of interior finishes, final cleaning and all other work necessary to fully restore the affected units.

The Contractor shall perform all work in accordance with the Contract Documents, including:

Attachment H-1 – General Reconstruction/Modernization Specifications Attachment H-2 – Supplemental Water Damage Restoration Requirements Attachment H-3 – Material Specifications Attachment H-4 – A8RM4 OKC HA Scope of Damage prepared by Summit Claims

These documents are complementary and collectively define the complete scope of work. In the event of a conflict, the more stringent requirement shall govern unless otherwise directed in writing by OCHA.

The Contractor shall furnish all labor, materials, equipment, supervision, permits, inspections and incidentals necessary to complete the work, except for Owner-furnished items specifically identified in the Contract Documents. All work shall be completed in a professional and workmanlike manner and in compliance with all applicable federal, state, and local laws, codes, regulations, manufacturer recommendations and OCHA requirements.

The Contractor shall visit the project site prior to submitting a bid and shall become familiar with the existing conditions. Submission of a bid shall constitute acknowledgment that the Contractor has examined the site, reviewed the Contract Documents and included all work necessary to complete the project. No additional compensation will be allowed for failure to inspect the site or become familiar with existing conditions.

5. PAYMENT TERMS

All federally required forms and compliance documents must be submitted as applicable throughout the project. Certified Payroll Reports (Form WH-347) must be submitted weekly for all contractors and subcontractor personnel. These reports are a condition of payment and must accompany each payment request.

• Progress Payments:

IFB # IFB2026-006, AMP 115, Andrews Square Water Damage Restoration Page 6 | 8

• Payments will be made on a monthly basis and will be issued upon verification of completed work.

• Retainage:

A 10% retainage will be withheld from each progress payment.

o The Request for Payment form must clearly identify the retainage as a 10% deduction from the subtotal.

• Payment Request Requirements:

Each request for payment must include:

o A detailed invoice showing:

Description of work completed Associated costs for each task, item, or service Project name and IFB number Invoice number and date Period of performance covered o Back-up documentation, as applicable:

Subcontractor invoices Material receipts Time logs or progress reports o All required HUD compliance forms listed in this IFB o Certified Payroll Reports (Form WH-347) for the billing period

• Final Payment and Retainage Release:

Final retainage will only be released upon:

o Completion and written approval of the final punch list o Submission and approval of all required close-out documentation o Final acceptance of work by OCHA

• Submission:

o All payment requests must be submitted to the Contracting Officer or designee for review and approval.

o Incomplete Cer�fied Payroll Reports (Form WH-347) or missing compliance documenta�on will result in delayed processing of payment requests.

6. EVALUATION & RATING SCHEDULE

Failure to meet any mandatory pass/fail criteria listed in the Evalua�on and Ra�ng Schedule will result in automa�c disqualifica�on of the bid.

Evaluation Factor Method Requirement

Licensing and Insurance Pass/Fail Required

SAM.gov / HUD Clearance Pass/Fail Required

Years in Business Pass/Fail Minimum 3 years

Similar Projects Completed Pass/Fail Minimum of 2 projects

Bid Form Complete and Signed Pass/Fail Required

Total Bid Price Lowest Cost Determines award

IFB # IFB2026-006, AMP 115, Andrews Square Water Damage Restoration Page 7 | 8

7. RESERVATION OF RIGHTS

OCHA reserves the right to:

• Reject any or all bids

• Not to award a contract pursuant to this IFB

• Waive informalities in the IFB process

• Terminate the IFB or awarded contract at any time for convenience

• Retain bids for 60 days without withdrawal

• Require additional documentation to assess bidder responsibility

• No obligation to compensate any bidder for any costs incurred in responding to this IFB.

8. INSURANCE AND LICENSING REQUIREMENTS

Prior to contract execution, the selected contractor must provide the following documentation:

8.1 Workers’ Compensation Insurance

• Workers' Compensation Insurance: Required for all employees including active owners.

Note: The CC-Form 36A (Affidavit of Exempt Status) will not be accepted as a substitute for coverage.

8.2 General Liability Insurance

• General Liability Insurance: Must provide a minimum of $1,000,000 per occurrence and a $2,000,000 aggregate limit for bodily injury and property damage.

• Automobile Liability Insurance: Must provide a combined single limit of $1,000,000 per occurrence and a $2,000,000 aggregate, covering all owned, hired, and non-owned vehicles used in the performance of the work.

OCHA must be listed as the certificate holder. The insurance document name must match the business name on application and bid documents.

8.3 Business License

If required by local law, a copy of the contractor’s valid business license authorizing operation within the City of Oklahoma City, Oklahoma County, and/or the State of Oklahoma.

9. BOND REQUIREMENTS

The following bonds are required for this Invitation for Bids (IFB) in accordance with HUD and OCHA procurement policy:

IFB # IFB2026-006, AMP 115, Andrews Square Water Damage Restoration Page 8 | 8

Bond Type When Required Amount Bid Guarantee Must be submitted with the bid At least 5% of the bid price

Performance Bond Required before contract execution (upon award) 100% of the contract price

Payment Bond Required before contract execution (upon award) 100% of the contract price

Failure to submit the required bid guarantee or to furnish the performance and payment bonds upon award may result in disqualification and forfeiture of award.

10. NOTES

Permits. The Contractor shall obtain any and all required permits pertaining to any assigned work at his/her expense.

No Escalation of Firm-fixed Fees. There shall be no escalation of the proposed firm-fixed fee amounts proposed and awarded at any time during the ensuing contract periods (except for, as designated by HUD, appropriate OCHA-approved change orders awarded for “unforeseen conditions” within the general scope of work).

Contract Form. OCHA will not execute a contract on the successful bidder's form—contracts will only be executed on OCHA’s form.

Prompt Return of Contract Documents. Any and all documents required to complete the contract, including contract signature by the successful bidders, shall be provided to the Agency within 10 workdays of notification by the Agency.

11. END OF BID REQUEST

Questions and Addenda
Initial Bid Submission Requirements
Required Documents (in order) for initial BID:
📄 1. OCHA 574 – IFB Contractor Contact Form
📄 2. OCHA 571 – Pricing Worksheet (BID FORM)
📄 3. Certificate – BID Bond
📄 4. HUD 5369-A – Representations, Certifications, and Other Statements of Bidders
📄 5. Experience Summary (Résumé)
Step One – Required with Initial Bid Submission:
Step Two – Post-Bid Submission (Apparent Low Bidder Only):
Step Three – Review:
Step Four – For Use During the Project:
This work will be subject to all the requirements pertaining to Davis-Bacon work, including the applicable Federal forms and procedures (i.e., on-site interviews; certified payrolls; etc.).
3. SCOPE OF WORK
6. EVALUATION & RATING SCHEDULE
7. RESERVATION OF RIGHTS
8.1 Workers’ Compensation Insurance
8.2 General Liability Insurance