This amendment document from the Mississippi Department of Marine Resources addresses questions and answers regarding the GBNERR Savanna Boardwalk Replacement project (Contract 3160007842). The scope of work involves demolition and removal of approximately 1,014 linear feet of existing decking and stringers with installation of new material spanning 1,024 linear feet, including new 2" x 6" CCA treated stringers (4) at 15 inches on center per 10-foot bent, FRP deck panels or approved equivalents secured with appropriate fasteners, and new 4" x 4" wheelchair bumpers secured with lag screws and riser blocks as necessary. The amendment clarifies that FRP decking panels are acceptable substitutes for ThruFlow decking, notes that FRP decking may require handicap rail redesign to avoid potential splintering issues when lagging into composite material, and confirms that only insurance requirements specified in the original IFB are mandatory rather than additional builders risk insurance. The notice is dated February 13, 2025, and applies to the competitive sealed bid solicitation with a bid due date of February 24, 2026, at 2:00 p.m. CST.

The base bid pricing is structured as a lump sum incorporating all labor, materials, equipment, mobilization, and demobilization associated with the complete scope of work. The amendment grants contractors flexibility to exercise best judgment regarding material specifications and design details based on the specific decking material selected, allowing for construction methodology adjustments while maintaining project objectives. No set-asides or restrictions targeting disadvantaged enterprises are mentioned. Monthly payments will be made in arrears following application for payment submissions, subject to five percent retainage until 50 percent completion with satisfactory progress, thereafter reducing to 2.5 percent retainage, with final payment due within 45 days of invoice receipt per Mississippi law.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment One GBNERR Savanna Boardwalk Replacement - 3160007842

February 13 2025

Mississippi Department of Marine Resources

To: Prospective Bidders

RE: Questions and Answers and Bid Form Bid Schedule - Base Bid Edit

1)-Will FRP decking panels be allowed for a substitute vs Thruflow decking?

Yes, FRP is allowed.

2)-If the FRP decking material is used, there will need to be a redesign of the handicap rail.

Otherwise, you would be trying to lag into the top of 2” r/c material that could create a problem with splintering of the r/c material.

See revised Scope below (number 5). We will allow the contractor to use their best judgement based on the material used.

3)-Will builders risk insurance be required?

Only the insurance requirements stated in the IFB are necessary.

Bid Form Bid Schedule - Base Bid Edit

The Base Bid section is changed as follows:

All labor, materials, equipment, mobilization, and demobilization pertaining to the procurement and execution of the scope of work as shown and specified within the contract documents.

1. Demolition and removal of existing 1014' decking and stringers and installation of new material to span 1024’ ;

2. Installation of new 2" x 6" 2.5 CCA treated stringers (4) @ 15 O.C. per 10' bent, outside stringers lagged to pilings with 3/8 x 6" HDG lags and CCA treated headers as needed;

3. Install new FRP deck panels or approved equivalent;

4. Decking screwed down with the appropriate fasteners and hardware;

5. Install new 4"x4" or approved equivalent, wheelchair bumper, bumpers secured using appropriate lag screws/hardware and riser blocks as necessary.