Amendment No_ 2.pdf
PDF 123 KB Posted
- Solicitation number
- PE-77892-NONST-2026-000000069
- Issued by
- Paulding County, Georgia
About this file
This is Amendment No. 2 to an advertised contract issued by Paulding County for the 2026 Safety Action Program - Thermoplastic Line Striping Project (Bid #26018-1511). The project involves refreshing existing striping and installing new Raised Pavement Markers (RPMs) on county roadways. The letting date is February 6, 2026. The amendment clarifies project scope and addresses bidder questions regarding existing line and RPM removal requirements. According to the amendment, eradication of existing thermoplastic lines is not required, nor is removal of existing RPMs mandatory. The work focuses on refreshing existing striping while installing new RPMs in their appropriate locations.
The amendment specifies that surface preparation for RPM installation must follow GDOT's specification 654.C.1, requiring pavement cleaning using either sand-blasting or grinding equipment to remove dirt, curing compound, grease, oil, paint, moisture, and loose or unsound layers. All dust must be removed before marker placement, and cleaning equipment air lines must be equipped with suitable traps to prevent oil or moisture redeposition on the road surface. A corrected cover sheet with a fixed bid number has been provided as part of this amendment, and bidders are required to acknowledge the amendment by checking the appropriate certification space on the amendment certification page.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment No_ 1.pdf | ||
| 5 _ Advertisement 1_9_26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
02/03/2026
AMENDMENT TO ADVERTISED CONTRACT
PROJECT NAME: 2026 Safety Action Program – Thermoplastic Line Striping Project
BID # 26018-1511
COUNTY: PAULDING
AMENDMENT NUMBER: 2
LETTING DATE: February 6, 2026
THE FOLLOWING AMENDMENTS ARE HEREBY MADE TO THIS CONTRACT.
THE BIDDER IS RESPONSIBLE FOR MAKING ANY NECESSARY CHANGES IN
INK IN THE PROPOSAL. BIDDER SHALL ACKNOWLEDGE THIS AMENDMENT
BY CHECKING THE APPROPRIATE SPACE ON THE AMENDMENT
CERTIFICATION PAGE.
ITEMS INCLUDED IN THIS AMENDMENT:
**Fixed Bid number on cover sheet. New Cover sheet attached.
Questions received by bidders. Responses shown in RED.
Q: Are the existing lines and RPM's to be removed prior to new work being installed? If so, for the existing thermoplastic lines, is the grinding method acceptable?
R: Scope of work is to refresh existing striping and install new RPM’s. Eradication of existing lines is not required; removal of existing RPM’s is not required.
As per GDOT’s specification for Raised Pavement Markers, 654.C.1: “Surface Cleaning: Clean pavement of dirt, curing compound, grease, oil, paint, moisture, loose or unsound layers, or other material that would impair the bond between the adhesive and the roadway.
a. Use either sand-blasting or grinding equipment to clean. Remove the dust before placing the marker.
b. Provide cleaning equipment air lines with suitable traps to prevent oil or moisture from being redeposited on the road surface
File details come from the government source that posted it. Updated .