Amendment No_ 1.pdf

PDF 95 KB Posted

Attached to
2026 Safety Action Program ¿ Thermoplastic Line Striping Project
Solicitation number
PE-77892-NONST-2026-000000069
Issued by
Paulding County, Georgia

About this file

This is Amendment No. 1 to an advertised contract for Paulding County, Georgia's 2026 Safety Action Program – Thermoplastic Line Striping Project (Bid #26018-1511). The project involves thermoplastic striping and raised pavement markers on fourteen county roads. The amendment, issued on January 23, 2026, precedes the February 6, 2026 letting date and clarifies project scope through responses to bidder inquiries. Key clarifications include confirmation that only items listed in the bid schedule quantities will be striped with no additional elements such as arrows, stop bars, or crosswalks; that Paulding County Department of Transportation (PCDOT) will clip and blade roadway edges prior to edge line installation; and that work on Coach Bobby Dodd Road will consist solely of refreshing existing striping within the project limits rather than adding new striping in previously unmarked areas.

The amendment includes a corrected cover sheet with a fixed bid number and requires bidders to acknowledge receipt by checking the appropriate certification space. Bidders are responsible for incorporating any necessary changes in ink on their proposals. No pricing terms, set-asides, incumbent information, or specific funding amounts are detailed in this amendment document.

View the file

Other files

File Type Posted
5 _ Advertisement 1_9_26.pdf PDF
Amendment No_ 2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01/23/2026

AMENDMENT TO ADVERTISED CONTRACT

PROJECT NAME: 2026 Safety Action Program – Thermoplastic Line Striping Project

BID # 26018-1511

COUNTY: PAULDING

AMENDMENT NUMBER: 1

LETTING DATE: February 6, 2026

THE FOLLOWING AMENDMENTS ARE HEREBY MADE TO THIS CONTRACT.

THE BIDDER IS RESPONSIBLE FOR MAKING ANY NECESSARY CHANGES IN

INK IN THE PROPOSAL. BIDDER SHALL ACKNOWLEDGE THIS AMENDMENT

BY CHECKING THE APPROPRIATE SPACE ON THE AMENDMENT

CERTIFICATION PAGE.

ITEMS INCLUDED IN THIS AMENDMENT:

**Fixed Bid number on cover sheet. New Cover sheet attached.

Questions received by bidders. Responses shown in RED.

1. Will only the items included in the bid schedule be striped? (IE. No arrows, stop bars, crosswalks, etc.)

R: Only items in the bid package quantities are to be included.

2. Will the County clip/blade the edges of the roadway prior to installing edgelines?

R: PCDOT will clip/blade the edges of the roadway prior to edge line installation.

3. Coach Bobby Dodd Road does not appear to have ever had striping outside of the intersection with SR 6. Is it the intention of this project to only re-stripe existing markings or will striping be add that did not previously exist?

R:Coah Bobby Dodd Rd is currently striped within the project limits listed in the bid documents. Project will consist of refreshing existing striping included on the bid quantities.

File details come from the government source that posted it. Updated .