This document is an Amendment #1 to a bid opportunity issued by the Illinois Department of Transportation (IDOT) District 7 for a New Sewer Line Installation project. The amendment provides responses to vendor questions regarding the project scope, which includes the installation of approximately 325 feet of 6-inch sewer line, 6 clean-outs suitable for heavy equipment, and capping of an existing sewer line. The work must be completed prior to ground freeze. IDOT did not provide existing plans showing the locations and depths of drain lines, and indicates the vendor will need to contact the City of Effingham to determine any required permits. Normal business hours for the project are 6:30 a.m. to 3:30 p.m.
Regarding pricing and other terms, the amendment states the backfill and bedding material is at the contractor's discretion, and disposal of materials will be off-site at a location provided by the vendor. IDOT did not specify any set-asides, incumbents, or funding sources for this project. Overall, this amendment clarifies technical requirements and provides additional details to bidders for the New Sewer Line Installation project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Overhead View A.pdf | ||
| Amendment 2.pdf | ||
| Scope of Work~1.docx | DOCX document | |
| Walk Through Information~5.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment #1 – Vendor Questions and IDOT Responses Illinois Department of Transportation District 7 ‐ New Sewer Line Installation BidBuy Bid # 22‐494DOT‐FINAD‐B‐24991
Responses are in red.
1. 325' 6" Sewer Line ‐ is this storm sewer, do you want this PVC? Yes.
2. How deep? Contractor’s discretion.
3. Are we out letting this into an existing structure? Yes, there is an existing structure.
4. 6 Clean outs ‐ what type of clean outs and what locations? Will need to be suitable for heavy duty equipment to drive over.
5. Backfill Aggregate ‐ what type of backfill? Are you requiring bedding material?
Contractor discretion that is best for IDOT to top with asphalt at a later date.
6. Cap existing sewer ‐ are we capping the existing line that is running to Wabash? if so, how big and how deep? Yes. Capping the existing line to Wabash. It will be either a 6 or
8 in cap and it will be less than 6 ft deep.
7. Disposal of Materials ‐ Is the disposal on site or off? If off site is there any sites available? Disposal will be off site and vendor will need to locate the disposal site.
8. Locate & connect drain lines ‐ any existing plans to show locations and how deep? IDOT is unsure if there are plans, if we locate plans, we will update this information.
9. Permits ‐ any anticipated? Vendor will need to contact City of Effingham and find out what permits will be needed to complete this project.
10. Normal business hours? 6:30 a.m. – 3:30 p.m.
11. Is this project to be completed this year? Work must be completed prior to ground freeze.
File details come from the government source that posted it. Updated .