Amendment #1.docx
DOCX document 29 KB Posted
- Attached to
- LADY LILLIAN ANNAUL MAINT & PAINT
- Solicitation number
- 5400028742
- Issued by
- Richland County, South Carolina
About this file
This document is an Amendment #1 to an Invitation for Bid issued by the South Carolina Department of Natural Resources (SCDNR) for the Lady Lillian Annual Maintenance & Repair project. The solicitation seeks comprehensive vessel maintenance services, with bids due on October 28, 2025, at 10:00 AM EST. The amendment addresses specific technical questions related to vessel repair, including shaft work, bearing replacements, and equipment modifications. Key aspects include permission to remove insulation in shaft alleys, approval for stern tube and output shaft modifications, and confirmation of new shaft and pillow bearing installations. The contract term appears to run from October 30, 2025, to March 5, 2026, with the vessel expected to return to its home port in Charleston Harbor by the final date.
The amendment provides detailed clarifications on repair specifications, such as exhaust fan requirements (approximately 3000 cfm with a preferred 3-speed option) and responsibilities for equipment removal and reinstallation. Vendors will be responsible for removing and reinstalling interferences like cabinets during window replacements, with vessel crew handling contents removal. The procurement does not specify minority business set-asides or specific vendor restrictions. Bidders must be registered South Carolina vendors and comply with state procurement regulations. While the total project budget is not explicitly stated, the comprehensive nature of the maintenance suggests a significant investment in vessel rehabilitation, targeting shipyards along the Atlantic and Gulf Coasts with capabilities to handle a vessel over 200 tons.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment #2.docx | DOCX document | |
| Solicit-Amend1 updated.docx | DOCX document | |
| Solicitation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of South Carolina
Invitation for Bid Amendment #1 Solicitation:
Date Issued:
Procurement Officer:
Phone:
E-Mail Address:
Mailing Address:
5400028742 10/9/2025 Andy Bowman, CPPB 803-734-3933 bowmana@dnr.sc.gov SC Department of Natural Resources Attn: Procurement Services Room 260 D Epting lane West Columbia SC 29172
DESCRIPTION : Lady Lillian Annual Maintenance & Repair
USING GOVERNMENTAL UNIT: SC Department of Natural Resources Admin
The Term "Offer" Means Your "Bid" or "Proposal". Your offer must be submitted in a sealed package. Solicitation Number & Opening Date must appear on package exterior. See "Submitting Your Paper Offer or Modification" provision.
SUBMIT YOUR SEALED OFFER TO EITHER OF THE FOLLOWING ADDRESSES:
MAILING ADDRESS:
SC Department of Natural Resources Attn: Procurement Services 260D Epting Lane West Columbia SC 29172
PHYSICAL ADDRESS:
SC Department of Natural Resources Attn: Procurement Services 260D Epting Lane West Columbia SC 29172
SUBMIT OFFER BY (Opening Date/Time): 10/28/2025 10 am e.s.t. (See "Deadline For Submission Of Offer" provision)
QUESTIONS MUST BE RECEIVED BY: 10/6/2025 12 pm E.S.T. (send questions to bowmana@dnr.sc.gov) (See "Questions From Offerors" provision)
NUMBER OF COPIES TO BE SUBMITTED ** Please submit online thru the Sceis portal, FEDX, UPS, or USPS to the physical address above, or drop off in person at the physical address above. No emails or faxed responses will be accepted.
CONFERENCE TYPE:
N/A (As appropriate, see "Conferences - Pre-Bid/Proposal" & "Site Visit" provisions)
LOCATION:
N/A
| AWARD & AMENDMENTS |
| Award will be posted on 10/29/2025 The award, this solicitation, any amendments, and any related notices will be posted at the following web address: http://www.procurement.sc.gov |
You must submit a signed copy of this form with Your Offer. By signing, You agree to be bound by the terms of the Solicitation. You agree to hold Your Offer open for a minimum of ninety (90) calendar days after the Opening Date
NAME OF OFFEROR
(full legal name of business submitting the offer) Any award issued will be issued to, and the contract will be formed with, the entity identified as the Offeror. The entity named as the offeror must be a single and distinct legal entity.
AUTHORIZED SIGNATURE
(Person must be authorized to submit binding offer to contract on behalf of Offeror.)
DATE SIGNED
TITLE
(business title of person signing above)
STATE VENDOR NO.
(Register to Obtain S.C. Vendor No. at www.procurement.sc.gov )
PRINTED NAME
(printed name of person signing above)
STATE OF INCORPORATION
(If you are a corporation, identify the state of incorporation.)
OFFEROR'S TYPE OF ENTITY: (Check one) (See "Signing Your Offer" provision.)
___ Sole Proprietorship ___ Partnership ___ Other_____________________________ ___ Corporate entity (not tax-exempt) ___ Corporation (tax-exempt) ___ Government entity (federal, state, or local)
SQUESTIONS FROM OFFERORS - AMENDMENT (JUN 2017)
THE SOLICITATION IS AMENDED AS PROVIDED HEREIN. INFORMATION OR CHANGES RESULTING FROM QUESTIONS WILL BE SHOWN IN A QUESTION-AND-ANSWER FORMAT. ALL QUESTIONS RECEIVED HAVE BEEN REPRINTED BELOW. THE “STATE’S RESPONSE” SHOULD BE READ WITHOUT REFERENCE TO THE QUESTIONS. THE QUESTIONS ARE INCLUDED SOLELY TO PROVIDE A CROSS-REFERENCE TO THE POTENTIAL OFFEROR THAT SUBMITTED THE QUESTION. QUESTIONS DO NOT FORM A PART OF THE CONTRACT; THE “STATE’S RESPONSE” DOES. ANY RESTATEMENT OF PART OR ALL OF AN EXISTING PROVISION OF THE SOLICITATION IN AN ANSWER DOES NOT MODIFY THE ORIGINAL PROVISION EXCEPT AS FOLLOWS: UNDERLINED TEXT IS ADDED TO THE ORIGINAL PROVISON. STRICKEN TEXT IS DELETED. [02-2A097-1] THE SOLICITATION IS AMENDED AS PROVIDED HEREIN. INFORMATION OR CHANGES RESULTING FROM QUESTIONS WILL BE SHOWN IN A QUESTION-AND-ANSWER FORMAT. ALL QUESTIONS RECEIVED HAVE BEEN REPRINTED BELOW. THE “STATE’S RESPONSE” SHOULD BE READ WITHOUT REFERENCE TO THE QUESTIONS. THE QUESTIONS ARE INCLUDED SOLELY TO PROVIDE A CROSS-REFERENCE TO THE POTENTIAL OFFEROR THAT SUBMITTED THE QUESTION. QUESTIONS DO NOT FORM A PART OF THE CONTRACT; THE “STATE’S RESPONSE” DOES. ANY RESTATEMENT OF PART OR ALL OF AN EXISTING PROVISION OF THE SOLICITATION IN AN ANSWER DOES NOT MODIFY THE ORIGINAL PROVISION
Questions and Answers:
1. Shafts, Seals & Bearings – Prior to performing the scope of work the shaft alleys will need to be clean and clear of spray insulation. Can we remove insulation in the shaft alleys? Yes, you can remove insulation in the shaft alleys as needed.
2. Output Shafts, Intermediate Shaft & Seal Replacement – Due to the location and condition of the stern tubes and mounting flanges in order to replace the existing seals the shipyard requests that the output shafts and the stern tubes be lengthened by approximately 2’ and replace the stern tube mounting flanges with new. This would also require the intermediate shaft to be shortened by 2’. If lengthening the stern tubes and output shafts by 2’ allows for a more cost-effective installation of the Simplan or agreed upon equivalent seal, this is acceptable. It is understood that this will result in a shorter intermediate shaft. The intermediate shaft is currently welded to the gear box coupling and would need to be changed to have a coupling connection. Can you confirm the repair plan? The current couplings on the intermediate shafts are welded to the intermediate shafts. The vendor will need to determine the most cost-effective way of adding a coupling to the replacement intermediate shafts.
3. Shaft Bearings – New shaft bearings are suggested to be installed for proper alignment of stern tube. Can new shaft bearings be included in repair plan? Yes, New shaft bearings are to be added to the scope of work.
4. Pillow Bearing - Due to the condition of the existing pillow bearing housing. The shipyard would suggests replacing the pillow bearing assembly and using the remaining foundation in lieu of collar replacement. Can new pillow bearing assembly be included in the repair plan? Due to the possibility that the stuffing box replacement may be most efficiently achieved by shifting its location, new pillow bearings are to be added to the scope of work
5. Bulwarks at escape hatch - Does the blast and repaint of bulwarks include the area currently in way of the escape hatch? Yes, blast and repaint includes bulwarks that are currently hidden behind the Lazarette hatch that is to be replaced.
6. Galley window carpentry - Who will be responsible for the removal and install of the interferences such as carpentry? Vendor will be responsible for removal and reinstallation of any interferences such as cabinets, but the vessel crew will remove contents of any cabinets that are in the vicinity of window replacements.
7. Exhaust Fan - Is there a cfm requirement for the new exhaust fan? Exhaust fan requirement is approximately 3000 cfm. A 3-speed fan that produces up to 3000 cfm would be preferred, but single speed is acceptable. Kill switch for exhaust fan should be located outside of the engine room.
All other terms and conditions remain unchanged