Amend 0002 Revised Spec Item 3.1.2 Fire Protection Systems Periodic Inspection and Service.pdf

PDF 83 KB Posted

Attached to
Fire Suppression & Fire Pumps Federal contract opportunity
Solicitation number
n40085-20-r-4084
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1502000 – Facility Investment Table of Content Spec Item Title 1 General Information

1.1 Concept of Operations

2 Management and Administration

2.1 Definitions and Acronyms

2.2 Personnel

2.2.1 Certification, Training and Licensing.

2.3 Special Requirements

2.3.1 Workmanship and Material Standards

2.3.2 Historical Preservation

2.3.3 Contractor Qualifications

2.3.4 Management Requirements

2.3.5 Inspection Testing and Maintenance Requirements

2.3.6 Repair Work

2.3.6.1 Fire Alarm Systems

2.3.6.2 Water Based Suppression Systems

2.3.6.3 Special Hazard Systems

2.4 References and Technical Documents

3 FFP Work

3.1 Routine Integrated Maintenance Program (IMP)

3.1.1 Fire Protection Systems Annual Inspections

3.1.1.1 Provide Complete Inventory

3.1.1.2 Update Inventory as needed

3.1.2 Fire Protection Systems Periodic Inspection and Service.

4 IDIQ Work

1502000-Facility Investment Spec Item

Title Performance Objective Related Information Performance Standard

3.1.2 Fire Protection

Systems periodic inspection and service

Within the IMP the Contractor shall be responsible for:

Imputing test dates in the provided matrix, as well as tracking and executing all periodic service tasks as called for in UFC 3-601-02 up to required 5 year service tasks.

Fire Protection Systems periodic inspection and service frequency as specified in UFC 3- 601-02.

If the Contractor becomes aware that a long term inspection or test is due they shall inform the Contracting Officer in a timely manner so those events can be ordered and completed in a timely manner to maintain system certification.

The Government will provide the inspection matrix for all buildings.

See (J- Attachment)

It shall be the Contractors responsibility to work with Government property managers to help identify when 5 year and beyond service events are due to be performed based on field records, Contractor records, and equipment age.

All inspections, tests and services are completed Per (J- Attachment) and are done in accordance with the guiding documents. The Contracting Officer is informed of long term events that are due to be performed.