AME Macro Artifact Restoration Services Solicitation.pdf
PDF 1 MB Posted
- Attached to
- Macro Artifact Restoration Services MATOC Federal contract opportunity
- Solicitation number
- W56HZV-23-R-L027
About this file
This is a solicitation for multiple award task order contracts to provide macro artifact restoration services for the U.S. Army's Center of Military History Army Museum Enterprise. Services include cosmetic restoration, hazardous materials abatement, and general repair of large-scale historical artifacts located at various installations. The award will consist of five 12-month ordering periods with a minimum $500 guarantee per contract. Offerors must submit all questions by June 5, 2023 at 12:00 p.m. EST, and the Army will post answers by June 12, 2023 at 3:00 p.m. EST. Services will be ordered competitively among awardees on a fair opportunity basis, with one week typically allowed to respond. Ceiling prices are set for labor categories and indirect rates applied to materials. The Department of the Army Materiel Command TACOM Life Cycle Management Command is the issuing agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W56HZV-23-R-L027 QA Log 06-26-23.pdf | ||
| W56HZV-23-R-L027 Solicitation Amendment 0002.pdf | ||
| W56HZV-23-R-L027 Solicitation Amendment 0001.pdf | ||
| CDRLS A001 - A005.pdf | ||
| Exhibit - Attachment 0002 Past Performance Questions_MARP.docx | DOCX document | |
| Attachment 0001 - Pricing Workbook AME Macro Artifact Restoration Services MATOC GFPM_18May2023.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W56HZV23RL027 24-May-2023
b. TELEPHONE NUMBER
571-588-9427
8. OFFER DUE DATE/LOCAL TIME
05:00 PM 23 Jun 2023
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W56HZV9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
NATALIE PERRAS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
ACC-DTA
6501 E ELEVEN MILE ROAD
DETROIT ARSENAL MI 48397-5000
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: (586) 282-1234 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$34,000,000
NAICS:
712110
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF94
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W56HZV23RL027
Section A - Solicitation/Contract Form
LOCAL NARRATIVES
A.1
ITEM/DESCRIPTION OF REQUIREMENT
The U.S. Army Contracting Command - Detroit Arsenal (ACC-DTA) intends to award approximately four (4) Firm Fixed Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contracts (MATOCs), each with five ordering years, for cosmetic restoration, condition stabilization, hazardous materials abatement (if required), and limited general repair of macro-scale Army Artifact Collection items owned by and to support the U.S. Army Center of Military History (CMH) and Army Museum Enterprise (AME) System.
A.2 ELECTRONIC CONTRACTING
(a) All Army Contracting Command – Detroit solicitations will be publicized on the System for Award Management website (https://www.beta.sam.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) RESERVED
(c) RESERVED
(d) RESERVED
(e) Solicitations may remain posted on beta.SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses. (f) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Government’s intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(g) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. Any questions regarding this RFP must be received by the Contract Specialist no later than 5 June 2023 12:00pm Eastern Time. Responses to questions are not considered changes to the RFP as the only way the RFP can be modified is through an amendment that will be issued. No phone calls will be accepted for any reason. All questions shall be in writing. The Government will post all Questions and Answers (Q&As) to SAM.gov no later than 3:00pm Eastern Time on 12 June 2023. The Government will notify potential offerors if an extension is needed to post the Q&As. For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.3 ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
A.4 ARMY CONTRACTING COMMAND – DETROIT ARSENAL (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website:
http://acc.army.mil/contractingcenters/acc-dta/CompMgmtOffice.html
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Quality Control Plan
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK.
Data Deliverables as set forth in Contract Data Requirements List (CDRL) DD Form 1423, CDRL A002 FOB: Destination
PSC CD: Z2PB
NET AMT
1001 1 Job Labor Ordering Period Year 1
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK.
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
1002 1 Job Material Ordering Period Year 1
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK.
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
2001 1 Job Labor Ordering Period Year 2
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK.
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
2002 1 Job Material Ordering Period Year 2
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK.
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
3001 1 Job Labor Ordering Period Year 3
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK.
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
3002 1 Job Material Ordering Period Year 3
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK.
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
4001 1 Job Labor Ordering Period Year 4
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK.
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
4002 1 Job Material Ordering Period 4
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK.
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
5001 1 Job Labor Ordering Period Year 5
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK.
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
5002 1 Job Material Ordering Period Year 5
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK.
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
9000 1 Job Service Contract Reporting
FFP
The contractor shall provide the information required by the Service Contract Reporting (SCR) in accordance with the Performance Work Statement (PWS), as detailed on Section C.
Not Separately Priced.
9001 1 Job CDRLs A001-A005
FFP
The contractor shall provide the information required by the Service Contract Reporting (SCR) in accordance with the Performance Work Statement (PWS), as detailed on Section C.
Data Deliverables as set forth in CDRL DD Form 1423, CDRL A001-A005.
Not Separately Priced.
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
Performance Work Statement (PWS) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOCs) For Macro
Artifact Restoration and Conservation
C-1 INTRODUCTION
This is a non-personal services IDIQ MATOC to provide restoration and conservation services for macro-scale historical artifacts owned by the US Army's Center of Military History Army Museum Enterprise (AME). The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately. As this is an AME-wide initiative and an IDIQ MATOC, it is within the individual Task Orders where specific details will be provided for work to be performed upon each macro-artifact (planes, helicopters, tanks, trucks, etc.).
C-1.1 Description of Services
The contractor shall provide services related to the cosmetic restoration, condition stabilization, hazardous materials abatement (if required), and limited general repair of macro-scale Army Artifact Collection items owned by the AME. All such work shall be performed in accordance with (IAW) actions defined in the PWS, governing Army Regulation such as AR 870-20 and AR 870-5, and in keeping with best museum practices. The contractor shall furnish, upon receipt of an individual Task Order award, all the necessary services to restore all macro-scale historical artifacts. The contractor shall perform all work to the standards of the current museum industry pertaining to restoration of macro-scale artifacts. Additionally, all work may be required to be performed in-situ, in an enclosed area, or in an area accessible by museum patrons and staff, requiring coordination and compliance with various installation commands and related environmental and/or safety offices/departments. The site locations for performance will be identified in each Task Order.
Work will include the complete exterior cosmetic refurbishment and restoration of the macro artifact(s) and may also include the partial or complete refurbishment and restoration of interior spaces as well. This will most often require the preparation of exterior (and interior, if required) surfaces for repainting and re-marking through the removal of failed paint and coatings. New primer, paint and markings of period-correct color, material formulation, and application scheme will only be applied to the artifact once all surfaces to be refinished have been prepared properly. The contractor will commit to preserving and re-using as much original historical material from the artifact as possible in order to preserve the artifact's historical integrity to the greatest extent possible. Purpose-made and period-manufactured replacement parts may be considered on a per-case basis, with prior notification and authorization received from AME COR and Curatorial SME personnel. Exceptions may be made in the case of tires, rubber components, natural materials, or any other perishable material type that may no longer exist as replacement parts or materials. Such exceptions will only be authorized on a per-case basis.
As part of the restoration and stabilization process, additional work may be required to abate and remove hazardous materials and/or elements from the artifact's materials and subsystems. Such abatable materials may include petroleum, oil, and/or lubricants (POLs); lead acid or other batteries; ionizing radiological sources and materials, such as Radium paint, Tritium, and/or Cesium; pressurized fire suppression systems and elements; main and support weapons systems; and other materials that could pose a hazard to museum patrons and staff members.
All materials identified as hazardous and/or requiring removal and disposal shall be approved by the AME COR and Curatorial SME personnel prior to removal and disposition, without exception. A list of such materials shall be provided to the AME COR for review as early in the restoration process as possible to provide sufficient time for review in accordance with IAW CDRL A001.
All personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, required items and non-personal services necessary to perform all work that is defined as part of this or a provided artifact-specific supplemental Performance Work Statement, except for those items specified as Government furnished property and services, shall be the responsibility of the vendor. AME curatorial staff will provide technical assistance with publications and documents to assist the contractor in the refurbishment/restoration process upon request, if such items are schemes and methods used during the artifact's time of service. Additionally, the contractor will complete all requirements and gain approval of mandated environmental and safety offices prior to contractor initiating on-site work. Documentation and reference materials will be furnished to the contractor, if available. This will include information related to period-correct paint formulations, and application methods.
C-1.2 Background
AME exhibits and maintains in excess of 569,000 individual artifacts ranging in size from lapel pins to main battle tanks and aircraft. Of particular importance are the macro-scale artifacts maintained as part of this artifact collection.
These macro artifacts are usually of high interest to the museum going public, and also serve as engineering and training references for engineers, design specialists, academicians and instructors. The AME is mandated by Army Regulation 870-20 and supplemental conservation directive documents to preserve these large-scale artifacts in as close to original, services-related condition as possible. However, due to the delicate and complex nature of these macro artifacts, combined with the deteriorating effects of exhibition and storage environments, occasional restoration and refurbishment may be required.
C-1.3 Objectives
The objective of this contract is to provide for an IDIQ MATOC that will accommodate the cosmetic restoration of up to 73 macro artifacts as part of various Task Order restoration projects that are currently pending or are anticipated to be needed in the near future. These artifacts are currently located at various AME institutions and locations within the United States. The tasks required to complete identified refurbishment/restoration projects by the contractor include, but are not limited to; surface cleaning; abatement of all fluids such as petroleum/oil/lubricants (to include fuel and hydraulic fluids); removal and disposal of any and all hazmat material such as batteries, fire suppression systems, etc. (if present); removal, refurbishment and reinstallation of parts and components as required and as authorized; photo-document all markings, colors and schemes present on the exterior prior to surface preparation and failed coating/paint removal and, if required, interior surfaces in order to ensure proper restoration; preparation of all exterior surfaces for restoration through the removal of failed paint, coatings, and markings as necessary; and repainting and re-marking the artifact using period-correct materials, methods and marking schemes.
The contractor shall identify any radiation sources which will need to be fully encapsulated and clearly marked as posing a radiation hazard or, if authorized, removed and disposed of in accordance with all Occupational Safety and Health Administration (OSHA) and any applicable US Army regulations and requirements, such as OSHA Standard for Disposal of Ionizing Radiation 1910.1096 and US Army Regulation 11-9.
Any and all hazardous material removed from the artifacts as part of surface preparation and abatement processes must be collected and disposed of in accordance with appropriate regulations such as OSHA Standard for General Industry (29 CFR 1910) and US Army Technical Manual TM 38-410. Once surface preparation and abatement are complete the contractor will repaint and re-mark the artifact using appropriate methods and materials. If previously authorized, the contractor may repair or replace any parts or systems that are heavily deteriorated, though such removals and repairs will only take place after thorough review by AM Curatorial SME staff. If authorized, the contractor shall clean interior surfaces, remove failed surface coatings, and repaint/re-mark as required. If present, contractor shall service or replace tires, similar rubber components, or natural material components only with prior Curatorial Subject Matter Expert (SME) authorization. Once completed, these services will restore the artifact to its original period appearance and cosmetic condition.
C-1.4 Scope
The contractor shall work closely with AME Curatorial staff during the refurbishment and restoration process of the artifact(s) being restored. The contractor shall provide all tasks defined in the PWS while observing all local, State and Federal regulatory requirements for the abatement and removal of toxic and/or hazardous materials and paint.
The contractor shall also adhere to pertinent installation requirements IAW applicable DoD and Army regulatory requirements and ensure accordance with AME requirements as they are written in AR 870-20 and AR 870-5. A site visit shall take place to evaluate and inspect the conditions of artifact(s) to be restored, as well as the facility or location where work is to be performed prior to the selection of an offeror and the issuance of the Task Order.
C-1.5 General Information
C-1.5.1 Quality Control
The contractor shall develop and maintain an effective quality control (QC) program to ensure services are performed IAW this and any supplemental PWs. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor's QC program is the means by which he assures himself his work complies with the requirement of the contract. As a minimum, the contractor shall develop QC procedures addressing the areas identified in the "Performance Requirements Summary." IAW CDRL A002, after acceptance of the QC plan, the contractor shall receive the PCO's acceptance in writing of any proposed change to his QC system within 14 days of submission.
C-1.5.2 Quality Assurance
The Government shall monitor and evaluate the contractor's progress and performance under this contract IAW the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure the contractor has performed IAW the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
C-1.5.3 Recognized Holidays
Holidays Dates New Year’s Day 1st day of January Martin Luther King Jr.’s Birthday 3rd Monday of January President’s Day 3rd Monday of February Memorial Day Last Monday of May Juneteenth 19th day of June Independence Day 4th day of July Labor Day 1st Monday of September Columbus Day 2nd Monday of October Veterans Day 11th day of November Thanksgiving Day 4th Thursday of November Christmas Day 25th day of December
C-1.5.4 Hours of Operation
The contractor is responsible for providing services between the hours of operation as established by the appropriate facility and/or location where work is to be performed. Typical operating days are Monday through Friday except federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government-directed facility closings. The contractor must at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this or supplemental performance work statement (PWS) when the Government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.
C-1.5.5 Place of Performance
This shall be specified in the Contract Task Order.
C-1.5.6 Security Requirements
C-1.5.6.1 ACCESS AND GENERAL PROTECTION/SECRUITY POLICY AND PROCEDURES.
(a) The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 “Personal Identity Verification of contractor Personnel”) as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
(b) For contractors requiring Common Access Card (CAC): Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation IAW Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or
(3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the Federal Bureau of Investigation (FBI) fingerprint check and a successfully scheduled NACI at the Office of Personal Management.
(c) For contractors that do not require CAC, but require access to a DOD facility or installation: contractor and all associated sub-contractor employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures elsewhere in Section C; and Non-disclosure Statement. For OCONUS locations, refer to the Status of Forces Agreement and other theater regulations.
C-1.5.6.2 Key Control
The contractor shall establish and implement methods of making sure all keys/key cards issued to the contractor by the Government are not lost or misplaced and are not used by unauthorized persons. (Note: All references to keys include key cards.) No keys issued to the contractor by the Government shall be duplicated. The contractor shall develop procedures covering key control that shall be included in the QC plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The contractor shall immediately report any occurrences of lost or duplicate keys to the KO. In the event keys other than master keys are lost or duplicated, the contractor shall, upon direction of the PCO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due to the contractor.
C-1.5.6.3 Physical Security
The contractor shall be responsible for safeguarding all Government property provided for contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.
C-1.5.7 Special Qualifications
Each of the contractor personnel performing restoration work on the macro-scale historical artifacts is required to possess a valid Government issued photo Identification for entry onto each installation, unless otherwise noted. The contractor shall be prepared to provide information on personnel performing the delivery and installation at the military installation in keeping with each installation’s regulatory requirements governing access and security.
C-1.5.8 Post Award Conference/Periodic Progress Meetings
The contractor agrees to attend any post award/ kick off meeting conference convened by the contracting activity or contract administration office IAW Federal Acquisition Regulation (FAR) Subpart 42.5. The PCO, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings, the PCO will apprise the contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
C-1.5.9 Contracting Officer’s Representative (COR)
The COR will be identified by a separate letter. The COR monitors all aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance;
maintain written and oral communications with the contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications;
monitor the contractor's performance and notify both the Contracting Officer and contractor of any deficiencies;
coordinate availability of Government furnished property; and provide site entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price and estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.
C-1.5.10 Key Personnel
The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the PCO and COR. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available during established working hours Monday thru Friday except Federal holidays or when the Government facility is closed for administrative reasons.
C-1.5.11 Identification of Contractor Employees
All contract personnel attending meetings or working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The contractor shall accomplish this through the issuance of identification badges for all contract personnel providing work on-site. Badges must be worn to be visible at all times and must clearly identify the name of the individual, the contractor’s company name, the date of the issuance and the date of expected expiration, which shall coincide with the anticipated Contract completion date. The contractor must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Personnel will be required to obtain required documentation for entry onto the base each day.
C-1.5.12 Contractor Travel contractor travel to and from the established work location will be the responsibility of the contractor.
C-1.6 Period of Performance
Period of Performance will be cited within the Individual Task Order.
C-2 DEFINITIONS AND ACRONYMS
C-2.1.1 Definitions
ARTIFACT RESTORATION- A process by which a three-dimensional artifact is restored to a previous state, condition or appearance. Restoration is most often required when artifact preservation and/or conservation efforts have failed or proven inadequate, and there is a need to physically restore the condition or appearance of an artifact to an identified previous state.
CONTRACTOR- A supplier or vendor awarded a contract to provide specific supplies or service to the Government.
The term used in this contract refers to the prime.
CONTRACTING OFFICER- A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
CONTRACTING OFFICER'S REPRESENTATIVE (COR)- An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
DEFECTIVE SERVICE- A service output that does not meet the standard of performance associated with the Performance Work Statement.
DELIVERABLE- Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
KEY PERSONNEL- Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
MACRO ARTIFACT- Any object that is too large for 1-2 soldiers to move by hand, or else an object meant to be driven, flown, manned, controlled, or operated in some manner.
PHYSICAL SECURITY- Actions that prevent the loss or damage of Government property.
QUALITY ASSURANCE- The Government procedures to verify that services being performed by the contractor are performed according to acceptable standards.
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)- An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
QUALITY CONTROL- All necessary measures taken by the contractor to assure that the quality of an end product or service shall meet contract requirements.
SUBCONTRACTOR - One that enters into a contract with a prime contractor.
WORKDAY-The number of hours per day the contractor provides services in accordance with the contract;
typically, between the hours of 0700-1600 IAW this or supplemental PWS statements.
WORK WEEK- Monday through Friday, unless specified otherwise.
C-2.2 Acronyms
AME Army Museum Enterprise AR Army Regulation CDRL Contract Data Requirements List CFR Code of Federal Regulations CMH U.S. Army Center of Military History CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative DOD Department of Defense FAR Federal Acquisition Regulation GFP Government Furnished Property HMD Historic Materiel Division KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States POC Point of Contact POL Petroleum, Oil, and Lubricants PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SME Subject Matter Expert TE Technical Exhibit
C-3 GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
C-3.1 Equipment
Equipment, personnel, and services necessary to accomplish artifact restoration IAW this and/or any task order specific PWS statements will be furnished by the contractor.
C-3.2 Materials
The only physical materials that will be furnished to the contractor will be those historical materials currently attached to the artifact(s). Additionally, manuals and other documents to support approved repaint, re-marking, parts fabrication or purchase of materials and supplies may be provided by the Government, if available.
C-3.3 Services:
C-3.1.1 Facilities
The Government will provide access to the facility or location where the macro artifact(s) is/are being restored and physically stabilized. At the close of each work period, workspace shall be cleaned and secured by the contractor.
C-3.1.2 Utilities
All utilities in the facility will be available for the contractor’s use in performance of duties outlined in this PWS.
The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities.
C-4 Task Order
C-4.1 Task Order Award
C-4.1.1 Contract Type:
The Task Orders will be Firm-Fixed Price.
C-4.1.2 Issuing Authority
The Contracting Officer is designated as issuing authority for Task Orders placed against the MATOC contract.
C-4.1.3 Task Order Issuance
Task Order awards will be issued on DD Form 1149 and will be sent via e-mail. Upon award of a Task Order, the contractor shall acknowledge receipt of the Task Order.
C-4.3 Materials
The contractor shall furnish all materials required to complete work as outlined, in section C-5 below, and/or in provided task order PWS statements. Any additional materials for EPA mandated response kits, cleaning supplies, residue storage, paints, and any other materials deemed necessary to complete work are also to be supplied by the contractor. Examples include all paint/coating removal media and materials, cleaning supplies, paint reapplication tools, marking masks/stencils/templates, all materials required to collect abated fluids, disposal containers for removed batteries, radiation source encapsulation containers, spill and accident clean-up materials, and other similar or related materials.
C-4.4 Equipment
The contractor shall furnish all equipment and tools required to complete work outlined above or in supplemental PWS statements.
Of particular note, paints/coatings currently covering artifacts may contain lead, barium, hexavalent chromium, cadmium, and other known carcinogens (such as CARC paint). The contractor must provide to all workers any and all necessary equipment to follow Occupational Safety Health Act (OSHA) regulations for preventing exposure to heavy metals and toxic materials as part of any paint/coating removal process. Additionally, all hazmat materials must be properly disposed of IAW Government requirements utilizing appropriate collection equipment and storage/disposal containers.
C-5 SPECIFIC TASKS
C-5.1 Basic Services
The contractor shall provide services for:
C-5.1.1 Project Schedule
The contractor shall prepare and present to COR a proposed project schedule, complete with meeting and milestone dates, for COR approval IAW CDRL A003. contractor shall, during the course of the project, track the project to see that the project remains on schedule.
C-5.1.2 Artifact Photo-documentation
The contractor shall fully and comprehensively photo-document all surfaces to be prepared and restored as part of the restoration process. This will ensure that any remnants of original markings or paint/coatings will be recorded and available for reference once surface preparation has been completed. These reference photos may assist greatly with the later re- application or paint/coatings and markings once that process has commenced. All such photos and documentary records created as part of this process will be provided to the AME and the contract COR as part of a comprehensive post-restoration report for each artifact restored IAW CDRL A004. This report will become part of each artifact's historical property record and will therefore be available for reference and review by future curatorial staff.
C-5.1.3 Artifact Surface Cleaning and Preparation
The contractor shall undertake the full cleaning of all exterior artifact surfaces in advance of any required coating removal. On a per-case basis, similar work may be required for interior surfaces as well. Initial surface cleaning and preparation will be performed prior to any succeeding steps in order to best determine the physical condition of the artifact, locate and note any areas of particular challenge related to deterioration or other issue, and ensure that historic materials will be preserved to the greatest extent possible during the surface coating removal and repainting preparation processes.
C-5.1.4 Artifact Abatement
If required and authorized, the contractor shall undertake the abatement of all hazardous materials that should be performed. This may include the removal and capture of potentially toxic fluids such as petroleum/oil/lubricants (POLs); the removal and proper disposal of batteries of all types; the removal and/or depressurization of pressurized fire suppression systems (determined on a per- case basis); encapsulation and marking (or removal if authorized) of all radiological sources and materials, such as Radium paint, Tritium, and/or Cesium; the demilitarization and safing of main and support weapons systems (if present); and removal or identification of other materials that could pose a hazard to museum patrons and staff.
C-5.1.5 Artifact Failed Coating Removed
The contractor shall fully and properly prepare all exterior (and interior, if required) surfaces for repainting and re-marking through the removal of failed paint and coatings, as well as surface corrosion and debris, if present. While it is desirable to retain as much original materials and components as possible, it is also understood that the failure of original or replacement paint and coatings often leads to the need for cosmetic restoration. This being the case, the contractor shall use a method(s) of surface paint/coating removal and preparation appropriate to the task of fully preparing the underlying substrate material for the re-application and re-marking of paint, coatings and markings. It should be noted that artifacts of this type are very rare, often one-of-a-kind, and great care must be taken to induce no damage to any part of the artifact. All work must be completed in accordance with all Federal, State, and local environmental and safety regulations. All work must be completed in a manner which allows for 100% material collection upon removal. Any such paint/coating removal methods and materials proposed must be authorized by the contract COR and AME Curatorial SMEs before such work can commence. Any method used should fully remove all paint/coatings and properly prepare all surfaces for new coating application.
C-5.1.6 Limited Parts Removal and Refurbishment
If required and authorized, the contractor may remove, refurbish and reinstall historic parts, components and materials. If parts or components are deemed to be too deteriorated to be reasonably restored, period-manufactured replacement parts of the exact same fit, finish and construction may be considered on a per-case basis. If no such parts or components are available, alternatives may be considered to include new fabrication of parts/components to replicate the original historic material as closely as possible (in-kind repair), assuming original materials and fabrication methods are replicated as closely as possible to the original. All such fabricated parts must be created using as close to original materials and methods of manufacture as possible, and all must be clearly marked as non-original and documented in the artifact's permanent record. In rare cases, damaged parts or components may be considered for use as a positive mold for resin casting as part of the creation of a 1-for-1 replica part that can be made to appear exactly like the original. No such repair or replacement will be performed unless explicitly authorized by the contract COR and AME Curatorial SME personnel. Replacement of tires, rubber components, plastic, or other natural or synthetic materials may be considered on a per-case basis, though only after consultation with and approval of the contract COR. Only period-original or, if unavailable, period-correct replacement materials may be used if replacement is authorized. Under no circumstances will the contractor undertake any part/component/material removal without first notifying the COR and AME SMEs of the need to do so and receiving authorization to proceed.
C-5.1.7 Primer, Surface Coating and Marking Reapplication
Once all surfaces to be cosmetically restored have been prepared, the contractor shall apply new paint and markings of period-correct color, material formulation, and application scheme to all surfaces being cosmetically restored.
Correct Federal Standard colors and markings appropriate for the era being represented by the artifact must be used, and all primer and paint formulations must similarly match paint formulations used when the artifact was in active Army service. Authenticity and historical integrity are paramount as part of any cosmetic restoration, and as such only original materials and methods will be authorized. Deviations or substitutions may be considered on a per-case basis, though no such change or substitution is to be performed without express authorization from the contract
COR.
C-5.1.8 Final Written and Photographic Completion Report
Upon completion and approval of all restoration work performed, the contractor shall provide to the COR a detailed photographic and written report to fully document restoration of the artifact(s) IAW CDRL A005. As work progresses, photos must be taken to document the process and progress made, and all such photos and written reports will be included in the final post-restoration report provided by the contractor to AME personnel. All such photographs and written records will become part of each restored artifact's permanent historical property record so that all work performed, and methods and materials used, will be preserved for review by future curatorial personnel.
C-6 LABOR CATEGORIES REQUIRED AND MINIMUM QUALIFICATIONS
The following labor categories and minimum qualifications must be met by any personnel used by the contractor to fulfill the requirements of work undertaken as part of this contract.
C-6.1. Project Manager
A minimum of ten years’ experience managing and monitoring the progress of all macro artifact restoration and abatement work through all documentation, surface preparation, abatement, limited structural repair, repainting/re-marking, and final detail phases of any cosmetic restoration project. Responsible for administering contract procedures, maintaining lines of communication between contract personnel and client, identifying the need for and overseeing any work performed by subcontractors, coordinating site abatement and restoration work while always ensuring that the work is performed to the contract specifications, on schedule and in a professional manner.
C-6.2 Lead Technician/Macro Artifact Restoration Specialist
A minimum of seven years’ experience performing all aspects of work associated with the cosmetic restoration and limited structural repair necessary for all phases of the restoration process for high-technology, primarily metal-based artifacts. This will include work related to the documentation, surface preparation, repainting/re-marking, and final detail phases of any cosmetic restoration project. This work may also include the removal, repair, replacement, and reinstallation of component elements of such artifacts on a per-case basis as authorized by the COR and/or AME SME curatorial personnel.
C-6.3 Paint Technician/Macro Artifact Restoration Specialist A minimum of five years’ experience performing all aspects of work associated with the surface preparation, failed coatings removal, paint coating re-application, and historic markings re-application needed for the limited cosmetic restoration of high-technology, primarily metal-based artifacts. Such work will require a great deal of care and attention to detail, and all such work must be performed to the highest level of quality utilizing historical research and provided applicable historical reference photos and documents (if available), as well as in keeping with established best museum practices for the cosmetic restoration of such technological artifacts.
C-6.4 Macro Artifact Abatement Specialist
A minimum of five years’ experience performing all aspects of work associated with the abatement of hazardous and/or toxic materials from high-technology artifacts of various types. Such work may include the removal of petroleum-based materials (POLs, fuel, hydraulic fluid, etc.), removal and safing of pressurized fire suppression systems, removal or encapsulation of materials that are a source of ionizing radiation (Radium paint, Tritium, Cesium, etc.), removal of batteries, and removal of other types of hazardous materials that may be present as part of an artifact being restored. This Specialist will need to ensure that all abatement work is performed safely and completely, in accordance with all pertinent safety and regulatory requirements, and will be responsible for all compliance documentation and assurance as part of their work.
C-7 APPLICABLE PUBLICATIONS
Army Regulations AR 870-20 and AR 870-5.
Federal Standards 595 (use appropriate version to correspond with service time period.)
C-8 PERFORMANCE REQUIREMENTS SUMMARY AND PROJECT DELIVERABLES
C-8.1Performance Requirements Summary (PRS)
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective Performance Indicator Performance Threshold
PRS # 1.
The work to be performed…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .