About this file

This is Standard Form 30 Amendment No. 0001 to Solicitation HC101926R0002, issued June 17, 2026, by DISA/DITCO-PACIFIC for custodial and janitorial services at Building 77, Joint Base Pearl Harbor-Hickam, Hawaii. The amendment attaches answers to questions, updated Building 77 floor plans for the first and second floors, building square footage documentation, and an updated Performance Work Statement (PWS). The proposal submission date and time remain unchanged, with no other modifications to the solicitation.

The PWS specifies comprehensive custodial services for approximately 70,653 square feet including administrative offices, restrooms, breakrooms, hallways, stairwells, and common areas. Services include daily cleaning tasks (trash removal, restroom disinfection, floor maintenance, kitchen/breakroom cleaning, and high-touch surface disinfection), weekly services (low dusting, window/glass cleaning, spot cleaning), monthly deep cleaning (restroom sanitation, floor machine scrubbing, high dusting), and semi-annual deep cleaning (carpet shampooing and floor stripping/waxing). The contractor must provide all labor, equipment, materials, and supplies. Performance standards require 95% compliance with deficiencies corrected within 24-72 hours depending on task severity. The contract period is one base year plus four one-year options. All contractor personnel require SECRET security clearance eligibility with SCI access for some positions, and must comply with JBPHH security requirements. Work is scheduled Monday-Friday, 0630-1530 hours, coordinated with the Contracting Officer's Representative. The Government will provide access to utilities and designated janitorial closets but no furnished property or equipment.

View the file

Other files

File Type Posted
HC101926R0002 AMD0004 SOLICITATION CANCELLED.pdf PDF
AMD 0003 HC101926R0002.pdf PDF
AMD 0002 HC101926R0002.pdf PDF
AMD 0001 Questions and Answers.pdf PDF
AMD 0001 B77 Space Square Footage.pdf PDF
AMD 0001 B77 2nd Floor JUNE 2026.pdf PDF
AMD 0001 B77 1st Floor JUNE 2026.pdf PDF
AMD 0001 PWS Custodial 15JUNE26.pdf PDF
DD254 Custodial Services.pdf PDF
QASP Custodial Services.pdf PDF
CLIN_Pricing_Wksht_FP.xlsx XLSX spreadsheet
B77 2nd Floor May 2026.pdf PDF
B77 1st Floor May 2026.pdf PDF
Questions and Answers.xlsx XLSX spreadsheet
HC101926R0002.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to attach the follow ing documents:

1) Answ ers to questions;

2) Updated Building 77 Floor Plan for the First Floor;

3) Updated Building 77 Floor Plan for the Second Floor;

4) Building 77 Space Square Footage; and

5) Updated PWS.

Proposal submission date and time remains the same. No other changes to the solicitation.

1. CONTRACT ID CODE PAGE OF PAGES

S 1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Jun-2026

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HC101926R0002

X 9B. DATED (SEE ITEM 11)

03-Jun-2026

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Jun-2026

CODE

DISA/DITCO-PACIFIC

477 ESSEX STREET

BUILDING 77, ROOM 129

PEARL HARBOR HI 96860-5815

HC1019 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

HC101926R0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

Award/Mod Effective Version Date Solicitation June 15, 2026

Contract Number: (completed by the KO at time of contract or TO award) Task Order Number: (completed by the KO at time of TO award or N/A) Contractor Name: (completed by the KO at time of contract or TO award) Tracking Number: 712674531 Follow-on to Previous Contract and Task Order Number:

Not Applicable

1. Contracting Officer’s Representative (COR).

a. Primary COR. See DITCO Additional Text G1 – Points of Contact

b. Alternate COR. See DITCO Additional Text G1 – Points of Contact

2. Contract or Task Order Title. Custodial and Janitorial Services for DISA PAC Building 77

3. Background. DISA Pacific (DISA PAC) requires custodial and janitorial services for Building 77 located at Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii. Current cleaning services under another agency’s contract have been inconsistent and do not meet required standards for cleanliness, sanitation, and facility upkeep.

This requirement is being established to ensure a dedicated, performance-based custodial contract that provides reliable, high-quality cleaning services to support mission readiness, personnel health, and facility operations. This effort is not a follow-on to an existing DITCO contract; this will be a new requirement.

4. Objectives. The objective of this contract is to provide comprehensive custodial services to maintain a clean, sanitary, and safe working environment within DISA PAC Building 77. The contractor shall deliver consistent, high-quality cleaning services that meet established performance standards and support DISA’s operational mission.

The contractor shall ensure all services are performed in accordance with applicable federal, DoD, and installation regulations and standards.

5. Scope. The contractor shall provide all labor, supervision, equipment, tools, materials, and supplies necessary to perform custodial services at DISA PAC Building 77.

The estimated square footage of DISA PAC Building 77 to be serviced under this contract is approximately 70,653 square feet. The facility includes administrative office spaces, restrooms, breakrooms, hallways, stairwells, and common areas.

Custodial and janitorial services include restroom cleaning and sanitation, office and workspace cleaning, trash removal, floor care (sweeping, mopping, vacuuming), breakroom and kitchen cleaning, and periodic deep cleaning services.

The contractor shall provide all cleaning chemicals, cleaning solutions, brooms, mops, buckets, rags, vacuum cleaners, personal protective gear (gloves etc.) to accomplish this service. The service provider shall be responsible for any damage to walls, doors, floors or any government equipment.

The Contractor shall be capable of providing surge custodial services upon Government request for special events, inspections, VIP visits, or mission-related requirements. Surge services will be ordered on an as-needed basis. The Government may require surge support during the base or any option period, and surge modifications shall be within the scope of the contract and provide increased support for the defined task areas of this PWS. Surge support over the life of the contract shall not exceed 10% of the contractor’s total proposed cost/price for the base and all option periods, excluding any six-month extension of services pursuant to FAR 52.217-8.

6. Performance Requirements.

The contractor shall provide routine custodial services to maintain a clean, sanitary, and safe environment within DISA PAC Building 77.

6.1 Task 1 – Daily Cleaning Services (Monday through Friday)

6.1.1 Subtask 1 – Trash Removal

6.1.1.1 Remove Trash: Restrooms

The contractor shall empty and return to their initial location all waste receptacles and other trash containers within the area. Replace liners daily. The contractor shall pick up any trash that may fall in or around the area during the removal of collected trash and ensure that trash containers are free of odors and visible dirt. The contractor shall dispose of trash in plastic bags secured with bag ties. The contractor shall deposit the trash in the nearest outside Government-provided dumpsters only.

6.1.1.2 Remove Trash: Administrative Areas, Conference Rooms, Private Offices, workspaces The contractor shall empty and return to their initial location all waste receptacles and other trash containers within the area. Replace liners as needed, if soiled, worn or torn. The contractor shall pick up any trash that may fall in or around the area during the removal of collected trash and ensure that trash containers are free of odors and visible dirt. The contractor shall dispose of trash in plastic bags secured with bag ties. The contractor shall deposit the trash in the nearest outside Government-provided dumpsters only.

6.1.1.3 Remove Trash: Kitchens and breakrooms

The contractor shall empty and return to their initial location all waste receptacles and other trash containers within the area. Replace liners daily. The contractor shall pick up any trash that may fall in or around the area during the removal of collected trash and ensure that trash containers are free of odors and visible dirt. The contractor shall dispose of trash in plastic bags secured with bag ties. The contractor shall deposit the trash in the nearest outside Government-provided dumpsters only.

6.1.1.4. Remove Trash and Smoking Area Trash: Lanai and Smoking area at the corners of Bldg. Exterior The contractor shall empty and return to their initial location all waste receptacles and other trash containers within the area. Replace liners daily. The contractor shall pick up any trash that may fall in or around the area during the removal of collected trash and ensure that trash containers are free of odors and visible dirt. The contractor shall dispose of trash in plastic bags secured with bag ties. The contractor shall deposit the trash in the nearest outside Government-provided dumpsters only.

6.1.2 Subtask 2 – Restroom Cleaning and Maintenance

The contractor shall completely clean and disinfect all fixtures of toilet bowls, urinals, faucets, showers, dispensers, metal accessories (i.e. chrome plated or stainless-steel accessories such as flush handles, dispensers, shelves, mirror trim, hooks, etc.) and other such surfaces, using germicidal detergent. The contractor shall disinfect toilet bowls, urinals, and sinks so that after sanitation, the entire surface shall be free from streaks, stains, scum, and urine deposits. Counters and mirrors shall be cleaned with an appropriate cleaner, leaving no streaks or smudges. The contractor shall replenish consumables such as liquid soap, paper towels, 2-ply toilet paper, and sanitary seat covers.

Contractor shall ensure restrooms are stocked sufficiently so any provided supplies including toilet tissue, paper towels, sanitary seat covers, and hand soap do not run out. Supplies shall be stored in designated areas. The contractor shall sweep the floor, so it is free of visible litter, dust, and foreign debris, then damp mop accessible areas. After mopping, floors shall have a uniform appearance and free of streaks, debris or standing water.

Bathrooms shall be CLOSED during cleaning to ensure the safety of the Customer, and ability of Contractor to complete the tasks without interruption.

6.1.3 Subtask 3 – Floor Maintenance

6.1.3.1 Floor Maintenance: Sweep and Mop Floors

The contractor shall sweep/vacuum the entire floor surface of uncarpeted areas, including hallways; entryways;

stairwells; common areas; corners and abutments, so that after sweeping they are free of all visible litter, dust and foreign debris. The contractor shall have chairs, trash receptacles, and easily moveable items tilted or moved to sweep underneath and return all items to their original position after cleaning has been accomplished. The contractor shall not sweep access floor (electrostatic flooring, typically computer room) surfaces. This will include the passenger and freight Elevator, as well as the SCIF areas, with DISA Supplied escorts. Does not include Mechanical and Electrical rooms.

The contractor shall mop all accessible uncarpeted floor areas, including hallways, entryways, stairwells, elevators, common areas, corners and abutments, so that after mopping they have a uniform appearance and are free of streaks, swirl marks, scuff marks, detergent residue, or any evidence of soil, stains, film, debris, or standing water. The contractor shall have chairs, trash receptacles, and easily moveable items moved to mop underneath and shall return all items to their original position after cleaning has been accomplished. The contractor shall remove all splash marks or mop streaks on furniture, walls, baseboards, etc., or mop strands remaining in the area. The contractor shall not mop access floor (electrostatic flooring, typically computer room) surfaces. Does not include Mechanical and Electrical rooms.

6.1.3.2 Floor Maintenance: Vacuum Carpeted areas

The contractor shall vacuum all carpeted floor areas (using a vacuum that has high efficiency filtration and a beater brush) so that after vacuuming they are free of all visible litter, dust and soil. This will include the SCIF areas, with DISA Supplied escorts. The contractor shall remove all spots as soon as noticed. The contractor is only responsible for removing spots smaller than two square feet. All carpet tears, bums, and raveling shall be brought to the attention of the COR within 4 hours of being noticed.

6.1.4 Subtask 4 – Cleaning and Maintenance of Kitchen, Breakrooms, Drinking Fountains, and Bottle Filling Stations The contractor shall clean, sanitize and disinfect break room fixtures and surfaces including but not limited to microwave ovens, toasters, coffee machines, other similar dispensary machines, freezers, refrigerators, countertops, tables, chairs, cabinet doors, and cabinet interior surfaces. The contractor shall disinfect polished metal surfaces, including the orifices, sinks and drains, so that after cleaning the sinks, drinking fountain, and bottle filling stations shall be free from streaks, stains, spots, smudges, scale, and other obvious soil. Particular care shall be taken to remove any mineral build-up and/or corrosion on or around the water outlet(s). The contractor shall also supply and stock the kitchens and breakrooms with liquid soap and paper towels, as necessary. The contractor shall refrain from handling any personal items such as lunch bags, food, etc.

6.1.5 Subtask 5 – Clean High-touch Surfaces

Disinfect high-touch surfaces like doorknobs, door handles, and handrails.

6.2. Task 2 – Weekly Cleaning Services (Once per week)

6.2.1 Subtask 1 – Perform Low Dusting

The contractor shall perform low dusting, so that after dusting, all dust, lint, litter, and dry soil shall be removed from surfaces of desks, chairs, file cabinets, and other types of office furniture and equipment, and from ledges, windowsills, etc., up to 7’-0” above the floor. The contractor shall not dust computers, business machines, and equipment of similar nature. All cleaning materials in these areas shall be anti-static, lint free, and non-shedding.

6.2.2 Subtask 2 – Window/Glass Cleaning

Clean interior windows, glass partition, display cases, directory boards, and other glass surfaces not otherwise stated with an appropriate glass cleaner free of streaks, smudges, soil, and fingerprints. The Contractor shall clean all interior and exterior glass doors and hardware to maintain a clean, streak-free appearance.

6.2.3 Subtask 3 – Spot Clean

Spot clean walls, doors, and partitions throughout the building with appropriate cleaner for the surface type, so that after spot cleaning, all dust, webs, and dry soil are removed.

6.3 Task 3 – Monthly Cleaning Services (Once per month)

6.3.1 Subtask 1 – Deep Clean Restrooms

The contractor shall perform a comprehensive, top-to-bottom sanitization process to remove accumulated grime, scale, and bacteria. The contractor shall disinfect all surfaces of partitions, stalls, stall doors, shower walls and wall areas adjacent to wall-mounted lavatories, urinals, and toilets. The contractor shall clean hard-to-reach areas like behind toilets and air vents. Contractor shall descale fixtures to remove hard water buildup. The contractor shall use appropriate cleaner to remove mineral buildup and rust. Floors shall be machine-scrubbed, leaving no excess water on the surface.

6.3.2 Subtask 2 – Machine Scrub Floors

The contractor shall sweep floor thoroughly to remove debris before scrubbing. The contractor shall machine scrub non-carpeted floors throughout the building, using an appropriate detergent. There shall be no excess water on surface when completed.

6.3.3 Subtask 3 – High Dusting

The contractor shall perform high dusting, so that after dusting, all dust, lint, litter, and dry soil shall be removed from all surfaces at and above 7’-0” from floor, to include vents, and ceiling corners. Air conditioning ceiling vents shall also be cleaned. After cleaning the vents, they shall be free of all visible dirt, oil, grease, soil, and dust. All cleaning materials in these areas shall be anti-static, lint free, and non-shedding.

6.4 Task 4 – Semi-Annual Deep Cleaning (Twice per year)

6.4.1 Subtask 1 – Carpet Shampooing/Extraction

The contractor shall shampoo (wet clean, steam clean, or similar, using cleaning product(s) appropriate to the installed carpeting material(s)) carpets, so after shampooing the carpet area shall be uniform in appearance and be free of stains and discoloration. Carpets shall be cleaned per manufactures recommendations, which are as follows:

Mohawk - it is recommended that the carpet tiles be cleaned according to manufacture instructions by hot water extraction, performed with truck mount equipment using a high-pressure force of water injected into the carpet followed by powerful suction to remove the suspended soil. Use a cleaning agent as a pre spray, agitate, and then rinse with extractor using plain water. During extraction it is essential to extract as much moisture as possible with 3 to 4 dry passes. Allow 3 to 4 hours drying time after the last extraction before traffic is allowed on the carpet.

Equivalent carpet cleaning methods may be utilized provided they achieve the required performance standards.

6.4.2 Subtask 2 – Floor stripping and waxing

Applies to non-carpeted flooring that currently has a wax surface. Stripping operation shall be performed to remove all dirt and old wax from the floor. An approved wax remover that is non-toxic and non-flammable shall be used.

Wax remover shall be suitable for use on floor coverings for which its use is intended. Applied wax stripping solution shall be allowed ample time to loosen wax before rinsing. Prior to stripping operation, all stationary

*Floors shall be properly stripped, cleaned, and finished.

*Carpets shall be free of stains and odors after extraction.

*Entire facility shall meet high-level cleanliness standards.

All deficiencies shall be corrected within 5 business days of notification.

Corrective Re-Cleaning Corrective requests for re-cleaning are handled appropriately and professionally. Customers are satisfied with the re-cleaning results. Response by the contractor shall be addressed within 24 hours of notification.

Response to requests for corrective re- cleaning are timely 90% of the time.

100% sampling

8. Incentives.

Positive Incentives - Actions to take if the work exceeds the standards. Standards should be challenging, yet reasonably attainable. On fixed price contracts, incentives are provided for quality services accepted by the government by allowing the contractor to invoice for the services rendered.

Negative Incentives - Actions to take if work does not meet standards. When unacceptable performance occurs on fixed price contracts, the Government will withhold payment for services until corrective action is taken. Upon Government acceptance of the corrected services the contractor will be permitted to invoice for service fee.

9. Place of Performance.

Mission Location:

DISA Pacific (DISA PAC) Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii

Primary Place of Performance:

DISA PAC Building 77 477 Essex Street

JBPHH, HI 96860

All work shall be performed on-site at the Government facility.

Secondary Place of Performance – Contingency Only:

As determined by the Contracting Officer’s Representative (COR), contractor personnel may be required to perform work at an alternate approved location in cases of unforeseen conditions (e.g., facility closure, emergency conditions, or base restrictions). The contractor shall ensure continuity of services to the maximum extent possible.

Contractor personnel shall comply with all installation access, security, and operational requirements while performing work on-site.

10. Period of Performance. The period of performance shall be one (1) base year from the date of contract award, with four (4) one-year option periods.

In the event of a Government shutdown, and as directed by the Contracting Officer’s Representative (COR), the contractor shall continue performance in emergency or mission essential conditions, as applicable.

Recognized Federal Holidays:

The contractor is not required to perform services on Federal holidays, unless otherwise directed by the COR.

Unplanned Federal Government Closure:

In the event of an authorized Federal Government closure, contractor personnel shall not report to the facility unless directed by the COR. The contractor shall coordinate with the COR to resume services as soon as conditions allow.

11. Security Requirements. This section supplements Block 13 of the Government provided DD Form 254, Contract Security Classification Specification. The following security requirements shall apply to this effort.

The contractor shall coordinate visits with site Point of Contract (POC)s providing at least a 72-hour notice (or according to each site security requirements) prior to any site access. Contractor personnel without security clearances performing any task under this PWS must be escorted by cleared DISA personnel (civilian, military, or contractor).

References:

a. DISA End User Access Agreement

b. DISA Instruction 240-240-01, External Peripheral Devices Authorized for Network Connectivity

c. DISA Instruction 240-110-8, Information Security

d. DISA Instruction 240-110-34, Controlled Unclassified Information (CUI)

e. DISA Instruction 240-110-36, Personnel Security

f. DISA Instruction 240-110-38, Industrial Security

g. DISA Instruction 240-110-43, Counterintelligence

h. DISA Instruction 240-110-43, Insider Threat Program

i. DISA Instruction 630-230-19, Cybersecurity

j. DoD Manual 5200.01, Vol. 1 and 3, DoD Information Security Program, 17 January 2025

k. DoD Manual 5200.01, Vol. 2, DoD Information Security Program, 28 July 2020

l. DoD Instruction 5200.48, Controlled Unclassified Information (CUI), 6 March 2020

m. DoD Manual 5200.02, Procedures for the DoD Personnel Security Program (PSP), 3 April 2017, Change 1, 29 October 2020

n. 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), 24 February 2021

o. DoD Directive 5240.06, Counterintelligence Awareness and Reporting (CIAR), 17 May 2011, Change 3, 31 August 2020

p. DoD Instruction O-5240.24, Counterintelligence (CI) Activities Supporting Research, Development, and

Acquisition (RDA), 8 June 2011, Change 2, 15 July 2020

q. DoD Instruction 5205.16, “The DoD Insider Threat Program,” December 20, 2024

r. DoD Instruction 5230.24, Distribution Statements for DoD Technical Information, 10 January 2023

s. DoD Instruction 8510.01, Risk Management Framework for DoD Systems, 19 July 2022

t. DoD Manuel 5400.07, DoD Freedom of Information Act (FOIA) Program, 25 January 2017

u. Security Executive Agent Directive 3 (SEAD 3) Reporting Requirements for Personnel With Access To

Classified Information or Who Hold Sensitive Position, 12 June 2017

v. Security Executive Agent Directive 4 (SEAD 4), National Security Adjudicative Guidelines, 8 June 2017

w. DISA Instruction 240-15-4 United States Security Authority for North Atlantic Treaty Organization Affairs

x. DISA Instruction 240-110-35 Sensitive Compartmented Information (SCI)

y. DoD Manual 5105.21, Vol. 1-3, Sensitive Compartmented Information (SCI) Administrative Security

Manual, 19 October 2012, Change 2, 06 October 2020

z. DoD Manual 5205.07 Special Access Program Security Manual, 17 January 2025

11.1 Facility Security Clearance. Work performed under this contract/order is up to the Secret level and will require Sensitive Compartmented Information (SCI) access eligibility for some personnel. Therefore, the company must have an interim or final Secret Facility Clearance from the Defense Counterintelligence and Security Agency (DCSA) Facility Clearance Branch.

11.1.2 Invalidated Facility Clearance. Companies with invalidated facility clearances (including those in partnerships, subcontracts, and Joint Ventures) are not eligible to bid on or be awarded any new or additional DISA classified contracts, subcontracts, or receive additional classified information except for information necessary for the completion of your current classified contracts. In addition, those companies with invalidated facility clearances will not be permitted access to all DISA networks. Performance on any DISA classified contracts, at any location,

11.6.2 Contractor employees shall be required to comply with all Government security regulations and requirements.

Initial and periodic safety and security training and briefings will be provided by Government security personnel.

Failure to comply with Government security regulations and requirements shall require the company to provide the Government with a written remediation/corrective action plan; furthermore, failure to comply with such requirements can be cause for removal and the contractor will not be able to provide service on this contract/order.

11.6.3. Contractor employees with an incident report in DISS who have had their access to classified suspended will not be permitted to fill positions requiring access to classified information on a DISA contract/order.

11.6.4 The Contractor shall not divulge any information, classified or unclassified, about DoD files, data processing activities or functions, user identifications, passwords, or any other knowledge that may be gained, to anyone who is not authorized to have access to such information. The Contractor shall observe and comply with the security provisions in effect at the DoD facility. Identification shall be worn and displayed as required.

11.6.5 The authority for the contractor personnel to regain access must be granted by DISA Chief of Security.

11.6.5.1 DISA retains the right to request removal of contractor personnel regardless of prior clearance or adjudication status, whose actions, while assigned to this contract, clearly conflict with the interest of the Government.

11.6.5.2 DISA retains the right to revoke access to DISA facilities from contractor personnel who violate one or more of the National Security Adjudicative Guidelines, harassment, insider threat, counterintelligence, or violence in the workplace while assigned to a contract clearly conflict with the interest of the Government.

11.6.5.3 If contractor employee is accused of violating state or federal laws and/or Government professional conduct policies or regulations, then the Government may require that such contractor employee be removed from Government premises and/or that such contractor employee be removed from supporting this contract, pending the duration and outcome of a Government investigation if the Contracting Officer finds that the conduct or violation alleged has the potential to negatively interfere with contract performance or operations at a Government facility.

Only the Contracting Officer can make such a request on behalf of the Government. Removal of contractor employee shall not negatively impact contract performance.

12. Government Furnished Property (GFP)/Government-Furnished Equipment (GFE)/ Government-Furnished Information (GFI).

No Government Furnished Property will be provided under this contract. The Government will provide access to utility services (water and electricity) and designated janitorial closets for storage of contractor supplies and equipment.

13. Other Pertinent Information or Special Considerations. The contractor shall comply with all Joint Base Pearl Harbor-Hickam (JBPHH) installation requirements, including security procedures, access requirements, and operational constraints.

Work shall be coordinated with the Contracting Officer’s Representative (COR) to minimize disruption to daily operations within Building 77.

The contractor shall ensure personnel are properly trained, equipped, and capable of performing custodial services in an active administrative and operational facility environment.

Services shall be performed during approved work hours as coordinated with the COR.

14. Section 508 Accessibility Standards. This requirement does not include Information and Communication Technology (ICT) deliverables. Therefore, Section 508 accessibility standards are not applicable.

15. Quality Assurance. The contractor shall implement and maintain a quality control program to ensure all services are performed in accordance with the requirements of this PWS.

The Government will monitor contractor performance through inspections and surveillance as outlined in the Quality Assurance Surveillance Plan (QASP).

This contract and its associated delivery/task orders are subject to the Federal CMMC policies and regulations including DFARS 204.75 Cybersecurity Maturity Model Certification, DFARS 252.204-7021 Contractor Compliance with the Cybersecurity Maturity Model Certification Level Requirements, and 32 CFR §170, Cybersecurity Maturity Model Certification (CMMC) Program. The CMMC Program is designed to ensure implementation of cybersecurity practices for defense contractors and to provide DoD with increased assurance that Federal Contract Information (FCI) and CUI will be adequately safeguarded when residing on or transiting contractor information systems.

The Program Management Office/COR has determined that CMMC Level 1 (Self) is required for this contract order.

In accordance with CMMC policy codified at 32 CFR §170, Contractor compliance CMMC Level 1 (Self) must be met at time of award, and continued compliance with the requirements of 32 CFR §170 is necessary for the life of the contract.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .